Pages that link to "05000423/LER-2019-001"
Jump to navigation
Jump to search
The following pages link to 05000423/LER-2019-001:
Displayed 50 items.
- 05000423/LER-1997-024, Revises Schedule for Commitment Made in LER 97-024-00, Engineeered Safeguards Bldg Monitor Noble Gas Activity Monitor Sensitivity Not Meeting TS Requirements (← links)
- 05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping (← links)
- 05000423/LER-1997-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1 (← links)
- 05000423/LER-1997-026, Forwards LER 97-026-00,documenting Condition That Occurred on 970325.Util Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000423/LER-1996-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment (← links)
- 05000423/LER-1996-048, Provides Commitments Re LER 96-048.Surveillance Procedures Used to Test Load Shed & re-energizing Feature for Both Trains of Charging Sys Pumps Will Be Revised to Conform W/ TS 4.8.1.1.2.g.6 (← links)
- 05000423/LER-1996-026, Forwards LER 96-026-02 Which Documents Condition That Was Determined at Plant,Unit 3 on 960730 (← links)
- 05000423/LER-1997-002, Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-001, Submits Commitments Re LER 97-001-00,documenting Condition Determined at Plant on 970104 (← links)
- 05000423/LER-1996-019, Forwards LER 96-019-01 Documenting Event That Occurred at Millstone Nuclear Power Station Unit 3 on 960627.Util Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-051, Forwards LER 96-051-00 & Util Commitments in Response to Event (← links)
- 05000423/LER-1996-007, Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl (← links)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval (← links)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage (← links)
- 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves (← links)
- IR 05000336/2020002 (← links)
- 05000423/LER-1998-038, Forwards LER 98-038-00 Re Manual Rt Due to High Conductivity in Condensate Sys on 980915.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-037, Forwards LER 98-037-00,re TS 3.0.3 Entry Due to Both SW Trains Declared Inoperable Following Failure of Check Valves Associated with Injection of Sodium Hypochlorite on 980910 & 18.Util Commitments Contained in Attachment 1 to (← links)
- 05000423/LER-1997-021, Provides Clarification of Actions Taken in Completing Commitment Previously Submitted in LER 97-021-00, Defective Design of RSS Expansion Joint Tie Rod Assembly (← links)
- 05000423/LER-1997-030, Provides Revised Schedule for Submittal of LAR as Identified in LER 97-030-00.LAR Was Previously Scheduled to Be Submitted on 970801 & Is Currently Scheduled to Be Submitted by 970831.W/revised Commitments (← links)
- 05000423/LER-1997-039, Forwards LER 97-039-00,documenting Condition Determined at Millstone Unit 3 on 970614.List of Commitments Provided (← links)
- 05000423/LER-1997-038, Forwards LER 97-038-00,documenting Condition Determined at Mnps,Unit 3 on 970613.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1998-043, Forwards LER 98-043-00,re Manual Rt Due to High Conductivity in Condensate Sys.Commitments Made by Util,Encl (← links)
- 05000423/LER-1999-006, Forwards LER 99-006-00,re Failure of Both Reactor Plant Aerated Drains SR Air Driven Sump Pumps During Technical Requirements Manual Surveillance on 990516.Commitments Also Encl (← links)
- 05000423/LER-1998-042, Forwards LER 98-042-00,re Licensing & Design Basis Review of Lpms Which Identified That TS Definition of Acot Was Not Met.Determined Event Reportable on 981020.Special Rept Dtd 980909,is Supplemented.Commitments Included in Att (← links)
- 05000423/LER-1998-041, Forwards LER 98-041-00,re Failure to Enter Action Statement for Inoperable SG Water Level Channel IAW TSs on 981016. Commitments Made by Util Also Encl (← links)
- 05000423/LER-1998-040, Forwards LER 98-040-00,documenting Condition That Was Determined Reportable on 981017.Attachment 1 Contains Commitments Made in Response to Event (← links)
- 05000423/LER-1999-005, Forwards LER 99-005-00,re Failure to Perform Surveillance on RCS Pressurizer Heater Penetration Breakers,Determined Reportable on 990510.Commitments Made,Encl (← links)
- 05000423/LER-1998-039, Forwards LER 98-039-00,documenting Event That Occurred on 981001 at Millstone Unit 3.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-053, Forwards LER 97-053-00,documenting Condition That Was Determined Reportable at Millstone Unit 3 on 971024. Attachment to Ltr Contains Commitments in Response to Event (← links)
- 05000423/LER-1997-009, Forwards Suppl 01 to LER 97-009-00,documenting Addl Conditions to Those Determined Reportable at Millstone Unit 3 on 970123.Commitments Made within Ltr Are Listed in LER 97-009-01.W/o Encl (← links)
- 05000423/LER-1997-050, Forwards LER 97-050-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971017,per 10CFR50.73 (a)(2)(ii)(B).Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000423/LER-1997-052, Forwards LER-97-052-00 Which Documents Event That Occurred at Millstone,Unit 3 on 971014.Commitments Made within Ltr, Encl (← links)
- 05000423/LER-1998-045, Forwards LER 98-045-00,re Rt Due to MSIV Closure During Partial Stroke Testing Due to Solenoid Valve Failure on 981211.Commitments,encl (← links)
- 05000423/LER-1997-051, Forwards LER 97-051-00,documenting Event That Occurred at Plant,Unit 3 on 971007,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted (← links)
- 05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted (← links)
- 05000423/LER-1997-061, Forwards LER 97-061-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 971218.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-044, Forwards LER 98-044-00,re Rt Due to High Differential Pressure Between a & B Condensers on 981111.Util Commitments in Response to Event Contained within Attachment 1 of Ltr (← links)
- 05000423/LER-1997-059, Forwards LER 97-059-00 Which Documents Condition That Was Determined Reportable at Millstone Unit 3 on 971125,per 10CFR50.73(a)(2)(ii)(B).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-058, Forwards LER 97-058-00 Which Documents Condition That Was Determined Reportable at Mnps,Unit 3 on 971122,per 10CFR50.73(a)(2)(i)(B).Commitments Made in Response to Event Also Encl (← links)
- 05000423/LER-1997-057, Forwards LER 97-057-00 Which Documents Condition That Was Determined Reportable at Unit 3 on 971118,per 10CFR50.73(a)(2)(i)(B).Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000423/LER-1996-034, Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl (← links)
- 05000423/LER-1997-036, Forwards LER 97-036-01 Which Documents Conditions That Was Determined Reportable at Facility on 970605,per 10CFR50.73(a)(2)(i)(B) & 10CFR50.73(a)(2)(ii)(B).Commitments in Response to Event Also Encl (← links)
- 05000423/LER-1996-040, Discusses LER 96-040-00, Potential Component Cooling Water Sys Overcooling Due to Loss of Instrument Air Sys Concurrent W/Low Svc Water Inlet Temp. Revised Commitment Provided in Encl (← links)
- 05000423/LER-1997-027, Provides Revised Completion Date for Commitment Submitted within LER 97-027-00 Re Corrective Action Not Met for Trending Valve Leakage.Revised Completion Date Is 970501 (← links)
- 05000423/LER-1997-055, Forwards LER 97-055-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971105.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-056, Forwards LER 97-056-00,documenting Condition That Was Determined Reportable on 971107,per 10CFR50.73(a)(2)(ii)(B). Attachment 1 Contains Commitments Made in Ltr (← links)
- 05000423/LER-1998-004, Forwards LER 98-004-00,re Event Which Occurred at Millstone Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-005, Forwards LER 98-005-00,documenting Condition That Was Determined to Be Reportable at Millstone,Unit 3 on 980116. Commitments Made by Ltr,Listed (← links)
- 05000423/LER-1998-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl (← links)