UFFLORIDA Herbert Wertheim College of Engineering UF Training Reactor Facility June 21, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
CY2022 Annual Report for the UFTR PO Box 116134 Gainesville, FL 32611 352-294-2104 bshea@ufl.edu Technical Specifications 6.7.1 License R-56, Docket 50-83 Please find enclosed the UFTR annual report for calendar year 2022. This report is being submitted as required by our Technical Specifications, Section 6.7.1.
I declare under penalty of perjury that the foregoing and attached are true and correct to my knowledge.
Executed on June 21, 2023.
Brian Shea Reactor Manager, University of Florida Training Reactor cc:
Duane Hardesty, Project Manager, NRC The Foundation for The Gator Nation An Equal Opportunity Institution
University of Florida Training Reactor Annual Report for Calendar Year 2022 The following annual report is submitted in accordance with Section 6. 7.1 of the UFTR Technical Specifications.
Summary of Reactor Operations:
Total Energy Output for CY2022:
Cumulative Energy Output Since Conversion to LEU:
21,501 kW-hrs 88,702 kW-hrs Routine operations were conducted throughout the year with brief outages for maintenance and surveillances with an extended outage for scheduled in-core fuel inventory and a fresh fuel addition to the core.
Unscheduled Shutdowns:
There were no unscheduled shutdowns during CY2022.
Major Maintenance:
A listing of all major maintenance is presented in Table I. The Date Opened entry is when the Maintenance Log Page (MLP) was opened; in a few cases, this date may be one or more days after the original problem was noted. The Date Closed entry is the day the MLP was closed which can also be one or more days after work completion. Update of CY2021 Report, MLP 21-8 was closed on 5/18/22.
MLP# Date Opened Date Closed 22-1 1/10/2022 1/10/2022 22-2 1/10/2022 1/10/2022 22-3 1/13/2022 1/13/2022 22-4 2/8/2022 2/8/2022 22-5 3/14/2022 3/14/2022 22-6 4/28/2022 5/6/2022 22-7 8/1/2022 8/1/2022 22-8 8/3/2022 8/9/2022 22-9 9/21/2022 OPEN 22-10 10/3/2022 10/3/2022 22-11 11/14/2022 11/14/2022 22-12 11/14/2022 11/14/2022 CY2022 Annual Report University of Florida Training Reactor Table I Summary Routine addition of makeup water to the PC Tank.
Cleaned the reactor console key switch due to carbon buildup.
Replaced Stack Fan motor belt.
Replaced rupture disk and added makeup water to the PC Tank.
Routine addition of makeup water to the PC Tank.
Factory calibration adjustments to Nuclear Instrumentation.
Routine addition of makeup water to the PC Tank.
Adjusted spacer combs on fuel and dummy bundles to be added to the core.
Replaced the piping and controls for the Rabbit System Routine addition of makeup water to the PC Tank.
Changed DI Water System Filter and Resin.
Routine addition of makeup water to the PC Tank.
Page 1 of 3 June 21, 2023
Changes, Tests, and Experiments Implemented under 10 CFR 50.59:
A listing of changes, tests, and experiments implemented under 10 CFR 50.59 is presented in Table II. All changes, tests, and experiments implemented during CY2022 screened-out from full evaluation.
Table II Number Date Summary Approved 22-1 5/23/2022 Procedure Change: SOP-A.1 Pre-Operational Checks, change sequence for cycling console power.
22-2 5/24/2022 Procedure Change: SOP-E.2 Calibration of Rx Measuring Channels, change connection point for measuring compensating voltage.
22-3 6/07/2022 Procedure Change: SOP-A.9 Startup using Inverse Multiplication, change units of reactivity.
22-4 7/06/2022 Modification: Use of MCNP6.2 for fuel addition calculations, newer version than that used for license renewal FSAR information.
22-5 7/06/2022 Modification: Load a fresh partial fuel bundle into the core.
22-6 9/21/2022 Modification: Confinement hole created for rabbit system conduit installation.
22-7 10/31/2022 Procedure Change: SOP-A.2 Reactor Startup, changes needed based on adding new fuel to the core.
22-8 10/31/2022 Procedure Change: SOP-A.3 Operation at Power, editorial changes to be consistent with SOP-A.2 revision.
22-9 10/31/2022 Procedure Change: SOP-B.1 Radiological Emergency, editorial changes and changes due to new power supply references.
22-10 10/31/2022 Procedure Change: SOP-B-2 Emergency Procedure - Fire, similar changes made from SOP-B.l revision.
Radioactive Effluents:
Liquid Waste No wastewater releases were made during CY2022.
Gaseous Waste The total activity of Argon-41 released during CY2022 was 95. 75 curies. Using the calculation method described in the UFSAR, the maximum potential dose to a member of the public from UFTR Ar-41 emissions during CY2022 was 0.4 mrem/year. This is significantly less than 25% of the ALARA constraint of 10 mrem/yr.
CY2022 Annual Report University of Florida Training Reactor Page 2 of 3 June 21, 2023
Environmental Surveys:
In addition to periodic radiation surveys using hand-held instruments, environmental monitoring is accomplished using radiation dosimeter badges. Areas monitored are located around the exterior of the Reactor Building (RB) and nearby buildings, including the Nuclear Sciences Building (NSB), the Rhines Hall (RH), Weil Hall (WH), Weimer Hall (WmH), and Wertheim Engineering Lab (WEL). The environmental dosimeter reports are tabulated and presented in Table III. Dose equivalents below the minimum measurable quantity are reported as "M".
Table III Quarterly TEDE Annual TEDE Area (mrem)
(mrem)
Oct-Jan-Mar Apr-Jun Jul-Sep Dec
- 1. NSB Rm. 316 window - inside 3
8 1
34 46
- 2. NSB, NW corner of Van de graff roof 6
14 6
35 61
- 3. UFTR West Lot, fence post 7
15 5
46 73
- 4. RH roof, SE roof corner near access 3
9 2
29 43
- 5. RH roof, above N entrance to bldg 4
13 1
5 23
- 6. WH roof, SE corner of main roof 4
8 3
32 47
- 7. WH roof, near roof access door 5
9 4
24 42
- 8. WH roof, due N of bldg 25 7
15 4
28 54
11 3
27 44
- 10. WmH, 3rd floor roof, SW corner 2
8 2
28 40
- 11. WmH Extension roof, SW corner 4
11 2
28 45
- 12. WmH Extension roof, NW corner 5
10 19 30 64
- 13. WEL roof, N side of Level 7 3
8 3
26 40
- 14. Control Badge - Building 683 west wall 3
5 M
43 51 Radiation Exposures:
There were no exposures received by facility personnel or visitors that were greater than 25% of that allowed in 10 CFR Part 20. Eight individuals received measurable occupational exposures during CY2022.
The maximum Total Effective Dose Equivalent (TEDE) received by any individual in CY2022 was 308 mrem. The maximum extremity dose (SDE, ME) received by any individual in CY2022 was 625 mrem.
CY2022 Annual Report University of Florida Training Reactor Page 3 of 3 June 21, 2023