IR 05000331/2018503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 25: Line 25:


SUBJECT: DUANE ARNOLD ENERGY CENTER
SUBJECT: DUANE ARNOLD ENERGY CENTER
-NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000 331/2018503
-NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000 331/2018 503


==Dear Mr. Curtland:==
==Dear Mr. Curtland:==
Line 36: Line 36:


Sincerely,/RA Gregory Hansen Acting for/
Sincerely,/RA Gregory Hansen Acting for/
Steven K. Orth, Chief Plant Support Branc h Division of Reactor Safety Docket Nos. 50
Steven K. Orth , Chief Plant Support Branc h Division of Reactor Safety Docket Nos. 50
-331; 72-032 License No. DPR-49  
-331; 72-032 License No. DPR-49  


===Enclosure:===
===Enclosure:===
IR 05000331/2018503 cc: Distribution via ListServ
IR 05000 331/2018 503 cc: Distribution via ListServ


Letter to Dean Curtland from Steven K. Orth dated May 29, 2018
Letter to Dean Curtland from Steven K. Orth dated May 29, 2018
Line 46: Line 46:
SUBJECT: DUANE ARNOLD ENERGY CENTER
SUBJECT: DUANE ARNOLD ENERGY CENTER
-NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000 331/2018503 DISTRIBUTION
-NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000 331/2018503 DISTRIBUTION
: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPreports.Resource@nrc.gov ADAMS Accession Number: ML18149A589 OFFICE RIII RIII RIII RIII NAME JKutlesa for GHansen:jw GHansen for SOrth DATE 05/29/18 05/29/18 OFFICIAL RECORD COPY
: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPreports.Resource@nrc.gov ADAMS Accession Number: ML18149A589 OFFICE RIII RIII RIII RIII NAME JKutlesa for GHansen:jw GHansen for SOrth DATE 0 5/29/18 0 5/29/18 OFFICIAL RECORD COPY


Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No:
Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No:
50-331 License No:
50-331 License No:
DPR-49 Report No:
DPR-49 Report No:
05000331/2018503 Enterprise Identifie r: I-2018-503-0006 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, IA Dates: April 13, 2018
05000 331/2 018503 Enterprise Identifie r: I-2018-503-000 6 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo , IA Dates: April 13, 2018
; May 14, 2018, through May 17, 2018 Inspectors:
; May 14, 2018 , through May 17, 2018 Inspectors:
G. Hansen, Senior Emergency Preparedness Inspect or K. Carrington, Resident Inspector J. Neurauter, Senior Reactor Inspector J. Park, Reactor Inspector J. Seymour, Operations Engineer Approved by:
G. Hansen , Senior Emergency Preparedness Inspect or K. Carrington, Resident Inspector J. Neurauter, Senior Reactor Inspector J. Park, Reactor Inspector J. Seymour, Operations Engineer Approved by:
S. Orth, Chief Plant Support Branch Division of Reactor Safety 2 SUMMARY The U.S. Nuclear Regulatory Commission continued monitoring licensee's performance by conducting an Emergency Preparedness Inspection at Duane Arnold Energy Center in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commission's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
S. Orth, Chief Plant Support Branch Division of Reactor Safety 2 SUMMARY The U.S. Nuclear Regulatory Commission continued monitoring licensee's performance by conducting an Emergency Preparedness Inspection at Duane Arnold Energy Center in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commission's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


Line 68: Line 68:


REACTOR SAFETY 71114.01-Exercise Evaluation (1 Sample)
REACTOR SAFETY 71114.01-Exercise Evaluation (1 Sample)
The inspectors evaluated the May 15, 2018, Biennial Emergency Plan Exercise.
The inspectors evaluated the May 15, 2018 , Biennial Emergency Plan Exercise.


The exercise scenario simulated an event at Duane Arnold Energy Center that initiated with the declaration and notification of an Alert in response to an event associated with an accident that created an internal flooding hazard. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of a Site Area Emergency and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
The exercise scenario simulated an event at Duane Arnold Energy Center that initiated with the declaration and notification of an Alert in response to an event associated with an accident that created an internal flooding hazard. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of a Site Area Emergency and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
Line 75: Line 75:
-Scenario Review (1 Sample)
-Scenario Review (1 Sample)
The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on April 13, 2018. OTHER ACTIVITIES
The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on April 13, 2018. OTHER ACTIVITIES
-BASELINE 71151-Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below. (3 Samples) (1) EP01: Drill/Exercise Performance
-BASELINE 71151-Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below. (3 Sample s) (1) EP01: Drill/Exercise Performance
-1 Sample (1st Quarter of 2017 through 4th Quarter of 2017); (2) EP02: Emergency Response Organization Drill Participation
-1 Sample (1 st Quarter of 2017 through 4 th Quarter of 2017); (2) EP02: Emergency Response Organization Drill Participation
-1 Sample (1st Quarter of 2017 through 4th Quarter of 2017); and (3) EP03: Alert and Notification System Reliability
-1 Sample (1 st Quarter of 2017 through 4 th Quarter of 2017); and (3) EP03: Alert and Notification System Reliability
-1 Sample (1st Quarter of 2017 through 4th Quarter of 2017). INSPECTION RESULTS No findings or violations were identified.
-1 Sample (1 st Quarter of 2017 through 4 th Quarter of 2017). INSPECTION RESULTS No findings or violations were identified.


4 EXIT MEETINGS AND DEBRIEFS The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.
4 EXIT MEETINGS AND DEBRIEFS The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.


On May 17, 2018, the inspectors presented the Emergency Preparedness inspection results to M
On May 17, 2018, the inspector s presented the Emergency Preparedness inspection results to M
}}
}}

Revision as of 23:31, 5 July 2018

Duane Arnold Energy Center - NRC Emergency Preparedness Inspection Report 05000331/2018503 (Gph)
ML18149A589
Person / Time
Site: Duane Arnold  NextEra Energy icon.png
Issue date: 05/29/2018
From: Orth S K
Plant Support Branch II
To: Dean Curtland
NextEra Energy Duane Arnold
References
IR 2018503
Download: ML18149A589 (8)


Text

May 29, 2018

Mr. Dean Curtland Director of Site Operations NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324

-9785

SUBJECT: DUANE ARNOLD ENERGY CENTER

-NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000 331/2018 503

Dear Mr. Curtland:

On May 17, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an Emergency Preparedness inspection at your Duane Arnold Energy Center. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report

. The NRC inspectors did not identify any finding or violation of more

-than-minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA Gregory Hansen Acting for/

Steven K. Orth , Chief Plant Support Branc h Division of Reactor Safety Docket Nos. 50

-331;72-032 License No. DPR-49

Enclosure:

IR 05000 331/2018 503 cc: Distribution via ListServ

Letter to Dean Curtland from Steven K. Orth dated May 29, 2018

SUBJECT: DUANE ARNOLD ENERGY CENTER

-NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000 331/2018503 DISTRIBUTION

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPreports.Resource@nrc.gov ADAMS Accession Number: ML18149A589 OFFICE RIII RIII RIII RIII NAME JKutlesa for GHansen:jw GHansen for SOrth DATE 0 5/29/18 0 5/29/18 OFFICIAL RECORD COPY

Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No:

50-331 License No:

DPR-49 Report No:

05000 331/2 018503 Enterprise Identifie r: I-2018-503-000 6 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo , IA Dates: April 13, 2018

May 14, 2018 , through May 17, 2018 Inspectors

G. Hansen , Senior Emergency Preparedness Inspect or K. Carrington, Resident Inspector J. Neurauter, Senior Reactor Inspector J. Park, Reactor Inspector J. Seymour, Operations Engineer Approved by:

S. Orth, Chief Plant Support Branch Division of Reactor Safety 2 SUMMARY The U.S. Nuclear Regulatory Commission continued monitoring licensee's performance by conducting an Emergency Preparedness Inspection at Duane Arnold Energy Center in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commission's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading

-rm/doc-collections/insp

-manual/inspection

-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, "Light

-Water Reactor Inspection Program

- Operations Phase." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY 71114.01-Exercise Evaluation (1 Sample)

The inspectors evaluated the May 15, 2018 , Biennial Emergency Plan Exercise.

The exercise scenario simulated an event at Duane Arnold Energy Center that initiated with the declaration and notification of an Alert in response to an event associated with an accident that created an internal flooding hazard. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of a Site Area Emergency and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08-Exercise Evaluation

-Scenario Review (1 Sample)

The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on April 13, 2018. OTHER ACTIVITIES

-BASELINE 71151-Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below. (3 Sample s) (1) EP01: Drill/Exercise Performance

-1 Sample (1 st Quarter of 2017 through 4 th Quarter of 2017); (2) EP02: Emergency Response Organization Drill Participation

-1 Sample (1 st Quarter of 2017 through 4 th Quarter of 2017); and (3) EP03: Alert and Notification System Reliability

-1 Sample (1 st Quarter of 2017 through 4 th Quarter of 2017). INSPECTION RESULTS No findings or violations were identified.

4 EXIT MEETINGS AND DEBRIEFS The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.

On May 17, 2018, the inspector s presented the Emergency Preparedness inspection results to M