IR 05000390/2015005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
[[Issue date::September 1, 2015]]
-1257 September 1
 
, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D
Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
-C Chattanooga, TN 37402
-2801


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005


==Dear Mr. Shea:==
Dear Mr. Shea
On August 13, 2015, the NRC completed its mid-cycle performance review of Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
:
On August 13, 2015, the NRC completed its mid
-cycle performance review of Watts Bar Nuclear Plant Unit The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30, 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end
-of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial
-Grade Dedication Programs
," and an initial operator license examinatio J. Shea 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice,
" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial-Grade Dedication Programs," and an initial operator license examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4415 with any questions you have regarding this letter.
Please contact me at 404-997-4415 with any questions you have regarding this lette


Sincerely,/RA/
Sincerely,/RA/
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-390 License Nos. NPF-90  
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50
-390 License No NPF
-90  


===Enclosure:===
===Enclosure:===
Watts Bar Inspection/Activity Plan (07/01/2015 - 06/30/2017) cc distribution via ListServ
Watts Bar Inspection/Activity Plan
 
(07/01/2015  
- 06/30/2017)
cc distribution via ListServ


_________________________ XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO Letter to Joseph Shea from Alan Blamey dated September 1, 2015
_________________________
XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION
Page 1 of 309/01/201510:35:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarInspection / Activity Plan09/01/2015-06/30/2017ISFSI-ISFSI PAD CONCRETE PLACEMENT11 IPOn-Site Fabrication Of Components And Construction On An ISFSI6085309/21/201509/25/2015RP-RP OCCUPATIONAL BASELINE WEEK 121 IPRadiological Hazard Assessment and Exposure Controls71124.0110/05/201510/09/20151 IPOccupational ALARA Planning and Controls71124.0210/05/201510/09/20151 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/05/201510/09/20151 IPOccupational Dose Assessment71124.0410/05/201510/09/20151 IPRadiation Monitoring Instrumentation71124.0510/05/201510/09/20151 IPPerformance Indicator Verification7115110/05/201510/09/2015ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/12/201510/16/2015RP-RP OCCUPATIONAL BASELINE WEEK 231 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151 IPOccupational ALARA Planning and Controls71124.0210/19/201510/23/20151 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/201510/23/20151 IPOccupational Dose Assessment71124.0410/19/201510/23/20151 IPRadiation Monitoring Instrumentation71124.0510/19/201510/23/20151 IPPerformance Indicator Verification7115110/19/201510/23/2015EP-EP EXERCISE81 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/20151 IPExercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/20151 IPPerformance Indicator Verification7115111/16/201511/20/2015CDBI-COMPONENT DESIGN BASES INSPECTION71 IPComponent Design Bases Inspection711112102/01/201602/05/20161 IPComponent Design Bases Inspection711112102/29/201603/04/20161 IPComponent Design Bases Inspection711112103/14/201603/18/20161 IPComponent Design Bases Inspection711112103/28/201604/01/2016OL EXAM-INITIAL LICENSE EXAM PREP31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIESV2347506/20/201606/24/2016OL EXAM-INITIAL LICENSE EXAM31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIESV2347507/18/201607/22/2016MODS-PLANT MODIFICATIONS INSPECTION31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T07/25/201607/29/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR


Page 2 of 309/01/201510:35:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarInspection / Activity Plan09/01/2015-06/30/2017MODS-PLANT MODIFICATIONS INSPECTION31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T08/08/201608/12/2016RP-RP PUBLIC RAD SAFETY BASELINE41 IPRadiological Hazard Assessment and Exposure Controls71124.0108/01/201608/05/20161 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/01/201608/05/20161 IPRadiological Environmental Monitoring Program71124.0708/01/201608/05/20161 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/01/201608/05/20161 IPPerformance Indicator Verification7115108/01/201608/05/2016PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41 IPProblem Identification and Resolution71152B10/31/201611/04/20161 IPProblem Identification and Resolution71152B11/14/201611/18/2016EP-EP PROGRAM INSPECTION41 IPAlert and Notification System Testing711140211/14/201611/18/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/20161 IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/20161 IPPerformance Indicator Verification7115111/14/201611/18/2016ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM21 IPInservice Inspection Activities - PWR7111108P03/27/201703/31/2017RP-RP OCCUPATIONAL INSPECTION WEEK 121 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/20171 IPOccupational ALARA Planning and Controls71124.0203/27/201703/31/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/201703/31/20171 IPOccupational Dose Assessment71124.0403/27/201703/31/20171 IPRadiation Monitoring Instrumentation71124.0503/27/201703/31/20171 IPPerformance Indicator Verification7115103/27/201703/31/2017SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/03/201704/07/2017RP-RP OCCUPATIONAL INSPECTION WEEK 231 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/201704/14/20171 IPOccupational ALARA Planning and Controls71124.0204/10/201704/14/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/201704/14/20171 IPOccupational Dose Assessment71124.0404/10/201704/14/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)


Page 3 of 309/01/201510:35:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarInspection / Activity Plan09/01/2015-06/30/2017RP-RP OCCUPATIONAL INSPECTION WEEK 231 IPRadiation Monitoring Instrumentation71124.0504/10/201704/14/20171 IPPerformance Indicator Verification7115104/10/201704/14/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 1 of 3 09/01/2015 10:35:16Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015
-06/30/2017 ISFSI-ISFSI PAD CONCRETE PLACEMENT 11 IPOn-Site Fabrication Of Components And Construction On An ISFSI 6085309/21/2015 09/25/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/05/2015 10/09/2015 1 IPOccupational ALARA Planning and Controls71124.0210/05/2015 10/09/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/05/2015 10/09/2015 1 IPOccupational Dose Assessment71124.0410/05/2015 10/09/2015 1 IPRadiation Monitoring Instrumentation71124.0510/05/2015 10/09/2015 1 IPPerformance Indicator Verification7115110/05/2015 10/09/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/12/2015 10/16/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/2015 10/23/2015 1 IPOccupational ALARA Planning and Controls71124.0210/19/2015 10/23/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/2015 10/23/2015 1 IPOccupational Dose Assessment71124.0410/19/2015 10/23/2015 1 IPRadiation Monitoring Instrumentation71124.0510/19/2015 10/23/2015 1 IPPerformance Indicator Verification7115110/19/2015 10/23/2015 EP-EP EXERCISE 81 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IPExercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 1 IPPerformance Indicator Verification7115111/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 71 IPComponent Design Bases Inspection711112102/01/2016 02/05/2016 1 IPComponent Design Bases Inspection711112102/29/2016 03/04/2016 1 IPComponent Design Bases Inspection711112103/14/2016 03/18/2016 1 IPComponent Design Bases Inspection711112103/28/2016 04/01/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347506/20/2016 06/24/2016OL EXAM-INITIAL LICENSE EXAM 31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347507/18/2016 07/22/2016 MODS-PLANT MODIFICATIONS INSPECTION 31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T07/25/2016 07/29/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 3 09/01/2015 10:35:16Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015
-06/30/2017 MODS-PLANT MODIFICATIONS INSPECTION 31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T08/08/2016 08/12/2016 RP-RP PUBLIC RAD SAFETY BASELINE 41 IPRadiological Hazard Assessment and Exposure Controls71124.0108/01/2016 08/05/2016 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/01/2016 08/05/2016 1 IPRadiological Environmental Monitoring Program71124.0708/01/2016 08/05/2016 1 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/01/2016 08/05/2016 1 IPPerformance Indicator Verification7115108/01/2016 08/05/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41 IPProblem Identification and Resolution71152B10/31/201611/04/2016 1 IPProblem Identification and Resolution71152B11/14/201611/18/2016 EP-EP PROGRAM INSPECTION 41 IPAlert and Notification System Testing711140211/14/201611/18/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016 1 IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016 1 IPPerformance Indicator Verification7115111/14/201611/18/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 21 IPInservice Inspection Activities - PWR7111108P03/27/2017 03/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/2017 03/31/2017 1 IPOccupational ALARA Planning and Controls71124.0203/27/2017 03/31/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/2017 03/31/2017 1 IPOccupational Dose Assessment71124.0403/27/2017 03/31/2017 1 IPRadiation Monitoring Instrumentation71124.0503/27/2017 03/31/2017 1 IPPerformance Indicator Verification7115103/27/2017 03/31/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/03/2017 04/07/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/2017 04/14/2017 1 IPOccupational ALARA Planning and Controls71124.0204/10/2017 04/14/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/2017 04/14/2017 1 IPOccupational Dose Assessment71124.0404/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 3 of 3 09/01/2015 10:35:16Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015
-06/30/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31 IPRadiation Monitoring Instrumentation71124.0504/10/2017 04/14/2017 1 IPPerformance Indicator Verification7115104/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 20:41, 30 June 2018

Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
ML15244B056
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2015
From: Blamey A J
Division Reactor Projects II
To: Shea J W
Tennessee Valley Authority
References
IR 2015005
Download: ML15244B056 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 September 1

, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D

-C Chattanooga, TN 37402

-2801

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005

Dear Mr. Shea

On August 13, 2015, the NRC completed its mid

-cycle performance review of Watts Bar Nuclear Plant Unit The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30, 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end

-of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non

-publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial

-Grade Dedication Programs

," and an initial operator license examinatio J. Shea 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice,

" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this lette

Sincerely,/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50

-390 License No NPF

-90

Enclosure:

Watts Bar Inspection/Activity Plan

(07/01/2015

- 06/30/2017)

cc distribution via ListServ

_________________________

XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR

RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 3 09/01/2015 10:35:16Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015

-06/30/2017 ISFSI-ISFSI PAD CONCRETE PLACEMENT 11 IPOn-Site Fabrication Of Components And Construction On An ISFSI 6085309/21/2015 09/25/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/05/2015 10/09/2015 1 IPOccupational ALARA Planning and Controls71124.0210/05/2015 10/09/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/05/2015 10/09/2015 1 IPOccupational Dose Assessment71124.0410/05/2015 10/09/2015 1 IPRadiation Monitoring Instrumentation71124.0510/05/2015 10/09/2015 1 IPPerformance Indicator Verification7115110/05/2015 10/09/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/12/2015 10/16/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/2015 10/23/2015 1 IPOccupational ALARA Planning and Controls71124.0210/19/2015 10/23/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/2015 10/23/2015 1 IPOccupational Dose Assessment71124.0410/19/2015 10/23/2015 1 IPRadiation Monitoring Instrumentation71124.0510/19/2015 10/23/2015 1 IPPerformance Indicator Verification7115110/19/2015 10/23/2015 EP-EP EXERCISE 81 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IPExercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 1 IPPerformance Indicator Verification7115111/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 71 IPComponent Design Bases Inspection711112102/01/2016 02/05/2016 1 IPComponent Design Bases Inspection711112102/29/2016 03/04/2016 1 IPComponent Design Bases Inspection711112103/14/2016 03/18/2016 1 IPComponent Design Bases Inspection711112103/28/2016 04/01/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347506/20/2016 06/24/2016OL EXAM-INITIAL LICENSE EXAM 31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347507/18/2016 07/22/2016 MODS-PLANT MODIFICATIONS INSPECTION 31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T07/25/2016 07/29/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 3 09/01/2015 10:35:16Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015

-06/30/2017 MODS-PLANT MODIFICATIONS INSPECTION 31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T08/08/2016 08/12/2016 RP-RP PUBLIC RAD SAFETY BASELINE 41 IPRadiological Hazard Assessment and Exposure Controls71124.0108/01/2016 08/05/2016 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/01/2016 08/05/2016 1 IPRadiological Environmental Monitoring Program71124.0708/01/2016 08/05/2016 1 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/01/2016 08/05/2016 1 IPPerformance Indicator Verification7115108/01/2016 08/05/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41 IPProblem Identification and Resolution71152B10/31/201611/04/2016 1 IPProblem Identification and Resolution71152B11/14/201611/18/2016 EP-EP PROGRAM INSPECTION 41 IPAlert and Notification System Testing711140211/14/201611/18/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016 1 IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016 1 IPPerformance Indicator Verification7115111/14/201611/18/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 21 IPInservice Inspection Activities - PWR7111108P03/27/2017 03/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/2017 03/31/2017 1 IPOccupational ALARA Planning and Controls71124.0203/27/2017 03/31/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/2017 03/31/2017 1 IPOccupational Dose Assessment71124.0403/27/2017 03/31/2017 1 IPRadiation Monitoring Instrumentation71124.0503/27/2017 03/31/2017 1 IPPerformance Indicator Verification7115103/27/2017 03/31/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/03/2017 04/07/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/2017 04/14/2017 1 IPOccupational ALARA Planning and Controls71124.0204/10/2017 04/14/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/2017 04/14/2017 1 IPOccupational Dose Assessment71124.0404/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 3 of 3 09/01/2015 10:35:16Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015

-06/30/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31 IPRadiation Monitoring Instrumentation71124.0504/10/2017 04/14/2017 1 IPPerformance Indicator Verification7115104/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.