ML12053A152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| project = TAC:ME1586
| stage = Other
}}
=Text=
{{#Wiki_filter:o~v~A~~QUF UNIVERSITY ofUFLORIDACollege of EngineeringUniversitv of l/orida Tra1ining Reactor202 Nuclear Sciences Bldg.PO Box 118300Gainesville, FL 32611-8300352-392-1401352-392-3380 FaxWWW.111"e.U .eCuFebruary 2, 2012Document Control DeskU.S. Nuclear Regulatory CommissionWashington, D.C. 20555Request additional time to respond to RAI re:License Renewal, TAC NO.ME1586, datedJanuary 6, 2012ATTN: Duane HardestyUniversity of Florida Training Reactor (UFTR) -Facility License R- 56, Docket 50-83Additional time to respond to the latest RAls is requested due to several reasons:(1) UFTR staff has been heavily involved in training and facility refurbishment projects which included along overdue consolidation of solid reactor waste. This project involved the use of an experienced licensedradioactive waste vendor and had already been planned and budgeted. Implementation of this projectresulted in a delay in addressing these RAIs.(2) Currently, we have one staff member available to address licensing related work. This individual isworking with a small group of Graduate Students to respond to the RAI's.(3) re RAI questions 1, 2, and 3. We are reevaluating and will likely redevelop our Ar-41 analysis andmethodologies. This will require a complete rewrite of the associated FSAR sections and will likely result ina change to our proposed Technical Specifications as well.(4) re RAI questions 4 and 6. We need to reevaluate and redevelop our MHA analysis. Additionally, weneed to incorporate the HEU-LEU Conversion SAR material into our final draft SAR. This will require acomplete rewrite of the associated SAR sections and has the potential to result in a change to our proposedTechnical Specifications as well.(5) re RAI question 5. We have a draft response for this RAI being routed internally for review. This willalso require rewrite of the associated ESAR sections and therefore we will be unable to meet the requestedFebruary 6, 2012 due date.(6) re RAI question 7. We are reevaluating and will likely revise our liquid release procedure and ALARApolicy. This will also require rewrite of the associated FSAR sections. Additionally, we are evaluating theD4ZIXDThe Foundation for The Galor NationTAn Equal Opportiiniy Institution feasibility of a replacement cell air handler system designed to minimize or eliminate chill watercondensation runoff which comprises a large majority of the liquid waste produced at the UFTR.Respectfully, we must request more time for this entire process. We currently anticipate completion of allitems should be possible by the end of December 2012. Responses completed in advance of this requesteddue date will be submitted as partial RAI transmittals following RSRS approval.Thank you for your patience and consideration.Dr. lly JordanThe Foundation for The Gator NationAn Equal Opportunity Institution
}}
}}

Revision as of 07:23, 2 April 2018

University of Florida Training Reactor - Request Additional Time to Respond to RAI License Renewal
ML12053A152
Person / Time
Site: 05000083
Issue date: 02/02/2012
From: Jordan K
Univ of Florida
To: Hardesty D A
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC ME1586
Download: ML12053A152 (2)


Text

o~v~A~~QUF UNIVERSITY ofUFLORIDACollege of EngineeringUniversitv of l/orida Tra1ining Reactor202 Nuclear Sciences Bldg.PO Box 118300Gainesville, FL 32611-8300352-392-1401352-392-3380 FaxWWW.111"e.U .eCuFebruary 2, 2012Document Control DeskU.S. Nuclear Regulatory CommissionWashington, D.C. 20555Request additional time to respond to RAI re:License Renewal, TAC NO.ME1586, datedJanuary 6, 2012ATTN: Duane HardestyUniversity of Florida Training Reactor (UFTR) -Facility License R- 56, Docket 50-83Additional time to respond to the latest RAls is requested due to several reasons:(1) UFTR staff has been heavily involved in training and facility refurbishment projects which included along overdue consolidation of solid reactor waste. This project involved the use of an experienced licensedradioactive waste vendor and had already been planned and budgeted. Implementation of this projectresulted in a delay in addressing these RAIs.(2) Currently, we have one staff member available to address licensing related work. This individual isworking with a small group of Graduate Students to respond to the RAI's.(3) re RAI questions 1, 2, and 3. We are reevaluating and will likely redevelop our Ar-41 analysis andmethodologies. This will require a complete rewrite of the associated FSAR sections and will likely result ina change to our proposed Technical Specifications as well.(4) re RAI questions 4 and 6. We need to reevaluate and redevelop our MHA analysis. Additionally, weneed to incorporate the HEU-LEU Conversion SAR material into our final draft SAR. This will require acomplete rewrite of the associated SAR sections and has the potential to result in a change to our proposedTechnical Specifications as well.(5) re RAI question 5. We have a draft response for this RAI being routed internally for review. This willalso require rewrite of the associated ESAR sections and therefore we will be unable to meet the requestedFebruary 6, 2012 due date.(6) re RAI question 7. We are reevaluating and will likely revise our liquid release procedure and ALARApolicy. This will also require rewrite of the associated FSAR sections. Additionally, we are evaluating theD4ZIXDThe Foundation for The Galor NationTAn Equal Opportiiniy Institution feasibility of a replacement cell air handler system designed to minimize or eliminate chill watercondensation runoff which comprises a large majority of the liquid waste produced at the UFTR.Respectfully, we must request more time for this entire process. We currently anticipate completion of allitems should be possible by the end of December 2012. Responses completed in advance of this requesteddue date will be submitted as partial RAI transmittals following RSRS approval.Thank you for your patience and consideration.Dr. lly JordanThe Foundation for The Gator NationAn Equal Opportunity Institution