ML13317B016: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = E-Mail | | document type = E-Mail | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:MF2838 | |||
| stage = Acceptance Review | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Lingam, Siva Sent:Wednesday, November 13, 2013 10:02 AM To:Connelly, Scott (Scott.C onnelly@duke-energy.com) | |||
Cc:Quichocho, Jessie; Elliott, Robert; Hamm, Matthew; richard.hightower@pgnmail.com | |||
==Subject:== | |||
H. B. Robinson, Unit 2 TSTF-491, Rev. 2 LAR, Removal of MS and FW Isolation Times From TSs - Acceptance Review( TAC No. MF2838)By letter dated September 30, 2013 (ADAMS Accession No. ML13283A012), Duke Energy submitted a license amendment request (LAR) for H. B. Robinson Steam Electric Plant (HBREP), Unit No. 2. The proposed LAR implements the NRC-approved TSTF-491, Removal of Main Steam and Main Feedwater Valve Isolation Times From Technical Specifications, via the Consolidated Line Item Improvement Process (CLIIP). This request will modify the current HBRSEP Technical Specifications (TS) 3 | |||
.7.2, Main Steam Isolation Valves (MSIVs) and 3.7 | |||
.3, Main Feedwater Isolation Valves (MFIVs), Main Feedwater Regulation Valves (MFRVs) and Bypass Valves by relocating the specific isolation time for the isolation valves from the associated Surveillance Requirements (SRs) | |||
. The isolation time in the TS SRs is replaced with the requirement to verify the valve isolation time is "within limits." The specific isolation times will be maintained in the HBRSEP2 Technical Requirements Manual (TRM) | |||
. The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in | |||
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that | |||
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | |||
If you have any questions, please contact me. | |||
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2) | |||
Sequoyah Nuclear Plant St. Lucie Plant Robinson Steam Electric Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov | |||
Hearing Identifier: NRR_PMDA Email Number: 917 Mail Envelope Properties (Siva.Lingam@nrc.gov20131113100200) | |||
==Subject:== | |||
H. B. Robinson, Unit 2 TSTF-491, Rev. 2 LAR, Removal of MS and FW Isolation Times From TSs - Acceptance Review( TAC No. MF2838) Sent Date: 11/13/2013 10:02:29 AM Received Date: 11/13/2013 10:02:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov> | |||
Tracking Status: None "richard.hightower@pgnmail.com" <richard.hightower@pgnmail.com> Tracking Status: None | |||
"Connelly, Scott (Scott.Conne lly@duke-energy.com)" <Scott.Connelly@duke-energy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2627 11/13/2013 10:02:00 AM | |||
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} |
Revision as of 15:11, 3 July 2018
ML13317B016 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 11/13/2013 |
From: | Lingam S P Plant Licensing Branch II |
To: | Connelly S R Duke Energy Progress |
References | |
MF2838, TSTF-491 | |
Download: ML13317B016 (2) | |
Text
1NRR-PMDAPEm Resource From:Lingam, Siva Sent:Wednesday, November 13, 2013 10:02 AM To:Connelly, Scott (Scott.C onnelly@duke-energy.com)
Cc:Quichocho, Jessie; Elliott, Robert; Hamm, Matthew; richard.hightower@pgnmail.com
Subject:
H. B. Robinson, Unit 2 TSTF-491, Rev. 2 LAR, Removal of MS and FW Isolation Times From TSs - Acceptance Review( TAC No. MF2838)By letter dated September 30, 2013 (ADAMS Accession No. ML13283A012), Duke Energy submitted a license amendment request (LAR) for H. B. Robinson Steam Electric Plant (HBREP), Unit No. 2. The proposed LAR implements the NRC-approved TSTF-491, Removal of Main Steam and Main Feedwater Valve Isolation Times From Technical Specifications, via the Consolidated Line Item Improvement Process (CLIIP). This request will modify the current HBRSEP Technical Specifications (TS) 3
.7.2, Main Steam Isolation Valves (MSIVs) and 3.7
.3, Main Feedwater Isolation Valves (MFIVs), Main Feedwater Regulation Valves (MFRVs) and Bypass Valves by relocating the specific isolation time for the isolation valves from the associated Surveillance Requirements (SRs)
. The isolation time in the TS SRs is replaced with the requirement to verify the valve isolation time is "within limits." The specific isolation times will be maintained in the HBRSEP2 Technical Requirements Manual (TRM)
. The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant St. Lucie Plant Robinson Steam Electric Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
Hearing Identifier: NRR_PMDA Email Number: 917 Mail Envelope Properties (Siva.Lingam@nrc.gov20131113100200)
Subject:
H. B. Robinson, Unit 2 TSTF-491, Rev. 2 LAR, Removal of MS and FW Isolation Times From TSs - Acceptance Review( TAC No. MF2838) Sent Date: 11/13/2013 10:02:29 AM Received Date: 11/13/2013 10:02:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov>
Tracking Status: None "richard.hightower@pgnmail.com" <richard.hightower@pgnmail.com> Tracking Status: None
"Connelly, Scott (Scott.Conne lly@duke-energy.com)" <Scott.Connelly@duke-energy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2627 11/13/2013 10:02:00 AM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: