{{#Wiki_filter:Perform a Local Reactor Trip IP-104 1  TASK TITLE:
{{#Wiki_filter:Perform a Local Reactor Trip IP-104 1  TASK TITLE:
Perform a Local Reactor Trip JPM No.: IP-104 REV: NRC 2014 TPO No.: 4.D.FR-01 K&A No.: 029000G2.1.20  TASK No.:
Perform a Local Reactor Trip JPM No.: IP-104 REV: NRC 2014 TPO No.: 4.D.FR-01 K&A No.: 029000G2.1.20  TASK No.: R-FR-018, Respond to an ATWS K&A IMP: 4.6/4.6 EXAMINE E:  RO  SRO (Circle One)
R-FR-018, Respond to an ATWS K&A IMP: 4.6/4.6 EXAMINEE:  RO  SRO (Circle One)
EVALUATOR:
EVALUATOR:
DATE:
DATE:
The Examinee:
The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 3, 4 (Bold closed bullet only)
  (*) 3, 4 (Bold closed bullet only)
APPROX COMPLETION TIME:
APPROX COMPLETION TIME:
6 MINUTES CRITICAL TIME:
6 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD:
N/A EVALUATION METHOD:
LOCATION:
LOCATION:       PERFORM  X  IN PLANT    X  SIMULATE      SIMULATOR GENERAL  
PERFORM  X  IN PLANT    X  SIMULATE      SIMULATOR
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 58: Line 52:
-1(2) reactor trip switchgear panel.
-1(2) reactor trip switchgear panel.
Hand the student a copy of 1(2)BwFR-S.1, step 6 and proceed to Unit 1(2) Reactor Trip Switchgear Panel (1(2)
Hand the student a copy of 1(2)BwFR-S.1, step 6 and proceed to Unit 1(2) Reactor Trip Switchgear Panel (1(2)
RD05E) at U-1 (2) MEER elev 451'. SAT    UNSAT      N/A Comments:
RD05E) at U-1 (2) MEER elev 451'. SAT    UNSAT      N/A Comments: 2. Attempt to open reactor trip breakers locally.
: 2. Attempt to open reactor trip breakers locally.
CUE: When examinee indicates that they would open the RTA or RTB door show them picture of page 6. Manual trip buttons for Rx Trip Breakers are depressed. Breakers did not open.
CUE: When examinee indicates that they would open the RTA or RTB door show them picture of page 6. Manual trip buttons for Rx Trip Breakers are depressed. Breakers did not open.
When examinee indicates that they would open the BYA or BY B door show them picture of page 7
When examinee indicates that they would open the BYA or BY B door show them picture of page 7. Manual trip buttons for Rx Trip Bypass Breakers are depressed (breakers are racked out.)
. Manual trip buttons for Rx Trip Bypass Breakers are depressed (breakers are racked out.)
Attempt to open reactor trip breakers locally as follows:
Attempt to open reactor trip breakers locally as follows:
DEPRESS switchgear manual TRIP buttons for Reactor Trip Breakers A and B. o DEPRESS switchgear manual TRIP buttons for Reactor Trip Bypass Breakers A and B.
DEPRESS switchgear manual TRIP buttons for Reactor Trip Breakers A and B. o DEPRESS switchgear manual TRIP buttons for Reactor Trip Bypass Breakers A and B.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: ***Alternate Path Begins Here****
***Alternate Path Begins Here****


Perform a Local Reactor Trip IP-104 3 Note: During the performance of JPM step 3 and 4, opening of one breaker (motor or generator) per MG set will meet the requirements of the Critical Step.
Perform a Local Reactor Trip IP-104 3 Note: During the performance of JPM step 3 and 4, opening of one breaker (motor or generator) per MG set will meet the requirements of the Critical Step.
Line 72: Line 63:


CUE: As switches are simulated being placed in pull out, cue that they are in pull out.
CUE: As switches are simulated being placed in pull out, cue that they are in pull out.
De-energize 1(2)A MG set by opening at least one breaker on the 1(2)A MG set as follows:  PLACE the 1(2)A Rod Drive MG Set Generator Output brkr control switch and/or the 1(2)A Rod Drive MG Set Motor brkr control switch in PULL OUT. SAT    UNSAT      N/A Comments:
De-energize 1(2)A MG set by opening at least one breaker on the 1(2)A MG set as follows:  PLACE the 1(2)A Rod Drive MG Set Generator Output brkr control switch and/or the 1(2)A Rod Drive MG Set Motor brkr control switch in PULL OUT. SAT    UNSAT      N/A Comments: *4. Locally shutdown the 1(2)B MG set. CUE: As switches are simulated being placed in pull out, cue that they are in pull out.  
*4. Locally shutdown the 1(2)B MG set. CUE: As switches are simulated being placed in pull out, cue that they are in pull out.  


Upon successful completion of this step, provide cue of announcement over page "Unit 1(2) Reactor Trip."  De-energize 1(2)B MG set by opening at least one breaker on the 1(2)B MG set as follows:
Upon successful completion of this step, provide cue of announcement over page "Unit 1(2) Reactor Trip."  De-energize 1(2)B MG set by opening at least one breaker on the 1(2)B MG set as follows:
Line 79: Line 69:


PULL OUT. SAT    UNSAT      N/A Comments:
PULL OUT. SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME
RECORD STOP TIME
:
:
COMMENTS:
COMMENTS:


Perform a Local Reactor Trip IP-104 4 Perform a Local Reactor Trip IP-104 5 Perform Local Reset of Containment Isolation Phase A IP-206 6 TASK TITLE:
Perform a Local Reactor Trip IP-104 4 Perform a Local Reactor Trip IP-104 5 Perform Local Reset of Containment Isolation Phase A IP-206 6 TASK TITLE:
Perform Local Reset of Containment Isolation Phase A JPM No.: IP-206 REV: NRC 2014 TPO No.: 4.D.EF-03 K&A No.: 013000G2.1.30 TASK No.:
Perform Local Reset of Containment Isolation Phase A JPM No.: IP-206 REV: NRC 2014 TPO No.: 4.D.EF-03 K&A No.: 013000G2.1.30 TASK No.: R-EF-003, Reset the Engineered K&A IMP: 4.4/4.0  Safety Features
R-EF-003, Reset the Engineered K&A IMP: 4.4/4.0  Safety Features


EXAMINEE:
EXAMINEE:   RO  SRO (Circle One)
RO  SRO (Circle One)


EVALUATOR:
EVALUATOR:
DATE:    The Examinee: PASSED this JPM.
DATE:    The Examinee: PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 3, 4 (Bold closed bullet only)
  (*) 3, 4 (Bold closed bullet only)
APPROX COMPLETION TIME: 18 MINUTES CRITICAL TIME:
APPROX COMPLETION TIME: 18 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD:
N/A EVALUATION METHOD:
LOCATION:
LOCATION:       PERFORM  X  IN PLANT    X  SIMULATE      SIMULATOR
PERFORM  X  IN PLANT    X  SIMULATE      SIMULATOR


GENERAL  
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 2BwOA PRI
: 1. 2BwOA PRI-5, Rev. 105, Attachment E, Control Room Inaccessibility Unit 2, ESF Manual Block or Reset
-5, Rev. 105, Attachment E, Control Room Inaccessibility Unit 2, ESF Manual Block or Reset


MATERIALS:
MATERIALS:
: 1. Cabinet Key for 2PA09J
: 1. Cabinet Key for 2PA09J
: 2. Laser pointer
: 2. Laser pointer
: 3. 2BwOA PRI
: 3. 2BwOA PRI-5, Attachment E
-5, Attachment E


TASK STANDARDS:
TASK STANDARDS:
Line 123: Line 105:
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 2 at full power and is responding to a spurious Containment Isolation Phase A signal.
: 2. Unit 2 at full power and is responding to a spurious Containment Isolation Phase A signal.
: 3. 2BwOA PRI
: 3. 2BwOA PRI-13 is in progress at step 6.a.
-13 is in progress at step 6.a.
: 4. Train A reset pushbutton for Containment Isolation Phase A does not work. INITIATING CUES:
: 4. Train A reset pushbutton for Containment Isolation Phase A does not work.
INITIATING CUES:
: 1. The Unit Supervisor has directed you to reset Train A of Containment Isolation Phase A per 2BwOA PRI
: 1. The Unit Supervisor has directed you to reset Train A of Containment Isolation Phase A per 2BwOA PRI
-5, Attachment E. No habitability concerns exist for entry into the room for the Phase A reset.
-5, Attachment E. No habitability concerns exist for entry into the room for the Phase A reset.
Line 138: Line 118:
. Locate and open 2BwOA PRI
. Locate and open 2BwOA PRI
-5, Attachment E. SAT    UNSAT      N/A Comments:
-5, Attachment E. SAT    UNSAT      N/A Comments:
Note: If in the following JPM step, the student goes to the Remote Shutdown Panel to locate the keys and/ or jumpers, after locating the necessary items, DO NOT allow them to be removed from the Remote Shutdown Panel. Prompt to get keys elsewhere because the cabinet (2PA09J) will need to be opened. Jumpers will not actually be placed, so after locating the jumpers, cue the student that there is a pair of jumpers at the cabinet, and the actual placing of jumpers will be simulated by using a laser pointer.
Note: If in the following JPM step, the student goes to the Remote Shutdown Panel to locate the keys and/ or jumpers, after locating the necessary items, DO NOT allow them to be removed from the Remote Shutdown Panel. Prompt to get keys elsewhere because the cabinet (2PA09J) will need to be opened. Jumpers will not actually be placed, so after locating the jumpers, cue the student that there is a pair of jumpers at the cabinet, and the actual placing of jumpers will be simulated by using a laser pointer.
Keys may also be obtained from the key cabinet in the shift office or from the MCR rack.
Keys may also be obtained from the key cabinet in the shift office or from the MCR rack.
Line 146: Line 125:
Key for 2PA09J.
Key for 2PA09J.
2 jumpers from cabinet at RSP or MCR
2 jumpers from cabinet at RSP or MCR
. Safety equipment NOT required.
. Safety equipment NOT required. SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
 
Note: Inform the student that all required actions in 2PA09J are to be simulated and to make every effort to NOT TOUCH any of the components in 2PA09J.
Note: Inform the student that all required actions in 2PA09J are to be simulated and to make every effort to NOT TOUCH any of the components in 2PA09J.
   *3. Reset Train A of Containment Isolation Phase A at 2PA09J.
   *3. Reset Train A of Containment Isolation Phase A at 2PA09J.
CUE: Jumper installed across points 7 and 8 of TB504.
CUE: Jumper installed across points 7 and 8 of TB504.
In the rear of LOGIC cabinet 2PA09J, LOCATE and PLACE one jumper across TB504, points 7 and 8.
In the rear of LOGIC cabinet 2PA09J, LOCATE and PLACE one jumper across TB504, points 7 and 8.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: *4. Unlatch Train A Containment Isolation Phase A Slave Relays at 2PA09J.
*4. Unlatch Train A Containment Isolation Phase A Slave Relays at 2PA09J.
CUE: Jumper installed across points 3 and 4 of TB644.
CUE: Jumper installed across points 3 and 4 of TB644.
In the rear of OUTPUT cabinet 2PA09J, LOCATE and PLACE one jumper across TB644, points 3 and  
In the rear of OUTPUT cabinet 2PA09J, LOCATE and PLACE one jumper across TB644, points 3 and  
: 4. SAT    UNSAT      N/A Comments:
: 4. SAT    UNSAT      N/A Comments:
Perform Local Reset of Containment Isolation Phase A IP-206 8 5. Check K605 relay for Train A of Containment Isolation Phase A DEENERGIZED
Perform Local Reset of Containment Isolation Phase A IP-206 8 5. Check K605 relay for Train A of Containment Isolation Phase A DEENERGIZED


Line 168: Line 143:
. In the front of cabinet 2PA09J, CHECK the following relays DEENERGIZED (not sucked in)
. In the front of cabinet 2PA09J, CHECK the following relays DEENERGIZED (not sucked in)
K605  K606  K607  K612  K613  K614  SAT    UNSAT      N/A Comments:
K605  K606  K607  K612  K613  K614  SAT    UNSAT      N/A Comments:
Note: The student may choose to notify the control room of his/her progress. If he/she has performed the reset correctly, acknowledge the report with confirmation that the Phase A signal is reset.
Note: The student may choose to notify the control room of his/her progress. If he/she has performed the reset correctly, acknowledge the report with confirmation that the Phase A signal is reset.
: 6. Remove jumpers.
: 6. Remove jumpers.
Line 175: Line 149:


In the rear of LOGIC cabinet 2PA09J, LOCATE and REMOVE one jumper across TB504, points 7 and 8.
In the rear of LOGIC cabinet 2PA09J, LOCATE and REMOVE one jumper across TB504, points 7 and 8.
In the rear of OUTPUT cabinet 2PA09J, LOCATE and REMOVE one jumper across TB644, points 3 and 4. SAT    UNSAT      N/A Comments:
In the rear of OUTPUT cabinet 2PA09J, LOCATE and REMOVE one jumper across TB644, points 3 and 4. SAT    UNSAT      N/A Comments: CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME
RECORD STOP TIME
:    COMMENTS:
:    COMMENTS:
Local Start of 1(2)B AF Pump  IP-409 S 9 TASK TITLE:
Local Start of 1(2)B AF Pump  JPM No.: IP-409 S REV: NRC 2014 TPO No.: 4.C.AF-02 K&A No.: 061000A3.01 TASK No.: R-AF-012, Operate the diesel driven K&A IMP: 4.2/4.2  Auxiliary Feedwater Pumps


Local Start of 1(2)B AF Pump IP-409S 9 TASK TITLE:
EXAMINEE:   RO  SRO (Circle One)
Local Start of 1(2)B AF Pump JPM No.: IP-409S REV: NRC 2014 TPO No.: 4.C.AF-02 K&A No.: 061000A3.01 TASK No.:
R-AF-012, Operate the diesel driven K&A IMP: 4.2/4.2  Auxiliary Feedwater Pumps
 
EXAMINEE:
RO  SRO (Circle One)


EVALUATOR:
EVALUATOR:
DATE:    The Examinee:
DATE:    The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 4, 8 (Bold closed bullet only)
  (*) 4, 8 (Bold closed bullet only)
APPROX COMPLETION TIME:
APPROX COMPLETION TIME:
28 MINUTES  CRITICAL TIME:
28 MINUTES  CRITICAL TIME:
NA  EVALUATION METHOD:
NA  EVALUATION METHOD:
LOCATION:
LOCATION:         PERFORM  X  IN PLANT    X  SIMULATE      SIMULATOR GENERAL  
PERFORM  X  IN PLANT    X  SIMULATE      SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 215: Line 182:
-9.a. are complete and step 17 is N/A.
-9.a. are complete and step 17 is N/A.


Local Start of 1(2)B AF Pump IP-409S 10 RECORD START TIME
Local Start of 1(2)B AF Pump   IP-409 S 10 RECORD START TIME
:    PERFORMANCE STEP STANDARD Circle applicable
:    PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to BwOP AF
: 1. Refer to BwOP AF
-7. CUE: Give a marked up copy of BwOP AF
-7. CU E: Give a marked up copy of BwOP AF
-7 to the student. Locate and open BwOP AF
-7 to the student. Locate and open BwOP AF
-7. SAT    UNSAT      N/A Comments:
-7. SAT    UNSAT      N/A Comments: 2. Perform actions at 1(2)AF01J.
: 2. Perform actions at 1(2)AF01J.
CUE: Reset pushbutton has been depressed.
CUE: Reset pushbutton has been depressed.
Select Switch is in Auto.
Select Switch is in Auto.
Line 231: Line 197:
VERIFY "Engine Ready" light is LIT.
VERIFY "Engine Ready" light is LIT.
VERIFY Diesel Governor Switch is in OFF position.
VERIFY Diesel Governor Switch is in OFF position.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 3. Verify the Air Box Trip is reset.
: 3. Verify the Air Box Trip is reset.


CUE: Air Box Trip annunciator is not lit.
CUE: Air Box Trip annunciator is not lit.
Line 239: Line 204:
CHECK "AIR BOX TRIP" annunciator NOT LIT.
CHECK "AIR BOX TRIP" annunciator NOT LIT.
  - OR -  Air Box Trip Lever (on back side of engine) in Normal position.
  - OR -  Air Box Trip Lever (on back side of engine) in Normal position.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: *4. Start Lube Oil systems.
*4. Start Lube Oil systems.


CUE: Gear box lube oil pump control switch is in start.
CUE: Gear box lube oil pump control switch is in start.
Aux lube oil pump control switch is pointing to the right. START Lube Oil Auxiliary Systems as follows at the local control panel:
Aux lube oil pump control switch is pointing to the right. START Lube Oil Auxiliary Systems as follows at the local control panel:
Aux FW Pp 1(2)B Gear Box Lube Oil Pp, 1(2)AF01PB-C. Aux FW Pp 1(2)B Lube Oil Pp, 1(2)AF01PB-A. SAT    UNSAT      N/A Comments:
Aux FW Pp 1(2)B Gear Box Lube Oil Pp, 1(2)AF01PB-C. Aux FW Pp 1(2)B Lube Oil Pp, 1(2)AF01PB-A. SAT    UNSAT      N/A Comments: 5. Start Lube Oil systems.
: 5. Start Lube Oil systems.
CUE: Lube Oil within sight glass (pump sump).
CUE: Lube Oil within sight glass (pump sump).


Line 252: Line 215:
VERIFY Lube Oil inventory in pump sump is within sightglass.
VERIFY Lube Oil inventory in pump sump is within sightglass.
VERIFY Lube Oil Filter Differential Pressure is < 4 psid. SAT    UNSAT      N/A Comments:
VERIFY Lube Oil Filter Differential Pressure is < 4 psid. SAT    UNSAT      N/A Comments:
 
Local Start of 1(2)B AF Pump   IP-409 S 11  PERFORMANCE STEP STANDARD Circle applicable
Local Start of 1(2)B AF Pump IP-409S 11  PERFORMANCE STEP STANDARD Circle applicable
: 5. RECORD the following oil pressure: CUE:  Aux FW Pump 1(2)B LO After Filter Pressure Indicator (1(2)PI-AF106) = 26 psig. CUE:  Aux FW Pump 1(2)B Gear Box LO Pressure Indicator (1(2)PI-AF124) = 20 psig. (located behind coupling)
: 5. RECORD the following oil pressure:
RECORD the following oil pressure: Aux FW Pump 2B LO After Filter Pressure Indicator (1(2)PI-AF106) ______psig
CUE:  Aux FW Pump 1(2)B LO After Filter Pressure Indicator (1(2)PI-AF106) = 26 psig. CUE:  Aux FW Pump 1(2)B Gear Box LO Pressure Indicator (1(2)PI-AF124) = 20 psig
. (located behind coupling)
RECORD the following oil pressure:
Aux FW Pump 2B LO After Filter Pressure Indicator (1(2)PI-AF106) ______psig
. Aux FW Pump 2B Gear Box LO Pressure Indicator (2PI-AF124) ______psig
. Aux FW Pump 2B Gear Box LO Pressure Indicator (2PI-AF124) ______psig
. SAT    UNSAT      N/A Comments:
. SAT    UNSAT      N/A Comments: 6. Verify/place VC in M/U mode per BwOP VC-5, at SM discretion.
: 6. Verify/place VC in M/U mode per BwOP VC-5, at SM discretion.
CUE: Another operator has performed BwOP VC
CUE: Another operator has performed BwOP VC
-5. Verify/place VC in M/U mode per BwOP VC
-5. Verify/place VC in M/U mode per BwOP VC
-5, at SM discretion.
-5, at SM discretion.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 7. Start 1(2)B AF pump locally.
: 7. Start 1(2)B AF pump locally.


CUE: Per task conditions, an EO is standing by to monitor governor linkage. Verify personnel in position at front of diesel to monitor governor linkage during start.
CUE: Per task conditions, an EO is standing by to monitor governor linkage. Verify personnel in position at front of diesel to monitor governor linkage during start.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: *8. Start 1(2)B AF pump locally.
*8. Start 1(2)B AF pump locally.


CUE: Engine start selector switch is pointing to the left (MAN
CUE: Engine start selector switch is pointing to the left (MAN). Start pushbutton is being depressed and held.
). Start pushbutton is being depressed and held.
START 1(2)B AF Pump locally at 1(2)AF01J as follows:
START 1(2)B AF Pump locally at 1(2)AF01J as follows:
PLACE the Engine Start Control Switch to MANUAL.
PLACE the Engine Start Control Switch to MANUAL.
DEPRESS and HOLD the START pushbutton.
DEPRESS and HOLD the START pushbutton.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 9. Verify 1(2)B AF pump started. CUE: Engine start noises are heard.
: 9. Verify 1(2)B AF pump started. CUE: Engine start noises are heard.
Engine starting light is lit.  
Engine starting light is lit.  


As RPM rising above 350 RPM, (Engine running) light is lit.
As RPM rising above 350 RPM, (Engine running) light is lit.


Start pushbutton is released.
Start pushbutton is released. Indicate speed at 1800 RPM. Verify 1(2)B AF pump started 1(2)AF01J as follows:
Indicate speed at 1800 RPM. Verify 1(2)B AF pump started 1(2)AF01J as follows:
VERIFY Engine Starting Light indicates starting sequence is in process.
VERIFY Engine Starting Light indicates starting sequence is in process.
VERIFY Engine Running Light is ILLUMINATED when speed indicates 350 RPM. Release the START pushbutton.
VERIFY Engine Running Light is ILLUMINATED when speed indicates 350 RPM. Release the START pushbutton.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
 
Local Start of 1(2)B AF Pump   IP-409 S 12  PERFORMANCE STEP STANDARD Circle applicable
Local Start of 1(2)B AF Pump IP-409S 12  PERFORMANCE STEP STANDARD Circle applicable
: 10. Verify AF pump recirc flow > 85 gpm. NOTE: Large black gauge located on wall to left of door. CUE: Recirc flow is 110 GPM.
: 10. Verify AF pump recirc flow > 85 gpm. NOTE: Large black gauge located on wall to left of door. CUE: Recirc flow is 110 GPM.


CUE: Another EO will complete the rest of the procedure.
CUE: Another EO will complete the rest of the procedure.
VERIFY Recirc Flow is > 85 GPM on 1(2)FI-AF096. SAT    UNSAT      N/A Comments:
VERIFY Recirc Flow is > 85 GPM on 1(2)FI-AF096. SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME
RECORD STOP TIME
:
:
COMMENTS:}}
COMMENTS:}}

Revision as of 09:17, 9 July 2018

2014 Braidwood Station Initial License Examination Administered In-Plant JPMs
ML15002A184
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Tennessee Valley Authority
References
Download: ML15002A184 (12)


Text

Perform a Local Reactor Trip IP-104 1 TASK TITLE:

Perform a Local Reactor Trip JPM No.: IP-104 REV: NRC 2014 TPO No.: 4.D.FR-01 K&A No.: 029000G2.1.20 TASK No.: R-FR-018, Respond to an ATWS K&A IMP: 4.6/4.6 EXAMINE E: RO SRO (Circle One)

EVALUATOR:

DATE:

The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 3, 4 (Bold closed bullet only)

APPROX COMPLETION TIME:

6 MINUTES CRITICAL TIME:

N/A EVALUATION METHOD:

LOCATION: PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. 1(2)BwFR-S.1, Rev. 201 (202) , Response to Nuclear Power Generation/ATWS

MATERIALS:

1. 1(2)BwFR-S.1, Copy posted in Unit 1(2)

MEER) TASK STANDARDS:

1. Correctly perform the actions of 1(2)BwFR

-S.1, step 6 RNO. TASK CONDITIONS:

1. You are an EO.
2. Unit 1(2) has experienced a Turbine Trip from 100% power.
3. The Unit 1(2) reactor DID NOT TRIP.
4. Attempts to trip Unit 1(2) reactor from the Control Room have been unsuccessful.

INITIATING CUES:

1. You have been directed by the US to trip Unit 1(2) reactor locally per 1(2)BwFR

-S.1, step 6.a, RNO.

Perform a Local Reactor Trip IP-104 2 RECORD START TIME

Note: Hand the student a copy of 1(2)BwFR

-S.1, step 6 after it has been located. PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1(2)BwFR

-S.1 step 6.a and proceed to U

-1(2) reactor trip switchgear panel.

Hand the student a copy of 1(2)BwFR-S.1, step 6 and proceed to Unit 1(2) Reactor Trip Switchgear Panel (1(2)

RD05E) at U-1 (2) MEER elev 451'. SAT UNSAT N/A Comments: 2. Attempt to open reactor trip breakers locally.

CUE: When examinee indicates that they would open the RTA or RTB door show them picture of page 6. Manual trip buttons for Rx Trip Breakers are depressed. Breakers did not open.

When examinee indicates that they would open the BYA or BY B door show them picture of page 7. Manual trip buttons for Rx Trip Bypass Breakers are depressed (breakers are racked out.)

Attempt to open reactor trip breakers locally as follows:

DEPRESS switchgear manual TRIP buttons for Reactor Trip Breakers A and B. o DEPRESS switchgear manual TRIP buttons for Reactor Trip Bypass Breakers A and B.

SAT UNSAT N/A Comments: ***Alternate Path Begins Here****

Perform a Local Reactor Trip IP-104 3 Note: During the performance of JPM step 3 and 4, opening of one breaker (motor or generator) per MG set will meet the requirements of the Critical Step.

  • 3. Locally shutdown the 1(2)A MG set.

CUE: As switches are simulated being placed in pull out, cue that they are in pull out.

De-energize 1(2)A MG set by opening at least one breaker on the 1(2)A MG set as follows: PLACE the 1(2)A Rod Drive MG Set Generator Output brkr control switch and/or the 1(2)A Rod Drive MG Set Motor brkr control switch in PULL OUT. SAT UNSAT N/A Comments: *4. Locally shutdown the 1(2)B MG set. CUE: As switches are simulated being placed in pull out, cue that they are in pull out.

Upon successful completion of this step, provide cue of announcement over page "Unit 1(2) Reactor Trip." De-energize 1(2)B MG set by opening at least one breaker on the 1(2)B MG set as follows:

PLACE the 1(2)B Rod Drive MG Set Generator Output brkr control switch and/or the 1(2)B Rod Drive MG Set Motor brkr control switch in

PULL OUT. SAT UNSAT N/A Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME

COMMENTS:

Perform a Local Reactor Trip IP-104 4 Perform a Local Reactor Trip IP-104 5 Perform Local Reset of Containment Isolation Phase A IP-206 6 TASK TITLE:

Perform Local Reset of Containment Isolation Phase A JPM No.: IP-206 REV: NRC 2014 TPO No.: 4.D.EF-03 K&A No.: 013000G2.1.30 TASK No.: R-EF-003, Reset the Engineered K&A IMP: 4.4/4.0 Safety Features

EXAMINEE: RO SRO (Circle One)

EVALUATOR:

DATE: The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 3, 4 (Bold closed bullet only)

APPROX COMPLETION TIME: 18 MINUTES CRITICAL TIME:

N/A EVALUATION METHOD:

LOCATION: PERFORM X IN PLANT X SIMULATE SIMULATOR

GENERAL

REFERENCES:

1. 2BwOA PRI-5, Rev. 105, Attachment E, Control Room Inaccessibility Unit 2, ESF Manual Block or Reset

MATERIALS:

1. Cabinet Key for 2PA09J
2. Laser pointer
3. 2BwOA PRI-5, Attachment E

TASK STANDARDS:

1. Correctly reset Containment Isolation Phase A signal on Train A per 2BwOA PRI

-5, Attachment E.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 at full power and is responding to a spurious Containment Isolation Phase A signal.
3. 2BwOA PRI-13 is in progress at step 6.a.
4. Train A reset pushbutton for Containment Isolation Phase A does not work. INITIATING CUES:
1. The Unit Supervisor has directed you to reset Train A of Containment Isolation Phase A per 2BwOA PRI

-5, Attachment E. No habitability concerns exist for entry into the room for the Phase A reset.

Perform Local Reset of Containment Isolation Phase A IP-206 7 RECORD START TIME

PERFORMANCE STEP STANDARD Circle applicable
1. Refer to 2BwOA PRI

-5, Attachment E.

CUE: Provide copy of procedure to student

. Locate and open 2BwOA PRI

-5, Attachment E. SAT UNSAT N/A Comments:

Note: If in the following JPM step, the student goes to the Remote Shutdown Panel to locate the keys and/ or jumpers, after locating the necessary items, DO NOT allow them to be removed from the Remote Shutdown Panel. Prompt to get keys elsewhere because the cabinet (2PA09J) will need to be opened. Jumpers will not actually be placed, so after locating the jumpers, cue the student that there is a pair of jumpers at the cabinet, and the actual placing of jumpers will be simulated by using a laser pointer.

Keys may also be obtained from the key cabinet in the shift office or from the MCR rack.

2. Obtain keys for 2PA09J and 2 jumpers. Instructor Note: Key for 2PA09J is located in the MCR. Examinee may grab keys for cabinets 2PA27J (Key 127) and 2PA28J (Key 128), these keys are not necessary for the JPM. Instructor Note: Jumpers can be found in the MCR in the black storage cabinet in the bottom drawer, they may also get them from a different location.

From either the Remote Shutdown Panel or MCR, obtain the following:

Key for 2PA09J.

2 jumpers from cabinet at RSP or MCR

. Safety equipment NOT required. SAT UNSAT N/A Comments:

Note: Inform the student that all required actions in 2PA09J are to be simulated and to make every effort to NOT TOUCH any of the components in 2PA09J.

  • 3. Reset Train A of Containment Isolation Phase A at 2PA09J.

CUE: Jumper installed across points 7 and 8 of TB504.

In the rear of LOGIC cabinet 2PA09J, LOCATE and PLACE one jumper across TB504, points 7 and 8.

SAT UNSAT N/A Comments: *4. Unlatch Train A Containment Isolation Phase A Slave Relays at 2PA09J.

CUE: Jumper installed across points 3 and 4 of TB644.

In the rear of OUTPUT cabinet 2PA09J, LOCATE and PLACE one jumper across TB644, points 3 and

4. SAT UNSAT N/A Comments:

Perform Local Reset of Containment Isolation Phase A IP-206 8 5. Check K605 relay for Train A of Containment Isolation Phase A DEENERGIZED

CUE: K605 post is in its current state

. K606 post is in its current state

. K607 post is in its current state. K612 post is in its current state

. K613 post is in its current state

. K614 post is in its current state

. In the front of cabinet 2PA09J, CHECK the following relays DEENERGIZED (not sucked in)

K605 K606 K607 K612 K613 K614 SAT UNSAT N/A Comments:

Note: The student may choose to notify the control room of his/her progress. If he/she has performed the reset correctly, acknowledge the report with confirmation that the Phase A signal is reset.

6. Remove jumpers.

CUE: As jumpers are removed, cue that the jumpers are removed Remove jumpers as follows:

In the rear of LOGIC cabinet 2PA09J, LOCATE and REMOVE one jumper across TB504, points 7 and 8.

In the rear of OUTPUT cabinet 2PA09J, LOCATE and REMOVE one jumper across TB644, points 3 and 4. SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME

COMMENTS:

Local Start of 1(2)B AF Pump IP-409 S 9 TASK TITLE:

Local Start of 1(2)B AF Pump JPM No.: IP-409 S REV: NRC 2014 TPO No.: 4.C.AF-02 K&A No.: 061000A3.01 TASK No.: R-AF-012, Operate the diesel driven K&A IMP: 4.2/4.2 Auxiliary Feedwater Pumps

EXAMINEE: RO SRO (Circle One)

EVALUATOR:

DATE: The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 8 (Bold closed bullet only)

APPROX COMPLETION TIME:

28 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION: PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. BwOP AF-7, Rev. 40, Auxiliary Feedwater Pump B (Diesel) Startup on Recir c

MATERIALS:

1. BwOP AF-7 TASK STANDARDS:
1. Perform a local emergency start of 1(2)B AF pump.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1(2) has just tripped in conjunction with an electrical fire in Unit 1(2) Remote Shutdown Panel. 3. 1(2)A AF pump is unavailable for operation due to maintenance.
4. 1(2)B AF pump did not auto start, nor will it manually start with the MCR switch.
5. Another EO is available to support. INITIATING CUES:
1. The US has directed you to perform a local emergency start of the 1(2)B AF pump at 1(2)AF01J per BwOP AF

-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1

-9.a. are complete and step 17 is N/A.

Local Start of 1(2)B AF Pump IP-409 S 10 RECORD START TIME

PERFORMANCE STEP STANDARD Circle applicable
1. Refer to BwOP AF

-7. CU E: Give a marked up copy of BwOP AF

-7 to the student. Locate and open BwOP AF

-7. SAT UNSAT N/A Comments: 2. Perform actions at 1(2)AF01J.

CUE: Reset pushbutton has been depressed.

Select Switch is in Auto.

Engine Ready light is lit.

Governor switch is off.

Perform the following at 1(2)AF01J: PUSH the Reset Pushbutton to clear circuit.

VERIFY the Select Switch is in AUTO position.

VERIFY "Engine Ready" light is LIT.

VERIFY Diesel Governor Switch is in OFF position.

SAT UNSAT N/A Comments: 3. Verify the Air Box Trip is reset.

CUE: Air Box Trip annunciator is not lit.

Another EO reports Air Box Trip lever is in normal position, limit switch is made up.

VERIFY the Air Box Trip is Reset as follows:

CHECK "AIR BOX TRIP" annunciator NOT LIT.

- OR - Air Box Trip Lever (on back side of engine) in Normal position.

SAT UNSAT N/A Comments: *4. Start Lube Oil systems.

CUE: Gear box lube oil pump control switch is in start.

Aux lube oil pump control switch is pointing to the right. START Lube Oil Auxiliary Systems as follows at the local control panel:

Aux FW Pp 1(2)B Gear Box Lube Oil Pp, 1(2)AF01PB-C. Aux FW Pp 1(2)B Lube Oil Pp, 1(2)AF01PB-A. SAT UNSAT N/A Comments: 5. Start Lube Oil systems.

CUE: Lube Oil within sight glass (pump sump).

After the student locates inlet and outlet pressure gages, indicate that the inlet is 28 psig, and the outlet is 26 psig.

START Lube Oil Auxiliary Systems as follows at the local control panel:

VERIFY Lube Oil inventory in pump sump is within sightglass.

VERIFY Lube Oil Filter Differential Pressure is < 4 psid. SAT UNSAT N/A Comments:

Local Start of 1(2)B AF Pump IP-409 S 11 PERFORMANCE STEP STANDARD Circle applicable

5. RECORD the following oil pressure: CUE: Aux FW Pump 1(2)B LO After Filter Pressure Indicator (1(2)PI-AF106) = 26 psig. CUE: Aux FW Pump 1(2)B Gear Box LO Pressure Indicator (1(2)PI-AF124) = 20 psig. (located behind coupling)

RECORD the following oil pressure: Aux FW Pump 2B LO After Filter Pressure Indicator (1(2)PI-AF106) ______psig

. Aux FW Pump 2B Gear Box LO Pressure Indicator (2PI-AF124) ______psig

. SAT UNSAT N/A Comments: 6. Verify/place VC in M/U mode per BwOP VC-5, at SM discretion.

CUE: Another operator has performed BwOP VC

-5. Verify/place VC in M/U mode per BwOP VC

-5, at SM discretion.

SAT UNSAT N/A Comments: 7. Start 1(2)B AF pump locally.

CUE: Per task conditions, an EO is standing by to monitor governor linkage. Verify personnel in position at front of diesel to monitor governor linkage during start.

SAT UNSAT N/A Comments: *8. Start 1(2)B AF pump locally.

CUE: Engine start selector switch is pointing to the left (MAN). Start pushbutton is being depressed and held.

START 1(2)B AF Pump locally at 1(2)AF01J as follows:

PLACE the Engine Start Control Switch to MANUAL.

DEPRESS and HOLD the START pushbutton.

SAT UNSAT N/A Comments: 9. Verify 1(2)B AF pump started. CUE: Engine start noises are heard.

Engine starting light is lit.

As RPM rising above 350 RPM, (Engine running) light is lit.

Start pushbutton is released. Indicate speed at 1800 RPM. Verify 1(2)B AF pump started 1(2)AF01J as follows:

VERIFY Engine Starting Light indicates starting sequence is in process.

VERIFY Engine Running Light is ILLUMINATED when speed indicates 350 RPM. Release the START pushbutton.

SAT UNSAT N/A Comments:

Local Start of 1(2)B AF Pump IP-409 S 12 PERFORMANCE STEP STANDARD Circle applicable

10. Verify AF pump recirc flow > 85 gpm. NOTE: Large black gauge located on wall to left of door. CUE: Recirc flow is 110 GPM.

CUE: Another EO will complete the rest of the procedure.

VERIFY Recirc Flow is > 85 GPM on 1(2)FI-AF096. SAT UNSAT N/A Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME

COMMENTS: