Letter Sequence RAI |
---|
|
|
MONTHYEARLIC-13-0146, Exigent License Amendment Request 13-08 Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment2013-10-0606 October 2013 Exigent License Amendment Request 13-08 Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment Project stage: Request ML13280A0892013-10-0808 October 2013 FRN, Exigent Local Proposed Notice of Consideration of Issuance of Amendment, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks Project stage: Other ML13280A0572013-10-0808 October 2013 Letter, Exigent Local Proposed Notice of Consideration of Issuance of Amendment, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks Project stage: Other ML13290A0022013-10-0909 October 2013 Request for Additional Information Email, License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks Project stage: RAI ML13290A0922013-10-15015 October 2013 LAR Comments - License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks Project stage: Request LIC-13-0148, Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment2013-10-15015 October 2013 Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment Project stage: Response to RAI ML13290A0712013-10-15015 October 2013 LAR Comments - License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks Project stage: Request LIC-13-0149, Supplemental Response to Request for Additional Information (RAI) for Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment2013-10-21021 October 2013 Supplemental Response to Request for Additional Information (RAI) for Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment Project stage: Supplement LIC-13-0152, Supplemental Response to Request for Additional Information (RAI) for Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment2013-10-22022 October 2013 Supplemental Response to Request for Additional Information (RAI) for Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment Project stage: Supplement LIC-13-0155, Supplemental Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containme2013-10-23023 October 2013 Supplemental Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment Project stage: Supplement ML13297A0472013-10-23023 October 2013 NRR E-mail Capture - Ft. Calhoun License Amendment Project stage: Other ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) Project stage: Approval 2013-10-23
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review ML16137A0092016-05-16016 May 2016 NRR E-mail Capture - Acceptance Review CAC No. MF7574 2024-10-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24180A2062024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information ML23151A0042023-06-0606 June 2023 Second Set RAIs Rev 4 ML22357A0672022-12-30030 December 2022 Enclosure RAI Re Approval of License Termination Plan ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review ML20111A2162020-05-20020 May 2020 Revised PSDAR Request for Additional Information - RAI ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML18067A1432018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to M. J. Fisher Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station ISFSI) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17067A3862017-03-15015 March 2017 Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16263A0492016-09-20020 September 2016 Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML16174A1502016-06-27027 June 2016 Request for Additional Information, Relief Request, Use of Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML16146A1782016-05-27027 May 2016 Request for Additional Information, Round 2, Request to Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16106A0232016-04-29029 April 2016 Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML16104A2872016-04-25025 April 2016 Request for Additional Information, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16048A1542016-02-23023 February 2016 Request for Additional Information, License Amendment Request, Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16048A0242016-02-23023 February 2016 Request for Additional Information, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15343A1082015-12-15015 December 2015 Request for Additional Information, License Amendment Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15323A0362015-11-24024 November 2015 Request for Additional Information, Relief Requests P-1 - LPSI and CS Pumps and P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21, Fifth 10-Year Inservice Testing Interval ML15194A2722015-07-14014 July 2015 Request for Additional Information, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15057A0152015-03-0303 March 2015 Request for Additional Information, Materials Reliability Program (MRP)-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines, Implementation Review ML15043A0612015-02-25025 February 2015 Request for Additional Information, Round 2, License Amendment Request to Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML14353A0512014-12-22022 December 2014 Request for Additional Information, Request to Revise Updated Safety Analysis Report, Design and Evaluation of Seismic Class I Structures Using Ascm (Alternate Seismic Criteria and Methodologies) Developed Floor Response Spectra ML14259A3652014-09-24024 September 2014 Request for Additional Information, License Amendment Request to Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML14195A0862014-07-16016 July 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML13317A5832013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13290A0022013-10-0909 October 2013 Request for Additional Information Email, License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks ML13282A5362013-10-0909 October 2013 Request for Additional Information Email, Round 2, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML13261A2122013-09-18018 September 2013 Request for Additional Information Email, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) ML13233A2482013-08-26026 August 2013 Supplemental Information Needed for Acceptance of Requested Licensing Action; Request for Exemption, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage in Lieu of 10 CFR 26.205(d)(7) ML13235A1682013-08-23023 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13234A4352013-08-22022 August 2013 Request for Additional Information Email, Round 2, Request to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem. or Component Due to Inoperable Power Source ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML13212A0092013-07-30030 July 2013 Request for Additional Information Email, Request to Revise Technical Specification (TS) 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML13205A1252013-07-24024 July 2013 Request for Additional Information Email Round 2, Exigent Amendment Request to Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact ML13205A0182013-07-23023 July 2013 Request for Additional Information Email, Exigent License Amendment Request to Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact ML13144A4822013-05-23023 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13100A1752013-04-10010 April 2013 Request for Additional Information Email, Request for One-Time Exemption from Requirements of 10 CFR 26.205(d)(7) to Allow Less Restrictive Working Hour Limitations to Support Activities for Plant Startup ML13086A4732013-03-27027 March 2013 Request for Additional Information Email, Request to Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13120A0842013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) 2024-09-12
[Table view] |
Text
From:Sebrosky, Joseph To: bhansher@oppd.com; medwards@oppd.com Cc:Wilkins, Lynnea; McMurtray, Anthony; Tsirigotis, Alexander; Davidson, Evan; Burkhardt, Janet; Hay, Michael
- Josey, Jeffrey; Wingebach, Jacob; Kirkland, John; Taylor, Nick
Subject:
Request for Additional Information Associated with Fort Calhoun High Energy Line Break License AmendmentRequest (MF2869)
Date:Wednesday, October 09, 2013 3:35:14 PMMr. Hansher,By letter dated October 6, 2013 (Agencywide Documents Access and ManagementSystem (ADAMS) Accession No. ML13280A089) Omaha Public Power District (the licensee) submitted for Nuclear Regulatory Commission (NRC) approval a license amendment request that would revise the Fort Calhoun Station Updated Safety Analysis Report for pipe break criteria for high energy piping outside of containment.
The proposedamendment would allow the use of U.S. Nuclear Regulatory Commission guidance provided in Branch Technical Position Mechanical Engineering Branch 3-1 Revision 2, which allows for the exemption of specific piping sections from postulated failures if certain criteria are met.
Based on a review of the submittal, the NRC staff has determined that the following additional information (RAIs) are required in order to complete its review.
The request foradditional information was discussed with you on October 9, 2013. It was agreed that aresponse to these RAIs would be provided by October 15, 2013.
Should the NRCdetermine that these RAIs are no longer necessary prior to the scheduled date, the request will be withdrawn.
If circumstances result in the need to revise the requestedresponse date, please contact me at (301) 415-1132 or via e-mail at
joseph.sebrosky@nrc.gov
. The NRC staff has determined that no security-related orproprietary information is contained herein.
Sincerely,
Joe Sebrosky Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing
joseph.sebrosky@nrc.gov301-415-1132
Request for additional information (RAI) for Fort Calhoun's Station (FCS) ExigentLicense Amendment Request (LAR) To ReviseCurrent Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment
Mechanical and Civil Engineering Branch (EMCB)-RAI-1
To exclude postulating high energy (HE) piping breaks (HELBs) and cracks (HELCs) in piping other than class 1 piping outside containment that are required in the stations current licensing basis (CLB), the proposed LAR requests approval to incorporate, in thestation's current LB, criteria from selected sections of SRP MEB 3-1, Rev 2 for selectedsections of piping systems. According to the proposed LAR, pipe stress analysis required to support MEB 3-1, Rev 2 HELB and HELC stress threshold evaluations will be performed in accordance with the criteria of ASME Section III 1986 edition, which is the code of reference in MEB 3-1, Rev 2. FCS's CLB for HELB and HELC is based on the Atomic Energy Commission (AEC) letter from A. Giambusso to applicants and licensees dated in December, 1972.
The licensee is requested to confirm that when using the stress criteria of the 1986 ASME Section III, the analyses will utilize the material allowable values from the original code of construction for subject piping.
EMCB-RAI-2
Verify that stresses developed in the pipe pressure boundary wall due to integral welded attachments (IWA) shall be added to the code stress equations. In addition, describe the methodology to address IWAs and whether this methodology is included in the station's current design basis (CDB).
EMCB-RAI-3
Verify that pipe stress analysis loadings includes seismic loads and safety relief valve loads along with any other applicable loads from the station's CDB for normal and upset (level A and level B) operating conditions.
EMCB-RAI-4
MEB 3-1, Rev 2 provides a definition for a terminal end. Neither the Giambusso letter nor the FCS's licensing basis provide a specific definition for terminal end. MEB 3-1, Rev 2, defines that for piping which is maintained pressurized during normal plant conditions for only a portion of the run up to a closed valve, a terminal end is the piping connection to the closed valve and, therefore, a break postulation is required at that location. The SRP is specific on this item, see MEB 3-1 Rev 2 last sentence in footnote 3.
To exclude a breakin such a location, described above, the proposed LAR on page seven proposes that this location is not a terminal end based on the terminal end definition of ANSI/ANS-58.2-1988, which has been withdrawn by ANS. The staff has reviewed the ANSI/ANS-58.2-1988 terminal end definition and has determined that it does not provide a definition for a terminal end for the situation of partial pipe run pressurization described above by MEB 3-1 Rev 2. The proposed LAR requests to utilize the MEB 3-1 to exclude breaks required by the CLB. The staff requests that the licensee properly implement MEB 3-1 and postulate a terminal end HELB for this type of situation as described above.
EMCB-RAI-5
The licensee is requested to consider including MEB 3-1, Rev 2 footnote 3 in the proposed
LAR. This will provide a clear definition of a terminal end and, thus, avoid complications indetermining terminal ends.
EMCB-RAI-6
The proposed LAR requests to add to the CLB MEB 3-1, Rev 2 Section B.1.c(3), which states:
Breaks in seismically analyzed non-ASME Class piping are postulated according to the same criteria as for ASME Class 2 and 3 piping above.
The licensee is requested to incorporate the intent of Footnote 4 which is part of Section B.1.c(3) or provide a justification and basis for omitting it.
EMCB-RAI-7
The proposed LAR requests to add to the CLB MEB 3-1, Rev 2 Section B.3.c(1) to eliminate HELCs in piping equal to or less than 1 inch. The licensee is requested to include all parts of Section B.3.c or to provide justifications and bases for omitting the remainder parts of Section B.3.c.
EMCB-RAI-8
The proposed LAR requests to add to the CLB MEB 3-1, Rev 2 Section B.1.e(2) to determine HELCs based on stress threshold. The licensee is requested to add Section B.1.e(3) which provides the HELC requirements for nonsafety related non-analyzed piping or for piping that does not include seismic loads in its analysis.
EMCB-RAI-9
The proposed LAR requests to add to the CLB MEB 3-1, Rev 2 Section B.1.c(2) (b)(ii) to determine HELBs based on stress threshold. The licensee is requested to add Section B.1.c(2) in its entirety or provide justifications and bases for omitted parts of Section B.1.c(2).
EMCB-RAI-10
The proposed LAR requests to add to the CLB MEB 3-1, Rev 2 Section B.1.c(2) (b)(ii) and Section B.1.c(3).
The licensee is requested to add Section B.1.c(4) which is applicable toB.1.c(2) and B.1.c(3).
EMCB-RAI-11
The licensee is requested to consider adding to the proposed LAR MEB 3-1, Rev 2 Section B.1.c(5) which is related to the environmental qualification of mechanical and electrical equipment or provide a justification and the basis for omitting this section.
EMCB-RAI-12 Enclosure page 6 section 3, 3rd paragraph, states "The application of Generic Letter 87-11 and the identified sections of BTP MEB 3-1 Revision 2 for specific piping systems-"
Clarify what are the "specific piping systems" to which this sentence applies.
Balance of Plant Branch (SBPB) RAI 1
To ensure clarity in the revised USAR Appendix M the ellipses used in quoted sections ofMEB 3-1 should be removed, and the full paragraph should be included.
SBPB RAI 2
The license amendment request identifies high energy lines as having temperature equal to or greater than 200ºF or pressure greater than 275 psig.
However, USAR Appendix Mstates that high energy lines have design temperature exceeding 200ºF or design pressure exceeding 275 psig.
No revisions to the criteria for determining high energy lines wereindicated in the USAR Appendix M markup included in the license amendment request.
Does the license amendment request modify the criteria used to identify high energy lines at the Fort Calhoun Station?
SBPB RAI 3
The license amendment identifies several modifications that were completed to address weaknesses in the station design with respect to high energy line breaks.
In particular,modifications EC61599 and EC53866 ensure the station can mitigate a high energy line break in Rooms 13 and 19.
Provide a discussion of the methods used to analyze thetemperature and pressure transients in Rooms 13 and 19, how the environmental qualification of equipment in these rooms and communicating spaces is addressed, and the leakage detection capabilities credited in mitigating a high energy line break in these
rooms.
SBPB RAI 4
It is not clear if the license amendment applies to systems such as low pressure safety injection or shutdown cooling.
Clarify whether these systems are within the scope of thehigh energy line break criteria and if they are not provide a basis for their exclusion.