ML24219A252

From kanterella
Jump to navigation Jump to search
University of Florida - Permanent Change in Facility Organization
ML24219A252
Person / Time
Site: 05000083
Issue date: 08/05/2024
From: Shea B
Univ Of Florida, Gainesville
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML24219A252 (1)


Text

Herbert Wertheim College of Engineering University of Florida Training Reactor 340 Weil Hall PO Box 116134 Gainesville, FL 32611 352-294-2100 August 5, 2024 ATTN: Document Control Desk Technical Specification 6.7.2.b.1 U.S. Nuclear Regulatory Commission Docket 50-83, License R-56 Washington, DC 20555-0001 Re:

Permanent Change in Facility Organization As required by Technical Specification 6.7.2.b.1, we are reporting a permanent change in facility organization involving Level 1.

Dr. Kent Fuchs will serve as interim president for the University of Florida effective August 1, 2024.

Please let us know if further information is needed.

Sincerely, Brian Shea Reactor Manager Universitiy of Florida Training Reactor cc:

NRC Project Manager, Duane Hardesty The Foundation for The Gator Nation An Equal Opportunity Institution