{{#Wiki_filter:0 7/2 4/2 O15U.S. Nuclear Regulatory Commission Onerations Center Event RennrtNon-Agreement State Event # 51181Rep Org: ELECTRIC POWER RESEARCH INSTITUTE Notification Date/ITime:
{{#Wiki_filter:0 7/2 4/2 O15 U.S. Nuclear Regulatory Commission Onerations Center Event Rennrt Non-Agreement State Event # 51181 Rep Org: ELECTRIC POWER RESEARCH INSTITUTE Notification Date/ITime:
06/25/2015 15:40 (EDT)Licensee:
06/25/2015 15:40 (EDT)Licensee:
ELECTRIC POWER RESEARCH INSTITUTE Event Date I Time: 05/01/2015 (EDT)Last Modification:
ELECTRIC POWER RESEARCH INSTITUTE Event Date I Time: 05/01/2015 (EDT)Last Modification:
07/24/2015 Region: 1 Docket #:City: CHARLOTTE Agreement State: YesCounty: License #:State: NCNRC Notified by: TRACY WILSON Notifications:
07/24/2015 Region: 1 Docket #: City: CHARLOTTE Agreement State: Yes County: License #: State: NC NRC Notified by: TRACY WILSON Notifications:
JOHN ROGGE R1 DOHQ Ops Officer:
JOHN ROGGE R1 DO HQ Ops Officer: DONG HWA PARK KATHLEEN O'DONOHUE R2DO Emergency Class: NON EMERGENCY VIVIAN CAMPBELL R4DO 10 CFR Section: 21 .21 (a)(2) INTERIM EVAL OF DEVIATION PART 21 REPORT -DEVIATION IN NOZZLE MODELING INTERNAL REPORTS The following was received via facsimile:
DONG HWA PARK KATHLEEN O'DONOHUE R2DOEmergency Class: NON EMERGENCY VIVIAN CAMPBELL R4DO10 CFR Section:21 .21 (a)(2) INTERIM EVAL OF DEVIATION PART 21 REPORT -DEVIATION IN NOZZLE MODELING INTERNAL REPORTSThe following was received via facsimile:
"[This report pertains]
"[This report pertains]
to a deviation in a basic product (EPRI nozzle modeling internal reports) supplied by EPRI(Electric Power Research Institute) regarding Westinghouse Pressurizer Head Nozzle Inner Corner RegionUltrasonic Inspections.
to a deviation in a basic product (EPRI nozzle modeling internal reports) supplied by EPRI (Electric Power Research Institute) regarding Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections.
EPRI will complete all evaluation efforts and provide a determination of reportability inaccordance with 10 CFR Part 21 no later than July 24, 2015."EPRI has conducted an evaluation to the basic product's actual use and determined that the ASME examination volume coverage for at least one of the pressurizer nozzles has changed and is now 90 percent or less. A 90percent threshold is required by ASME Boiler & Pressure Vessel Code, Section Xl."Design inputs used in EPRI modeling for ultrasonic scanning coverage for nuclear safety related component nozzles may have been inaccurate.
EPRI will complete all evaluation efforts and provide a determination of reportability in accordance with 10 CFR Part 21 no later than July 24, 2015."EPRI has conducted an evaluation to the basic product's actual use and determined that the ASME examination volume coverage for at least one of the pressurizer nozzles has changed and is now 90 percent or less. A 90 percent threshold is required by ASME Boiler & Pressure Vessel Code, Section Xl."Design inputs used in EPRI modeling for ultrasonic scanning coverage for nuclear safety related component nozzles may have been inaccurate.
In some cases, the upper and lower heads of Westinghouse pressurizers canbe offset from the center of each nozzle (spray, safety, relief, surge). This offset results in a change in thethickness of the pressurizer head as compared to an on-axis pressurizer head with the same radial dimensions.
In some cases, the upper and lower heads of Westinghouse pressurizers can be offset from the center of each nozzle (spray, safety, relief, surge). This offset results in a change in the thickness of the pressurizer head as compared to an on-axis pressurizer head with the same radial dimensions.
Some of the computer models EPRI used to describe these pressurizer heads did not account for an increase inthe thickness due to these offsets.
Some of the computer models EPRI used to describe these pressurizer heads did not account for an increase in the thickness due to these offsets. As a result, in some cases the ultrasonic inspection parameters produced by these computer models may have produced inaccuracies in the examination volume coverage calculations."In the case of a basic component which contains a defect or falls to comply, the number-and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
As a result, in some cases the ultrasonic inspection parameters produced bythese computer models may have produced inaccuracies in the examination volume coverage calculations.
07/24/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 Utility Name/Plant Name Exelon Corporation  
"In the case of a basic component which contains a defect or falls to comply, the number-and location of thesecomponents in use at, supplied for, being supplied for, or may be supplied for, manufactured, or beingmanufactured for one or more facilities or activities subject to the regulations in this part.
/ Ginna First Energy Nuclear Operating  
07/24/2015 U.S. Nuclear Regulatory Commission Operations Center Event ReportPage 2Utility Name/Plant NameExelon Corporation  
/ Beaver Valley 1 Entergy I Indian Point 2 Entergy I Indian Point 3 Pacific Gas & Electric Co. / Diablo Canyon Unit 2 Dominion Generation  
/ GinnaFirst Energy Nuclear Operating  
/ North Anna"EPRI has reviewed the pressurizer upper and lower head drawings for the nozzles that it has modeled and determined if these offsets are present. For those cases that are potentially affected EPRI has recalculate the new examination volume coverage for the nozzle inspection detection techniques and provided this information to the corresponding licensees."EPRI staff shall develop a matrix or table to better define the necessary design inputs for computer modeling of nozzles. This should also include a question to the utility regarding any obstructions or thickness changes which 'would impact the ultrasonic inspection parameters.
/ Beaver Valley 1Entergy I Indian Point 2Entergy I Indian Point 3Pacific Gas & Electric Co. / Diablo Canyon Unit 2Dominion Generation  
EPRI staff shall improve its documentation for review and approval of design inputs for computer modeling.
/ North Anna"EPRI has reviewed the pressurizer upper and lower head drawings for the nozzles that it has modeled anddetermined if these offsets are present.
Consideration shall also be given to including a review of design inputs by the member along with an acknowledgement from the member that the design inputs are appropriate for use. EPRI staff shall consider methods of including additional conservatism to the modeling results to better accommodate changes which may be observed in the field. The project quality plan and quality project instruction shall be updated as necessary to accommodate or clarify these improvements.
For those cases that are potentially affected EPRI has recalculate the newexamination volume coverage for the nozzle inspection detection techniques and provided this information to thecorresponding licensees.
Completion commitment date -10/27/2015."The coverage calculations indicated in the notification letters would likely increase if the EPRI modeled scan plans are exceeded and or if additional inspection angles were implemented.
"EPRI staff shall develop a matrix or table to better define the necessary design inputs for computer modeling ofnozzles.
Conversely, these coverage calculations would likely decrease if physical field limitations prevented the ultrasonic probe from executing the EPRI modeled scan pattern. It is on this basis that recipients of this letter must evaluate the condition pursuant to 10 CFR Part 21.21 to determine if it could represent a substantial safety hazard reportable under 10 CFR Part 21 ." Potentially affected US plants include Ginna, Beaver Valley Unit 1, Indian Point Units 2 and 3, Diablo Canyon Unit 2, and North Anna.* *
This should also include a question to the utility regarding any obstructions or thickness changes which 'would impact the ultrasonic inspection parameters.
EPRI staff shall improve its documentation for review andapproval of design inputs for computer modeling.
Consideration shall also be given to including a review of designinputs by the member along with an acknowledgement from the member that the design inputs are appropriate foruse. EPRI staff shall consider methods of including additional conservatism to the modeling results to betteraccommodate changes which may be observed in the field. The project quality plan and quality project instruction shall be updated as necessary to accommodate or clarify these improvements.
Completion commitment date -10/27/2015.
"The coverage calculations indicated in the notification letters would likely increase if the EPRI modeled scanplans are exceeded and or if additional inspection angles were implemented.
Conversely, these coveragecalculations would likely decrease if physical field limitations prevented the ultrasonic probe from executing theEPRI modeled scan pattern.
It is on this basis that recipients of this letter must evaluate the condition pursuant to10 CFR Part 21.21 to determine if it could represent a substantial safety hazard reportable under 10 CFR Part 21 ."Potentially affected US plants include Ginna, Beaver Valley Unit 1, Indian Point Units 2 and 3, Diablo Canyon Unit2, and North Anna.* *
* UPDATE AT 0938 EDT ON 07/24/15 FROM NEIL WILMSHURST TO JEFF HERRERA VIA FACSIMILE  
* UPDATE AT 0938 EDT ON 07/24/15 FROM NEIL WILMSHURST TO JEFF HERRERA VIA FACSIMILE  
* * *"As part of the evaluation, EPRI [Electric Power Research Institute]
* * *"As part of the evaluation, EPRI [Electric Power Research Institute]
performed an 'extent of condition' review.During the course of the review, EPRI found that the above described deviation also affected EPRI nozzlemodeling internal reports supplied by EPRI (Electric Power Research Institute) regarding Westinghouse SteamGenerator Primary Nozzles."After conducting the 'extent of condition' review, which included recalculation of the modeling data, EPRIconcluded that there were no other known reportable conditions associated with this deviation.
performed an 'extent of condition' review.During the course of the review, EPRI found that the above described deviation also affected EPRI nozzle modeling internal reports supplied by EPRI (Electric Power Research Institute) regarding Westinghouse Steam Generator Primary Nozzles."After conducting the 'extent of condition' review, which included recalculation of the modeling data, EPRI concluded that there were no other known reportable conditions associated with this deviation."EPRI has completed all evaluation efforts and issued reportability notification letters in accordance with 10CFR Part 21 within the respective reporting timeframes." Notified the R1 DO (Kennedy), R2DO (Musser) and R4DO (Gepford) and Part 21 Group (via email).  
"EPRI has completed all evaluation efforts and issued reportability notification letters in accordance with 10CFRPart 21 within the respective reporting timeframes."
~E2lRES(, INSrflruT______ ~Message --- j..__....7 V~i71cIL~IW~F~
Notified the R1 DO (Kennedy),
R2DO (Musser) and R4DO (Gepford) and Part 21 Group (via email).  
~E2lRES(, INSrflruT
______ ~Message  
--- j..__....7V~i71cIL~IW~F~
utW5-( i tILINIIYZJ
utW5-( i tILINIIYZJ
_.n rL=  
_.n rL=  
~RESEARCHI INSTITUTE
~RESEARCHI INSTITUTE* I'!'NEIL WILMSNURST
* I'!'NEIL WILMSNURST
* It Vice President and* Chief Nltear Officer S July 22, 2:015 S U.S. Nuclear Regulatory Commission
* It Vice President and* Chief Nltear OfficerS July 22, 2:015S U.S. Nuclear Regulatory Commission
,, Attn: Document Control Desk" Washington, DC 20555-0001
,, Attn: Document Control Desk" Washington, DC 20555-0001


==Subject:==
==Subject:==
Final Report: Part 21 -Notification:
Final Report: Part 21 -Notification:
Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections Dear Sir/M~adam; This letter constitutes the Electric Power Research Institute's (EPRI) final report addressing a deviation in abasic product (EPRi nozzle modeling internal reports) supplied by EPRI to its utility members regarding Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections.
Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections Dear Sir/M~adam; This letter constitutes the Electric Power Research Institute's (EPRI) final report addressing a deviation in a basic product (EPRi nozzle modeling internal reports) supplied by EPRI to its utility members regarding Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections.
As part of the evaluation, EPRI performed an "extent of condition" review. During the course of the review,EPRI found that the above described deviation also affected EPRI nozzle modeling internal reportssupplied by EPRI (Electric Power Research Institute) regarding Westinghouse Steam Generator PrimaryNozzles.After conducting the "extent of condition" review, which ihncluded recalculation of the modeling data, EPRIconcluded that there were no other known reportable conditions associated with this deviation, EPRI has completed all evaluation efforts and issued reportability notification letters in accordance withIOCFR Part 21 within the respective reporting timeframes.
As part of the evaluation, EPRI performed an "extent of condition" review. During the course of the review, EPRI found that the above described deviation also affected EPRI nozzle modeling internal reports supplied by EPRI (Electric Power Research Institute) regarding Westinghouse Steam Generator Primary Nozzles.After conducting the "extent of condition" review, which ihncluded recalculation of the modeling data, EPRI concluded that there were no other known reportable conditions associated with this deviation, EPRI has completed all evaluation efforts and issued reportability notification letters in accordance with IOCFR Part 21 within the respective reporting timeframes.
i The information for this report per §21.21 is provided in the following attachments.
i The information for this report per §21.21 is provided in the following attachments.
I' If you have any questions, please contact me.Sincerely, ii. NMW/rv/tw
I' If you have any questions, please contact me.Sincerely, ii. NMW/rv/tw[ Attachment(s)
[ Attachment(s)
Togethler  
Togethler  
...Shaping the Future oF: Electricity 1300 West W.T. Harris Boulevard, Charlotie, NC 28262-8550 USA
...Shaping the Future oF: Electricity 1300 West W.T. Harris Boulevard, Charlotie, NC 28262-8550 USA
* 704.595.2732  
* 704.595.2732  
*, Mobile 704,,490.2653 e nwilmshursttepricom Part 21 -Final Report Notification:
*, Mobile 704,,490.2653 e nwilmshursttepricom Part 21 -Final Report Notification:
Westinghouse Pressurizer Head Nozzle inner Corner Region Ultrasonic inspections Page 2Attachment 1U.S. Plants AffectedS --AExelon Corporation First Energy Nuclear Operating EntergyEntergyPacific Gas & Electric Co.Dominion Generation Dominion Generation GinnaBeaver Valley 1Indian Point 2Indian Point 3Diablo Canyon Unit 2North Anna Unit INorth Anna Unit 2Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer NOTE: Calculations for another twelve plants resulted in changes to certain examination coveragecalculations, but not to levels below the 90% threshold.
Westinghouse Pressurizer Head Nozzle inner Corner Region Ultrasonic inspections Page 2 Attachment 1 U.S. Plants Affected S --A Exelon Corporation First Energy Nuclear Operating Entergy Entergy Pacific Gas & Electric Co.Dominion Generation Dominion Generation Ginna Beaver Valley 1 Indian Point 2 Indian Point 3 Diablo Canyon Unit 2 North Anna Unit I North Anna Unit 2 Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer NOTE: Calculations for another twelve plants resulted in changes to certain examination coverage calculations, but not to levels below the 90% threshold.
EPRI has sent Information Notices to these plants.A third group of plants had no changes.  
EPRI has sent Information Notices to these plants.A third group of plants had no changes.  
! Part 21 -Final Report Nolifocallon:Westinghouse Pressurizer H-ead Nozzle Inner Corner Region UhIrasonlc Inspections
! Part 21 -Final Report Nolifocallon:Westinghouse Pressurizer H-ead Nozzle Inner Corner Region UhIrasonlc Inspections" Page 3 E;Attachment 2'i Part 21.Reporting Information
" Page 3E;Attachment 2'i Part 21.Reporting Information
,,, (i) Name and address of the Individual or individuals informing the Commission.
,,, (i) Name and address of the Individual or individuals informing the Commission.
Neil M. Wilmshurst Vice President and CNOElectric Power Research Institute 1300 West WT Harris Blvd j Charlotte NC 28262-2867 (ii) Identification of the facility, the actlvity; or the basic component suppilied for such facilitywhich fails to cOmply or contains a defect.EPRI has conducted an evaluation to the basic product's actual use and determined that the ASMEexamination volume coverage for the pressurizer nozzles identified in this letter have changed sinceoginael modeling calculations were preformed and are now 90% or less. A 90% threshold is required byASME Boiler & Pressure Vessel Code, Section Xl. .:! (i~i) Identification of the firm constructing the facility or supplying the basic component whichS fails to comply or contains a defect.EPRI supplied the basic product (report) to the licensees listed in Table 1 from 2008 to the present.!I (iv) Nature of the defect or failure to comply and the safety hazat'd which is created or could bei! created by such defect or failure to comply.Design inputs used in EPRI modeling for ultrasonic  
Neil M. Wilmshurst Vice President and CNO Electric Power Research Institute 1300 West WT Harris Blvd j Charlotte NC 28262-2867 (ii) Identification of the facility, the actlvity; or the basic component suppilied for such facility which fails to cOmply or contains a defect.EPRI has conducted an evaluation to the basic product's actual use and determined that the ASME examination volume coverage for the pressurizer nozzles identified in this letter have changed since oginael modeling calculations were preformed and are now 90% or less. A 90% threshold is required by ASME Boiler & Pressure Vessel Code, Section Xl. .:! (i~i) Identification of the firm constructing the facility or supplying the basic component which S fails to comply or contains a defect.EPRI supplied the basic product (report) to the licensees listed in Table 1 from 2008 to the present.!I (iv) Nature of the defect or failure to comply and the safety hazat'd which is created or could be i! created by such defect or failure to comply.Design inputs used in EPRI modeling for ultrasonic scanning, coverage for nuclear safety related ,4.component nozzles may have been inaccurate, in some cases, the upper and lower heads of 2. Westinghouse pressurizers can be offset from the center of each nozzle (spray. safety, relief, surge). This.offset results in a change in the thickness of the pressurizer head as compared to an on-axis pressurizer il head with the same radial dimensions (see examples in Attachment 3). Some of the computer models EPRI used to describe these pressurizer heads did not account for an increase in the thickness due to these offsets. As a result, in some cases the ultrasonic inspection parameters produced by these computer models may have produced inaccuracies in the examination volume coverage calculations.
: scanning, coverage for nuclear safety related,4.component nozzles may have been inaccurate, in some cases, the upper and lower heads of2. Westinghouse pressurizers can be offset from the center of each nozzle (spray. safety, relief, surge). This.offset results in a change in the thickness of the pressurizer head as compared to an on-axis pressurizer il head with the same radial dimensions (see examples in Attachment 3). Some of the computer modelsEPRI used to describe these pressurizer heads did not account for an increase in the thickness due tothese offsets.
This offset condition was also found in the case of some Westinghouse steam generator channel heads (refer to Figure 3).(v) The date on which the In formation of such defect or failure to comply was obtained.,l An EPRI Corrective Action Report (CAR 2015-0032) to explore the extent of the issue was initiated on I , May 2015...1  
As a result, in some cases the ultrasonic inspection parameters produced by these computermodels may have produced inaccuracies in the examination volume coverage calculations.
'I ii' Part 21 -Final Report Notification:
This offsetcondition was also found in the case of some Westinghouse steam generator channel heads (refer toFigure 3).(v) The date on which the In formation of such defect or failure to comply was obtained.
,l An EPRI Corrective Action Report (CAR 2015-0032) to explore the extent of the issue was initiated on I, May 2015...1  
'Iii' Part 21 -Final Report Notification:
:i Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections
:i Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections
=,;Page 4, (vi) In the case of a basic component which contains a defect or fails to cornply1 the numberi; and location of these components in use at, supplied for, being supplied for, or may be suppliedi for, manufactured, or being manufactured for one or more facilities or activities subject to theregulations in this part.i See Table 1.: (vii) The corrective action, which has been, is being, or will be taken; the name of the Individualor organization responsible for the action; and the length of time that has been or will be taken tocomplete the action.i' EPRI has reviewed the pressurizer upper and lower head drawings for the nozzles that it has modeled andi; determined that these offsets are present, Steam generator channel head drawings were as included in this:! review. For those cases that are potentially affected EPRI has recalculated the new examination volumei! coverage for the nozzle inspection detection techniques and provided this information to the corresponding Ji licensees.
=,;Page 4 , (vi) In the case of a basic component which contains a defect or fails to cornply 1 the number i; and location of these components in use at, supplied for, being supplied for, or may be supplied i for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.i See Table 1.: (vii) The corrective action, which has been, is being, or will be taken; the name of the Individualor organization responsible for the action; and the length of time that has been or will be taken tocomplete the action.i' EPRI has reviewed the pressurizer upper and lower head drawings for the nozzles that it has modeled and i; determined that these offsets are present, Steam generator channel head drawings were as included in this:! review. For those cases that are potentially affected EPRI has recalculated the new examination volume i! coverage for the nozzle inspection detection techniques and provided this information to the corresponding Ji licensees.
li EPRI staff shall develop a matrix or table to better define the necessary design inputs for computer, modeling of nozzles.
li EPRI staff shall develop a matrix or table to better define the necessary design inputs for computer , modeling of nozzles. This should also include a question to the utility regarding any obstructions or i! thickness changes which would impact the ultrasonic inspedtion parameters.
This should also include a question to the utility regarding any obstructions ori! thickness changes which would impact the ultrasonic inspedtion parameters.
EPRI staff shall improve its i documentation for review and approval of design inputs for computer modeling.
EPRI staff shall improve itsi documentation for review and approval of design inputs for computer modeling.
Consideration shall also be!: given to including a review of design inputs by the member along with an acknowledgement from the , member that' the design inputs are appropriate for use. EPRI staff shall consider methods of including:J!, additional conservatism to the modeling results to better accommodate changes which may be observed in;i the field. The project quality plan and quality project instruction shall be updated as necessary toaccommodate or clarify these improvements.
Consideration shall also be!: given to including a review of design inputs by the member along with an acknowledgement from the, member that' the design inputs are appropriate for use. EPRI staff shall consider methods of including
Completion commitment date -10/27/2015 h (viii) Any advice related to the defect or failure to comply about the facility, activity, or basic" component that has been, is being, or will be given to purchasers or licensees.The coverage calculations indicated in the notification letters would likely increase if the EPRI modeled scan plans were exceeded and or if additional inspection angles were implemented.
:J!, additional conservatism to the modeling results to better accommodate changes which may be observed in;i the field. The project quality plan and quality project instruction shall be updated as necessary toaccommodate or clarify these improvements.
Conversely, these i coverage calculations would likely decrease if physical field limitations prevented the ultrasonic probe fromexecuting the EPRI modeled scan pattern. It is on this basis that recipients of this letter must evaluate thecondition pursuant to 10 CFR Part 21.21 to determine if it could represent a substantial safety hazardreportable under 10 CFR Part 21.:: (ix) In the case of an early site permits the en titles to whom an early site permit was transferred., This is not an early site permit concern.
Completion commitment date -10/27/2015 h (viii) Any advice related to the defect or failure to comply about the facility,  
: activity, or basic" component that has been, is being, or will be given to purchasers or licensees.The coverage calculations indicated in the notification letters would likely increase if the EPRI modeledscan plans were exceeded and or if additional inspection angles were implemented.
Conversely, thesei coverage calculations would likely decrease if physical field limitations prevented the ultrasonic probe fromexecuting the EPRI modeled scan pattern.
It is on this basis that recipients of this letter must evaluate thecondition pursuant to 10 CFR Part 21.21 to determine if it could represent a substantial safety hazardreportable under 10 CFR Part 21.:: (ix) In the case of an early site permits the en titles to whom an early site permit was transferred.
, This is not an early site permit concern.
Part 21 -Final Report Nolification:
Part 21 -Final Report Nolification:
Wesltnghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections Page 6*iiAttachment 3Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections  
Wesltnghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections Page 6*i i Attachment 3 Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections -Supporting Figures Figure i below contains a sketch of a typical Westinghouse pressurizer upper head indicating that the outside surface is offset from the center of the inside surface and the center of each safety-relief and spray nozzle. The ASME Section XI Class 1 examination volume is also identified in this figure.Ceter Pont (s)io lIed (Shell) Outsde S Radius RL'diuo Flgu~e 1. Westinghouse Ohange In Tolclcras Due tQ, w:)s.l Nnz~le xi 0dmIg I Deaf Volum.Prnaerbor Sproy Nofle~cl auu I Elmni Volume ePressurizer Upper Head Sketch with Offsets 1.
-Supporting FiguresFigure i below contains a sketch of a typical Westinghouse pressurizer upper head indicating that theoutside surface is offset from the center of the inside surface and the center of each safety-relief and spraynozzle. The ASME Section XI Class 1 examination volume is also identified in this figure.Ceter Pont (s)iolIed (Shell) Outsde S RadiusRL'diuoFlgu~e 1. Westinghouse Ohange In Tolclcras Due tQ, w:)s.lNnz~lexi 0dmIg I Deaf Volum.Prnaerbor Sproy Nofle~cl auu I Elmni VolumeePressurizer Upper Head Sketch with Offsets1.
Part 21 -FinaiRepori Notification:
Part 21 -FinaiRepori Notification:
Westinghouse Pressurizer Head Nozzle Inner Corner Region U[trasonic Inspections Page 6Attachment 3 (cant.)Figure 2 below contains a sketch of a typical Westinghouse pressurizer lower head indicating that theoutside surface is offset from the center of the inside surface and the center of the surge nozzle. The ASMESection XI Class 1 examination volume is also identified in this figure.I,)tentHeedProeurizr SuASEX Cu -ExmVlOenlcr PcInt (or;Wad (Sh.O) hntd* Aqous-V~¶w PeW(s) IonHead ~Stc5~ OrAsd. Rq#eyFigure 2. Westinghouse Pressurizer Lower Head Sketch with OffsetsI.,,,'1i,'in Part 21 -Final Report Nofificaflon:
Westinghouse Pressurizer Head Nozzle Inner Corner Region U[trasonic Inspections Page 6 Attachment 3 (cant.)Figure 2 below contains a sketch of a typical Westinghouse pressurizer lower head indicating that the outside surface is offset from the center of the inside surface and the center of the surge nozzle. The ASME Section XI Class 1 examination volume is also identified in this figure.I,)tentHeedProeurizr Su ASEX Cu -ExmVl Oenlcr PcInt (or;Wad (Sh.O) hntd* Aqous-V~¶w PeW(s) Ion Head ~Stc5~ OrAsd. Rq#ey Figure 2. Westinghouse Pressurizer Lower Head Sketch with Offsets I.,,,'1 i,'i n Part 21 -Final Report Nofificaflon:
Westinghouse Pressurizer Head Nozzle Inner Corner Region Uilrasoniic Inspections Page 7Attachment 3 (cont.)Flgure 3 below contains a sketch of a typical Westinghouse steam generator channel head (excluding themanway) indicating that the outside surface is offset from the center of the inside surface and the center ofthe primary nozzles.
Westinghouse Pressurizer Head Nozzle Inner Corner Region Uilrasoniic Inspections Page 7 Attachment 3 (cont.)Flgure 3 below contains a sketch of a typical Westinghouse steam generator channel head (excluding the manway) indicating that the outside surface is offset from the center of the inside surface and the center of the primary nozzles. The ASME Section XI Class 1 examination volume is also identified in this figure.i" I, L Note Ohortge In TI~iCtkrces Due to Offset'cm Prtnitiy Waflle XI Cbs. 1 Exam Volume-7/.9.9-7/ii,);: , 7 I/7/7 7 A 7, 9/Center Point for Channel H-ead Outsie~l Ibdius C.enter Paont for Channel Head Inside Rodlus Figure 3. Westinghouse Steam Generator Channel Head Primary Nozzle Sketch with Offset ,j'j , i.}}
The ASME Section XI Class 1 examination volume is also identified in this figure.i"I,LNote Ohortge In TI~iCtkrces Due to Offset'cm Prtnitiy WaflleXI Cbs. 1 Exam Volume-7/.9.9-7/ii,);:, 7I/7/77A7,9/Center Point forChannel H-ead Outsie~l IbdiusC.enter Paont for Channel Head Inside RodlusFigure 3. Westinghouse Steam Generator Channel Head Primary Nozzle Sketch with Offset,j'j ,i.}}

Revision as of 01:20, 9 July 2018

Notification of Part 21 Report - Deviation in Nozzle Modeling Internal Reports
ML15205A289
Person / Time
Site: Beaver Valley, Indian Point, North Anna, Ginna, Diablo Canyon  Constellation icon.png
Issue date: 07/24/2015
From: Wilson T
Electric Power Research Institute
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
51181
Download: ML15205A289 (10)


Text

0 7/2 4/2 O15 U.S. Nuclear Regulatory Commission Onerations Center Event Rennrt Non-Agreement State Event # 51181 Rep Org: ELECTRIC POWER RESEARCH INSTITUTE Notification Date/ITime:

06/25/2015 15:40 (EDT)Licensee:

ELECTRIC POWER RESEARCH INSTITUTE Event Date I Time: 05/01/2015 (EDT)Last Modification:

07/24/2015 Region: 1 Docket #: City: CHARLOTTE Agreement State: Yes County: License #: State: NC NRC Notified by: TRACY WILSON Notifications:

JOHN ROGGE R1 DO HQ Ops Officer: DONG HWA PARK KATHLEEN O'DONOHUE R2DO Emergency Class: NON EMERGENCY VIVIAN CAMPBELL R4DO 10 CFR Section: 21 .21 (a)(2) INTERIM EVAL OF DEVIATION PART 21 REPORT -DEVIATION IN NOZZLE MODELING INTERNAL REPORTS The following was received via facsimile:

"[This report pertains]

to a deviation in a basic product (EPRI nozzle modeling internal reports) supplied by EPRI (Electric Power Research Institute) regarding Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections.

EPRI will complete all evaluation efforts and provide a determination of reportability in accordance with 10 CFR Part 21 no later than July 24, 2015."EPRI has conducted an evaluation to the basic product's actual use and determined that the ASME examination volume coverage for at least one of the pressurizer nozzles has changed and is now 90 percent or less. A 90 percent threshold is required by ASME Boiler & Pressure Vessel Code, Section Xl."Design inputs used in EPRI modeling for ultrasonic scanning coverage for nuclear safety related component nozzles may have been inaccurate.

In some cases, the upper and lower heads of Westinghouse pressurizers can be offset from the center of each nozzle (spray, safety, relief, surge). This offset results in a change in the thickness of the pressurizer head as compared to an on-axis pressurizer head with the same radial dimensions.

Some of the computer models EPRI used to describe these pressurizer heads did not account for an increase in the thickness due to these offsets. As a result, in some cases the ultrasonic inspection parameters produced by these computer models may have produced inaccuracies in the examination volume coverage calculations."In the case of a basic component which contains a defect or falls to comply, the number-and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

07/24/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 Utility Name/Plant Name Exelon Corporation

/ Ginna First Energy Nuclear Operating

/ Beaver Valley 1 Entergy I Indian Point 2 Entergy I Indian Point 3 Pacific Gas & Electric Co. / Diablo Canyon Unit 2 Dominion Generation

/ North Anna"EPRI has reviewed the pressurizer upper and lower head drawings for the nozzles that it has modeled and determined if these offsets are present. For those cases that are potentially affected EPRI has recalculate the new examination volume coverage for the nozzle inspection detection techniques and provided this information to the corresponding licensees."EPRI staff shall develop a matrix or table to better define the necessary design inputs for computer modeling of nozzles. This should also include a question to the utility regarding any obstructions or thickness changes which 'would impact the ultrasonic inspection parameters.

EPRI staff shall improve its documentation for review and approval of design inputs for computer modeling.

Consideration shall also be given to including a review of design inputs by the member along with an acknowledgement from the member that the design inputs are appropriate for use. EPRI staff shall consider methods of including additional conservatism to the modeling results to better accommodate changes which may be observed in the field. The project quality plan and quality project instruction shall be updated as necessary to accommodate or clarify these improvements.

Completion commitment date -10/27/2015."The coverage calculations indicated in the notification letters would likely increase if the EPRI modeled scan plans are exceeded and or if additional inspection angles were implemented.

Conversely, these coverage calculations would likely decrease if physical field limitations prevented the ultrasonic probe from executing the EPRI modeled scan pattern. It is on this basis that recipients of this letter must evaluate the condition pursuant to 10 CFR Part 21.21 to determine if it could represent a substantial safety hazard reportable under 10 CFR Part 21 ." Potentially affected US plants include Ginna, Beaver Valley Unit 1, Indian Point Units 2 and 3, Diablo Canyon Unit 2, and North Anna.* *

  • UPDATE AT 0938 EDT ON 07/24/15 FROM NEIL WILMSHURST TO JEFF HERRERA VIA FACSIMILE
  • * *"As part of the evaluation, EPRI [Electric Power Research Institute]

performed an 'extent of condition' review.During the course of the review, EPRI found that the above described deviation also affected EPRI nozzle modeling internal reports supplied by EPRI (Electric Power Research Institute) regarding Westinghouse Steam Generator Primary Nozzles."After conducting the 'extent of condition' review, which included recalculation of the modeling data, EPRI concluded that there were no other known reportable conditions associated with this deviation."EPRI has completed all evaluation efforts and issued reportability notification letters in accordance with 10CFR Part 21 within the respective reporting timeframes." Notified the R1 DO (Kennedy), R2DO (Musser) and R4DO (Gepford) and Part 21 Group (via email).

~E2lRES(, INSrflruT______ ~Message --- j..__....7 V~i71cIL~IW~F~

utW5-( i tILINIIYZJ

_.n rL=

~RESEARCHI INSTITUTE* I'!'NEIL WILMSNURST

  • It Vice President and* Chief Nltear Officer S July 22, 2:015 S U.S. Nuclear Regulatory Commission

,, Attn: Document Control Desk" Washington, DC 20555-0001

Subject:

Final Report: Part 21 -Notification:

Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections Dear Sir/M~adam; This letter constitutes the Electric Power Research Institute's (EPRI) final report addressing a deviation in a basic product (EPRi nozzle modeling internal reports) supplied by EPRI to its utility members regarding Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections.

As part of the evaluation, EPRI performed an "extent of condition" review. During the course of the review, EPRI found that the above described deviation also affected EPRI nozzle modeling internal reports supplied by EPRI (Electric Power Research Institute) regarding Westinghouse Steam Generator Primary Nozzles.After conducting the "extent of condition" review, which ihncluded recalculation of the modeling data, EPRI concluded that there were no other known reportable conditions associated with this deviation, EPRI has completed all evaluation efforts and issued reportability notification letters in accordance with IOCFR Part 21 within the respective reporting timeframes.

i The information for this report per §21.21 is provided in the following attachments.

I' If you have any questions, please contact me.Sincerely, ii. NMW/rv/tw[ Attachment(s)

Togethler

...Shaping the Future oF: Electricity 1300 West W.T. Harris Boulevard, Charlotie, NC 28262-8550 USA

  • 704.595.2732
  • , Mobile 704,,490.2653 e nwilmshursttepricom Part 21 -Final Report Notification:

Westinghouse Pressurizer Head Nozzle inner Corner Region Ultrasonic inspections Page 2 Attachment 1 U.S. Plants Affected S --A Exelon Corporation First Energy Nuclear Operating Entergy Entergy Pacific Gas & Electric Co.Dominion Generation Dominion Generation Ginna Beaver Valley 1 Indian Point 2 Indian Point 3 Diablo Canyon Unit 2 North Anna Unit I North Anna Unit 2 Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer Pressurizer NOTE: Calculations for another twelve plants resulted in changes to certain examination coverage calculations, but not to levels below the 90% threshold.

EPRI has sent Information Notices to these plants.A third group of plants had no changes.

! Part 21 -Final Report Nolifocallon:Westinghouse Pressurizer H-ead Nozzle Inner Corner Region UhIrasonlc Inspections" Page 3 E;Attachment 2'i Part 21.Reporting Information

,,, (i) Name and address of the Individual or individuals informing the Commission.

Neil M. Wilmshurst Vice President and CNO Electric Power Research Institute 1300 West WT Harris Blvd j Charlotte NC 28262-2867 (ii) Identification of the facility, the actlvity; or the basic component suppilied for such facility which fails to cOmply or contains a defect.EPRI has conducted an evaluation to the basic product's actual use and determined that the ASME examination volume coverage for the pressurizer nozzles identified in this letter have changed since oginael modeling calculations were preformed and are now 90% or less. A 90% threshold is required by ASME Boiler & Pressure Vessel Code, Section Xl. .:! (i~i) Identification of the firm constructing the facility or supplying the basic component which S fails to comply or contains a defect.EPRI supplied the basic product (report) to the licensees listed in Table 1 from 2008 to the present.!I (iv) Nature of the defect or failure to comply and the safety hazat'd which is created or could be i! created by such defect or failure to comply.Design inputs used in EPRI modeling for ultrasonic scanning, coverage for nuclear safety related ,4.component nozzles may have been inaccurate, in some cases, the upper and lower heads of 2. Westinghouse pressurizers can be offset from the center of each nozzle (spray. safety, relief, surge). This.offset results in a change in the thickness of the pressurizer head as compared to an on-axis pressurizer il head with the same radial dimensions (see examples in Attachment 3). Some of the computer models EPRI used to describe these pressurizer heads did not account for an increase in the thickness due to these offsets. As a result, in some cases the ultrasonic inspection parameters produced by these computer models may have produced inaccuracies in the examination volume coverage calculations.

This offset condition was also found in the case of some Westinghouse steam generator channel heads (refer to Figure 3).(v) The date on which the In formation of such defect or failure to comply was obtained.,l An EPRI Corrective Action Report (CAR 2015-0032) to explore the extent of the issue was initiated on I , May 2015...1

'I ii' Part 21 -Final Report Notification:

i Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections

=,;Page 4 , (vi) In the case of a basic component which contains a defect or fails to cornply 1 the number i; and location of these components in use at, supplied for, being supplied for, or may be supplied i for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.i See Table 1.: (vii) The corrective action, which has been, is being, or will be taken; the name of the Individualor organization responsible for the action; and the length of time that has been or will be taken tocomplete the action.i' EPRI has reviewed the pressurizer upper and lower head drawings for the nozzles that it has modeled and i; determined that these offsets are present, Steam generator channel head drawings were as included in this:! review. For those cases that are potentially affected EPRI has recalculated the new examination volume i! coverage for the nozzle inspection detection techniques and provided this information to the corresponding Ji licensees.

li EPRI staff shall develop a matrix or table to better define the necessary design inputs for computer , modeling of nozzles. This should also include a question to the utility regarding any obstructions or i! thickness changes which would impact the ultrasonic inspedtion parameters.

EPRI staff shall improve its i documentation for review and approval of design inputs for computer modeling.

Consideration shall also be!: given to including a review of design inputs by the member along with an acknowledgement from the , member that' the design inputs are appropriate for use. EPRI staff shall consider methods of including:J!, additional conservatism to the modeling results to better accommodate changes which may be observed in;i the field. The project quality plan and quality project instruction shall be updated as necessary toaccommodate or clarify these improvements.

Completion commitment date -10/27/2015 h (viii) Any advice related to the defect or failure to comply about the facility, activity, or basic" component that has been, is being, or will be given to purchasers or licensees.The coverage calculations indicated in the notification letters would likely increase if the EPRI modeled scan plans were exceeded and or if additional inspection angles were implemented.

Conversely, these i coverage calculations would likely decrease if physical field limitations prevented the ultrasonic probe fromexecuting the EPRI modeled scan pattern. It is on this basis that recipients of this letter must evaluate thecondition pursuant to 10 CFR Part 21.21 to determine if it could represent a substantial safety hazardreportable under 10 CFR Part 21.:: (ix) In the case of an early site permits the en titles to whom an early site permit was transferred., This is not an early site permit concern.

Part 21 -Final Report Nolification:

Wesltnghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections Page 6*i i Attachment 3 Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections -Supporting Figures Figure i below contains a sketch of a typical Westinghouse pressurizer upper head indicating that the outside surface is offset from the center of the inside surface and the center of each safety-relief and spray nozzle. The ASME Section XI Class 1 examination volume is also identified in this figure.Ceter Pont (s)io lIed (Shell) Outsde S Radius RL'diuo Flgu~e 1. Westinghouse Ohange In Tolclcras Due tQ, w:)s.l Nnz~le xi 0dmIg I Deaf Volum.Prnaerbor Sproy Nofle~cl auu I Elmni Volume ePressurizer Upper Head Sketch with Offsets 1.

Part 21 -FinaiRepori Notification:

Westinghouse Pressurizer Head Nozzle Inner Corner Region U[trasonic Inspections Page 6 Attachment 3 (cant.)Figure 2 below contains a sketch of a typical Westinghouse pressurizer lower head indicating that the outside surface is offset from the center of the inside surface and the center of the surge nozzle. The ASME Section XI Class 1 examination volume is also identified in this figure.I,)tentHeedProeurizr Su ASEX Cu -ExmVl Oenlcr PcInt (or;Wad (Sh.O) hntd* Aqous-V~¶w PeW(s) Ion Head ~Stc5~ OrAsd. Rq#ey Figure 2. Westinghouse Pressurizer Lower Head Sketch with Offsets I.,,,'1 i,'i n Part 21 -Final Report Nofificaflon:

Westinghouse Pressurizer Head Nozzle Inner Corner Region Uilrasoniic Inspections Page 7 Attachment 3 (cont.)Flgure 3 below contains a sketch of a typical Westinghouse steam generator channel head (excluding the manway) indicating that the outside surface is offset from the center of the inside surface and the center of the primary nozzles. The ASME Section XI Class 1 examination volume is also identified in this figure.i" I, L Note Ohortge In TI~iCtkrces Due to Offset'cm Prtnitiy Waflle XI Cbs. 1 Exam Volume-7/.9.9-7/ii,);: , 7 I/7/7 7 A 7, 9/Center Point for Channel H-ead Outsie~l Ibdius C.enter Paont for Channel Head Inside Rodlus Figure 3. Westinghouse Steam Generator Channel Head Primary Nozzle Sketch with Offset ,j'j , i.