Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Acceptance Review Letter
MONTHYEARML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21147A2982021-05-27027 May 2021 Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) ML21084A0042021-03-25025 March 2021 3/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements ML21012A0442021-01-12012 January 2021 1/12/2021 E-mail Acceptance Review Determination, Alternative Requests RR-05-04 and IR-4-02 ML21011A2832021-01-11011 January 2021 1/11/2021 E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20357A0282020-12-21021 December 2020 E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML20350B8272020-12-15015 December 2020 (12/15/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review Determination Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency ML20337A2692020-12-0202 December 2020 12/2/20 E-mail, Acceptance Review Determination, LAR Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML20325A3762020-11-20020 November 2020 (11/20/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review, Unacceptable with Opportunity to Supplement Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency ML20287A3372020-10-13013 October 2020 Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 4th 10-year Inservice Inspection Interval (EPID L-2020-LLR-0129 and LLR-0130) ML20224A0702020-08-11011 August 2020 Acceptance Review Determination (E-mail Dated 8/11/2020) Alternative Request RR-05-06 Insepection Interval Extension for SG Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML20198M3742020-07-16016 July 2020 Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR=0088) ML20142A4682020-05-21021 May 2020 Acceptance Review Determination (E-mail Dated 5/21/2020) Proposed Technical Specification Change to Battery Surveillance Requirements ML20092K9572020-04-0101 April 2020 Acceptance Review Determination (E-mail Dated 4/1/2020) LAR to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20079M4772020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0024 to LLR-0026) ML20079M6752020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0027 to LLR-0032) ML20021A3772020-01-21021 January 2020 Acceptance Review Determination (E-mail 1/21/2020) Alternative Request RR-05-05 ML20021A3782020-01-21021 January 2020 Acceptance Review Determination (E-mail 1/21/2020) LAR to Revise TS 6.25 ML19304B1542019-10-31031 October 2019 Acceptance Review Determination (E-mail 10/31/19) Extension of TS 3.8.1.1 Allowed Outage Time ML19295C8342019-10-22022 October 2019 Acceptance Review Determination (E-mail 10/22/19) Alternative Request RR-05-03 Extension of ASME Code Case N-770-2 RCP Nozzle DM Butt Welds ML19277B9082019-10-0707 October 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19249B5482019-09-0606 September 2019 Acceptance Review Determination (E-mail 9/6/19) - Revised TS Limits for Primary and Secondary Coolant Activity ML19249B5972019-09-0606 September 2019 Acceptance Review Determination (E-mail 9/6/19) LAR to Revise Integrated Leak Rate Test ML19126A3232019-05-0606 May 2019 Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request RR-05-01, VT-2 Pressure Testing Requirements for the Lower Portion of the RPV ML19126A3252019-05-0606 May 2019 Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Requests RR-05-02, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19126A3262019-05-0606 May 2019 Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request IR-4-01, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19122A3032019-05-0202 May 2019 Acceptance Review Determination (e-mail 5/2/19) License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 ML19087A0692019-03-28028 March 2019 Acceptance Review Determination (E-mail 3/28/19) Proposed Alternative Request IR-3-39 ML19058A8622019-02-27027 February 2019 Acceptance Review Determination (E-mail 2/27/19), LAR Proposed Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19036A9022019-02-0505 February 2019 Acceptance of Amendment Request Revising Emergency Action Level Schemes ML18186A4282018-07-0505 July 2018 Acceptance Review Determination (E-mail 7/5/2018), Proposed Alternative Request P-06 for 'C' Charging Pump Test ML18163A1732018-06-12012 June 2018 Acceptance Review Determination (E-mail 6/12/2018), LAR Regarding Proposed TS Changes to Spent Fuel Storage and New Fuel Storage ML18127A0232018-05-0707 May 2018 Acceptance Review Determination (E-mail 5/7/2018), LAR to Revise TS Action Statement for Loss of Control Building Inlet Ventilation Rad Monitor Instrumentation Channels ML18078A0072018-03-19019 March 2018 Acceptance Review Determination (E-mail), Inservice Testing Program for Pumps, Valves, and Snubbers, Fifth and Fourth 10-Year Interval Updates (EPID: L-2018-LLR-0011 to L-2018-LLR-0022) ML18078A0042018-03-19019 March 2018 Acceptance Review Determination (E-mail), Proposed Alternative Request RR-04-27 and IR-3-38 Use of Encoded Paut in Lieu of Rt ML17313A1602017-11-0909 November 2017 Acceptance Review Determination Regarding License Amendment Request to Revise the Integrated Leak Rate Test (Type a) and Type C Test Intervals ML17202A0062017-07-21021 July 2017 Acceptance Review Determination Regarding License Amendment Request to Revise the Company Name ML16354B5972016-12-19019 December 2016 Acceptance Review Determination - LAR to Revise TS Surveillance Requirement 4.1.3.1.2 for CEA-39 ML16335A2772016-11-30030 November 2016 Acceptance Review Determination - 2016/11/30 E-Mail from R. Guzman to W.C Raft Proposed Exemption from Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability ML16308A1932016-11-0303 November 2016 Acceptance Review Determination - 2016/11/03 E-Mail from R.Guzman to W.Craft Alternative Requests RR-04-24 and IR-3-30, Elimination of RPV Threads in Flange Examination (CAC Nos. MF8468/MF8469) ML16223A9392016-08-10010 August 2016 Acceptance Review Determination - 2016/08/10 E-mail from R.Guzman to W.Craft Exemption Request for Use of Axiom Cladding Material in Lead Test Assemblies (MF8120) 2024-04-25
[Table view] |