MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures ML20045G6831993-07-0202 July 1993 Application for Amends to Licenses NPF-4 & NPF-7 Modifying Table 4.4-1 of TS 4.4.5.1 to Reduce Minimum Number of SGs Required to Be Opened for Insp During First Insp (I.E.,Refueling Outage)Following SG Replacement 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures 1999-08-04
[Table view] |
Text
i
)
VIRGINIA EI.ECTHIC ANI) POWER COMI*ANY d
RICIIMOND,YIHOINIA 232 61 December 10, 1993 i
U.S. Nuclear Regulatory Conaission Serial No.93-769 j Attention: Document Control 'esk NL&P/ETS Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7
. Gentlemen: :
VIRGINIA ELECTRIC AND POWER COMPANY !
- NORTH ANNA POWER STATION UNITS 1 and 2
- PROPOSED TECHNICAL SPECIFICATIONS CHANGES -'
AUXILIARY FEEDWATER SYSTEM TESTING -
Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Facility- t Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, l respectively. The proposed changes modify the surveillance frequency of the Auxiliary ;
Feedwater System pumps from monthly to_ quarterly in accordance with the guidance ;
provided in Generic Letter 93-05, "Line-Item Technical Specifications improvements ;
to Reduce Surveillance Requirement for Testing During Power Operation," dated i September 27,1993. .
A discussion of the proposed Technical Specifications changes is provided in
. Attachment 1. The proposed Technical Specifications changes are provided in Attachment 2. It has been determined that the proposed Technical Specifications ;
changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in'10 CFR 50.92. The basis for our j determination that these changes do not involve a significant hazards consideration is i provided in Attachment 3. The proposed Technical Specifications changes have been
- reviewed and approved by the Station Nuclear Safety and Operating Committee and .
the Management Safety Review Committee.
l Should you have any questions or require additional information, please contact us.
4 Very truly yours,
)
. w
[N. L. Stewart Senior Vice President - Nuclear
- 1 Attachments bfkhShho$8 Pnk g, ([ /.
- . . - =
...:-....,,._,e _ _ , , , . . . . ,
4 oc: U S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector '
North Anna Power Station ,
i Commissioner '
Department of Health !
Room 400 109 Governor Street !
Richmond, Virginia 23219 t
i
)
4 i
J l
)
l 1
l l
. , , , , , , , = , + . ie,w
j 1
l i
I i
COMMONWEALTH OF VIRGINIA )
) ;
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and l Commonwealth aforesaid, today by J. P. O'Hanlon, who is Vice President - Nuclear 1 Operations, for W. L. Stewart who is Senior Vice President . . Nuclear, of Virginia j Electric and Power Company.~ He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to !
the best of his knowledge and belief. !
Acknowledged before me this /d day. of M un ht.419 3 '
My Commission Expires: ( d/A ' S/ ,19 N
~
y :
= .
h . .
Notar/P6blic' I
(SEAL) !
i 6
r n
_.._-._ _ ~ _ _- ._- _ - - - - - - - - - - - - - - - ---- - - - - -
I- .
l l
Attachment 1 Discussion of Changes i i
4 i
i l
I l
i
^
- a. . .
Discussion of Changes introduction , i j
1 The NRC has completed a comprehensive examination of surveillance requirements in - ]j technical specifications that require testing at power.)Thel evaluation is documented in 4 NUREG-1366, " Improvements to Technical Specification Surveillance Requirements,"i :
dated December 1992. The NRC staff found, that while the majority' of testing at poweri 1 is important, safety can be improved, equipment-degradation decreased,~ and.~ani . <!
unnecessary burden on personnel resources eliminated by reducing lthe' amount'of . j testing at power that is required by technical specifications. Based on th's results of thei d evaluations documented in NUREG 1366, the NRC iss'ued Generic Letter 93-05, "Line- = ;j ltem Technical Specifications improvements to Reduce'Suiveillance' Requirements fori "j
Testing During Power Operation," dated September 27,1993.'
- i The Auxiliary Feedwater System supplies water to the steam generators to remove, j:
decay heat from the Reactor Coolant System 2 To ensure operability of the Auxiliary [ '
~
l Feedwater System, the pumps are currently tested on a' mon't hly basis as required byL Technical Specifications. Consistent with Generic Letter'93-05; item 9.1 and NUREG-?
1366, we are requesting a change to the surveillance testing frequency for the' Auxiliary, j
~
Feedwater Pumps from monthly to quarterly on'a staggered test basis.1 ,
d
._ , q y
Background j
~
l The Auxiliary Feedwater System consists of three separate and independent pumps - ,
with dedicated flow paths to the three steam generators. ITwo of thesefauxiliary.. d feedwater pumps are motor driven.and power is supplied toLthe motors by the' ,
emergency busses. The third auxiliary feedwater pump is a steam dnven pump with the:.
steam supplied by the steam generators. -] ;
In the past, the NRC has required monthly. testing of the auxiliary. feedwater pumps.
However, as specified in NUREG-1366, " Improvements to Teshnicalt Specifications . -
Surveillance Requirements" of December 1992 and NRC Generic Letter 9'3-05 dated
~
September 27,1993, operating and testing ' experience has indicated that the monthly . 4 testing requirement of the auxiliary feedwater pumps is not necessary to'adequaietyl }
ensure that the auxiliary feedwater pumps will perform their intended function. This .
. .i L____ _
l l
amendment request will require the auxiliary feedwater pumps be tested quarterly on a staggered basis. This new testing frequency should reduce the Auxiliary Feedwater System unavailability resulting from failures and equipment degradation and result in increased system reliability. The acceptance criteria for operability of the auxiliary feedwater pumps are consistent with ASME Section XI requirements.
Soecific Chanaes This Technical Specification change applies to both Unit 1 and Unit 2. Surveillance Requirement (SR) 4.7.1.2 is being modified as follows:
- SR 4.7.1.2.a is changed to only include valve testing and will read:
4.7.1.2.a.1 "At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position."
SR 4.7.1.2.b is changed to incorporate the pump testing and will read:
4.7.1.2.b.1 'At least once per 92 days on a STAGGERED TEST BASIS by verifying that each pump develops adequate discharge pressure and flow.
The acceptance criterion shall be consistent with Specification 4.0.5. The provisions of Specification 4.0.4 are not applicable to steam turbine driven pump testing."
Previous SR 4.7.1.2.b is renumbered as 4.7.1.2.c. l Previous SR 4.7.1.2.c is renumbered as 4.7.1.2.d.
Safety Significance l
The proposed change to the surveillance requirements for the Auxiliary Feedwater l System are consistent with the intent of Generic Letter 93-05, "Line-Item Technical l Specifications improvement to Reduce Surveillance Requirements for Testing During Power Operation," dated September 27,1993. The proposed change will require l auxiliary feedwater pumps to be tested quarterly on a staggered basis. ;
i
. \
l Changing the test frequency of the Auxiliary Feedwater System pumps does not affect the probability of occurrence or the consequences of the accidents identified in the UFSAR. No new accident precursors are being generated by the proposed surveillance ;
- requirement. Further, quarterly testing and ASME Section XI acceptance criteria for the I Auxiliary Feedwater System pumps provides assurance that the system is capable of performing its intended safety function. Therefore, the consequences of a postulated accident are not increased by this change in surveillance requirements for the Auxiliary l Feedwater System pumps.
The reduced testing frequency of the Auxiliary Feedwater System pumps will not j
[
significantly increase the probability of a malfunction of a pump to perform its intended I safety function. This reduction in test frequency of the Auxiliary Feedwater Pumps at power has been examined and accepted by the NRC staff in Generic Letter 93-05, item 9.1. The staff found that while the majority of the testing at power is important, safety i can be improved, equipment degradation decreased, and an unnecessary burden on personnel resources eliminated by reducing the amount of testing at power that is required by technical specifications.
Testing of the Auxiliary Feedwater System pumps will continue to be performed through the full-flow test lines. The pumps will be tested quarterly on a staggered test basis instead of monthly. This change in the surveillance requirements do not affect plant or Auxiliary Feedwater System operations. Therefore, no new accident precursors are being generated by the proposed surveillance changes for the Auxiliary Feedwater System.
l The Technical Specifications operability requirements for the Auxiliary Feedwater System are not being changed. The quarterly testing of the pumps is adequate to ensure that the Auxiliary Feedwater System will be capable of performing its intended function. Therefore, the change in test frequency for the Auxiliary Feedwater System )
pumps does not reduce the margin of safety as described in the Technical Specifications.
1
1 1
i
)
, \
Attachment 2 Technical Specifications Changes l
1 l
l l