ML21110A146

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Robinson Relief Request Acceptance Review Results: IST-RR-7, EPID: L-2021-LLR-0022
ML21110A146
Person / Time
Site: Robinson Duke energy icon.png
Issue date: 04/20/2021
From: John Klos
NRC/NRR/DORL/LPL2-1
To: Duc B, Zaremba A
Duke Energy Progress
References
L-2021-LLR-0022
Download: ML21110A146 (3)


Text

From: Klos, John Sent: Tuesday, April 20, 2021 11:01 AM To: Duc, Joshua Brian; Zaremba, Arthur H.

Cc: Klos, John

Subject:

Robinson Relief Request acceptance review results; IST-RR-7, EPID: L-2021-LLR-0022

Joshua, By letter dated March 29, 2021, Duke Energy Progress, LLC submitted a relief request for H. B.

Robinson Steam Electric Plant, Unit No. 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 70 hours8.101852e-4 days <br />0.0194 hours <br />1.157407e-4 weeks <br />2.6635e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 8 months, which is December 31, 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me, John Klos, at the contact information below.

Thank you, John Klos DORL Mcguire and H.B. Robinson Licensing Project Manager U.S. NRC, Office of Nuclear Reactor Regulation (NRR),

Division of Operating Reactor Licensing (DORL),

NRC/NRR/DORL/LPL2-1, MS O9E3 Washington, DC 20555-0001 301.415.5136, John.Klos@NRC.gov

Hearing Identifier: NRR_DRMA Email Number: 1136 Mail Envelope Properties (SA0PR09MB6649DB78DA971EC438839859E3489)

Subject:

Robinson Relief Request acceptance review results; IST-RR-7, EPID:

L-2021-LLR-0022 Sent Date: 4/20/2021 11:00:34 AM Received Date: 4/20/2021 11:00:35 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None "Duc, Joshua Brian" <Joshua.Duc@duke-energy.com>

Tracking Status: None "Zaremba, Arthur H." <Arthur.Zaremba@duke-energy.com>

Tracking Status: None Post Office: SA0PR09MB6649.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2460 4/20/2021 11:00:35 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: