MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23254A2012023-08-0909 August 2023 07-Public Forms ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test 2024-09-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis 2024-09-23
[Table view] |
Text
ST P 2021-0 7 Draft Operating T est Comments
NOTE: This summary is being provided in lieu of Form 301 -7, Operating Test Review Worksheet, because the operating test was NRC-developed. Comments reflect exam validation.
ALL Scenarios - include a scenario summary at the beginning, where the scenario objectives are.
Scenario 1 (100% BOL):
- 1. D1 - Event 8 add (LOCA O/S CTMT) for clarity.
- 2. Event 1 - Add steps for RCS boration and turbine load reduction.
- 3. Turnover sheet: explicitly direct the Primary Operator to perform the boration and the Secondary Operator to perform turbine load reduction.
- 4. Event 3 - all actions should be credited to BOP, not RO.
- 5. Event 3 - page 11 of 44, BOP stops battery room exh fan 11A not 11C.
- 6. Event 8 - page 26 -Unbold actions to Ensure SI-MOV-1B CLOSED and RESET cmtmt spray auto act train B - these are not CRITICAL.
- 7. Critical Task 3 - change acceptance criteria to PRIOR TO COMPLETING FR-Z1.
Because EO00 doesnt explicitly direct manually initiating CS.
Scenario 3 (98 % BOL):
- 1. D-1 -Event 4 remove credit from the BOP for NI CH 41 failure RO event only.
- 2. Event 1 - include guidance in turnover sheet for Primary Operator to perform dilution and secondary operator to increase turbine load.
- 3. Event 8 page 25 - there are more steps that are performed than what is documented.
Include.
- 4. CT-52 page 28 - CT bounding criteria I wrote down that validator also opened MOV-025. Also, revise last part of NOTE to say or emergency boration can occur until RCS boron concentration is > 2800 ppm
- 5. D-1 Event 5 -remove verbiage that local action required to trip RTB -not correct.
Scenario 4 (Intermediate Range MOL)
- 1. D-1: event 2, credit to BOP, not RO.
- 2. D-1: event 5, replace with RO event, CCP breaker overcurrent trip, also TRM call.
- 3. Event 1 - specify SUR limit is 0.5 DPM.
- 4. Event 4 - page 14, tech spec call, add that If crew attempts to close C AFW OCIV MOV-0085, it will not close and SRO would be expected to enter TS 3.6.3.a because it will be identified as INOP.
- 5. CT-11, pg 26 Close CV-MOV-0079
- 6. CT page 30 Reduce at least 2 steam generator PORV or Steam Dump setpoints < 1000 psig within 45 minutes of initiation of the SBLOCA. Currently says between 990 and 1000 psig I believe that less than or equal to 1000 psig is sufficient if they go less than 990 it would be a performance deficiency but not a CT failure I believe
Scenario 5 (85% BOL):
- 1. Event 1, dilution to Primary, turbine increase to Secondary.
- 2. Turnover sheet: explicitly direct the Primary Operator to perform the dilution and the Secondary Operator to perform turbine load increase.
- 3. Event 3 tech specs, page 15 use 2015 format for full documentation.
- 4. Event 6 page 26, delete comment that RCS Tave will be trending down but MSIVs are closed
- 5. Addendum 5 page 34, document Fan #s to be manipulated.
JPM S1:
- 1. After alternate path begins, another operator will acknowledge further alarms.
JPM S-2:
- 1. Task standard: DELETE or exceeding the TS limit of 9100 gallons as its redundant to the HI alarm.
- 2. JPM step 1: include in initial condition to student 0PSP03 -RC-0006 RCS Inventory is NOT in progress.
- 3. Per discussion on validation, Revert to Unit 1 for this JPM. Due to the T-MOD for lower accumulator pressure in Unit 1 not being modeled in the simulator (but incorporated into the procedure), applicant should use UNIT 2 value for accumulator pressure in step 5.8.
On procedure handout, One line out and initial Unit 1 value in Step 5.8, as a US or SM would do. Include instruction in handout to use UNIT 2 values for accumulator pressure only. Note in initiating cue says temporary mode instead of Mod.
JPM S-3:
- 1. Add to task standard, CCW Pump 1A has been secured before surge tank level = 0%
JPM S-4:
- 1. No comments at this time.
JPM S-5:
- 1. Validation time = 5 min
JPM S-6:
- 1. No comments at this time.
JPM S-7:
- 1. Task standard: delete reference to tripping pzr backup heaters, add that should attempt to manually close 655C FIRST.
- 2. Step 1 standard, should be RC-PCV-0655B? or is C correct?
- 3. Examiner cue at end of JPM (and before step 1), revise to another operator will perform EO00 and instruct the Operator to continue with the procedure in effect.
- 4. Initiating Cue: you are directed to procedurally respond to alarms JPM S-8:
JPM P-1:
- 1. Add a second picture for closed breakers
JPM P-2:
- 1. Step 2, in cue, add Another operator will perform Alarm Response Procedure, continue with checklist.
- 2. Step 3 - put the examiner cues after each bulleted light to be checked. Give a position, dont document as you see it. Master Trip Circuit reset amber light was OFF in plant when we validated. Bold the DG AVAILABLE FOR EMERGENCY verbiage. Just trying to make the read through of this flow better.
- 3. Step 4 - The procedure says ensure the applicant shouldnt n eed to be cued by the US to reset the Field Ground Dev 64F. At most, US should say Implement procedure as written.
- 4. Step 4 -add cue after flag reset on FIELD GROUND DEV 64F, flag is now black.
JPM P-3:
- 1. Step 5 cue, the applicant should himself find FC-0011B, and demonstrate how he would open it. Then examiner inform applicant that another operator reports gauge FC-FI-1408 now indicates 9.
- 2. Step 5 cue: Delete the verbiage Instruct operator to locate gauges first and Now instruct operator to locate valves adding that Examiner should not be instructing the applicant to do this, they should do this per the procedural direction. Also replace Ensure the operator with After the operator.
3.
JPM A-1:
- 1. Step 5: DELETE note from standard that operator may state it is not possible to determine SAT or UNSAT.
JPM A-2:
- 1. Task standard: The applicant must successfully identify that N44L should be 424.5, accurately re-calculate the QPTR to at least 2 decimal places in accordance with key, and
- 2. Step 1 standard should say NI-44
- 3. Step 2 standard should include Sum IL -4.072 and Avg IL - 1.018.
JPM A-3:
- 1. Task standard, add note to AFW Pump 11: (position: none reqd for caution, required for danger)
JPM A-4:
JPM A-5:
- 1. Create a 2nd cue sheet to be given to applicant direting to determine any applicable tech specs, if they answer unacceptable. Initating cue sheet #2 doesnt need to repeat the same verbiage from cue sheet 1 -it will be confusing.
- 2. Task standard: SDM calc is in error due to 2 RCCA INOP vice 1, calculates correct SDM = -241 pcm. In accordance with the key.
- 3. Step 6 note: 2nd cue sheet for TS applicability only in applicant determines surveillance is Unacceptable.
JPM A-6:
- 1. Task standard: and calculates the correct as-found and as-left difference IAW key.
Delete rest of 1st paragraph. Include more detail about tech spec call in second paragraph, functional unit, action statement. Include Functions 2 & 3, Action 2a. in task standard.
- 2. Step 1 cue: but doesnt know whether data sheet 2 or 3 is correct, then inform..
- 3. Step 1 standard calculates correct as-found and as-left difference per key.
JPM A-7:
- 1. Task standard With 2AF-0040 NOT closed, Train A AFW is INOPERABLE per TS 3.7.1.2 ACTION A.
JPM A-8:
JPM A-9:
- 1. No comments at this time.
OTHER COMMENTS