|
---|
Category:Letter
MONTHYEARIR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 2024-09-04
[Table view] Category:License-Operator
MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23254A2012023-08-0909 August 2023 07-Public Forms ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis ML20079L7832020-03-19019 March 2020 Operator Licensing Examination Schedule NOC-AE-20003719, Operator Licensing Examination Schedule2020-03-19019 March 2020 Operator Licensing Examination Schedule ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18309A3512018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2019301 and 05000499/2019301 NOC-AE-18003562, Operator Licensing Examination Schedule - NRC Form 5362018-04-10010 April 2018 Operator Licensing Examination Schedule - NRC Form 536 ML18100A6652018-04-10010 April 2018 Project Units 1 & 2 - Operator Licensing Exam Schedule, Per NRC Regulatory Issue Summary 2018-02 2024-09-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test NOC-AE-20003719, Operator Licensing Examination Schedule2020-03-19019 March 2020 Operator Licensing Examination Schedule ML20079L7832020-03-19019 March 2020 Operator Licensing Examination Schedule ML18309A3512018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2019301 and 05000499/2019301 NOC-AE-18003562, Operator Licensing Examination Schedule - NRC Form 5362018-04-10010 April 2018 Operator Licensing Examination Schedule - NRC Form 536 ML18100A6652018-04-10010 April 2018 Project Units 1 & 2 - Operator Licensing Exam Schedule, Per NRC Regulatory Issue Summary 2018-02 ML18029A1572018-01-29029 January 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2018301 and 05000499/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 IR 05000498/20173012017-12-13013 December 2017 NRC Initial Operator Licensing Examination Report 05000498/2017301 and 05000499/2017301 ML17319A7072017-10-0909 October 2017 09 Draft Outlines 2024-09-23
[Table view] |
See also: IR 05000498/2018301
Text
January 29, 2018
Mr. G. T. Powell Executive Vice President and CNO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000498/2018301 AND 05000499/2018301
Dear Mr. Powell:
In a telephone conversation on January 11, 2018, between Ms. Melissa Ripple, Lead
Regulatory Exam Author, and Mr. John Kirkland, Chief Examiner, arrangements were made for
the administration of operator licensing examinations at South Texas Project Electric Generating Station, Units 1 and 2, during the weeks of October 22 and October 29, 2018.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 of NUREG-1021, "O
perator Licensing Examination Standards for Power Reactors." The Nuclear Regulatory Commission's (NRC's) regional office will discuss
with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by May 25, 2018. The written examination outline was provided to your staff on January 11, 2018. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by August 8, 2018. Pursuant to
Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests
before they are submitted to the NRC for review and approval. All materials shall be complete
and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be cancelled or rescheduled. In addition, your support for on-site
validation of the examinations is required during the week of September 17, 2018.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests along with any video and audio
G. Powell 2 recordings of the dynamic operating tests until the NRC takes its licensing action on all of the applications and any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. Kirkland should be contacted to determine the method for submission of the waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and, medical certifications
(OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the
examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the
first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when Mr. Kirkland is contacted to determine the method for submission). The
NRC's final decision on whether to grant a waiver or excusal will be documented on the final
(not preliminary) NRC Form 398 submitted for the applicant and will not be provided until the final application is submitted to the NRC.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management
and Budget, approval number 3150-0018.
The burden to the public for these [mandatory information collections is estimated to average
400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination including the time for re
viewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. You may submit comments on any aspect of the information collection, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO
V; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
G. Powell 3 In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter and its enclosures will be
available electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Ms. Ripple has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact John Kirkland at 817-200-1771
or me at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
cc: Electronic Distribution
ML18029A157 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JKirkland Yes No Publicly Available Sensitive NRC-002 OFFICE SOE: OB C: OB NAME JKirkland VGaddy SIGNATURE /RA/ /RA/ DATE 1/24/18 1/29/18