MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML21148A2552021-07-21021 July 2021 Issuance of Amendment Nos. 269 and 271 Technical Specification Changes to Implement New Surveillance Methods for Transient Heat Flux Hot Channel Factor ML20363A1762021-02-23023 February 2021 Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis ML20241A0582020-09-25025 September 2020 Issuance of Amendment No. 267 for One-Time Extension of License Condition 4.I, Containment Building Construction Truss (EPID L-2020-LLA-0180 (COVID-19)) ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML19064A9042019-04-25025 April 2019 Issuance of Amendments to Extend Containment Leakage Rate Test Frequency ML19052A5442019-03-27027 March 2019 Issuance of Amendments 264 and 267 to Adopt TSTF-547, Clarification of Rod Position Requirements ML18345A1102019-03-26026 March 2019 Redacted Version, Issuance of Amendment Nos. 263 and 266 for Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances ML18289A3782018-11-26026 November 2018 Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18079A0452018-06-13013 June 2018 Issuance of Amendments Revision to the Point Beach Nuclear Plant Emergency Action Level Scheme (CAC Nos. MF9859 and MF9860 EPID L-2017-LLS-0278) ML17159A7782017-07-27027 July 2017 Issuance of Amendment to Approve H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region ML17130A9352017-06-27027 June 2017 Correction Letter for Amendment Nos. 258 and 262 Removal of Completed License Conditions and Changes to the Ventilation Filter Testing Program ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17039A3002017-02-22022 February 2017 Issuance of Amendments -Removal of Completed License Conditions and Changes to the Ventilation Filter Testing Program ML16349A0802017-01-30030 January 2017 Issuance of Amendments for Elimination of Technical Specifications 3.7.14, Primary Auxiliary Building Ventilation ML16196A0932016-09-0808 September 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C) ML16118A1542016-06-17017 June 2016 Issuance of Amendments ML15293A4572015-11-25025 November 2015 Issuance of Amendments for the Steam Generator Technical Specifications, to Reflect Adoption of TSTF-510 ML15195A2012015-07-28028 July 2015 Issuance of Amendments Regarding Relocation of Surveillance Frequencies to Licensee Control ML15155A5392015-07-14014 July 2015 Issuance of Amendments Concerning Extension of Cyber Security Plan Milestone 8 ML15028A1822015-02-12012 February 2015 Correction of Typographical Error Incurred During Prior License Amendment ML15014A2492015-01-27027 January 2015 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation (Tac Nos. MF4353 and MF4354) ML14126A3782014-06-30030 June 2014 Issuance of License Amendment Nos. 250 and 254 Regarding Change to Technical Specification 5.6.5, Reactor Coolant System Pressure and Temperature Limits Report ML14058B0292014-05-0909 May 2014 Issuance of Amendment Nos. 249 and 253 Regarding Use of Optimized Zirlo Fuel Cladding Material ML12362A0092013-01-29029 January 2013 Issuance of License Amendment Nos. 248 and 252 Operations Manager Qualification Requirements ML12251A1552012-11-23023 November 2012 Issuance of Amendment to Renewed Facility Operating License Revised Cyber Security Plan Implementation Schedule Milestone 6 ML1135401472012-01-30030 January 2012 Issuance of Amendment to Revise Technical Specification Operating Limits to Include Measurement Uncertainty ML1103200602011-03-25025 March 2011 (Pbnp), Units 1 and 2 - Issuance of License Amendments Revision of Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrumentation Setpoints ML0825408832008-10-0707 October 2008 Issuance of License Amendment, Technical Specification 5.5.8 and 5.6.8 ML0809503412008-07-14014 July 2008 Issuance of Amendments Deletion of E Bar Definition and Revision of Reactor Coolant System Specific Activity ML0803803562008-02-26026 February 2008 Issuance of Amendments Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0724101042007-11-16016 November 2007 Issuance of Amendments 230 and 235 TSTF- 491, Revision 2, Removal of Main Steam and Feedwater Valve Isolation Times Technical Specification 3.7.2 ML0721801912007-10-18018 October 2007 License Amendment, Revises TS 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) to Add the Ferret Code as an Approved Methodology for Determining RCS Pressure and Temperature Limits ML0726801932007-09-28028 September 2007 License Pages - Ownership and Operating Authority ML0722800022007-08-16016 August 2007 Revised Pages of Facility Operating License DPR-24 and DPR-27 B.5.b ML0720803942007-07-31031 July 2007 License Pages for the Transfer of Point Beach Ownership and Operating Authority ML0715601242007-07-31031 July 2007 Order Approving Transfer of License and Conforming Amendment Relating to the Point Beach Nuclear Plant ML0720803972007-07-31031 July 2007 License Pages for the Transfer of Operating Authority Prior to Sale ML0713006232007-05-10010 May 2007 Issuance of Amendments Regarding Review of Reactor Vessel Fracture Mechanics Analysis ML0708006252007-04-0404 April 2007 Amendment Steam Generator Tube Repair in the Tubesheet ML0706006082007-03-21021 March 2007 Issuance of Amendments 225 and 231, Loss of Power Diesel Generator ML0634500732007-02-15015 February 2007 License Amendments 224 and 230 Regarding Core Alterations ML0704302892007-02-0101 February 2007 Administrative Change Without Safety Evaluation ML0620502992006-08-22022 August 2006 License Amendment, Steam Generator Tube Integrity, MD0194 & MD0195 ML0612800132006-06-0808 June 2006 Issuance of Amendments Inservice Testing Program ML0535302092005-12-22022 December 2005 Renewed Facility Operating License No. DPR-24 ML0531100312005-12-22022 December 2005 Current Facility Operating License DPR-24, Tech Specs, Revised 05/07/2019 2024-01-23
[Table view] |
Text
eFF',C:A,' US.... EURIYRIA:E NI1IMT UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 1, 2007 Mr. Dennis L. Koehl Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 REGARDING REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS. MD2263 AND MD2264)
Dear Mr. Koehl:
By letter to the Nuclear Regulatory Commission (NRC) dated May 10, 2006, Nuclear Management Company, LLC (NMC), submitted its revised security plans and confirmed the full implementation at Point Beach Nuclear Plant, Unit Nos. 1 and 2 (PBNP 1 and 2) of Order EA-06-037. Order EA-06-037 provided an update to an adversary characteristic of the design-basis threat.
The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation (Enclosure 3), the NRC staff has determined that NMC's changes to the security plans meet the requirements of the NRC Order and Title 10 of the Code of FederalRegulations (10 CFR) Part 73 requirements and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection:
Consistent with the Order, administrative license changes to Renewed Facility Operating License Nos. DPR-24 and DPR-27 are being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan. The changes comply with the standards and requirements of the Atomic Energy Act of 1954, as OFFICIAL USE ,-L,, SECURITY RELATED"INFORMATION .-
OFFICIAL USE ONLY' - SEeURIli' RELATED !NFORMATI3EN--
D. Koehl amended, and the Commission's rules and regulations set forth in 10 CFR Chapter i. Please replace Page 4 of the PBNP 1 and 2 Renewed Facility Operating Licenses with the enclosed pages (Enclosures 1 and 2). Enclosure 3 to this letter is designated exempt from public disclosure under 10 CFR 2.390(d)(1).
Please contact me at (301) 415-1457 if you have any questions on this issue.
Sincerely, Patrick D. Milano, Senior Project Manager Plant Licensing Branch Il1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosures:
- 1. Revised Page 4 of License DPR-24
- 2. Revised Page 4 of License DPR-27
- 3. Safeguards Evaluation cc w/encls 1, 2, and 3: Brian Kopetsky, Security Manager, PBNP Patrick Loudon, Region IIl cc w/encls 1 and 2 only: See next page OFFICGIAL UGE O)NL=Y SECR RELATED INFORMATION .
Point Beach Nuclear Plant, Units 1 and 2 cc:
Jonathan Rogoff, Esquire Mr. Jeffery Kitsembel Vice President, Counsel & Secretary Electric Division Nuclear Management Company, LLC Public Service Commission of Wisconsin 700 First Street P.O. Box 7854 Hudson, WI 54016 Madison, WI 53707-7854 Mr. F. D. Kuester Nuclear Asset Manager President & Chief Executive Officer Wisconsin Electric Power Company WE Generation 231 West Michigan Street 231 West Michigan Street Milwaukee, WI 53201 Milwaukee, WI 53201 Michael B. Sellman Regulatory Affairs Manager President and Chief Executive Officer Point Beach Nuclear Plant Nuclear Management Company, LLC Nuclear Management Company, LLC 700 First Street 6610 Nuclear Road Hudson, MI 54016 Two Rivers, WI 54241 Douglas E. Cooper Mr. Ken Duveneck Senior Vice President & Chief Nuclear Town Chairman Officer Town of Two Creeks Nuclear Management Company, LLC 13017 State Highway 42 700 First Street Mishicot, WI 54228 Hudson, WI 54016 Chairman Site Director of Operations Public Service Commission Nuclear Management Company, LLC of Wisconsin 6610 Nuclear Road P.O. Box 7854 Two Rivers, WI 54241 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241
D. Physical Protection NMC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 4)," submitted by letter dated May 10, 2006.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. NMC shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:
NMC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program NMC shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
- 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
- 2. Identification of the procedures used to quantify parameters that are critical to control points;
- 3. Identification of process sampling points;
- 4. Procedure for the recording and management of data;
- 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-24 Revised by letter dated February 1, 2007
D. Physical Protection NMC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 4)," submitted by letter dated May 10, 2006.
E. Safety Iniection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. NMC shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:
NMC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program NMC shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
- 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
- 2. Identification of the procedures used to quantify parameters that are critical to control points;
- 3. Identification of process sampling points;
- 4. Procedure for the recording and management of data;
- 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-27 Revised by letter date February 1, 2007