ML15063A562

From kanterella
Jump to navigation Jump to search
RBS 2014 Annual Assessment Letter
ML15063A562
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/04/2015
From: Troy Pruett
NRC/RGN-IV/DRP
To: Olson E
Entergy Operations
R. Azua
References
IR 20144001
Download: ML15063A562 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 March 4, 2015 Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2014001)

Dear Mr. Olson:

On February 19, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the River Bend Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at the River Bend Station during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix. On October 23, 2014, the NRC issued an Assessment Follow-up Letter for the River Bend Station (ML14296A082) which stated that based on the issuance of a Greater-than-Green inspection finding in the Security Cornerstone, the NRC determined the performance at River Bend Station to be in the Regulatory Response Column of the NRCs Reactor Oversight Process Action Matrix, beginning in the second quarter of 2014. Therefore, the NRC plans to conduct a supplemental inspection.

In addition, the River Bend Stations safety-significant performance indicator (PI) for Unplanned Scrams with Complications, crossed the Green-White threshold during the 4th Quarter 2014.

This was due to two unplanned scrams the River Bend Station experienced in the 4th Quarter of 2014. Therefore, the NRC plans to conduct Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection. Because, this White input is not in the same strategic performance area as the finding in the Security Cornerstone described above, the River Bend Station remains in the Regulatory Response Column.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will

E. Olson contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Greg Warnick, Chief, Project Branch C, at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy W. Pruett, Director Division of Reactor Projects Docket: 50-458 License: NPF-47

Enclosure:

River Bend Station Inspection Plan

Page 1 of 2 River Bend 02/26/2015 19:47:10 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71111.08 - INSERVICE INSPECTION 1 1 02/23/2015 03/06/2015 IP 7111108G Inservice Inspection Activities - BWR RS 12 PI - RADIATION SAFETY 2 1 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 03/02/2015 03/06/2015 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 03/02/2015 03/06/2015 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences TSB 52B - BIENNIAL PI&R INSPECTION 4 1 06/08/2015 06/12/2015 IP 71152B Problem Identification and Resolution 1 06/29/2015 07/02/2015 IP 71152B Problem Identification and Resolution EP-1 - BIENNAIL EP PROGRAM INSPECTION 1 1 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing 1 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 08/17/2015 08/21/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATORS 1 1 08/17/2015 08/21/2015 IP 71151-EP01 Drill/Exercise Performance 1 08/17/2015 08/21/2015 IP 71151-EP02 ERO Readiness 1 08/17/2015 08/21/2015 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - RBS PERMANENT PLANT MODS & 50.59 6 1 09/21/2015 10/09/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications RS 5678 - RADIATION SAFETY - TEAM 4 1 12/07/2015 12/11/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 12/07/2015 12/11/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 12/07/2015 12/11/2015 IP 71124.07 Radiological Environmental Monitoring Program 1 12/07/2015 12/11/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS 24 - RADIATION SAFETY 2 1 01/18/2016 01/22/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 01/18/2016 01/22/2016 IP 71124.04 Occupational Dose Assessment EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 04/11/2016 04/15/2016 IP 7111105T Fire Protection [Triennial]

1 04/25/2016 04/29/2016 IP 7111105T Fire Protection [Triennial]

RS 13 PI - RADIATION SAFETY 2 1 05/09/2016 05/13/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 River Bend 02/26/2015 19:47:10 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 13 PI - RADIATION SAFETY 2 1 05/09/2016 05/13/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/09/2016 05/13/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 05/09/2016 05/13/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences ISFSI - ROUTINE LOADING INSPECTION (ONE WEEK) 1 1 06/01/2016 06/01/2016 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EP-2 - EP PERFORMANCE INDICATORS 2 1 06/27/2016 07/01/2016 IP 71151-EP01 Drill/Exercise Performance 1 06/27/2016 07/01/2016 IP 71151-EP02 ERO Readiness 1 06/27/2016 07/01/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EXERCISE INSPECTION 4 1 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation 1 06/27/2016 07/01/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

E. Olson contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Greg Warnick, Chief, Project Branch C, at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy W. Pruett, Director Division of Reactor Projects Docket: 50-458 License: NPF-47

Enclosure:

River Bend Station Inspection Plan DISTRIBUTION See next page RBS 2014 EOC Ltr. ML15063A562 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: RA Yes No Non-Sensitive Publicly Available RGN-002 OFFICE DRP BC-C DRS/DIR DRP/DIR NAME GWarnick: tk AVegel TPruett SIGNATURE /RA/ /RA/ /RA/

DATE 2/27/15 2/27/15 3/4/15 OFFICIAL RECORD COPY

Letter to Eric Olson from Troy Pruett, dated March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2014001)

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeff.Sowa@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Site Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP (Ray.Azua@nrc.gov)

Project Engineer, DRP (Paul.Nizov@nrc.gov)

Project Engineer, DRP (Michael.Stafford@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV State Liaison Officer (Bill.Maier@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

DRP Branch Chiefs (R4DRP-BC1@nrc.gov)

DRS Branch Chiefs (R4DRS-BC1@nrc.gov)

Director, DIRS, NRR (Scott.Morris@nrc.gov)

Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)

Director, DORL, NRR (Michele.Evans@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Chief, PLB IV-2, DORL, NRR (Doug.Broaddus@nrc.gov)

Director, NSIR/DPR (Robert.Lewis@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

ROPassessment.Resource@nrc.gov ROPreports.Resources@nrc.gov OEMail.Resource@nrc.gov