Pages that link to "IR 05000255/1996001"
Jump to navigation
Jump to search
The following pages link to IR 05000255/1996001:
Displayed 33 items.
- ML20217A477 (← links)
- ML20215C523 (← links)
- IR 05000255/1986023 (← links)
- ML20214W189 (← links)
- ML20214U326 (← links)
- ML20214T912 (← links)
- IR 05000255/1986035 (← links)
- PNO-III-87-097A, on 870714,preliminary Review of Incident Determined That Startup Transformer 1-2 Faulted.Cause of Initial Fault Still Under Investigation (← links)
- PNO-III-86-146, on 861212 Unidentified Male Telephoned Bangor,Michigan,Fire Dept & South Haven Tribune Newspaper Threatening to Randomly Shoot at Plant.Law Enforcement Armed Personnel Positioned on Site.No Gunfire Reported (← links)
- ML20211N663 (← links)
- IR 05000255/1987002 (← links)
- IR 05000255/1986016 (← links)
- IR 05000255/1986015 (← links)
- IR 05000255/1985028 (← links)
- PNO-III-87-044C, on 870405,unit Completed Testing Activities at 30% Level & Increased Power at 45% for Further Testing & Review.Power Held at 45% for Repair of Valve in Cooling Tower Sys & Oil Flow in Main Feedwater Pump Bearing (← links)
- PNO-III-87-044B, on 870403,unit Tied to Util Electrical Grid for First Time Since 860519 Reactor Trip.Licensee Began Plant Startup on 870327 But Returned to Cold Shutdown to Replace Failed Nuclear Instrument (← links)
- PNO-III-87-044, on 870326,licensee Formally Requested Region III to Allow Restart of Unit.On 870327,region Issued Confirmatoru Action Ltr Permitting Restart & Power Ascension Program.Instrument Channel Malfunctioned During Preparation (← links)
- PNO-III-87-044A, on 870327,after Attempted Critical Approach, Plant Taken Back to Cold Shutdown to Replace Nuclear Instrument Detector Which Did Not Indicate Properly.Work Should Be Completed by 870401 (← links)
- PNO-III-83-098A, on 831116 Licensee Informed That eddy-current Exam of All Tubes in Both SG Using New High Sensitivity Probe W/Continued Identification of Crack Indications Essentially Completed (← links)
- PNO-III-86-049A, on 860519,reactor Trip Occurred Resulting in Multiple Equipment Failures Which Hindered Operator Response Due to Previous Equipment Problems.Augmented Investigation Team Completed Review on 860525 (← links)
- IR 05000255/1982017 (← links)
- IR 05000255/1993020 (← links)
- ML20059G207 (← links)
- IR 05000255/1993030 (← links)
- IR 05000255/1993025 (← links)
- IR 05000155/1990020 (← links)
- IR 05000255/1993001 (← links)
- IR 05000255/1993027 (← links)
- IR 05000255/1993005 (← links)
- IR 05000255/1993018 (← links)
- IR 05000255/1990016 (← links)
- IR 05000255/1982015 (← links)
- PNO-III-82-065, on 820711,operator Discovered Smoke Emanating from B Cooling Tower Pump Motor & on 820710,A Cooling Tower Pump Taken Out of Svc Due to Bearing Problems.Repairs Expected to Take at Least 30 Days (← links)