{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511  March 4, 2015  Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61N St. Francisville, LA  70775 
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2014001)   
==Dear Mr. Olson:==
On February 19, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the River Bend Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at the River Bend Station during the most recent quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix. On October 23, 2014, the NRC issued an Assessment Follow-up Letter for the River Bend Station (ML14296A082) which stated that based on the issuance of a Greater-than-Green inspection finding in the Security Cornerstone, the NRC determined the performance at River Bend Station to be in the Regulatory Response Column of the NRC's Reactor Oversight Process Action Matrix, beginning in the second quarter of 2014. Therefore, the NRC plans to conduct a supplemental inspection. In addition, the River Bend Station's safety-significant performance indicator (PI) for Unplanned Scrams with Complications, crossed the Green-White threshold during the 4th Quarter 2014. This was due to two unplanned scrams the River Bend Station experienced in the 4th Quarter of 2014. Therefore, the NRC plans to conduct Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area."  The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection. Because, this White input is not in the same strategic performance area as the finding in the Security Cornerstone described above, the River Bend Station remains in the Regulatory Response Column. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will E. Olson  contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Greg Warnick, Chief, Project Branch C, at 817-200-1144 with any questions you have regarding this letter. Sincerely,      /RA/  Troy W. Pruett, Director    Division of Reactor Projects        Docket:  50-458    License:  NPF-47   
==Enclosure:==
River Bend Station Inspection Plan   
Page 1 of 202/26/201519:47:10Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteRiver BendInspection / Activity Plan03/01/2015-06/30/201671111.08-INSERVICE INSPECTION11    IPInservice Inspection Activities - BWR7111108G02/23/201503/06/2015RS 12 PI-RADIATION SAFETY21    IPRadiological Hazard Assessment and Exposure Controls71124.0103/02/201503/06/20151    IPOccupational ALARA Planning and Controls71124.0203/02/201503/06/20151    IPOccupational Exposure Control Effectiveness71151-OR0103/02/201503/06/20151    IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/02/201503/06/2015TSB 52B-BIENNIAL PI&R INSPECTION41    IPProblem Identification and Resolution71152B06/08/201506/12/20151    IPProblem Identification and Resolution71152B06/29/201507/02/2015EP-1-BIENNAIL EP PROGRAM INSPECTION11    IPAlert and Notification System Testing711140208/17/201508/21/20151    IPEmergency Preparedness Organization Staffing and Augmentation System711140308/17/201508/21/20151    IPEmergency Action Level and Emergency Plan Changes711140408/17/201508/21/20151    IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/17/201508/21/2015EP-2-EP PERFORMANCE INDICATORS11    IPDrill/Exercise Performance71151-EP0108/17/201508/21/20151    IPERO Readiness71151-EP0208/17/201508/21/20151    IPAlert & Notification System Reliability71151-EP0308/17/201508/21/2015EB1-17T-RBS PERMANENT PLANT MODS & 50.5961    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/21/201510/09/2015RS 5678-RADIATION SAFETY - TEAM41    IPRadiation Monitoring Instrumentation71124.0512/07/201512/11/20151    IPRadioactive Gaseous and Liquid Effluent Treatment71124.0612/07/201512/11/20151    IPRadiological Environmental Monitoring Program71124.0712/07/201512/11/20151    IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/07/201512/11/2015RS 24-RADIATION SAFETY21    IPOccupational ALARA Planning and Controls71124.0201/18/201601/22/20161    IPOccupational Dose Assessment71124.0401/18/201601/22/2016EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41    IPFire Protection [Triennial]7111105T04/11/201604/15/20161    IPFire Protection [Triennial]7111105T04/25/201604/29/2016RS 13 PI-RADIATION SAFETY21    IPRadiological Hazard Assessment and Exposure Controls71124.0105/09/201605/13/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 202/26/201519:47:10Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteRiver BendInspection / Activity Plan03/01/2015-06/30/2016RS 13 PI-RADIATION SAFETY21    IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/09/201605/13/20161    IPOccupational Exposure Control Effectiveness71151-OR0105/09/201605/13/20161    IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/09/201605/13/2016ISFSI-ROUTINE LOADING INSPECTION (ONE WEEK)11    IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.106/01/201606/01/2016EP-2-EP PERFORMANCE INDICATORS21    IPDrill/Exercise Performance71151-EP0106/27/201607/01/20161    IPERO Readiness71151-EP0206/27/201607/01/20161    IPAlert & Notification System Reliability71151-EP0306/27/201607/01/2016EP-3-BIENNIAL EXERCISE INSPECTION41    IPExercise Evaluation711140106/27/201607/01/20161    IPEmergency Action Level and Emergency Plan Changes711140406/27/201607/01/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
E. Olson  contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Greg Warnick, Chief, Project Branch C, at 817-200-1144 with any questions you have regarding this letter. Sincerely,      /RA/  Troy W. Pruett, Director    Division of Reactor Projects        Docket:  50-458    License:  NPF-47   
==Enclosure:==
River Bend Station Inspection Plan DISTRIBUTION See next page      RBS 2014 EOC Ltr.      ML15063A562        SUNSI Review By:  RA ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword RGN-002 OFFICE DRP BC-C DRS/DIR  DRP/DIR NAME GWarnick: tk AVegel  TPruett SIGNATURE /RA/ /RA/  /RA/ DATE 2/27/15 2/27/15  3/4/15 OFFICIAL RECORD COPY Letter to Eric Olson from Troy Pruett, dated March 4, 2015 
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION  (REPORT 05000458/2014001)
DISTRIBUTION:      Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Jeff.Sowa@nrc.gov) Resident Inspector (Andy.Barrett@nrc.gov) Site Administrative Assistant (Lisa.Day@nrc.gov) Branch Chief, DRP (Greg.Warnick@nrc.gov) Senior Project Engineer, DRP (Ray.Azua@nrc.gov) Project Engineer, DRP (Paul.Nizov@nrc.gov) Project Engineer, DRP (Michael.Stafford@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) RIV State Liaison Officer (Bill.Maier@nrc.gov) Project Manager (Alan.Wang@nrc.gov) DRP Branch Chiefs (R4DRP-BC1@nrc.gov) DRS Branch Chiefs (R4DRS-BC1@nrc.gov) Director, DIRS, NRR (Scott.Morris@nrc.gov) Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) Director, DORL, NRR (Michele.Evans@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Chief, PLB IV-2, DORL, NRR (Doug.Broaddus@nrc.gov) Director, NSIR/DPR (Robert.Lewis@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA:  OEDO (Michael.Waters@nrc.gov) ROPassessment.Resource@nrc.gov ROPreports.Resources@nrc.gov OEMail.Resource@nrc.gov}}

Revision as of 13:53, 14 June 2018

RBS 2014 Annual Assessment Letter
ML15063A562
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/04/2015
From: Pruett T W
NRC/RGN-IV/DRP
To: Olson E W
Entergy Operations
R. Azua
References
IR 20144001
Download: ML15063A562 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 March 4, 2015 Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2014001)

Dear Mr. Olson:

On February 19, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the River Bend Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at the River Bend Station during the most recent quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix. On October 23, 2014, the NRC issued an Assessment Follow-up Letter for the River Bend Station (ML14296A082) which stated that based on the issuance of a Greater-than-Green inspection finding in the Security Cornerstone, the NRC determined the performance at River Bend Station to be in the Regulatory Response Column of the NRC's Reactor Oversight Process Action Matrix, beginning in the second quarter of 2014. Therefore, the NRC plans to conduct a supplemental inspection. In addition, the River Bend Station's safety-significant performance indicator (PI) for Unplanned Scrams with Complications, crossed the Green-White threshold during the 4th Quarter 2014. This was due to two unplanned scrams the River Bend Station experienced in the 4th Quarter of 2014. Therefore, the NRC plans to conduct Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection. Because, this White input is not in the same strategic performance area as the finding in the Security Cornerstone described above, the River Bend Station remains in the Regulatory Response Column. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will E. Olson contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Greg Warnick, Chief, Project Branch C, at 817-200-1144 with any questions you have regarding this letter. Sincerely, /RA/ Troy W. Pruett, Director Division of Reactor Projects Docket: 50-458 License: NPF-47

Enclosure:

River Bend Station Inspection Plan

Page 1 of 202/26/201519:47:10Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRiver BendInspection / Activity Plan03/01/2015-06/30/201671111.08-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G02/23/201503/06/2015RS 12 PI-RADIATION SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0103/02/201503/06/20151 IPOccupational ALARA Planning and Controls71124.0203/02/201503/06/20151 IPOccupational Exposure Control Effectiveness71151-OR0103/02/201503/06/20151 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/02/201503/06/2015TSB 52B-BIENNIAL PI&R INSPECTION41 IPProblem Identification and Resolution71152B06/08/201506/12/20151 IPProblem Identification and Resolution71152B06/29/201507/02/2015EP-1-BIENNAIL EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140208/17/201508/21/20151 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/17/201508/21/20151 IPEmergency Action Level and Emergency Plan Changes711140408/17/201508/21/20151 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/17/201508/21/2015EP-2-EP PERFORMANCE INDICATORS11 IPDrill/Exercise Performance71151-EP0108/17/201508/21/20151 IPERO Readiness71151-EP0208/17/201508/21/20151 IPAlert & Notification System Reliability71151-EP0308/17/201508/21/2015EB1-17T-RBS PERMANENT PLANT MODS & 50.5961 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/21/201510/09/2015RS 5678-RADIATION SAFETY - TEAM41 IPRadiation Monitoring Instrumentation71124.0512/07/201512/11/20151 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0612/07/201512/11/20151 IPRadiological Environmental Monitoring Program71124.0712/07/201512/11/20151 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/07/201512/11/2015RS 24-RADIATION SAFETY21 IPOccupational ALARA Planning and Controls71124.0201/18/201601/22/20161 IPOccupational Dose Assessment71124.0401/18/201601/22/2016EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41 IPFire Protection [Triennial]7111105T04/11/201604/15/20161 IPFire Protection [Triennial]7111105T04/25/201604/29/2016RS 13 PI-RADIATION SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/09/201605/13/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 202/26/201519:47:10Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRiver BendInspection / Activity Plan03/01/2015-06/30/2016RS 13 PI-RADIATION SAFETY21 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/09/201605/13/20161 IPOccupational Exposure Control Effectiveness71151-OR0105/09/201605/13/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/09/201605/13/2016ISFSI-ROUTINE LOADING INSPECTION (ONE WEEK)11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.106/01/201606/01/2016EP-2-EP PERFORMANCE INDICATORS21 IPDrill/Exercise Performance71151-EP0106/27/201607/01/20161 IPERO Readiness71151-EP0206/27/201607/01/20161 IPAlert & Notification System Reliability71151-EP0306/27/201607/01/2016EP-3-BIENNIAL EXERCISE INSPECTION41 IPExercise Evaluation711140106/27/201607/01/20161 IPEmergency Action Level and Emergency Plan Changes711140406/27/201607/01/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

E. Olson contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Greg Warnick, Chief, Project Branch C, at 817-200-1144 with any questions you have regarding this letter. Sincerely, /RA/ Troy W. Pruett, Director Division of Reactor Projects Docket: 50-458 License: NPF-47

Enclosure:

River Bend Station Inspection Plan DISTRIBUTION See next page RBS 2014 EOC Ltr. ML15063A562 SUNSI Review By: RA ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword RGN-002 OFFICE DRP BC-C DRS/DIR DRP/DIR NAME GWarnick: tk AVegel TPruett SIGNATURE /RA/ /RA/ /RA/ DATE 2/27/15 2/27/15 3/4/15 OFFICIAL RECORD COPY Letter to Eric Olson from Troy Pruett, dated March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2014001)

DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Jeff.Sowa@nrc.gov) Resident Inspector (Andy.Barrett@nrc.gov) Site Administrative Assistant (Lisa.Day@nrc.gov) Branch Chief, DRP (Greg.Warnick@nrc.gov) Senior Project Engineer, DRP (Ray.Azua@nrc.gov) Project Engineer, DRP (Paul.Nizov@nrc.gov) Project Engineer, DRP (Michael.Stafford@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) RIV State Liaison Officer (Bill.Maier@nrc.gov) Project Manager (Alan.Wang@nrc.gov) DRP Branch Chiefs (R4DRP-BC1@nrc.gov) DRS Branch Chiefs (R4DRS-BC1@nrc.gov) Director, DIRS, NRR (Scott.Morris@nrc.gov) Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) Director, DORL, NRR (Michele.Evans@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Chief, PLB IV-2, DORL, NRR (Doug.Broaddus@nrc.gov) Director, NSIR/DPR (Robert.Lewis@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov) ROPassessment.Resource@nrc.gov ROPreports.Resources@nrc.gov OEMail.Resource@nrc.gov