AEC DI
~iIBUTION FOR, PART 50 DOCKET MA AL (TEMPORARY FORM)
PILE:
Niagara Mohawk Power Corp
- Syracuse, N.Y. 13202 Philip D.
Raymond DATE OF DOC 8-2-73 DATE REC'D 8-7-73 LTR MEMO RPT OTHER TO:
Mr. Ziemann ORIG CC OTHER SENT AEC PDR CLASS UNCLASS PROP INFO INPU NO' REC'D DOCKET NO:
50-220 DESCRIPTION:
ltr re our 7-26-73...advising requested info willbe submitted on or before 9-10-73 ENCLOSURES:
PLANT NAME:
Nine Point Unit gl
'rACKNOWLEDGEO LINKOT REMOVE FOR ACTION/INFORMATION BUTLER(L)
W/.Copies CLARK(L)
W/
Copies GOLLER(L)
W/
Copies KNIEL(L)
W/
Copies SCHWENCER(L)
W/
Copies STOLZ(L)
W/
Copies VASSALLO(L)
W/
Copies SCHEMEL(L)
W/
Copies NIEMANN(L)
W/ /Copies DICKER(E)
W/
Copies KNIGHTON(E)
W/
Copies YOUNGBLOOD(E)
W/
Copies INTERNAL DISTRIBUTION REGAN(E)
W/
Copies W/
Copies W/
Copies W/
Copies G FIL DR
'GC, RMM P-506A MUNTZING/STAPF
~SE GIAliBUSSO BOYD MOORE (L) (BWR)
DEYOUNG(L) (PWR)
~SKOVHOLT (L)
P, COLLINS G OPR ILE & REGION(3)
MORRIS STEELE TECH REVIEW
~NDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO S TELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLI2iER DENTON GRIMES GAIRiILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST BROWN (E)
CAIGGS (L)
GEARIN (L)
GOULBOURNE (L)
LEE (L)
MAIGRET (L)
SERVICE (L)
SHEPPARD (E)
SMITH (L)
TEETS (L)
WADE (E)
WILLIAMS (E)
WILSON (L)
A/T IND BEAIIMAN SALTZMAN ANS CDONALD DUBE INFO C. MILES 1 - LOCAL PDR 1 - DTIE(ABERNATHY) 1 - NSXC(BUCHANAN) 1 - ASLB(YORE/SAYRE/
WOODARD/"H" ST.
16 -
CYS ACRS HOLDING EXTERNAL DISTRIBUTION (1) (2) (9)-NATIONALLAB'S 1-'R.Schoonmaker,OC,GT,D"323 1-R.
CATLIN, E-256-GT 1-CONSULTANT'S NEWMARK/BLEiE/AGBABIAN 1-GERALD ULRIKSON.,
ORNL 1-PDR"SAN/LA/NY 1-GERALD LELLOUCHE BROOKHAVEN NAT. LAB 1"AGMED(WALTER KOESTER HM-C-427-GT
"'A1~RD<<<<MULLER <<F'99 e'GT
I A
'I I
NIAGARAMOHAWKPOWER CORPORATION 1"
i%I>m; NIAGARA '
MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE, N. Y. 13202 August 2,
'LS t1r.
Denni s L. Ziemann Chief, Operating Reactors Branch No.
2 Directorate of Licensing United States Atomic Energy Commission Washington, D.C.
20545
Dear !1r. Ziemann:
p~
aifE~I Z4H'7 Re:
Nine t<ile Point Unit 1
Docket No. 50-220 Your letter of July 26, 1973 requested additional information concerning two aspects of design and operation of Nine flile Point Unit 1.
This information is presently being prepared by our engineering staff.
The responses to Section B of the attachment to your letter will be submitted on or before September 10, 1973.
These responses concern the access platform addition to the refueling bri'dge structure.
The information requested in Section A of the attachment to your letter concerns the quality assurance program for Nine flile Point Unit 1
operation.
'Much of this information is similar to the information requested in your Nay 21, 1973 letter on the same subject.
To preclude unnecessary iterations, the responses to the quality assurance requests contained in both of your letters will be combined into a single response.
All of the information on quality assurance, including that previously requested, will be submitted on'r before November 23, 1973.
Very truly yours, Philip D.
Raymond Vice President-Engineering