ENCLOSURE 1 REVISED PAGES TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 DOCKET NOS. 50-266 AND 50-301 Replace the following pages of the Renewed Facility Operating Licenses. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT Unit 1 License Page 5 Unit 1 License Page 5 Unit 1 License Page 6 Unit 1 License Page 6 Unit 2 License Page 5 Unit 2 License Page 5 Unit 2 License Page 6 Unit 2 License Page 6

6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.

The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, NMC may make changes to the programs and activities described in the supplement without prior Commission approval, provided that NMC evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NMC shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

L. Mitigation Strategy The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

1. Fire fighting response strategy with the following elements:
a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets
c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel Renewed License No. DPR-24 Revised by letter dated August 16, 2007
2. Operations to mitigate fuel damage considering the following:
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy
g. Spent fuel pool mitigation measures
3. Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders M. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 201, are hereby incorporated into this license. NMC shall operate the facility in accordance with the additional conditions.
5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. -RM 50-1).
6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.

FOR THE NUCLEAR REGULATORY COMMISSION OriginalSigned by R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Appendix B - Environmental Technical Specifications
3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-24 Revised by letter dated August 16, 2007
6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

H. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, NMC may make changes to the programs and activities described in the supplement without prior Commission approval, provided that NMC evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NMC shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

K. Mitigation Strategy The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

1. Fire fighting response strategy with the following elements:
a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets
c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel
2. Operations to mitigate fuel damage considering the following:
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy
g. Spent fuel pool mitigation measures Renewed License No. DP.R-27 Revised by letter dated August 16, 2007
3. Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 206, are hereby incorporated into this license. NMC shall operate the facility in accordance with the additional conditions.
5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION OriginalSigned by R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A -Technical Specifications
2. Appendix B - Environmental Technical Specifications
3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-27 Revised by letter dated August 16, 2007