Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24002A7382 January 2024NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2
ML23262B45019 September 2023NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology
ML23220A2348 August 2023NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML23172A01320 June 2023Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program
ML23153A1892 June 2023Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program
ML23151A34830 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23142A27322 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23131A41910 May 2023003 Radiation Safety Baseline Inspection Information RequestContraband
Process Control Program
Coronavirus
ML23124A1214 May 2023Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)
ML23073A22813 March 2023Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review
ML23058A05627 February 2023Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System InstrumentationSurveillance Frequency Control Program
Operational leakage
ML23048A15116 February 2023Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003)
ML23011A01511 January 2023NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.bAnticipated operational occurrence
ML22285A15512 October 2022NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b
ML22222A10810 August 2022NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16
ML22146A36525 May 2022Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition InformationHealth Physics Network
High winds
ML22112A14822 April 2022Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02
ML22080A00418 March 2022Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
ML22038A1577 February 2022NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2
ML22018A02718 January 20222022 All RFI Responses - Exercise and Program Inspections - Revl
ML22012A36612 January 2022Acceptance of Requested Licensing Action License Amendment Re2uest for Application to Revise Technical Specification to Adopt TSTF-577, Revised Frequencies for Steam Generating Tube Inspections
ML22005A0875 January 2022Acceptance of Requested Licensing Action Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves
ML21361A01223 December 2021NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility
ML21295A29922 October 2021Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004
ML21286A66113 October 2021Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections
ML21119A22729 April 2021NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-9, EPID: L-2021-LLR-0024
ML21116A25926 April 2021NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-8, EPID: L-2021-LLR-0023
ML21116A25826 April 2021NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-3, EPID: L-2021-LLR-0020
ML21113A13123 April 2021NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-5, EPID: L-2021-LLR-0021
ML21110A14620 April 2021NRR E-mail Capture - Robinson Relief Request Acceptance Review Results: IST-RR-7, EPID: L-2021-LLR-0022
ML21049A2634 February 2021NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency PlanFLEX
Siren
ML20353A13018 December 20202021 Hbr 50.59 Info Request - E-mail Request- Upcoming 50.59 Inspection (IP71111.17T)- Week of March 1-5, 2021
ML20323A40718 November 2020NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180)Safeguards Contingency Plan
Exemption Request
Pandemic
Coronavirus
COVID-19
Grace period
ML20297A31013 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126)Incorporated by reference
ML20297A3087 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124)Incorporated by reference
ML20297A3096 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125)Incorporated by reference
ML20063M19421 February 2020NRR E-mail Capture - Accepted for Review - Robinson Unit 2 One-Time Pressure Relief Valve Test Frequency Extension EPID: L-2020-LLR-0019
ML20085F93120 February 2020SPRA - Spr Audit Questions - 2nd BatchProbabilistic Risk Assessment
ML20049A03416 February 2020NRR E-mail Capture - Accepted for Review - Robinson Unit 2 to Correct Administrative Renewed Facility Operating License Error in the 50.69 LAR EPID: L-2020-LLL-0000
ML20063L4564 February 2020NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072
ML20087N6633 February 2020SPRA - Spr Audit Questions RedactedSafe Shutdown
Safe Shutdown Earthquake
FLEX
ML20027C20427 January 2020Audit Documents Needed for the Robinson Seismic Probabilistic Risk Assessment Review - FLEX and HRA ReferencesProbabilistic Risk Assessment
FLEX
ML20015A18913 January 2020Audit Documents Needed for the Robinson SPRA Review - Fragility AnalysisProbabilistic Risk Assessment
ML20009C0928 January 2020Audit Documents Needed for the Robinson SPRA Review - Seismic Hazard AnalysisProbabilistic Risk Assessment
ML19365A04830 December 2019Request for Eportal Access for Audit Review of the Robinson SPRA Supporting Documents
ML19365A04618 December 2019Audit Documents Needed for the Robinson SPRA ReviewProbabilistic Risk Assessment
ML19288A29415 October 2019NRR E-mail Capture - RAIs for Robinson Revision to RPV Surveillance Program Withdrawal Schedule
ML19283A03726 September 2019Draft Requests for Additional Information for H.B. Robinson LAR to Revise TS 3.8.2, AC Sources - Shutdown, SR 3.8.2.1
ML19235A12021 August 2019Acceptance Review for Robinson LAR to Add Feedwater Bypass Valve to TS 3.7.3 (L-2019-LLA-0170)