Pages that link to "1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections"
Jump to navigation
Jump to search
The following pages link to 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections:
Displayed 50 items.
- 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests (← links)
- 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) (← links)
- 1CAN030907, Steam Generator Tube Inspection Report - 1R21 (← links)
- 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) (← links)
- 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) (← links)
- 1CAN110702, Inservice Inspection (ISI) Summary Report (← links)
- 1CAN080701, Inservice Inspection (ISI) Summary Report (← links)
- 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (← links)
- NEI 12-06, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- 2CAN021906, Steam Generator Tube Inspection Report (← links)
- RC-18-0128, (Vcsns), Unit 1 - NEI 12-06, Appendix H, Revision 4, H.4.5. Path 5: GMRS ≫ 2X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- JAFP-17-0104, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- SBK-L-17135, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- PLA-7551, Ne 12-06, Appendix H, Revision 2, H.4.3 Path 3: GMRS ≫ SSE ≪ IHS, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection (← links)
- 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R24 (← links)
- 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R23 (← links)
- RS-17-092, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-16-170, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- BSEP 17-0069, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4:GMRS ≪ 2xSSE (← links)
- 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program (← links)
- L-2019-071, Response to Request for Additional Information (RAI} Set 10 Subsequent License Renewal Application Safety Review Requests (← links)
- CNRO-2007-00033, Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination Activities (← links)
- 1CAN030601, Unit 1 Inservice Inspection (ISI) Summary Report (← links)
- W3F1-2016-0028, NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- LR-N16-0142, Special Report 05000272/2016002-00, Pursuant to the Requirements of Technical Specification (TS) 3.3.3.1, Action 23, for the Containment Gaseous Activity Radiation Monitor (1R12A) Inoperable for >7 Days (← links)
- 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program (← links)
- RS-16-084, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- 1CAN080501, License Amendment Request Response to NRC Request for Additional Information on ANO-1 Once Through Steam Generator Inservice Inspection Report (← links)
- LR-N05-0342, Response to Request for Additional Information Regarding Amendment Request to Revise Technical Specification - Emergency Core Cooling Systems Tavg ≪ 350 F, Salem Generating Station - Unit 1 and Unit 2 (← links)
- 2CAN070501, Inservice Inspection (ISI) Summary Report (← links)
- NL-05-0732, Request for Relief from System Hydrostatic Test Requirements for Large Bore (≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, and Flush Lines and Connections (← links)
- ML051520070 (← links)
- 2CAN040501, Unit 2, Steam Generator Plugged Tube Report (← links)
- 2CAN030502, Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 (← links)
- LR-N05-0003, Request for Change to Technical Specifications Emergency Core Cooling Systems Tavg <335 Degrees F, (← links)
- 1CAN080403, Unit 1 - Inservice Inspection (ISI) Summary Report (← links)
- 1CAN080401, Arkansas, Unit 1 - Once Through Steam Generator Inservice Inspection Report (← links)
- CNRO-2004-00026, Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- 1CAN050401, Steam Generator C-3 Report for 1R18 (← links)
- CNRO-2004-00016, Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal Assemblies (← links)
- 1CAN030402, Response to RAI Regarding ANO-1 Steam Generator Tube Inspection Report from 1R17 (← links)
- 2CAN010403, (Ano), Unit 2 - Inservice Inspection (ISI) Summary Report (← links)
- 2CAN040301, Annual Report of Steam Generator Tubing In-service Inspections (← links)
- 1CAN050201, Inservice Inspection (ISI) Summary (← links)
- 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) (← links)
- 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection (← links)
- 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) (← links)
- 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan (← links)
- 1CAN102104, Steam Generator Tube Inspection Report - 1R29 (← links)