MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures ML20045G6831993-07-0202 July 1993 Application for Amends to Licenses NPF-4 & NPF-7 Modifying Table 4.4-1 of TS 4.4.5.1 to Reduce Minimum Number of SGs Required to Be Opened for Insp During First Insp (I.E.,Refueling Outage)Following SG Replacement 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures 1999-08-04
[Table view] |
Text
_ _ .
l . .
l , ,
VIRGINIA ELecTIIIC AND Powen COMPANY Hicnwonn,vinorna cason i l
October 17, 1995 U.S. Nuclear Regulatory Commission Serial No.95-533 Attention: Document Control Desk NL&OS/JBL: R1 ,
Washington, D.C. 20555 Docket No. 50-339 '
Ucense No. NPF-7 4
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 2 '
l PROPOSED TECHNICAL SPECIFICATIONS CHANGE STEAM GENERATOR INSPECTION SCOPE REDUCTION Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of a change to the Technical Specifications, to Facility Operating License No. NPF-7 for North Anna Power Station Unit 2. The proposed change would modify Table 4.4-1 of Technical Specification 4.4.5.1 to reduce from two to one the minimum number of steam generators required to be inspected during the first inservice inspection following steam generator replacement. This change would considerably reduce resources required for this outage without any corresponding reduction in nuclear safety.
A discussion of the proposed change is provided in Attachment 1. The proposed Technical Specifications change is provided in Attachment 2. It has been determined that the proposed change does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.
The basis for our determination that the change does not involve a significant hazards consideration is provided in Attachment 3. The proposed Technical Specifications change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee.
This proposed Technical Specifications change is needed for the North Anna Unit 2 i' refueling outage currently scheduled to begin October 18,1996. However, the steam generator inspection scope needs to be defined considerably in advance of the ,
outage in order to appropriately plan the associated outage activities. Therefore, !
Virginia Electric and Power Company requests approval of the proposed Technical i Specifications change by June 1,1996.
1
, h
, o\
951024o269 951017 PDR ADOCK 0500o339 k \
P PDR
l
\ . .
The proposed Technical Specifications change would provide a cost savings of greater than $100,000 during the affected refueling outage. Therefore, this proposed Technical Specifications change is being submitted as part of our Cost Beneficial 4 Licensing Actions (CBLA) Program and complies with the NRC guidelines for consideration as a CBLA.
Should you have any questions or require additional information, please contact us.
Very truly yours, L4 James P. O'Hanlon Senior Vice President - Nuclear Attachments cc: U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station Commissioner Department of Radiological Health j Room 104A 1500 East Main Street Richmond, Virginia 23219
b l
i COMMONWEALTH OF VIRGINIA )
-)
COUNTY OF HENRICO )
1 The foregoing document was acknowledged before me, in and for the County and 1 Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this /77 day of /I'7/ud ,19.f4
. My Commission Expires: A/ ,198f_. l 0 i l
i lS h/AD, Notary f ublic l 1
I (SEAL)
)
1
% - + w< a. a.- a s~ k.,, J sA - - _s A a-a a m-b r n 4
O ATTACHMENT 1 DISCUSSION OF CHANGE l
l l
I I
I 1
VIRGINIA ELECTRIC AND POWEl; COMPANY l
1
Discussion _ of Change Steam Generator inspection Scope Reduction North Anna Power Station Unit 2 Introduction r
Pursuant to 10 CFR 50.90, Virginia Electric and Power Company is requesting a
, change to the Technical Specifications for North Anna Power Station Unit 2. The l North Anna Technical Specifications (Table 4.4-1) currently require a minimum of two steam generators be inspected during the first inservice inspection (including the first inspection following steam generator replacement) and at least one steam generator be inspected during the second and subsequent inservice inspections. However, inspection of more than one steam generator is considered to be unnecessary for essentially new components after operating only one fuel cycle. The purpose of this proposed change is to reduce from two to one the minimum number of steam generators required to be opened for inspection during the first inspection (i.e.,
refueling outage) foliowing the North Anna Unit 2 steam generator replacement.
Background
L Current Licensing Basis Surveillance Requirements 4.4.5.' through 4.4.5.5 of the North Anna Power Station Unit 2 Technical Specifications describe an inservice inspection program which is required to be performed in conjunction with the inservice inspection requirements of Section XI of the ASME Boiler and Pressure Vessel Code. The program for inservice i inspection of steam generator tubes as described in the Technical Specifications is based on a modification of Regulatory Guide 1.83, Revision 1, inservice Inspection of Pressurized Water Reactor Steam Generator Tubes, dated July 1975.
1 The existing requirement that two steam generators be inspected during the first inservice inspection is located in Table 4.4-1 of Technical Specifications Surveillance Requirement 4.4.5.1. This table specifies the minimum number of steam generators required to be inspected during inservice inspections. These Technical Specifications requirements were issued as part of the original operating license for North Anna Unit 2, dated August 21,1980, and were based on the Standard Technical Specifications for Westinghouse Pressurized Water Reactors (NUREG-0452).
Current Design Basis Periodic inservice inspection of steam generator tubing provides for early detection of defects and deterioration thus ensuring that the structural integrity of this portion of the g reactor coolant system (RCS) is maintained. Inservice inspection of steam generator tubing is essential in order to assess the condition of the tubes in the event that there is Page 1 of 6
. .- l evidence of mechanical damage or _ progressive degradation due to design, l manufacturing errors, or inservice conditions that lead to corrosion, inservice
- inspection of steam generator tubing also provides a means of characterizing the -
nature and cause of any tube degradation so that corrective measures can be taken.
~ The North Anna Unit 2 steam generators were replaced during the second quarter of 1995. The replacement steam generator components utilize tubing made of thermally treated Alloy 690 material which, along with other design enhancements, reduce the possibility of corrosion degradation. Thermally treated Alloy 690 is generally' accepted
- as the currently available steam generator tube material of choice due to its significant ,
resistance to stress corrosion cracking. ,
- Discussion The North Anna Unit 2 steam generators were replaced during the second quarter of 1995. The general purpose of steam generator replacement was to restore the integrity _ of the steam generator tubes to a level equivalent to new steam generators.
In reality, replacement steam generator components incorporate a large number of design improvements which reflect the " state-of-the-art" technology that currently exists for steam generator design. These design improvements w;ll improve the long term l maintainability and reliability of the repaired steam generators. l The replacement steam generator components for North Anna were manufactured using current codes and manufacturing techniques without compromising the
- requirements of the original code, thus reflecting current technology in the areas of design, fabrication, and materials. Design changes and enhancements made to replacement steam generator components address the operating experience of the industry and the original steam generators and enhance the overall reliability.and maintainability of the steam generators. These enhancements do not adversely affect the mechanical or thermal hydraulic performance of the steam generators. Thus, the replacement steam generators are considered superior to the original steam l 3
generators in terms of design and materials.
The North Anna Unit 1 steam generators were replaced in 1993 using essentially the same design and materials as used for the North Anna Unit 2 replacement. The first inservice inspection for the Unit 1 replacement steam generators was performed in the fall of 1994.~ As expected, the results'of the North Anna Unit 1 inspection identified no )
- signs ofl deterioration. In fact, the performance history of replaced Westinghouse e steam generators fully supports the position that degradation of the tubes is not
~
significant in the early cycles of operation.
p The North Anna Unit 1 and Unit 2 steam generators utilize Alloy 690 thermally treated
)
(TT) tubing. - Alloy 690 TT tubing material has been utilized in service in domestic !
replacement steam generators since 1989. As stated above, Alloy 690 TT is generally )
accepted as the currently available steam generator tube material of choice due to its-Page 2 of 6
,,.__ _ , _ _,, ___4 j j
--=P.. ' ---* .____.me .,_
_ %_, , 4,a_.,n,,p,,,.,__, , ,., ,y p , ,,
significant resistance to stress corrosion cracking. To date, there have been no reported instances of localized tube wall corrosion induced degradation involving Alloy 690 TT tube material.
Other steam generator design enhancements also contribute to the overall long term integrity of the North Anna Unit 2 replacement steam generator tubes. Full depth hydraulic expansion of the tube within the tubesheet minimizes the crevice between the tube and the tubesheet where sludge and corrosion products could accumulate.
The hydraulic expansion process results in relatively low localized stresses in the transition region at the top of the tubesheet. Quatrefoil broached holes in stainless steel tube support plates significantly reduces the potential for corrosion products to form between the tube and the tube support p: ate. Finally, the small radius U bends were stress relieved to reduce to possibility of stress corrosion cracking in that region of the steam generators.
North Anna Power Station also continues to adhere to industry guidelines and standards for operating chemistry performance. The secondary system chemistry control program, adopted even prior to the replacement, continues to be used in its basic form with refinements that have been implemented through ongoing industry experience. Continuing efforts in the area of secondary side pH and oxygen control with attendant actions to avoid condenser contaminant ingress have significantly improved chemistry performance at North Anna. The secondary system chemistry controls and awareness of industry trends provide early warning of impending concerns that may affect steam generator reliability and reduce the possibility of corrosion attack.
Experience indicates that the development of defects or degradation in the North Anna Unit 2 steam generators after only one cycle of operation is not likely. The enhanced corrosion resistant performance of Alloy 690 TT tubing and steam generator design enhancements further reduce the possibility of defects or degradation developing during the initial cycle of operation. Therefore, based on the above evaluation, a reduction from two to one in the minimum number of steam generators required to be 4
opened for inspection during the first inspection is warranted.
Specific Change The proposed change would modify Table 4.4-1 of Technical Specification 4.4.5.1 to reduce from two to one the minimum number of steam generators required to be inspected during the first refueling outage following a steam generator replacement.
The table has also been revised to remove those sections of the table not applicable to North Anna because of the total number of steam generators involved. These changes to the table in turn eliminate Note 2. Note 3 has subsequently been renumbered. (Elimination of the non-applicable information from the table is considered an editorial correction.)
Page 3 of 6
Sahsty Significance The current Technical Specifications requirement to. inspect more than one steam generator, after the initial cycle of operation. is considered unnecessary. A full
- baseline inspection of the steam generator tubes was performed for the replacement components and the quality of the replacement steam generators' design, fabrication, and materials is superior to the original steam generators. In addition, as evidenced by industry experience,'no degradation is expected during this cycle of operation. .
Although the proposed change reduces the number of steam generators required to
~be opened for inspection, the minimum number of tubes required to be examined during the inspection is not being changed. Specifically, for one steam generator,9%
of the tubes in that steam generator are required to be examined and, for two steam
. generators,4.5% of the tubes in each steam generator are required to be examined for a total of 9% also.'
-The capability and reliability of primary-to-secondary leakage detection have been greatly increased since these Technical Specifications inspection requirements were originally imposed. Improvements in primary-to-secondary leak rate monitoring and trending capabilities provide added assurance that any potential degradation of steam generator tubes will be detected.
Finally, approval of this change request will reduce radiation exposure of those personnel involved in opening and closing the steam generator manways and setting up the tube inspection equipment.
This proposed change does not affect or change any limiting conditions for operation (LCO) or any.other surveillance requirements in the Technical Specifications and the Technical Specifications Bases for this surveillance requirement remains unchanged.
The proposed change has been evaluated by Virginia Electric and Power Company and it has been determined that the proposed change would not involve an unreviewed safety question.
- 1. The proposed inspection scope change does not increase the probability of occurrence of an accident previously evaluated. The performance history of
, replaced Westinghouse steam generators has shown that degradation of the tubes '
is not significant in the early cycles of operation. In addition, the minimum number of tubes required to'be inspected during the first refueling outage following steam generator replacement is not being changed.
- 2. The proposed inspection scope change does not increase the consequences of an
-accident previously evaluated. Any hypothetical tube leak or failure is bounded by the consequences _of a postulated steam generator tube rupture event.
- Page 4 of 6
+
i 3. e proposed inspection scope change does not create the possibility of an accident of a different type than any previously evaluated. As noted previously, the effect of any hypothetical failure of a tube would be bounded by existing tube rupture analyses. The proposed change does not introduce any new failure mechanisms or postulated accident effects. Therefore, operation of the steam generators with this modified inspection schedule will not result in an accident previously not analyzed in the UFSAR.
- 4. The proposed inspection scope change does not increase the probability of occurrence of a malfunction of equipment important to safety previously evaluated.
Each of the replacement steam generators is manufactured and operated essentially identically. The minimum number of steam generator tubes required to be examined 'during the first refueling outage following steam generator j replacement is not being changed. The proposed change does not affect the )
inspections of steam generators during the second and subsequent refueling j outages. Thus, the size of the inspection population has not changed and there is no increase in the probability of occurrence of a steam generator tube leak or -
rupture. No other components or equipment important to safety would be affected.
- 5. The proposed inspection scope change does not increase the consequences of a
- malfunction of equipment important to safety previously evaluated. As stated in
- items 1,2, and 3 above, the reduction in the number of steam generators required to be opened during the first refueling outage following steam generator replacement does not increase the probability or consequences of any event or accident in excess of the effects due to the rupture of a steam generator tube.
Current UFSAR analysis resuits remain bounding.
- 6. The proposed inspection scope change does not create the possibility of a malfunction of equipment important to safety of a different type than any previously evaluated. Overall steam generator tube bundle integrity and leaktightness continue to be required during all plant operating conditions. The Technical Specifications inservice inspection program continues to sample the steam l generator tubes to assure their condition.
- 7. The proposed inspection scope change does not reduce the margin of safety as defined in the basis for any Technical Specification. The margin of safety with respect to sampling inspections of tubes continues to provide assurance of tube bundle integrity. Nondestructive examination of the same number of steam generator tubes is still required -- only the number of steam generators required to be opened is changed.
4 Page 5 of 6
1
)
z . .
l Bas d on the above evaluation, reducing the minimum number of steam generators required to be opened during the first refueling outage following steam generator replacement will not adversely affect the safe operation of the steam generators or the plant. Therefore, the proposed Technical Specifications change for the North Anna Unit 2 steam generators does not result in an unreviewed safety question as defined in the criteria of 10 CFR 50.59.
1 l
l l
l Page 6 of 6