ML17037C550

From kanterella
Revision as of 07:58, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Letter Respond to a Letter of July 26, 1973 Requesting Additional Information Concerning Two Aspects of Design and Operation of Unit 1 and Advising That Responses Will Be Submitted on or Before September 10, 1973
ML17037C550
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/02/1973
From: Raymond P
Niagara Mohawk Power Corp
To: Ziemann D
US Atomic Energy Commission (AEC)
References
Download: ML17037C550 (4)


Text

AEC DI ~iIBUTION FOR, PART 50 DOCKET MA AL (TEMPORARY FORM)

PILE:

Niagara Mohawk Power Corp DATE OF DOC DATE REC'D LTR - MEMO RPT OTHER Syracuse, N.Y. 13202 Philip D. Raymond 8-2-73 8-7-73 TO: Mr. Ziemann ORIG CC OTHER SENT AEC PDR CLASS UNCLASS PROP INFO INPU NO' REC'D DOCKET NO:

50-220 DESCRIPTION: ENCLOSURES:

ltr re our 7-26-73...advising requested info willbe submitted on or before 9-10-73

'rACKNOWLEDGEO PLANT NAME: Nine Point Unit gl ACTION/INFORMATION LINKOT REMOVE FOR BUTLER(L) SCHWENCER(L) NIEMANN(L) REGAN(E)

W/ .Copies W/ Copies W/ /Copies W/ Copies CLARK(L) STOLZ(L) DICKER(E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L) VASSALLO(L) KNIGHTON(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L) SCHEMEL(L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION G FIL TECH REVIEW DEN TON LIC ASST A/T IND DR ~NDRIE GRIMES BROWN (E) BEAIIMAN RMM P-506A

'GC, SCHROEDER GAIRiILL CAIGGS (L) SALTZMAN MUNTZING/STAPF MACCARY KASTNER GEARIN (L)

~SE KNIGHT BALLARD GOULBOURNE (L) ANS GIAliBUSSO PAWLICKI SPANGLER LEE (L) CDONALD BOYD SHAO MAIGRET (L) DUBE MOORE (L) (BWR) S TELLO ENVIRO SERVICE (L)

DEYOUNG (L) (PWR) HOUSTON MULLER SHEPPARD (E) INFO

~SKOVHOLT (L) NOVAK DICKER SMITH (L) C. MILES P, COLLINS ROSS KNIGHTON TEETS (L)

IPPOLITO YOUNGBLOOD WADE (E)

G OPR TEDESCO REGAN WILLIAMS (E)

ILE & REGION(3) LONG PROJECT LDR WILSON (L)

MORRIS LAINAS STEELE BENAROYA HARLESS VOLI2iER EXTERNAL DISTRIBUTION 1 - LOCAL PDR 1 - DTIE(ABERNATHY) (1) (2) (9)-NATIONAL LAB'S 1-PDR"SAN/LA/NY 1 - NSXC(BUCHANAN) 1-'R.Schoonmaker,OC,GT,D"323 1-GERALD LELLOUCHE 1 - ASLB(YORE/SAYRE/ 1-R. CATLIN, E-256-GT BROOKHAVEN NAT. LAB WOODARD/"H" ST. 1-CONSULTANT'S 1"AGMED(WALTER KOESTER 16 - CYS ACRS HOLDING NEWMARK/BLE iE/AGBABIAN HM-C-427-GT 1-GERALD ULRIKSON., ORNL "'A1~RD<<<<MULLER <<F'99 e'GT

I A 'I I

NIAGARA MOHAWK POWER CORPORATION 1"

i%I>m; NIAGARA ' MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE, N. Y. 13202 p~

August 2, aif E~I Z4H'7

'LS t1r. Denni s L. Zi emann Chief, Operating Reactors Branch No. 2 Directorate of Licensing United States Atomic Energy Commission Washington, D.C. 20545

Dear !1r. Ziemann:

Re: Nine t<ile Point Unit 1 Docket No. 50-220 Your letter of July 26, 1973 requested additional information concerning two aspects of design and operation of Nine flile Point Unit 1.

This information is presently being prepared by our engineering staff.

The responses to Section B of the attachment to your letter will be submitted on or before September 10, 1973. These responses concern the access platform addition to the refueling bri'dge structure.

The information requested in Section A of the attachment to your letter concerns the quality assurance program for Nine flile Point Unit 1 operation. 'Much of this information is similar to the information requested in your Nay 21, 1973 letter on the same subject. To preclude unnecessary iterations, the responses to the quality assurance requests contained in both of your letters will be combined into a single response. All of the information on quality assurance, including that previously requested, will be submitted on'r before November 23, 1973.

Very truly yours, Philip D. Raymond Vice President-Engineering

lj I

'v