Pages that link to "05000354/LER-2007-001"
Jump to navigation
Jump to search
The following pages link to 05000354/LER-2007-001:
Displayed 50 items.
- 05000354/LER-2004-008 (← links)
- 05000354/LER-2004-007 (← links)
- 05000354/LER-2004-006 (← links)
- 05000354/LER-2004-005 (← links)
- 05000354/LER-2004-004 (← links)
- 05000354/LER-2004-003 (← links)
- 05000354/LER-2004-002 (← links)
- 05000354/LER-2004-001 (← links)
- 05000354/LER-2003-005 (← links)
- 05000354/LER-2003-004 (← links)
- 05000354/LER-2001-010 (← links)
- 05000354/LER-2001-009 (← links)
- 05000354/LER-2001-006 (← links)
- 05000354/LER-2001-003 (← links)
- 05000354/LER-2001-002 (← links)
- 05000354/LER-2001-001 (← links)
- IR 05000354/2008003 (← links)
- 05000354/LER-2017-001 (← links)
- ML071020149 (redirect page) (← links)
- 05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable (← links)
- 05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up (← links)
- 05000354/LER-1997-008, Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl (← links)
- 05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 (← links)
- 05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed (← links)
- 05000354/LER-1998-006, Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl (← links)
- 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER (← links)
- 05000354/LER-1997-026, Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed (← links)
- 05000354/LER-1998-008, Forwards LER 98-008-00 Re Esfa Automatic Reactor Scram Due to Tt by High Moisture Separator Level,Per Requirements of 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(iv).Commitments,encl (← links)
- 05000354/LER-1988-022, Special Rept 88-006-00:on 880826,HPCI Injection Occurred. Caused by Low Reactor Vessel Level Signal Following Reactor Scram Described in LER 88-022-00.HPCI Injection Nozzle Usage Factor Not Calculated (← links)
- 05000354/LER-1986-074, Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail (← links)
- 05000354/LER-1998-004, Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks (← links)
- 05000354/LER-1989-009, Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded (← links)
- 05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl (← links)
- 05000354/LER-1997-018, Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl (← links)
- 05000354/LER-1998-002, Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl (← links)
- 05000354/LER-1998-001, Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI (← links)
- 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl (← links)
- 05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00 (← links)
- 05000354/LER-1994-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC (← links)
- 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement (← links)
- 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) (← links)
- 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram (← links)
- 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram (← links)
- 05000354/LER-2023-001-02, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable (← links)
- 05000354/LER-2023-001-01, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable (← links)
- 05000354/LER-2023-001, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable (← links)
- 05000354/LER-1922-002, Inoperable Isolation Actuation Instrumentation Caused by Failure to Remove Electrical Jumper (← links)
- 05000354/LER-2022-001, B EDG Inoperable Resulting in a Condition Prohibited by Technical Specifications (← links)
- 05000354/LER-2021-001, Safety Relief Valve (SRV) As-Found Setpoint Failures (← links)
- 05000354/LER-1998-004-03, :on 980522,EDG B Declared Inoperable.Caused by Contamination W/Lubrication Oil in Delivered Fuel Oil. EDG Drained,Cleaned,Refilled & Sampled (← links)