Letter Sequence Other |
---|
TAC:ME0936, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (Open) TAC:ME0937, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (Open) |
|
MONTHYEARNOC-AE-09002389, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process2009-03-0303 March 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process Project stage: Request ML0908904582009-03-30030 March 2009 Acceptance Review Email Adoption of TSTF-511, Rev 0, Eliminate Working Hours Restriction from TS 5.2.2 in Support of Compliance with 10 CFR Part 26 Project stage: Acceptance Review ML0920202892009-08-18018 August 2009 License Amendment Nos. 192 and 180, Regarding Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. Project stage: Other 2009-03-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24318C5082024-11-13013 November 2024 Condition Prohibited by Technical Specifications IR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 IR 05000498/20240032024-11-0707 November 2024 Integrated Inspection Report 05000498/2024003 and 05000499/2024003 ML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML23298A0002023-11-0101 November 2023 The Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23279A0432023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 2 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Draft Conforming Amendments) ML23015A0012023-02-0606 February 2023 Issuance of Amendment Nos. 225 and 210 to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21319A3552021-12-0909 December 2021 Issuance of Amendment Nos. 224 and 209 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index ML21033A2392021-04-0808 April 2021 Issuance of Amendment Nos. 222 and 207 to Revise Technical Specifications to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML20141L6122020-05-28028 May 2020 Issuance of Amendment No. 219 to Revise Technical Specifications to Reduce Safety Injection Accumulators Minimum Pressures (Exigent Circumstances) ML19322A7192019-12-0909 December 2019 Issuance of Amendment Nos. 218 and 204 to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML19217A0602019-10-24024 October 2019 Issuance of Amendment Nos. 217 and 203 Revision to Technical Specification Tables to Change Terminology for the P-13 Permissive Interlock Description ML19213A1472019-08-20020 August 2019 Issuance of Amendment Nos. 216 and 202 Standby Diesel Generator Surveillance Requirements ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18179A4882018-08-0909 August 2018 Correction of Amendment Nos. 213 and 199, and Correction of Amendment Nos. 188 and 175 ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML18128A3422018-06-0707 June 2018 Issuance of Amendment Nos. 213 and 199 to Revise TSs for Administrative Changes and to Relocate Fxy Exclusion Zones to the Colrs(Cac Nos. MG0253 and MG0254, EPID-L-2017-LLA-0300) ML17192A0182017-09-28028 September 2017 South Texas Project, Unit 2, Renewed Facility Operating License and Appendices NPF-80 ML17191B1372017-09-28028 September 2017 South Texas Project, Unit 1, Renewed Facility Operating License NPF-76 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16319A0102016-12-21021 December 2016 Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15254A2412015-09-11011 September 2015 Correction to Enclosures 1 and 2 Related to Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13221A0042013-09-0909 September 2013 Issuance of Amendment Nos. 201 and 189, Revise TS 5.0, Design Features, to Reflect Removal of Visitor'S Center Building and References to Emergency Operations Facility ML13008A5282013-04-25025 April 2013 Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML12152A2452012-08-14014 August 2012 Issuance of Amendment Nos. 199 and 187, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1124402222011-11-17017 November 2011 Issuance of Amendment Nos. 198 and 186, Revise Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlo Cladding ML1119200822011-07-26026 July 2011 Issuance of Amendment Nos. 197 and 185, Revise Physical Security License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1113702772011-05-27027 May 2011 Issuance of Amendment Nos. 196 and 184, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program and Surveillance Requirement 4.6.1.6, Containment Prestressing System. ML1109501462011-04-25025 April 2011 Issuance of Amendment Nos. 195 and 183, Revise Action Requirement in Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration Systems ML1102803222011-03-22022 March 2011 Issuance of Amendment Nos. 194 and 182, Revise Updated Final Safety Analysis Report Related to Reactor Coolant System Pressure Transmitter Replacement ML1007800752010-03-31031 March 2010 Issuance of Amendment Nos. 193 and 181, Revise License Condition E, Deviation from Fire Protection Program Requirements for Fire Areas 27 and 31 ML0920202892009-08-18018 August 2009 License Amendment Nos. 192 and 180, Regarding Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0920904312009-08-12012 August 2009 License Amendment Nos. 191 and 179, Revise Updated Final Safety Analysis Report Section 13.7.2.3, Component Categorization Process to Add Criteria for Assessment of Risk Significance ML0901206542009-01-28028 January 2009 License Amendment Nos. 189 and 177, Revise Action 5 in TS Table 3.3-1 to Add Remedial Actions, Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 ML0900706922009-01-16016 January 2009 Issuance of Exigent Amendment No. 176, Revise Technical Specification 3.7.1.7, Main Feedwater System, to Allow One-Time Allowed Outage Time ML0827503372008-11-10010 November 2008 Correction to Pages Issued for Amendment Nos. 185 and 172, Adoption of Technical Specifications Task Force (TSTF) Traveler No. TSTF-448, Revision 3, Control Room Envelope Habitability ML0828102862008-10-16016 October 2008 License Amendment Nos. 187 and 174, Revise TS 3.3.1, Reactor Trip Instrumentation, to Establish Required Action for Inoperable Extended Range Neutron Flux Instrumentation ML0822804652008-09-16016 September 2008 License Amendments, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements ML0820405952008-07-29029 July 2008 Issuance of Amendment Nos. 185 and 172, New License Condition/ Revised Technical Specification Requirements Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 ML0818901822008-07-0808 July 2008 Correction to Amendment No. 184 and 171 Issued June 30, 2008, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0813303442008-06-30030 June 2008 Issuance of Amendment No. 184 and 171, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0803603212008-03-25025 March 2008 License Amendment Nos. 183 and 170, Revision to Technical Specification Surveillance Requirement 4.5.2.d for Inspection of Emergency Core Cooling System Sumps ML0801600132008-03-0606 March 2008 Issuance of Amendment Nos. 182 and 169, Regarding Adoption of Alternate Radiological Source Term in Assessment of Design-Basis Accident Dose Consequences 2024-02-20
[Table view] Category:Safety Evaluation
MONTHYEARML24201A0462024-07-26026 July 2024 Authorization and Safety Evaluation for Alternative Request No. RR-ENG-4-07 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) ML23279A0482023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 4 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Nonproprietary Safety Evaluation) ML23015A0012023-02-0606 February 2023 Issuance of Amendment Nos. 225 and 210 to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22300A2492022-12-0606 December 2022 Approval for Alternate Disposal Procedures for Very Low-Level Radioactive Material (EPID: L?2021?LLL?0022) ML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML21319A3552021-12-0909 December 2021 Issuance of Amendment Nos. 224 and 209 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index NUREG-0654, Correction to Amendment Nos. 221 and 206 to Authorize Revision of the Emergency Plan Based on NUREG-0654/FEMA-REP-1, Revision 22021-05-11011 May 2021 Correction to Amendment Nos. 221 and 206 to Authorize Revision of the Emergency Plan Based on NUREG-0654/FEMA-REP-1, Revision 2 ML21033A2392021-04-0808 April 2021 Issuance of Amendment Nos. 222 and 207 to Revise Technical Specifications to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML20253A0462020-09-29029 September 2020 Issuance of Amendment Nos. 220 and 205 to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML20199M1622020-07-21021 July 2020 Proposed Alternatives PRR-01, PRR-02, PRR-03, and PRR-04 to the Requirements of the ASME OM Code (Epids L-2020-LLR-0007 to L-2020-LLR-0010) ML20141L6122020-05-28028 May 2020 Issuance of Amendment No. 219 to Revise Technical Specifications to Reduce Safety Injection Accumulators Minimum Pressures (Exigent Circumstances) ML19322A7192019-12-0909 December 2019 Issuance of Amendment Nos. 218 and 204 to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML19217A0602019-10-24024 October 2019 Issuance of Amendment Nos. 217 and 203 Revision to Technical Specification Tables to Change Terminology for the P-13 Permissive Interlock Description ML19213A1472019-08-20020 August 2019 Issuance of Amendment Nos. 216 and 202 Standby Diesel Generator Surveillance Requirements ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML18128A3422018-06-0707 June 2018 Issuance of Amendment Nos. 213 and 199 to Revise TSs for Administrative Changes and to Relocate Fxy Exclusion Zones to the Colrs(Cac Nos. MG0253 and MG0254, EPID-L-2017-LLA-0300) ML17019A0022017-07-11011 July 2017 Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16319A0102016-12-21021 December 2016 Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13221A0042013-09-0909 September 2013 Issuance of Amendment Nos. 201 and 189, Revise TS 5.0, Design Features, to Reflect Removal of Visitor'S Center Building and References to Emergency Operations Facility ML13142A1602013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13008A5282013-04-25025 April 2013 Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval ML13007A1362013-01-31031 January 2013 Review of Operations Quality Assurance Plan, Revision 20 ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 ML12152A2452012-08-14014 August 2012 Issuance of Amendment Nos. 199 and 187, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1124402222011-11-17017 November 2011 Issuance of Amendment Nos. 198 and 186, Revise Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlo Cladding 2024-07-26
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 AUgust 18, 2009 Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 -ISSUANCE OF AMENDMENTS RE: IMPLEMENTATION OF TSTF-511, REVISION 0, "ELIMINATE VVORKING HOUR RESTRICTIONS FROM TS 5.2.2 TO SUPPORT COMPLIANCE VVITH 10 CFR PART 26" (TAC NOS. ME0936 AND ME0937)
Dear Mr. Halpin:
The Commission has issued the enclosed Amendment No. 192 to Facility Operating License 1\10. NPF-76 and Amendment No. 180 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2, respectively.
The amendments consist of changes to the Technical Specifications (TSs) in response to the STP Nuclear Operating Company's application dated March 3, 2009. The amendments revise the TSs to eliminate working hour restrictions from TS 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The request is consistent with the guidance contained in U.S. Nuclear Regulatory Commission approved Technical Specifications Task Force (TSTF) Improved Standard Technical Specification change traveler, TSTF-511, Revision 0, "Eliminate VVorking Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." The availability of this improvement was announced in the Federal Register on December 30, 2008 (73 FR 79923), as part of the Consolidated Line Item Improvement Process.
E. Halpin -2 A copy of our related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Sincerely,
+ Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
- 1. Amendment No. 192 to NPF-76 2. Amendment No. 180 to NPF-80 3. Safety Evaluation cc w/encls: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-498 SOUTH TEXAS PROJECT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 192 License No. NPF-76 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment by STP Nuclear Operating Company (STPNOC)*
acting on behalf of itself and for NRG South Texas LP, the City Public Service Board of San Antonio (CPS), and the City of Austin, Texas (COA) (the licensees), dated March 3, 2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- STPNOC is authorized to act for NRG South Texas LP, the City Public Service Board of San Antonio, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Enclosure 1
-2Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-76 is hereby amended to read as follows: Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment NO.1 92, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. The license amendment is effective as of its date of issuance and shall be implemented by October 1, 2009. FOR THE NUCLEAR REGULATORY COMMISSION J/)1b(atL if , Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. NPF-76 and the Technical Specifications Date of Issuance:
August 18, 2009 UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-499 SOUTH TEXAS UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 180 License No. NPF-80 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment by STP Nuclear Operating Company (STPNOC)*
acting on behalf of itself and for NRG South Texas LP, the City Public Service Board of San Antonio (CPS), and the City of Austin, Texas (COA) (the licensees), dated March 3,2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- STPNOC is authorized to act for NRG South Texas LP, the City Public Service Board of San Antonio, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Enclosure 2
-2Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License l\Jo. NPF-80 is hereby amended to read as follows: Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 180, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. The license amendment is effective as of its date of issuance and shall be implemented by October 1, 2009. FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Attachment Changes to the Facility Operating License No. NPF-80 and the Technical Specifications Date of Issuance:
August 18, 2009 ATTACHMENT TO LICENSE AMENDMENT NOS. 192 AND FACILITY OPERATING LICENSE NOS. NPF-76 AND DOCKET NOS. 50-498 AND Replace the following pages of the Facility Operating Licenses, Nos. NPF-76 and NPF-80, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. Facility Operating License No. NPF-76 REMOVE INSERT Facility Operating License No. NPF-80 REMOVE INSERT Technical Specifications REMOVE INSERT 6-3 6-3 SOUTH TEXAS LICENSE -4 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 192, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. (3) Not Used (4) Initial Startup Test Program (Section 14, SER)* Any changes to the Initial Test Program described in Section 14 of the Final Safety Analysis Report made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change. (5) Safety Parameter Display System (Section 18, SSER No. 4)* Before startup after the first refueling outage, HL&P[**] shall perform the necessary activities, provide acceptable responses, and implement all proposed corrective actions related to issues as described in Section 18.2 of SER Supplement
- 4. (6) Supplementary Containment Purge Isolation (Section 11.5, SSER No.4) HL&P shall provide, prior to startup from the first refueling outage, control room indication of the normal and supplemental containment purge sample line isolation valve position.
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
- The original licensee authorized to possess, use and operate the facility was HL&P. Consequently, historical references to certain obligations of HL&P remain in the license conditions.
Amendment No. 192
-4 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 180 and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. (3) Not Used (4) Initial Startup Test Program (Section 14, SR)* Any changes to the Initial Test Program described in Section 14 of the Final Safety Analysis Report made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change. (5) License Transfer Texas Genco, LP shall provide decommissioning funding assurance, to be held in decommissioning trusts for South Texas Project, Unit 2 (Unit 2) upon the direct transfer of the Unit 2 license to Texas Genco, LP, in an amount equal to or greater than the balance in the Unit 2 decommissioning trust immediately prior to the transfer.
In addition, Texas Genco, LP shall ensure that all contractual arrangements referred to in the application for approval of the transfer of the Unit 2 license to Texas Genco, LP to obtain necessary decommissioning funds for Unit 2 through a non-bypassable charge are executed and will be maintained until the decommissioning trusts are fully funded, or shall ensure that other mechanisms that provide equivalent assurance of decommissioning funding in accordance with the Commission's regulations are maintained.
(6) License Transfer The master decommissioning trust agreement for Unit 2, at the time the direct transfer of Unit 2 to Texas Genco, LP is effected and thereafter, is subject to the following:
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 180 ADMINISTRATIVE CONTROLS Organization Unit Staff (continued) A radiation protection technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence, provided immediate action is taken to fill the required position. Not Used. The individual to whom the shift managers directly report shall hold an SRO license. The Shift Technical Advisor (STA) shall provide advisory technical support to the shift manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift (Generic Letter 86-04). This position may also be filled by the shift manager or an individual with an SRO license provided that person meets the qualifications specified by the Commission Policy Statement. Not Used Not Used SOUTH TEXAS -UNITS 1 & 2 6-3 Unit 1 -Amendment No. 3, 4, 29,4-a4-, 192 Unit 2 -Amendment No. 2G, 4-J9, 180 UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 192 AND 180 TO FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 STP NUCLEAR OPERATING COMPANY, ET AL. SOUTH TEXAS UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499
1.0 INTRODUCTION
By application dated March 3, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090690687), STP Nuclear Operating Company (STPNOC, the licensee) submitted to the U.S. Nuclear Regulatory Commission (NRC) a request for changes to the Technical Specifications (TSs) for South Texas Project (STP), Units 1 and 2. The proposed changes would delete paragraph d of STP, Units 1 and 2, TS 6.2.2, "Unit Staff." The licensee stated that the application is consistent with NRC-approved Revision 0 to Technical Specification Task Force (TSTF) Improved Standard Technical Specification change traveler, TSTF-511, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." The availability of this improvement was announced in the Federal Register on December 30, 2008 (73 FR 79923), as part of the Consolidated Line Item Improvement Process (CLlIP).
2.0 REGULATORY EVALUATION
The NRC's regulatory requirements related to the content of the TSs are contained in 10 CFR Part 50.36, which requires that the TSs include items in the following categories:
(1) safety limits, limiting safety systems settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls.
The administrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner. The background of the NRC regulations pertaining to prevention of worker impairment is summarized in the Federal Register notice containing the final rule that amended 10 CFR Part 26 (73 FR 16966, March 31, 2008). Subpart I of 10 CFR Part 26 provides the regulatory requirements for managing worker fatigue at nuclear power plants. Enclosure 3
-2 The NRC's guidance for the format and content of licensee's TSs can be found in NUREG-1431, Revision 3, "Standard Technical Specifications Westinghouse Plants" (STS). Section 5 of the STS contains administrative controls.
Paragraph d of TS 5.2.2, "Unit Staff," contains NRC's precedent for developing administrative procedures to limit the working hours of personnel who perform safety-related functions.
Under TS requirements, licensees limit the working hours of personnel to varying degrees due to minor administrative differences and differences in each licensee's current licensing basis. This has resulted in inconsistent implementation of TS requirements and interpretation.
This has also made it difficult for NRC to enforce the TS requirements.
To address these problems, the NRC staff developed new requirements of 10 CFR Part 26, Subpart I, that supersede the guidance for requirements limiting the working hours of personnel as described in paragraph d of TS 5.2.2 of STS. Subpart I distinguishes between work hour controls and fatigue management and strengthens the requirements for both. Subpart I requires nuclear power plant licensees to ensure against worker fatigue, which would adversely affect public health and safety, and common defense and security, by establishing clear and enforceable requirements for the management of worker fatigue. Licensees are required to implement Subpart I by October 1, 2009, as announced in the final rule that revised 10 CFR Part 26 (73 FR 16966, March 31,2008).
TSTF-511, Revision 0, proposed a change to the STS that would delete paragraph d of STS 5.2.2. Proper adoption of TSTF-511 J Revision 0, and implementation of 10 CFR Part 26, Subpart I, by STPNOC will provide reasonable assurance that STP, Units 1 and 2, will maintain limits on the working hours of personnel who perform safety-related functions.
STPNOC has committed to remove STP, Units 1 and 2, plant-specific TS requirements concurrently with the implementation of the 10 CFR Part 26, Subpart I requirements.
3.0 TECHNICAL EVALUATION Controls on work hours for personnel at nuclear power plants are necessary to prevent worker fatigue from adversely affecting public health and safety, and the common defense and security.
As discussed above, work hour controls for STP, Units 1 and 2, are currently located in paragraph d of STP, Units 1 and 2, TS 6.2.2. When implemented, the regulatory requirements of 10 CFR 26, Subpart I, would replace the plant-specific TS requirements found in TS 6.2.2 paragraph d of the STP, Units 1 and 2, TSs. 3.1 Licensee's Regulatory Commitment To ensure control on the change process, the licensee has committed to implement the new requirements of 10 CFR Part 26, Subpart I concurrently with the deletion of the TS requirements on work hour controls.
The NRC staff finds that the licensee's commitment will provide reasonable controls for the implementation and for subsequent evaluation of proposed changes subject to the above described regulatory commitment.
-3 The NRC staff also finds that regulatory commitments are best managed by the licensee's administrative processes included in its commitment management program (see NRC Regulatory Issue Summary 2000-017, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000). The above regulatory commitments do not warrant the creation of regulatory requirements (items requiring prior NRC approval of subsequent changes).
The NRC staff finds that the proposed licensee commitment will adequately ensure effective implementation of the proposed changes. Therefore, the NRC staff finds the proposed commitment acceptable.
3.2 Licensee's Deviation from TSTF-511 The changes proposed by STPNOC for STP, Units 1 and 2, have one variation from the TS changes as described in TSTF-511, Revision O. The equivalent STP, Units 1 and 2, TS work hour restrictions are located in TS 6.2.2, paragraph
- d. This differs from TSTF-511, Revision 0, where work hour restrictions are located in STS 5.2.2, paragraph
- d. The NRC staff finds that this difference in numbering is insignificant, as the intent of TSTF-511 is to delete TSs superseded by the revised regulations in 10 CFR Part 26, Subpart I. This minor variation proposed for STP Units 1 and 2 TS changes remains bounded by NRC staff's model safety evaluation (73 FR 79923; December 30, 2008) accepting the deletion of paragraph d of TS 5.2.2. 3.3 NRC Staff's Evaluation The NRC staff evaluated the licensee's proposed change against the applicable precedents in TSTF-511 and regulatory requirements listed in Section 2.0 above. The NRC staff considered the licensee's commitment to implement 10 CFR Part 26, Subpart I, concurrently with the deletion of TS work hour control requirements in its evaluation of the proposed change. Based on its evaluation, the NRC staff concludes that there is reasonable assurance that the licensee will develop adequate procedures to ensure compliance with the new regulations for work hour controls established in 10 CFR Part 26, Subpart I, for STP, Units 1 and 2. Also, the NRC staff expects that the licensee will continue to prevent worker fatigue from adversely affecting public health and safety and common defense and security.
Therefore, the NRC staff finds the proposed changes acceptable.
4.0 REGULATORY COMMITMENT In its March 3, 2009, letter, the licensee stated that it will make the following regulatory commitment:
Removal of the plant-specific TS requirements will be performed concurrently with the implementation of the 10 CFR Part 26, Subpart I requirements.
This commitment will be completed no later than the implementation deadline of October 1, 2009. The NRC staff finds this commitment acceptable.
-5.0 STATE In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendment.
The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION The amendments change administrative procedures or requirements.
Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
A. Marrero Date: August 18, 2009 E. Halpin -2 A copy of our related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Sincerely, IRA by Balwant K. Singal fori Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
- 1. Amendment No. 192 to NPF-76 2. Amendment No. 180 to NPF-80 3. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMSouthTexas Resource LPLIV Reading RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn4MailCenter Resource RidsNrrDorlDpr Resource AMarrero, NRR/DIRS/ITSB RidsNrrDorlLpl4 Resource ALewin, NRRIDIRS/ITSB ADAMS Accession No. ML092020289
- SE memo dated OFFICE NRR/LPL4/PM NRR/LPL4/LA DIRSIITSB/BC OGC -NLO NRR/LPL4/BC NRR/LPL4/PM NAME MThadani ,IBurkhardt RElliott*
AJones MMarkley MThadani for MThadani BSingal for DATE 7/27109 7/24/09 6/17109 8/4109 8/17109 8/18/09 OFFICIAL RECORD COpy