{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Miernicki, MichaelSent:Monday, July 07, 2014 9:28 AMTo:garent@tva.gov; rhbryan@tva.govCc:Quichocho, Jessie; Poole, Justin; Kulesa, Gloria; Johnson, Andrew
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Miernicki, Michael Sent:Monday, July 07, 2014 9:28 AM To:garent@tva.gov; rhbryan@tva.gov Cc:Quichocho, Jessie; Poole, Justin
; Kulesa, Gloria; Johnson, Andrew


==Subject:==
==Subject:==
Watts Bar 2 - RAIs - Developmental Tech Specs Rev I -  Steam GeneratorsAttachments:RAI WBN2 Stm Gen T.S. 7-7-14docx..docxAttached please find RAIs from the Steam Generator Branch regarding Watts Bar 2 Developmental Technical Specifications Revision I. Please provide your responses within 30 days.
Watts Bar 2 - RAIs - Developmental Tech Specs Rev I -  Steam Generators Attachments:
Mike Michael J. Miernicki Sr. Project Manager NRC/NRR/DORL/LP-WB 301-415-2304 Hearing Identifier:  NRR_PMDA Email Number:  1418  Mail Envelope Properties  (Michael.Miernicki@nrc.gov20140707092700)  
RAI WBN2 Stm Gen T.S. 7-7-14docx..docxAttached please find RAIs from the Steam Generator Branch regarding Watts Bar 2 Developmental Technical Specifications Revision I. Please provide your responses within 30 days.  
 
Mike Michael J. Miernicki  
 
Sr. Project Manager NRC/NRR/DORL/LP-WB 301-415-2304  
 
Hearing Identifier:  NRR_PMDA Email Number:  1418  Mail Envelope Properties  (Michael.Miernicki@nrc.gov20140707092700)


==Subject:==
==Subject:==
Watts Bar 2 - RAIs - Developmental Tech Specs Rev I -  Steam Generators  Sent Date:  7/7/2014 9:27:38 AM  Received Date:  7/7/2014 9:27:00 AM From:    Miernicki, Michael Created By:  Michael.Miernicki@nrc.gov Recipients:    "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>  Tracking Status: None  "Poole, Justin" <Justin.Poole@nrc.gov>
Watts Bar 2 - RAIs - Developmental Tech Specs Rev I -  Steam Generators  Sent Date:  7/7/2014 9:27:38 AM  Received Date:  7/7/2014 9:27:00 AM From:    Miernicki, Michael Created By:  Michael.Miernicki@nrc.gov Recipients:    "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>  Tracking Status: None  "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None  "Kulesa, Gloria" <Gloria.Kulesa@nrc.gov>  Tracking Status: None "Johnson, Andrew" <Andrew.Johnson@nrc.gov>  Tracking Status: None  "garent@tva.gov" <garent@tva.gov>
Tracking Status: None  "Kulesa, Gloria" <Gloria.Kulesa@nrc.gov>  Tracking Status: None "Johnson, Andrew" <Andrew.Johnson@nrc.gov>  Tracking Status: None  "garent@tva.gov" <garent@tva.gov>
Tracking Status: None  "rhbryan@tva.gov" <rhbryan@tva.gov>  Tracking Status: None  
Tracking Status: None  "rhbryan@tva.gov" <rhbryan@tva.gov>  Tracking Status: None  


Post Office:      Files    Size      Date & Time MESSAGE    288      7/7/2014 9:27:00 AM  RAI WBN2 Stm Gen T.S. 7-7-14docx..docx    20968   Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Post Office:      Files    Size      Date & Time MESSAGE    288      7/7/2014 9:27:00 AM  RAI WBN2 Stm Gen T.S. 7-7-14docx..docx    20968 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION                    REVIEW OF DEVELOPMENTAL TECHNICAL SPECIFICATIONS REV. I                                        WATTS BAR NUCLEAR PLANT UNIT 2                                                DOCKET NUMBER 50-391   BACKGROUND By letter dated June 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14169A525), Tennessee Valley Authority (the licensee) submitted developmental Revision I of the Watts Bar Unit 2 Technical Specifications, for review and licensing by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff has reviewed sections 3.4.17 "Steam Generator (SG) Tube Integrity," B 3.4.17 "Steam Generator (SG) Tube Integrity Bases," 5.7.2.12 "Steam Generator (SG) Program," and 5.9.9 "Steam Generator Tube Inspection Report," which the licensee provided, and determined that additional information is required in order to complete the review. In order for the NRC staff to complete its review of the document listed above, please provide the following additional information: QUESTION 1 On page B 3.4-90, the "Applicable Safety Analyses" section of B 3.4.17, "Steam Generator (SG) Tube Integrity Bases" does not adequately identify the leakage rates associated with the faulted and non-faulted SGs. The described leakage rates do not appear to be consistent with Section 15 of the Final Safety Analysis Report (Amendment 106). Please clarify which leakage rates are associated with the appropriate SGs. QUESTION 2   On page B 3.4-95, the "Surveillance Requirements" section of B 3.4.17, "Steam Generator (SG) Tube Integrity Bases" contains an extraneous paragraph. The second paragraph on this page is an optional paragraph from Technical Specification Task Force 510 (TSTF-510) that is only used when approved repair methods are contained in the Technical Specification 5.7.2.12, "Steam Generator (SG) Program." Since Watts Bar Unit 2 has no approved repair methods, please confirm that this paragraph will be removed. QUESTION 3   On pages 5.0-14 and 5.0-15, in Technical Specification 5.7.2.12, "Steam Generator (SG) Program," the incorporated wording is inconsistent with the wording in TSTF-510. In TSTF-510, at the end of the opening paragraph, the word "provisions" was deleted because it is repeated at the beginning of paragraph 5.7.2.12.a. The closing parenthesis in paragraph 5.7.2.12.b.1 was moved, because not all of the anticipated transients in the design specification are considered part of normal operating conditions. Finally, in paragraph 5.7.2.12.d, the phrase, "An assessment of degradation" was replaced with, "A degradation assessment" so that the wording would be consistent with that used in industry SG program documents. Please revise these pages to be consistent with TSTF-510. QUESTION 4 In Technical Specification 5.7.2.12, "Steam Generator (SG) Program," the most restrictive SG inspection periods were chosen from TSTF-510 (i.e., inspect 100% of the tubes at sequential periods of 60 effective full power months). Please confirm that the SGs at Watts Bar Unit 2 contain mill annealed Alloy 600 tubes. Also, please provide the model designation of the Watts Bar Unit 2 SGs.}}
REQUEST FOR ADDITIONAL INFORMATION                    REVIEW OF DEVELOPMENTAL TECHNICAL SPECIFICATIONS REV. I                                        WATTS BAR NUCLEAR PLANT UNIT 2                                                DOCKET NUMBER 50-391 BACKGROUND By letter dated June 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14169A525), Tennessee Valley Authority (the licensee) submitted developmental Revision I of the Watts Bar Unit 2 Technical Specifications, for review and licensing by the U.S. Nuclear Regulatory Commission (NRC).
The NRC staff has reviewed sections 3.4.17 "Steam Generator (SG) Tube Integrity," B 3.4.17 "Steam Generator (SG) Tube Integrity Bases," 5.7.2.12 "Steam Generator (SG) Program," and 5.9.9 "Steam Generator Tube Inspection Report," which the licensee provided, and determined that additional information is required in order to complete the review. In order for the NRC staff to complete its review of the document listed above, please provide the following additional information:
QUESTION 1 On page B 3.4-90, the "Applicable Safety Analyses" section of B 3.4.17, "Steam Generator (SG) Tube Integrity Bases" does not adequately identify the leakage rates associated with the faulted and non-faulted SGs. The described leakage rates do not appear to be consistent with Section 15 of the Final Safety Analysis Report (Amendment 106). Please clarify which leakage rates are associated with the appropriate SGs.
QUESTION 2 On page B 3.4-95, the "Surveillance Requirements" section of B 3.4.17, "Steam Generator (SG) Tube Integrity Bases" contains an extraneous paragraph. The second paragraph on this page is an optional paragraph from Technical Specification Task Force 510 (TSTF-510) that is only used when approved repair methods are contained in the Technical Specification 5.7.2.12, "Steam Generator (SG) Program." Since Watts Bar Unit 2 has no approved repair methods, please confirm that this paragraph will be removed.
QUESTION 3 On pages 5.0-14 and 5.0-15, in Technical Specification 5.7.2.12, "Steam Generator (SG) Program," the incorporated wording is inconsistent with the wording in TSTF-510. In TSTF-510, at the end of the opening paragraph, the word "provisions" was deleted because it is repeated at the beginning of paragraph 5.7.2.12.a. The closing parenthesis in paragraph 5.7.2.12.b.1 was moved, because not all of the anticipated transients in the design specification are considered part of normal operating conditions. Finally, in paragraph 5.7.2.12.d, the phrase, "An assessment of degradation" was replaced with, "A degradation assessment" so that the wording would be consistent with that used in industry SG program documents. Please revise these pages to be consistent with TSTF-510.
QUESTION 4  
 
In Technical Specification 5.7.2.12, "Steam Generator (SG) Program," the most restrictive SG inspection periods were chosen from TSTF-510 (i.e., inspect 100% of the tubes at sequential periods of 60 effective full power months). Please confirm that the SGs at Watts Bar Unit 2 contain mill annealed Alloy 600 tubes. Also, please provide the model designation of the Watts Bar Unit 2 SGs.}}

Revision as of 13:35, 1 July 2018

2014/07/07 NRR E-mail Capture - Watts Bar 2 - RAIs - Developmental Tech Specs Rev I - Steam Generators
ML14191A758
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/07/2014
From: Miernicki M J
Watts Bar Special Projects Branch
To: Arent G P
Tennessee Valley Authority
References
Download: ML14191A758 (4)


Text

1NRR-PMDAPEm Resource From:Miernicki, Michael Sent:Monday, July 07, 2014 9:28 AM To:garent@tva.gov; rhbryan@tva.gov Cc:Quichocho, Jessie; Poole, Justin

Kulesa, Gloria; Johnson, Andrew

Subject:

Watts Bar 2 - RAIs - Developmental Tech Specs Rev I - Steam Generators Attachments:

RAI WBN2 Stm Gen T.S. 7-7-14docx..docxAttached please find RAIs from the Steam Generator Branch regarding Watts Bar 2 Developmental Technical Specifications Revision I. Please provide your responses within 30 days.

Mike Michael J. Miernicki

Sr. Project Manager NRC/NRR/DORL/LP-WB 301-415-2304

Hearing Identifier: NRR_PMDA Email Number: 1418 Mail Envelope Properties (Michael.Miernicki@nrc.gov20140707092700)

Subject:

Watts Bar 2 - RAIs - Developmental Tech Specs Rev I - Steam Generators Sent Date: 7/7/2014 9:27:38 AM Received Date: 7/7/2014 9:27:00 AM From: Miernicki, Michael Created By: Michael.Miernicki@nrc.gov Recipients: "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Kulesa, Gloria" <Gloria.Kulesa@nrc.gov> Tracking Status: None "Johnson, Andrew" <Andrew.Johnson@nrc.gov> Tracking Status: None "garent@tva.gov" <garent@tva.gov>

Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 288 7/7/2014 9:27:00 AM RAI WBN2 Stm Gen T.S. 7-7-14docx..docx 20968 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

REQUEST FOR ADDITIONAL INFORMATION REVIEW OF DEVELOPMENTAL TECHNICAL SPECIFICATIONS REV. I WATTS BAR NUCLEAR PLANT UNIT 2 DOCKET NUMBER 50-391 BACKGROUND By letter dated June 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14169A525), Tennessee Valley Authority (the licensee) submitted developmental Revision I of the Watts Bar Unit 2 Technical Specifications, for review and licensing by the U.S. Nuclear Regulatory Commission (NRC).

The NRC staff has reviewed sections 3.4.17 "Steam Generator (SG) Tube Integrity," B 3.4.17 "Steam Generator (SG) Tube Integrity Bases," 5.7.2.12 "Steam Generator (SG) Program," and 5.9.9 "Steam Generator Tube Inspection Report," which the licensee provided, and determined that additional information is required in order to complete the review. In order for the NRC staff to complete its review of the document listed above, please provide the following additional information:

QUESTION 1 On page B 3.4-90, the "Applicable Safety Analyses" section of B 3.4.17, "Steam Generator (SG) Tube Integrity Bases" does not adequately identify the leakage rates associated with the faulted and non-faulted SGs. The described leakage rates do not appear to be consistent with Section 15 of the Final Safety Analysis Report (Amendment 106). Please clarify which leakage rates are associated with the appropriate SGs.

QUESTION 2 On page B 3.4-95, the "Surveillance Requirements" section of B 3.4.17, "Steam Generator (SG) Tube Integrity Bases" contains an extraneous paragraph. The second paragraph on this page is an optional paragraph from Technical Specification Task Force 510 (TSTF-510) that is only used when approved repair methods are contained in the Technical Specification 5.7.2.12, "Steam Generator (SG) Program." Since Watts Bar Unit 2 has no approved repair methods, please confirm that this paragraph will be removed.

QUESTION 3 On pages 5.0-14 and 5.0-15, in Technical Specification 5.7.2.12, "Steam Generator (SG) Program," the incorporated wording is inconsistent with the wording in TSTF-510. In TSTF-510, at the end of the opening paragraph, the word "provisions" was deleted because it is repeated at the beginning of paragraph 5.7.2.12.a. The closing parenthesis in paragraph 5.7.2.12.b.1 was moved, because not all of the anticipated transients in the design specification are considered part of normal operating conditions. Finally, in paragraph 5.7.2.12.d, the phrase, "An assessment of degradation" was replaced with, "A degradation assessment" so that the wording would be consistent with that used in industry SG program documents. Please revise these pages to be consistent with TSTF-510.

QUESTION 4

In Technical Specification 5.7.2.12, "Steam Generator (SG) Program," the most restrictive SG inspection periods were chosen from TSTF-510 (i.e., inspect 100% of the tubes at sequential periods of 60 effective full power months). Please confirm that the SGs at Watts Bar Unit 2 contain mill annealed Alloy 600 tubes. Also, please provide the model designation of the Watts Bar Unit 2 SGs.