ML18100A665

From kanterella
Jump to navigation Jump to search
Operator Licensing Exam Schedule, Per NRC Regulatory Issue Summary 2018-02
ML18100A665
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/10/2018
From: Curry H
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-18003562, RIS-18-002, STI: 34651969
Download: ML18100A665 (3)


Text

Nuclear Operating Company

">>~s~"

South Texas Project Electric Generating Station HO. Box 289 Wadsimlh, Texas 77483 April10,2018 NOC-AE-18003562 File No. G30 10 CFR 55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 South Texas Project Units land 2 Docket Nos. STN 50-498; STN 50-499 Operator Licensing Examination Schedule

Reference:

NRC Regulatory Issue Summary (RIS) 2018-02 STP Nuclear Operating Company is submitting the attached response to RIS 2018-02.

There are no commitments in this letter.

If you have any questions, please contact me at (361) 972-7327 or Mr. Adrian Culver at (361) 972-8604.

lenryT. Curr Manager, Operations Training

Attachment:

NRC Form 536 STI:34651969

NOC-AE-18003562 Page 2 of 2 cc:

(paper copy)

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (O8H04) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 (electronic copy)

Morgan, Lewis & Bockius LLP Paul Bessette U.S. Nuclear Regulatory Commission Lisa M. Regner Jennifer Bridges Kelly Clayton NRG South Texas LP Kevin Malcarney Jim von Suskil Skip Zahn CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock City of Austin William Sweeney John Wester Texas Dept. of State Health Services Robert Free

iRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION (11-2017) ^nfl^

f^rfl OPERATOR LICENSING

^V/ EXAMINATION DATA

"^'y APPROVED BY 0MB: N0.3150-0131 EXPIRES: 11/30/202C EsUmated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thi; information collection is used to plan budgets and resources for operator examinations. Send commenti regarding burden estimate to the information Services Branch fT-2 F43), U.S. Nuclear Regulator; Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office o Management and Budget, Washington, DC 20503. If a means used to impose an information collectior does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and £ person is not required to respond to, the information collection.

FACILITY SOUTH TEXAS PROJECT NRC REGION IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 2020 1

0 CY 2021 1

0 CY 2022 1

0 CY 2023 1

0

3. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS IUMBER OF SENIOR REACTORl OPERATORS - INSTANT UMBER OF SENIOR REACTORl OPERATORS - UPGRADE UMBER OF SENIOR REACTORl OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2020 8

13 3

0 7/13/20 8/10/20 CY 2021 8

11 2

0 7/12/21 8/9/21 CY 2022 10 6

2 0

7/25/22 8/22/22 CY 2023 6

6 3

0 7/24/23 8/21/23 NRC FORM 536 (11-2017)