Category:Letter
MONTHYEARML24346A4162024-12-11011 December 2024 Operator Licensing Examination Schedule ML24319A0342024-12-11011 December 2024 The Associated Independent Spent Fuel Storage Installation - Order Approving Direct Transfer of Licenses (EPID L-2024-LLM-0002) - Letter/Safety Evaluation IR 05000498/20240122024-11-25025 November 2024 License Renewal Phase 1 Inspection Report 05000498/2024012 IR 05000498/20240502024-11-21021 November 2024 Project Electric Generating Station, Units 1 and 2 - NRC Special Inspection Report 05000498/2024050 and 05000499/2024050 and Preliminary White Finding ML24318C5082024-11-13013 November 2024 Condition Prohibited by Technical Specifications IR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 IR 05000498/20240032024-11-0707 November 2024 Integrated Inspection Report 05000498/2024003 and 05000499/2024003 ML24305A1742024-10-31031 October 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML23298A0002023-11-0101 November 2023 The Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23279A0432023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 2 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Draft Conforming Amendments) ML23015A0012023-02-0606 February 2023 Issuance of Amendment Nos. 225 and 210 to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21319A3552021-12-0909 December 2021 Issuance of Amendment Nos. 224 and 209 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index ML21033A2392021-04-0808 April 2021 Issuance of Amendment Nos. 222 and 207 to Revise Technical Specifications to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML20141L6122020-05-28028 May 2020 Issuance of Amendment No. 219 to Revise Technical Specifications to Reduce Safety Injection Accumulators Minimum Pressures (Exigent Circumstances) ML19322A7192019-12-0909 December 2019 Issuance of Amendment Nos. 218 and 204 to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML19217A0602019-10-24024 October 2019 Issuance of Amendment Nos. 217 and 203 Revision to Technical Specification Tables to Change Terminology for the P-13 Permissive Interlock Description ML19213A1472019-08-20020 August 2019 Issuance of Amendment Nos. 216 and 202 Standby Diesel Generator Surveillance Requirements ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18179A4882018-08-0909 August 2018 Correction of Amendment Nos. 213 and 199, and Correction of Amendment Nos. 188 and 175 ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML18128A3422018-06-0707 June 2018 Issuance of Amendment Nos. 213 and 199 to Revise TSs for Administrative Changes and to Relocate Fxy Exclusion Zones to the Colrs(Cac Nos. MG0253 and MG0254, EPID-L-2017-LLA-0300) ML17192A0182017-09-28028 September 2017 South Texas Project, Unit 2, Renewed Facility Operating License and Appendices NPF-80 ML17191B1372017-09-28028 September 2017 South Texas Project, Unit 1, Renewed Facility Operating License NPF-76 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16319A0102016-12-21021 December 2016 Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15254A2412015-09-11011 September 2015 Correction to Enclosures 1 and 2 Related to Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13221A0042013-09-0909 September 2013 Issuance of Amendment Nos. 201 and 189, Revise TS 5.0, Design Features, to Reflect Removal of Visitor'S Center Building and References to Emergency Operations Facility ML13008A5282013-04-25025 April 2013 Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML12152A2452012-08-14014 August 2012 Issuance of Amendment Nos. 199 and 187, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1124402222011-11-17017 November 2011 Issuance of Amendment Nos. 198 and 186, Revise Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlo Cladding ML1119200822011-07-26026 July 2011 Issuance of Amendment Nos. 197 and 185, Revise Physical Security License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1113702772011-05-27027 May 2011 Issuance of Amendment Nos. 196 and 184, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program and Surveillance Requirement 4.6.1.6, Containment Prestressing System. ML1109501462011-04-25025 April 2011 Issuance of Amendment Nos. 195 and 183, Revise Action Requirement in Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration Systems ML1102803222011-03-22022 March 2011 Issuance of Amendment Nos. 194 and 182, Revise Updated Final Safety Analysis Report Related to Reactor Coolant System Pressure Transmitter Replacement ML1007800752010-03-31031 March 2010 Issuance of Amendment Nos. 193 and 181, Revise License Condition E, Deviation from Fire Protection Program Requirements for Fire Areas 27 and 31 ML0920202892009-08-18018 August 2009 License Amendment Nos. 192 and 180, Regarding Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0920904312009-08-12012 August 2009 License Amendment Nos. 191 and 179, Revise Updated Final Safety Analysis Report Section 13.7.2.3, Component Categorization Process to Add Criteria for Assessment of Risk Significance ML0901206542009-01-28028 January 2009 License Amendment Nos. 189 and 177, Revise Action 5 in TS Table 3.3-1 to Add Remedial Actions, Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 ML0900706922009-01-16016 January 2009 Issuance of Exigent Amendment No. 176, Revise Technical Specification 3.7.1.7, Main Feedwater System, to Allow One-Time Allowed Outage Time ML0827503372008-11-10010 November 2008 Correction to Pages Issued for Amendment Nos. 185 and 172, Adoption of Technical Specifications Task Force (TSTF) Traveler No. TSTF-448, Revision 3, Control Room Envelope Habitability ML0828102862008-10-16016 October 2008 License Amendment Nos. 187 and 174, Revise TS 3.3.1, Reactor Trip Instrumentation, to Establish Required Action for Inoperable Extended Range Neutron Flux Instrumentation ML0822804652008-09-16016 September 2008 License Amendments, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements ML0820405952008-07-29029 July 2008 Issuance of Amendment Nos. 185 and 172, New License Condition/ Revised Technical Specification Requirements Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 ML0818901822008-07-0808 July 2008 Correction to Amendment No. 184 and 171 Issued June 30, 2008, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0813303442008-06-30030 June 2008 Issuance of Amendment No. 184 and 171, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0803603212008-03-25025 March 2008 License Amendment Nos. 183 and 170, Revision to Technical Specification Surveillance Requirement 4.5.2.d for Inspection of Emergency Core Cooling System Sumps ML0801600132008-03-0606 March 2008 Issuance of Amendment Nos. 182 and 169, Regarding Adoption of Alternate Radiological Source Term in Assessment of Design-Basis Accident Dose Consequences 2024-02-20
[Table view] Category:Safety Evaluation
MONTHYEARML24319A0342024-12-11011 December 2024 The Associated Independent Spent Fuel Storage Installation - Order Approving Direct Transfer of Licenses (EPID L-2024-LLM-0002) - Letter/Safety Evaluation ML24201A0462024-07-26026 July 2024 Authorization and Safety Evaluation for Alternative Request No. RR-ENG-4-07 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML23279A0482023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 4 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Nonproprietary Safety Evaluation) ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) ML23015A0012023-02-0606 February 2023 Issuance of Amendment Nos. 225 and 210 to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22300A2492022-12-0606 December 2022 Approval for Alternate Disposal Procedures for Very Low-Level Radioactive Material (EPID: L?2021?LLL?0022) ML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML21319A3552021-12-0909 December 2021 Issuance of Amendment Nos. 224 and 209 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index ML21033A2392021-04-0808 April 2021 Issuance of Amendment Nos. 222 and 207 to Revise Technical Specifications to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML20253A0462020-09-29029 September 2020 Issuance of Amendment Nos. 220 and 205 to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML20199M1622020-07-21021 July 2020 Proposed Alternatives PRR-01, PRR-02, PRR-03, and PRR-04 to the Requirements of the ASME OM Code (Epids L-2020-LLR-0007 to L-2020-LLR-0010) ML20141L6122020-05-28028 May 2020 Issuance of Amendment No. 219 to Revise Technical Specifications to Reduce Safety Injection Accumulators Minimum Pressures (Exigent Circumstances) ML19322A7192019-12-0909 December 2019 Issuance of Amendment Nos. 218 and 204 to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML19217A0602019-10-24024 October 2019 Issuance of Amendment Nos. 217 and 203 Revision to Technical Specification Tables to Change Terminology for the P-13 Permissive Interlock Description ML19213A1472019-08-20020 August 2019 Issuance of Amendment Nos. 216 and 202 Standby Diesel Generator Surveillance Requirements ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML18128A3422018-06-0707 June 2018 Issuance of Amendment Nos. 213 and 199 to Revise TSs for Administrative Changes and to Relocate Fxy Exclusion Zones to the Colrs(Cac Nos. MG0253 and MG0254, EPID-L-2017-LLA-0300) ML17019A0022017-07-11011 July 2017 Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16319A0102016-12-21021 December 2016 Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13221A0042013-09-0909 September 2013 Issuance of Amendment Nos. 201 and 189, Revise TS 5.0, Design Features, to Reflect Removal of Visitor'S Center Building and References to Emergency Operations Facility ML13142A1602013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13008A5282013-04-25025 April 2013 Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval ML13007A1362013-01-31031 January 2013 Review of Operations Quality Assurance Plan, Revision 20 ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 ML12152A2452012-08-14014 August 2012 Issuance of Amendment Nos. 199 and 187, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1124402222011-11-17017 November 2011 Issuance of Amendment Nos. 198 and 186, Revise Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlo Cladding 2024-07-26
[Table view] |
Text
June 30, 2008 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: BATTERY SURVEILLANCE REQUIREMENTS (TAC NOS. MD7366 AND MD7367)
Dear Mr. Sheppard:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 184 to Facility Operating License No. NPF-76 and Amendment No. 171 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated November 8, 2007.
The amendments modify TS surveillance requirements related to battery testing, by revising TS 3/4.8.2.1, DC [Direct Current] Sources - Operating, TS 3/4.8.2.2, DC Sources -
Shutdown, and TS 3/4.8.2.3, Battery Parameters. The changes allow battery testing activities to be performed during any MODE of operation.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
- 1. Amendment No. 184 to NPF-76
- 2. Amendment No. 171 to NPF-80
- 3. Safety Evaluation cc w/encls: See next page
Pkg ML081330342, Amendment ML081330344, License/TS Pgs ML081330355 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EEEB OGC - no legal objection NRR/LPL4/BC NRR/LPL4/PM NAME MThadani (**) JBurkhardt (**) GWilson (*) SBrock (**) THiltz MThadani DATE 5/15/08 5/13/08 4/21/2008 6/20/08 6/30/08 6/30/08 South Texas Project, Units 1 and 2 6/10/2008 cc:
Senior Resident Inspector S. M. Head, Manager, Licensing U.S. Nuclear Regulatory Commission STP Nuclear Operating Company P.O. Box 289 P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Wadsworth, TX 77483 C. M. Canady C. T. Bowman, General Manager, Oversight City of Austin STP Nuclear Operating Company Electric Utility Department P.O Box 289 721 Barton Springs Road Wadsworth, TX 77483 Austin, TX 78704 Ms. Marilyn Kistler J. J. Nesrsta/R. K. Temple Senior Staff Specialist, Licensing E. Alercon/Kevin Pollo STP Nuclear Operating Company CPS Energy P.O. Box 289, Mail Code 5014 P.O. Box 1771 Wadsworth, TX 77483 San Antonio, TX 78296 Environmental and Natural Resources INPO Policy Director Records Center P.O. Box 12428 700 Galleria Parkway Austin, TX 78711-3189 Atlanta, GA 30339-3064 Mr. Jon C. Wood Regional Administrator, Region IV Cox, Smith, & Matthews U.S. Nuclear Regulatory Commission 112 East Pecan, Suite 1800 612 E. Lamar Blvd., Suite 400 San Antonio, TX 78205 Arlington, TX 76011-4125 Director, Division of Compliance & Inspection Steve Winn/Christie Jacobs Bureau of Radiation Control Eddy Daniels/Marty Ryan Texas Department of State Health Services NRC Energy, Inc. 1100 West 49th Street 211 Carnegie Center Austin, TX 78756 Princeton, NJ 08540 Mr. Ted Enos Mr. Nate McDonald 4200 South Hulen County Judge for Matagorda County Suite 422 1700 7th Street, Room 301 Ft. Worth, TX 76109 Bay City, TX 77414 Mr. Brian Almon A. H. Gutterman, Esq. Public Utility Commission of Texas Morgan, Lewis & Bockius P.O. Box 13326 1111 Pennsylvania Avenue, NW Austin, TX 78711-3326 Washington, DC 20004 E. D. Halpin, Site Vice President STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
South Texas Project, Units 1 and 2 06/10/2008 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Ken Coates, Plant General Manager STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 Mr. Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711
STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-498 SOUTH TEXAS PROJECT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 184 License No. NPF-76
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by STP Nuclear Operating Company (STPNOC)*
acting on behalf of itself and for NRG South Texas LP, the City Public Service Board of San Antonio (CPS), and the City of Austin, Texas (COA) (the licensees), dated November 8, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- STPNOC is authorized to act for NRG South Texas LP, the City Public Service Board of San Antonio, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
ENCLOSURE 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-76 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 184, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. NPF-76 and the Technical Specifications Date of Issuance: June 30, 2008
STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-499 SOUTH TEXAS PROJECT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. NPF-80
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by STP Nuclear Operating Company (STPNOC)*
acting on behalf of itself and for NRG South Texas LP, the City Public Service Board of San Antonio (CPS), and the City of Austin, Texas (COA) (the licensees), dated November 8, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- STPNOC is authorized to act for NRG South Texas LP, the City Public Service Board of San Antonio, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
ENCLOSURE 2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-80 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 171, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. NPF-80 and the Technical Specifications Date of Issuance: June 30, 2008
ATTACHMENT TO LICENSE AMENDMENT NOS. 184 AND 171 FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 DOCKET NOS. 50-498 AND 50-499 Replace the following pages of the Facility Operating Licenses, Nos. NPF-76 and NPF-80, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License No. NPF-76 REMOVE INSERT Facility Operating License No. NPF-80 REMOVE INSERT Technical Specifications REMOVE INSERT 3/4 8-11 3/4 8-11 3/4 8-13a 3/4 8-13a 3/4 8-13c 3/4 8-13c
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 184 AND 171 TO FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 STP NUCLEAR OPERATING COMPANY, ET AL.
SOUTH TEXAS PROJECT, UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499
1.0 INTRODUCTION
By letter dated November 8, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073230120), the STP Nuclear Operating Company (STPNOC, the licensee) requested an amendment to Facility Operating License Nos. NPF-76 and NPF-80 for South Texas Project (STP), Units 1 and 2, respectively.
The licensee proposed to modify Technical Specification (TS) Surveillance Requirements (SRs) related to battery testing. The proposed changes would revise TS 3/4.8.2.1, DC [Direct Current] Sources - Operating, TS 3/4.8.2.2, DC Sources - Shutdown, and TS 3/4.8.2.3, Battery Parameters. The proposed changes would allow battery testing activities to be performed during any MODE of operation.
2.0 REGULATORY EVALUATION
The following U.S. Nuclear Regulatory Commission (NRC) requirements and guidance documents are applicable to the staffs review of the licensees amendment request:
- Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36, Technical Specifications outlines the requirements of Safety Limits, Limiting Safety System Settings, and Limiting Control Settings.
- Paragraph 50.36(d)(2)(ii) of 10 CFR, Technical specifications, requires that a technical specification limiting condition for operation of a nuclear reactor must be established for each item meeting one or more of the criteria set forth in 10 CFR 50.36(d)(2)(ii)(A)-(D).
- Paragraph 50.36(d)(3) of 10 CFR, Technical specifications, requires that TSs include SRs, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
ENCLOSURE 3
- Appendix A of 10 CFR Part 50, General Design Criterion (GDC) 17, Electric power systems, requires, in part, that [a]n onsite electric power system and an offsite electric power system shall be provided to permit functioning of structures, systems, and components important to safety. . . . The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure. Electric power from the transmission network to the onsite electric distribution system shall be supplied by two physically independent circuits (not necessarily on separate rights of way) designed and located so as to minimize to the extent practical the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. . . . Provisions shall be included to minimize the probability of losing electric power from any of the remaining supplies as a result of, or coincident with, the loss of power generated by the nuclear power unit, the loss of power from the transmission network, or the loss of power from the onsite electric power supplies.
- GDC 18, Inspection and testing of electric power systems, requires, in part, that
[e]lectric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features
- Paragraph 50.65(a)(3) of 10 CFR, Requirements for monitoring the effectiveness of maintenance at nuclear power plants, requires, in part, that
[p]erformance and condition monitoring activities and associated goals and preventive maintenance activities shall be evaluated at least every refueling cycle provided the interval between evaluations does not exceed 24 months. . . .
Adjustments shall be made where necessary to ensure that the objective of preventing failures of structures, systems, and components through maintenance is appropriately balanced against the objective of minimizing unavailability of structures, systems, and components due to monitoring or preventive maintenance.
- Regulatory Guide (RG) 1.6, Independence Between Redundant Standby (Onsite) Power Sources and Between Their Distribution Systems, describes an acceptable degree of independence between redundant standby (onsite) power sources and between their distribution systems.
- RG 1.32, Revision 2, Criteria for Safety-Related Electric Power Systems for Nuclear Power Plants, provides guidance for complying with GDCs 17 and 18 with respect to the design, operation, and testing of safety-related electric power systems of all types of nuclear power plants.
3.0 TECHNICAL EVALUATION
The Class 1E 125 volt (V) DC battery system for each STP unit consists of four independent, physically separate buses, each energized by one of two available battery chargers and one battery. The batteries serve to provide uninterrupted power for systems that maintain protection and control of the nuclear plant when alternating current (AC) power sources are unavailable.
The capacity of the STP batteries is sufficient to provide electrical power for a minimum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to DC controls and to the vital instrumentation and protection system. Once an STP battery is discharged to its design minimum state, the battery chargers are capable of restoring the battery to its fully charged state within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while providing normal steady state-loads.
The Class 1E 125 V DC batteries are of the 59 cell lead-calcium type, assembled in shock-absorbing, clear plastic, sealed containers. The four 125 V DC batteries are located in separate rooms in a seismic Category I building, which inhibits propagation of fire and provides protection against missiles. Additionally, the STP batteries are sized to provide an output at 80 percent of their nameplate rating, which corresponds to the expected capacity at end of life.
The two battery chargers are associated with each of the four 125 V DC buses. The battery chargers are connected to their train-related AC buses. One battery charger is necessary for each of the four channels for operability. Each battery charger is of sufficient size to power the normal steady-state DC loads while providing some minimal over potential to the battery.
TS SRs 4.8.2.2.c and 4.8.2.3.f prescribe the conditions when a battery service test or modified performance discharge test must be performed. The purpose of the battery service test prescribed by SR 4.8.2.2.c is to test a batterys capability, as found, to satisfy the design requirements (i.e., the battery duty cycle) of the DC electrical power system. The battery performance discharge test prescribed by SR 4.8.2.3.f is a test of constant current capacity of a battery, normally done in the as-found condition, to detect any change in the capacity. The performance discharge test is intended to determine overall battery degradation due to age and usage. Either the battery performance discharge test or the modified performance discharge test is acceptable for satisfying SR 4.8.2.3.f. A modified discharge test is a test of the battery capacity and its ability to provide a high rate, short duration load (usually the highest rate of the duty cycle). This will confirm the battery's ability to meet the critical period of the load duty cycle, in addition to determining its percentage of rated capacity. Initial conditions for the modified performance discharge test should be identical to those specified for a service test.
Therefore, note 4.8.2.1.2 referencing a test in SR 4.8.2.3.f is acceptable.
The existing STP TS require that SRs 4.8.2.2.c and 4.8.2.3.f be performed during shutdown.
The licensee is proposing to remove this restriction to allow performance of the SRs while STP is operating. The proposed change would also create new SR 4.8.2.1.c.2 to address the ability to perform the service or modified performance test while in MODES 1, 2, 3, and 4. Therefore, deletion of the mode restriction in SRs 4.8.2.2.c and 4.8.2.3.f is acceptable.
In Amendments 179 and 166 for STP Units 1 and 2, respectively, dated July 13, 2007, the NRC staff approved a methodology proposed by the Nuclear Energy Institute (NEI) to support the licensees adoption of risk-informed technical specifications. The NRC staff approved the methodology documented in NEI 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines, Industry Guidance Document, on May 17, 2007. The guidance ensures defense-in-depth by requiring preservation of existing balance between avoidance of core damage, avoidance of containment failure, and consequence mitigation by ensuring that the TS allowed outage times are based on cumulative risk associated with the current plant configuration. The licensees configuration risk management program (CRMP), in conjunction with the probabilistic risk assessment (PRA),
measures and accounts for the level of defense-in-depth on both instantaneous and cumulative
basis. Thus, the application of CRMP and PRA provides the operators a structure to assist the operators in identifying effective compensatory actions for various plant maintenance configurations to maintain and manage adequate defense-in-depth. The approval of the license Amendments 179 and 166 permitted the licensee to extend the TS allowed outage times up to 30 days.
The licensee is typically limited to a 2-hour TS allowable outage time for an inoperable battery bank. However, as discussed above, this allowable outage time could potentially be extended based on the results of the licensees CRMP and PRA analysis. Provided that the licensees CRMP and PRA analysis allows a sufficient outage time extension, the licensee could remove a battery bank from service for longer than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, for testing purposes. The licensee stated that battery discharge testing typically takes approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This includes time needed to restore the battery bank to OPERABLE status.
Furthermore, as discussed above, the licensee must implement the compensatory measures during the extended period that a safety-related battery is inoperable for elective maintenance.
Implementation of these compensatory measures will ensure that adequate defense-in-depth is maintained to provide adequate protection of health and safety of the public.
Based on the above evaluation, the NRC staff finds that removing the MODE restrictions for SRs 4.8.2.2.c and 4.8.2.3.f, and creating new SR 4.8.2.1.c.2 to address the ability to perform the service or modified performance test while in MODES 1, 2, 3, and 4, is acceptable.
Therefore, the NRC staff concludes that the proposed revisions to the STP TS provide reasonable assurance of the continued availability of the required DC power to shut down the reactors and to maintain the reactors in a safe condition after an anticipated operational occurrence or a postulated design-basis accident. The staff also concludes that the proposed TS changes are in accordance with 10 CFR 50.36, 10 CFR 50.65, and the requirements of GDCs 17 and 18. Therefore, the staff finds the proposed changes acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on February 12, 2008 (73 FR 8072). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: M. McConnell Date: June 30, 2008