|
---|
Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] Category:License-Operator
MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23254A2012023-08-0909 August 2023 07-Public Forms ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test 2024-09-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis 2024-09-23
[Table view] |
Text
~..... Attachment 3 - Withhold from Public Nuclear Operating C om pany Disclosure Under 10 CFR 2.390
-- - ~ South 'lex3s Project Electric Generating Station P.Q Box 289 Wadsworth, 7eKas 77483 ------ ---- - ~vvv,..,....-
August 10, 2021 NOC-AE-21003829 10 CFR 55 10 CFR 2.390(a)(8)
File No.: 043.02
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511
South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Post-Examination Material
This letter provides Post-Examination Materials for the NRC License Examination that was administered on July 12, 2021, through July 29, 2021, at South Texas Project (STP), in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors.
STP Nuclear Operating Company requests the NRC consider Attachment 3 to this letter as Exempt from Public Disclosure. None of the exam materials are to go to the Public Document Room (ADAMS) for at least two years.
There are no commitments in this letter.
The following Post-Examination material is being sent:
- 1. Form ES-403-1, Written Examination Grading Quality Checklist (Signed Paper Copy)
- 2. Written examination cover sheet with the original graded answer sheet and 1 clean copy of the answer sheet for each examinee. (Paper Copy)
- 3. CD-ROM-1, that includes the following electronic files:
- LOT 25 NRC Simulator Scenarios
- LOT 25 NRC Written Exam Analysis
- LOT 25 NRC Written Exam Applicant Comments After Exam
- LOT 25 NRC Written Exam Question Challenges by STP
- LOT 25 NRC Written Exam Questions and Clarifications During Exam
- LOT 25 NRC Written Exam Seating Arrangement
The completed ES-201-3, Examination Security Agreement, will be forwarded to you as soon as possible.
STI: 35199592 Attachment 3 - Withhold from Public Disclosure Under 10 CFR 2.390 - Withhold from Public Disclosure Under 10 CFR 2.390 NOC-AE-21003829 Page2 of 3
If you have any questions, please contact Stan Mason at (361) 972-4356 or me at (361) 972-7327.
o by Simpson, Jr.
Manager, Operations Training
Attachments: 1. ES-403-1, Written Examination Grading Quality Checklist (Signed Paper Copy)
- 2. Written examination cover sheet with the original graded answer sheet and 1 clean copy of the answer sheet for each examinee. (Paper Copy)
- 3. CD-ROM with Post-Exam Information
Attachment 3 - Withhold from Public Disclosure Under 1 0 CFR 2.390 - Withhold from Public NOC-AE-21003829 Disclosure Under 10 CFR 2.390 Page 3 of 3
cc:
Thomas Farina Chief Examiner U. S. Nuclear Regulatory Commission 1600 E. Lamar Blvd.
Arlington, TX 76011-4511
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
RMS without Attachments 2 or 3
Attachment 3 - Withhold from Public Disclosure Under 10 CFR 2.390