Category:Letter
MONTHYEARML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 IR 05000237/20230112024-08-0707 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 ML24184A1712024-08-0202 August 2024 SLRA Schedule Letter RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24193A0882024-07-24024 July 2024 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 1 Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations (Docket 50-10) ML24204A1862024-07-24024 July 2024 – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2; TSTF-591, Revision 0; and 10 CFR 50.69 IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR ML24138A1812024-06-18018 June 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter ML24156A2332024-06-11011 June 2024 Letter Supplemental Information for Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities SVPLTR 24-0020, Registration of Use of Casks to Store Spent Fuel2024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24158A0012024-05-22022 May 2024 License Amendment Request to Adopt TSTF-564 (EPID L-2023-LLA-0120) Illinois State Concurrence ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24135A0722024-05-10010 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24134A1132024-05-0808 May 2024 Retraction: LER 2303-001-00 for Dresden Nuclear Power Station, Unit 2, HPCI Inoperable Due to Air Void Accumulation ML24129A1352024-05-0808 May 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-59 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24092A3412024-05-0101 May 2024 SLRA - Receipt and Availability - Letter IR 05000237/20240012024-05-0101 May 2024 Integrated Inspection Report 05000237/2024001 & 05000249/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24127A0982024-04-30030 April 2024 Radioactive Effluent Release Report ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 IR 05000237/20244012024-04-18018 April 2024 – Security Baseline Inspection Report 05000237/2024401 and 05000249/2024401 ML24108A0082024-04-17017 April 2024 Application for Renewed Operating License RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 2024-09-06
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARRS-11-124, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE142011-07-28028 July 2011 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE14 SVPLTR 09-0044, Day Response on Inadvertent Control Rod Withdrawal2009-09-21021 September 2009 Day Response on Inadvertent Control Rod Withdrawal SVPLTR 09-0027, Written Follow Up Report on Release of Radionuclide2009-07-0606 July 2009 Written Follow Up Report on Release of Radionuclide RS-08-073, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima22008-05-23023 May 2008 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima2 ML0216407762002-06-0707 June 2002 Offsite Dose Calculation Manual (OCDM) Required Action Not Met During Units 2/3 Main Chimney Particulate, Iodine, and Noble Gas Sampling System Inoperability ML17252A3201977-11-23023 November 1977 LER 77-047/03L-0 for Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation of T.S.1.0.CC.b Maximum Combined Interval Time by 3.5 Days for HPCI Monthly Valve and Pump Operability ML17252A2881977-05-0303 May 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-8 ML17252A2911977-04-22022 April 1977 License Event Report - Rod Withdrawal at Approx. 44% Power, Discovered Rod Block Monitor Channels 7 and 8 Automatically Bypassed ML17252A2901977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-10 ML17252A2711977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-9 ML17252A2721977-04-20020 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-7 ML17252A2751977-03-23023 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2821977-03-0202 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2581977-01-20020 January 1977 Transmittal of Reportable Occurrence Report No. 50-249/1976-36 ML17252A2701976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 IR 05000249/20190761976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 ML17252A2461976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-23 in Accordance with Technical Specifications, Section 6.6.B ML17252A2451976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-25 in Accordance with Technical Specifications, Section 6.6.B ML17252A2391976-10-22022 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-20 in Accordance with Technical Specifications, Section 6.6.B ML17252A2411976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-18 in Accordance with Technical Specifications, Section 6.6.B ML17252A2401976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-19 in Accordance with Technical Specifications, Section 6.6.B ML17252A2231976-10-12012 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-15 in Accordance with Technical Specifications, Section 6.6.B ML17252A2261976-09-30030 September 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-17 in Accordance with Technical Specifications, Section 6.6.B ML17252A2361976-07-0101 July 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-1 ML17252A2101976-02-0505 February 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-3 in Accordance with Technical Specifications, Section 6.6.B IR 05000249/19750361975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1761975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1711975-08-15015 August 1975 Report of A.O. Per Section 6.6.A of the Technical Specifications Isolation Condenser High Flow Sensor Setpoint Drift IR 05000249/19750321975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A1741975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A4471975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings IR 05000249/19750311975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings ML17252A7861975-03-27027 March 1975 Report of Abnormal Occurrence Per Section 6.6.a of the Technical Specification - Exceeding Set-point on Main Stream Line Hi Hi Rad ML17252A8271975-02-14014 February 1975 Report of Abnormal Occurrence Per Section 6.6.A of the Technical Specification - Reactor Feed Pump 3C Pump Casting Vent Line Weld Leak ML17252A8361975-01-14014 January 1975 Report of 4 Inch Recirculation Bypass Line Inspection 2011-07-28
[Table view] |
Text
---:::::~ - - , .4 .
. .:! *~
,,.Common.h EdisQ..n J Dresden NuClear Power Station
-" R.R. #1 .j,,.,
Morris, Illinois 60450 Telephone 815/942-2920 Mail Section Docket Clerk Mr. JamesG. Keppler, Regional Director Directorate of Regulatory Operations - Regiori III U~ S. Nuclear Regulatory Commission 799 Roosevelt Road I.'*'
Glen!Ellyn, Illinois 60137 Enclosed please find Reportable Occurren_ce report number 50"'.'"249/1976-19.
This report is being submitted to your office-in accordance with th_e Dresden -
Nuclear Power Station Technical Specifications,. Section 6.6.B.
//~~
~. ~: Stephen~on _-_-
- Station Superintendent Dresden Nuclear Power Station BBS:jo_
Enclosure_
cc: Director of Inspection& Enforcement Director of Management. Information & Program Control File/NRC 10869
\~
coNTRoL sLocK:l LICENSEE 1
LICENSEE EVENT REPORT
\;
I . I
- . t.r LEAse PRINT ALL REQUIRED 1NFoRMAr10N 1 LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE
@E]II 7 8 9 ILIDI RIS 131 14 IOIOl~10101010101~10101 15 . . . *. 25 IJfl 11111111 10131 26 30 31 32 REPORT REPORT CATEGORY TYPE. SOURCE DOCKET NUMBER EVENT DATE REPORT DATE
@DJ CON'T I I I lbJ LbJ 101s101-1012141q1 101<11111171c, I 11 I 0 I :l I I 1710 I 7 B 57 5B 59 60 . 61 6B 69 . 74 75 BO .
EVENT DESCRIPTION
@lg] I AT 8 PPRO)(/MATELY 1930 HOURS ON 9 /l1 /7c,) THE 13"R£AK£R§ RCTW££.A/ I 7 B 9 r '
@@) I Bus. 34 AND 34-/ W£RE *0P£)J6D B>R BR.£Ak..R IN~PECTIOAI. IH UN1T-3 I 7 B 9 . 80 lti141 I Dll~SEL 7 .B 9. . .
GE.f\/CR..ATDR.. WAS USED To SUE'PJ...y BUS 34-t DuR.1J1JG- TH£ GR.EAt<CR I
80
~ I OUIAG-E, WHICH WAS CL.EARED Al ABOUT 1940 HOVR.~. IN OR.C.R. /0 ALJ...OW (H~ I 7 B 9 BO lfilID 1£NG-JN£ 'To. WARYY!. UP UJy'Y!Pl£TtELy THE ])1£S~L G-E.NER.ATo R,. WAS NOT I 7 B 9. . ~E (SE:C: lri'rnc.1-JE.D SHa:i)Bo SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLIER MANUFACTURER VlOl.ATION 7
@El 1£1£1 B 9 10 LE.J 11 IEINIGI tJNl£1 12 17 L.~J 43 44 IWl:Olq 111
.* 47 LN.I 48 CAUSE DESCRIPTION lolBI8 9l*IHS ENCr1N£ HIGH TEfY/Pt;.RAIURE COND1Ttof'J wAS IH£ RESULI oF A PARllALJ...Y I 7 .' . .. . . .. . . 80 .*
lol9l .1 CJ./)C.GED
- SIR..fl1NER iN THE.LUBE OtL C.fRCULAT1NG- purvip,. {H/5
7 8 9 . . . .. *. .** .. . . 80 IT@J. I OIJ.. FJ...ow SUFF1C1ENTLY lo cAusE A ~1G-NtF1cANT R1s£ 1N 011,_ 1£.MP.E.RA!uRE. I 1,*0'*9 * * * (~E.'117..fl-iC,1-riii>'*~sHEET) ***00
- . ",FACILITY MpHOO OF ** - .. *,
~'STATUS % POWER OTHER. STATUS DISCOVERY DISCOVERY DESCRIPTION.
EEJ . 9lliJ.
7 .* 8 I0 I 0 I 0 I I 10 12 13 NA 44 llLl 45 46
" . 80 FORM OF ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE *
[!E) lZJ ~ .._I--~N"'-'-ff_ _,.--..lf 7 8 9 10 11 44 . 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION
~ 1010101 gj 12 13 JJA 7 8 9 . 11 80 PERS.ONNEL INJURIES NUMBER DESCRIPTION*
[ilil IOjo jo I .. JvA 7 8 9 11 12 80 OFFSITE CONSEQUENCES
[lfil NA 7 8 9 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION EJfilB 91.ZJ 7 10 N 11 80 PUBLICITY *
(ill] /VA:
7 8 9 80 ADDITIONAL FACTORS E@ ..NA 7 8 9 80
[I@)B, 9*!-------------------------------------,.-'
7 80 NAME:_l<_;;._1_.;;c_H_11_12.~v__fVl_1_R.,....o_GH_N_li'-------- PHONE: ExT. .. J. bs GPO 881 *.857
>'~
EVENT DESCRIPTION (Continued)
"shut down following the return to service of bus 34-1. At approximately 2020 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.6861e-4 months <br />; the engine high temperature alarm was received, and the diesel generator was manually shut; down. The Unit 2/3 diesel generator was available and operable.
(50-249/1976-19)
CAUSE DESCRIPTION (Continued)
The strainer was cleaned, and t'he diesel. generator was operated successfully for approximately 40 minutes. To prevent recurrence, the lube oil circulating pump strainer will be cleaned.as part of the diesel generator annual inspection pro'c~dure. This* is not. a repetitive occurrence.