ML23279A043

From kanterella
Jump to navigation Jump to search

Associated Independent Spent Fuel Storage Installation - Enclosure 2 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Draft Conforming Amendments)
ML23279A043
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/30/2023
From: Bo Pham
Division of Operating Reactor Licensing
To:
Shared Package
ML23279A022 List:
References
EPID L-2023-LLM-0004
Download: ML23279A043 (1)


Text

STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-498 SOUTH TEXAS PROJECT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. XXX Renewed License No. NPF-76

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by STP Nuclear Operating Company (STPNOC)*, acting on behalf of NRG South Texas LP and its parent companies and Constellation Energy Generation, LLC, dated June 12, 2023, as supplemented by letters dated August 31, 2023, and October 5, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

  • STPNOC is authorized to act for NRG South Texas LP, the City Public Service Board of San Antonio, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

Enclosure 1

2. Accordingly, Renewed Facility Operating License No. NPF-76 is hereby amended as indicated in the attachment to this license amendment.
3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Bo M. Pham, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-76 Date of Issuance:

STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-499 SOUTH TEXAS PROJECT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. XXX Renewed License No. NPF-80

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by STP Nuclear Operating Company (STPNOC)*, acting on behalf of NRG South Texas LP and its parent companies and Constellation Energy Generation, LLC, dated June 12, 2023, as supplemented by letters dated August 31, 2023, and October 5, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

  • STPNOC is authorized to act for NRG South Texas LP, the City Public Service Board of San Antonio, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

Enclosure 2

2. Accordingly, Renewed Facility Operating License No. NPF-80 is hereby amended as indicated in the attachment to this license amendment.
3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Bo M. Pham, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-80 Date of Issuance:

ATTACHMENT TO LICENSE AMENDMENT NOS. XXX AND XXX TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 SOUTH TEXAS PROJECT, UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 Replace the following pages of Renewed Facility Operating License Nos. NPF-76 and NPF-80 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Renewed Facility Operating License No. NPF-76 REMOVE INSERT Renewed Facility Operating License No. NPF-80 REMOVE INSERT CONSTELLATION SOUTH TEXAS, LLC CITY PUBLIC SERVICE BOARD OF SAN ANTONIO CITY OF AUSTIN, TEXAS STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-498 SOUTH TEXAS PROJECT, UNIT 1 RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-76

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A. The application for a renewed license filed by STP Nuclear Operating Company (STPNOC)*, acting on behalf of itself and for Constellation South Texas, LLC, the City Public Service Board of San Antonio (CPS), and City of Austin, Texas (COA) (the Owners) complies with the standards and requirements of the Atomic Energy Act of 1954, as of 1954 as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the South Texas Project, Unit 1, (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-128 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below);

D. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below);

  • STPNOC is authorized to act for Constellation South Texas, LLC, the City Public Service Board of San Antonio, and City of Austin, Texas and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

Renewed License No. NPF-76 Amendment No. XXX

SOUTH TEXAS RENEWED LICENSE E. STPNOC is technically qualified to engage in the activities authorized by this renewed license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; F. The Owners have satisfied the applicable provisions of 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements, of the Commissions regulations; G. The issuance of this renewed license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Facility Operating License No. NPF-76, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied; and I. The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this renewed license will be in accordance with the Commissions regulations in 10 CFR Parts 30, 40 and 70.

J. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1), and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations.

2. Based on the foregoing findings by the Nuclear Regulatory Commission, Facility Operating License No. NPF-76, dated March 22, 1988, and expiring August 20, 2027, as amended, is superseded by Renewed Facility Operating License No. NPF-76 and hereby issued to STPNOC to read as follows:

A. This renewed license applies to the South Texas Project, Unit 1, a pressurized water reactor, and associated equipment (the facility) owned by Constellation South Texas, LLC, City Public Service Board of San Antonio, and City of Austin, Texas and operated by STPNOC. The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston and is described in the licensees Final Safety Analysis Report, as supplemented and amended, and in the licensees Environmental Report, as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

Renewed License No. NPF-76 Amendment No. XXX

SOUTH TEXAS RENEWED LICENSE (1) STPNOC pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in Matagorda County, Texas, in accordance with the procedures and limitations set forth in this renewed license; (2) Constellation South Texas, LLC, the City Public Service Board of San Antonio (CPS), and the City of Austin, Texas (COA), pursuant to the Act and 10 CFR Part 50, to possess the facility at the designated location in Matagorda County, Texas, in accordance with the procedures and limitations set forth in this renewed license; (3) STPNOC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) STPNOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) STPNOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) STPNOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level STPNOC is authorized to operate the facility at reactor core power levels not in excess of 3,853 megawatts thermal (100% power) in accordance with the conditions specified herein.

Renewed License No. NPF-76 Amendment No. XXX

CONSTELLATION SOUTH TEXAS, LLC CITY PUBLIC SERVICE BOARD OF SAN ANTONIO CITY OF AUSTIN, TEXAS STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-499 SOUTH TEXAS PROJECT, UNIT 2 RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-80

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A. The application for a renewed license filed by STP Nuclear Operating Company (STPNOC)*, acting on behalf of itself and for Constellation South Texas, LLC, the City Public Service Board of San Antonio (CPS), and City of Austin, Texas (COA) (the Owners) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the South Texas Project, Unit 2, (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-129 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below);

D. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below);

  • STPNOC is authorized to act for Constellation South Texas, LLC, the City Public Service Board of San Antonio, and City of Austin, Texas and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

Renewed License No. NPF-80 Amendment No. XXX

SOUTH TEXAS RENEWED LICENSE E. STPNOC is technically qualified to engage in the activities authorized by this renewed license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; F. The Owners have satisfied the applicable provisions of 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements, of the Commissions regulations; G. The issuance of this renewed license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Facility Operating License No. NPF-80, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied; and I. The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this renewed license will be in accordance with the Commissions regulations in 10 CFR Parts 30, 40 and 70.

J. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1), and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations.

2. Based on the foregoing findings by the Nuclear Regulatory Commission, Facility Operating License No. NPF-80, dated March 28, 1989, and expiring December 15, 2028, as amended, is superseded by Renewed Facility Operating License No. NPF-80 and hereby issued to STPNOC to read as follows:

A. This renewed license applies to the South Texas Project, Unit 2, a pressurized water reactor, and associated equipment (the facility) owned by Constellation South Texas, LLC, City Public Service Board of San Antonio, and City of Austin, Texas and operated by STPNOC. The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston and is described in the licensees Final Safety Analysis Report, as supplemented and amended, and in the licensees Environmental Report, as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

Renewed License No. NPF-80 Amendment No. XXX

SOUTH TEXAS RENEWED LICENSE (1) STPNOC pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in Matagorda County, Texas, in accordance with the procedures and limitations set forth in this renewed license; (2) Constellation South Texas, LLC, the City Public Service Board of San Antonio (CPS), and the City of Austin, Texas (COA), pursuant to the Act and 10 CFR Part 50, to possess the facility at the designated location in Matagorda County, Texas, in accordance with the procedures and limitations set forth in this renewed license; (3) STPNOC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) STPNOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) STPNOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) STPNOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level STPNOC is authorized to operate the facility at reactor core power levels not in excess of 3,853 megawatts thermal (100% power) in accordance with the conditions specified herein.

Renewed License No. NPF-80 Amendment No. XXX