ML20076F647: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 21: Line 21:
=Text=
=Text=
{{#Wiki_filter:_.
{{#Wiki_filter:_.
VINGINIA ELECTRIC AND Pownu COMI*ANY R icunown, Vi no NIA 2 0 0 61 W. L. Srnwimr Vaca Passiosur weci.mi.o,.     rio,.                         June 3, 1983 Mr. Harold R. Denton, Director                                     Serial No. 333 Office of Nuclear Reactor Regulation                               N0/JHL:acm Attn: Mr. Rcbert A. Clark, Chief                                   Docket No. 50-338 Operating Reactors Branch No. 3                                     50-339 Division of Licensing                                   License Nos. NPF-4 U. S. Nuclear Regulatory Commission                                               NPF-7 Washington, D. C. 20555 Gentlemen:
VINGINIA ELECTRIC AND Pownu COMI*ANY R icunown, Vi no NIA 2 0 0 61 W. L. Srnwimr Vaca Passiosur weci.mi.o,.
rio,.
June 3, 1983 Mr. Harold R. Denton, Director Serial No. 333 Office of Nuclear Reactor Regulation N0/JHL:acm Attn:
Mr. Rcbert A. Clark, Chief Docket No. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:
AMENDMENT TO OPERATING LICENSES NPF-4 AND NPF-7 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses NPF-4 and NPF-7 for the North Anna Power Station, Unit Nos.
AMENDMENT TO OPERATING LICENSES NPF-4 AND NPF-7 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses NPF-4 and NPF-7 for the North Anna Power Station, Unit Nos.
I and 2. The proposed changes are enclosed.
I and 2.
The proposed changes add additional Accident Monitoring Instrumentation and Instrumentation for Detection of Inadequate Core Cooling in accordance with the requirements of NUREG-0737, Items II.F.1 and II.F.2, respectively. The Accident Monitoring Instrumentation Items added are:               Noble Gas Effluent Monitors-II.F.1.1,       Containment High Range         Radiation   Monitors-II.F.1.3, Containment         Pressure     Monitors-II.F.1.4,       Containment     Water     Level Monitors-II.F.1.5, and Containment Hydrogen Monitors-II.F.1.6.           All additional instrumentation systems of Item II.F.1 have been installed, tested, and are operational except for the North Anna Unit 1 Containment High Range Radiation Monitors.       These monitors require a final in-situ calibration in order to be considered operational. The Instrumentation for Detection of Inadequate Core Cooling has also been installed, calibrated and is considered operational.
The proposed changes are enclosed.
Final       implementation of     these   systems   must   be   coordinated   with   the implementation of the revised emergency operating procedures prior to issuance of   this amendment.       The proposed Technical Specification changes for NUREG-0737, Items       II.F.1   and II.F.2 are provided in Attachment I with discussions of the proposed changes in Attachment 2 and 3, respectively.
The proposed changes add additional Accident Monitoring Instrumentation and Instrumentation for Detection of Inadequate Core Cooling in accordance with the requirements of NUREG-0737, Items II.F.1 and II.F.2, respectively.
This requese has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.
The Accident Monitoring Instrumentation Items added are:
f e4 h      5,A l
Noble Gas Effluent Monitors-II.F.1.1, Containment High Range Radiation Monitors-II.F.1.3, Containment Pressure Monitors-II.F.1.4, Containment Water Level Monitors-II.F.1.5, and Containment Hydrogen Monitors-II.F.1.6.
i 8306140208 830603 PDR ADOCK 05000338 P                         PDR b
All additional instrumentation systems of Item II.F.1 have been installed, tested, and are operational except for the North Anna Unit 1 Containment High Range Radiation Monitors.
These monitors require a final in-situ calibration in order to be considered operational.
The Instrumentation for Detection of Inadequate Core Cooling has also been installed, calibrated and is considered operational.
Final implementation of these systems must be coordinated with the implementation of the revised emergency operating procedures prior to issuance of this amendment.
The proposed Technical Specification changes for NUREG-0737, Items II.F.1 and II.F.2 are provided in Attachment I with discussions of the proposed changes in Attachment 2 and 3, respectively.
This requese has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.
It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.
fh e4 A
5, i
8306140208 830603 PDR ADOCK 05000338 P
PDR b


Vaaoixar Es.ECTRIC AND PowEn CoxPANY TO Harold R. Denton We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request involves a safety issue which the Staff should be able to determine does not involve a significant hazards consideration for Unit 1 and a duplicate safety issue for Unit 2, a Class III license amendment fee and a Class I license amendment fce are required for Unit I and Unit 2, respectively. A check in the amount of $4,400 is enclosed in payment of the required fees.
Vaaoixar Es.ECTRIC AND PowEn CoxPANY TO Harold R. Denton We have reviewed this request in accordance with the criteria in 10 CFR 170.22.
Very truly yours-4 s     9     )
Since this request involves a safety issue which the Staff should be able to determine does not involve a significant hazards consideration for Unit 1 and a duplicate safety issue for Unit 2, a Class III license amendment fee and a Class I license amendment fce are required for Unit I and Unit 2, respectively. A check in the amount of $4,400 is enclosed in payment of the required fees.
hl W. L. Stewart Attachments:
Very truly yours-s 9
: 1. Proposed Technical Specification Changes fcr NUREG-0737, Item II.F.1 and II.F.2.
)
: 2. Discussion of Proposed Technical Specification Change for NUREG-0737, Item II.F.1.
4 hl W. L. Stewart Attachments:
: 3. Discussion of Proposed Technical Specification Changes for NUREG-0737, Item II.F.2.
1.
: 4. Voucher Check for $4,400 cc:     Mr. James P. O'Reilly Regional Administrator Region II Mr. M. B. Shymlock NRC Resident Inspector North Anna Power Station Mr. Charles Price Department of Health 109 Governor Street j                   Richmond, Virginia 23219 l
Proposed Technical Specification Changes fcr NUREG-0737, Item II.F.1 and II.F.2.
2.
Discussion of Proposed Technical Specification Change for NUREG-0737, Item II.F.1.
3.
Discussion of Proposed Technical Specification Changes for NUREG-0737, Item II.F.2.
4.
Voucher Check for $4,400 cc:
Mr. James P. O'Reilly Regional Administrator Region II Mr. M. B. Shymlock NRC Resident Inspector North Anna Power Station Mr. Charles Price Department of Health 109 Governor Street j
Richmond, Virginia 23219 l
l
l


i COMMONWEALTH OF VIRGINIA )
i COMMONWEALTH OF VIRGINIA )
                                  )
)
CITY OF RICHMOND         )
CITY OF RICHMOND
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W. R. Cartwright who is Manager-Nuclear Operations Support, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
)
Acknowledged before me this J     day of   h.-.               , 19 P 3 .
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.
U My Commission expires:       4   L4     , 19 F#     .
R.
0 . W 'W Notary Public l
Cartwright who is Manager-Nuclear Operations Support, of the Virginia Electric and Power Company.
l 4
He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
(SEAL)
Acknowledged before me this J day of h.-.
                                                                                -          1 S/001 i
19 P 3 U
l
My Commission expires:
4 L4 19 F#
0. W 'W Notary Public (SEAL) 4 S/001 w
i e


                                      - -- ._ -  s_ . - .
s_
  ,  e e
e e
4 e
4 e
S I
S I
i 9
i 9
ATTACHMENT 1 Y           g-- -.          - . - . _                      --%.,}}
ATTACHMENT 1 Y
a g--
--%.,}}

Latest revision as of 02:43, 15 December 2024

Application for Amend to Licenses NPF-4 & NPF-7,adding Addl Accident Monitoring Instrumentation & Instrumentation for Detection of Inadequate Core Cooling Per Requirements of NUREG-0737,Items II.F.1 & II.F.2
ML20076F647
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/03/1983
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20076F648 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-2.F.2, TASK-TM 333, NUDOCS 8306140208
Download: ML20076F647 (4)


Text

_.

VINGINIA ELECTRIC AND Pownu COMI*ANY R icunown, Vi no NIA 2 0 0 61 W. L. Srnwimr Vaca Passiosur weci.mi.o,.

rio,.

June 3, 1983 Mr. Harold R. Denton, Director Serial No. 333 Office of Nuclear Reactor Regulation N0/JHL:acm Attn:

Mr. Rcbert A. Clark, Chief Docket No. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSES NPF-4 AND NPF-7 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses NPF-4 and NPF-7 for the North Anna Power Station, Unit Nos.

I and 2.

The proposed changes are enclosed.

The proposed changes add additional Accident Monitoring Instrumentation and Instrumentation for Detection of Inadequate Core Cooling in accordance with the requirements of NUREG-0737, Items II.F.1 and II.F.2, respectively.

The Accident Monitoring Instrumentation Items added are:

Noble Gas Effluent Monitors-II.F.1.1, Containment High Range Radiation Monitors-II.F.1.3, Containment Pressure Monitors-II.F.1.4, Containment Water Level Monitors-II.F.1.5, and Containment Hydrogen Monitors-II.F.1.6.

All additional instrumentation systems of Item II.F.1 have been installed, tested, and are operational except for the North Anna Unit 1 Containment High Range Radiation Monitors.

These monitors require a final in-situ calibration in order to be considered operational.

The Instrumentation for Detection of Inadequate Core Cooling has also been installed, calibrated and is considered operational.

Final implementation of these systems must be coordinated with the implementation of the revised emergency operating procedures prior to issuance of this amendment.

The proposed Technical Specification changes for NUREG-0737, Items II.F.1 and II.F.2 are provided in Attachment I with discussions of the proposed changes in Attachment 2 and 3, respectively.

This requese has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.

fh e4 A

5, i

8306140208 830603 PDR ADOCK 05000338 P

PDR b

Vaaoixar Es.ECTRIC AND PowEn CoxPANY TO Harold R. Denton We have reviewed this request in accordance with the criteria in 10 CFR 170.22.

Since this request involves a safety issue which the Staff should be able to determine does not involve a significant hazards consideration for Unit 1 and a duplicate safety issue for Unit 2, a Class III license amendment fee and a Class I license amendment fce are required for Unit I and Unit 2, respectively. A check in the amount of $4,400 is enclosed in payment of the required fees.

Very truly yours-s 9

)

4 hl W. L. Stewart Attachments:

1.

Proposed Technical Specification Changes fcr NUREG-0737, Item II.F.1 and II.F.2.

2.

Discussion of Proposed Technical Specification Change for NUREG-0737, Item II.F.1.

3.

Discussion of Proposed Technical Specification Changes for NUREG-0737, Item II.F.2.

4.

Voucher Check for $4,400 cc:

Mr. James P. O'Reilly Regional Administrator Region II Mr. M. B. Shymlock NRC Resident Inspector North Anna Power Station Mr. Charles Price Department of Health 109 Governor Street j

Richmond, Virginia 23219 l

l

i COMMONWEALTH OF VIRGINIA )

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.

R.

Cartwright who is Manager-Nuclear Operations Support, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this J day of h.-.

19 P 3 U

My Commission expires:

4 L4 19 F#

0. W 'W Notary Public (SEAL) 4 S/001 w

i e

s_

e e

4 e

S I

i 9

ATTACHMENT 1 Y

a g--

--%.,