MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures ML20045G6831993-07-0202 July 1993 Application for Amends to Licenses NPF-4 & NPF-7 Modifying Table 4.4-1 of TS 4.4.5.1 to Reduce Minimum Number of SGs Required to Be Opened for Insp During First Insp (I.E.,Refueling Outage)Following SG Replacement 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures 1999-08-04
[Table view] |
Text
o VIRGINIA ELucTurc ann Powen COMPANY HIcuwoxu, VIRGINIA 20261 September 19, 1995 U.S. Nuclear Regulatory Commission Serial No.95-463 Attention: Document Control Desk NL&OS/JDH RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REVISED NEUTRON FLUX HIGH TRIP SETPOINTS WITH INOPERABLE MAIN STEAM SAFETY VALVES Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Facility Operating Ucense Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. The proposed changes will revise the maximum allowable power range neutron flux high setpoints for operation with inoperable main steam safety valves. The revised setpoints resolve the concern expressed in the Westinghouse Nuclear Safety Advisory Letter NSAL-94-001, " Operation at Reduced Power Levels with inoperable Main Steam Safety Valves."
A discussion of the proposed Technical Specifications changes is provided in Attachment 1. The proposed Technical Specifications changes are provided in Attachment 2. It has been determined that the proposed Technical Specifications changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or
! a significant hazards consideration as defined in 10 CFR 50.92. The basis for our l determination that the changes do not involve a significant hazards consideration is
- provided in Attachment 3.
l
! The proposed Technical Specifications changes have been reviewed and approved i by the Station Nuclear Safety and Operating Committee and the Management Safety i Review Committee.
l Should you have any questions or require additional information, please contact us.
Very truly yours, l, L4 U l ames P. O'Hanlon
, Senior Vice President - Nuclear Attachments ,,
9509220057 95o919 ,
"- (l PDR ADOCK 05o00338 g I
P PDR
oc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter
. NRC Senior Resident inspector North Anna Power Station Commissioner , .
Department of Radiological Health I Room 104A 1500 East Main Street Richmond, Virginia 23219 1
1 l
- ~
L,.
COMMONWEALTH OF VIRGINIA )
)
! COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and-Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute
. and file the foregoing document in behalf of that Company, and the statements in the '
document are true to the best of his knowledge and belief.
Acknowledged before me this NEday of AdmJo> ,1985 My Commission Expires: ( [4h 8/ ,19fl..
O l
/S1 ASx Notary F$ublic ~
(SEAL) ' .
1 ATTACHMENT 1 DISCUSSION OF CHANGES i
VIRGINIA ELECTRIC AND POWER COMPANY I
9 Discussion of Changes Introduction i Virginia Electric and Power Company requests changes to Technical Specifications Limiting Condition for Operation 3.7.1.1 Action Statements.. Technical Specifications f Table 3.7-1, dually entitled " Maximum Allowable Power Range Neutron Flux High Setpoint With inoperable Steam Line Safety Valves During 3 Loop Operation" and
" Maximum Allowable Power Range Neutron Flux High Setpoint With inoparable Steam Line Safety Valves During 2 Loop Operation," and the Technical Specifications j Bases 3/4.7.1.1, " Safety Valves" for North Anna Power Station Units 1 and 2. Table l 3.7-1 provides the maximum allowable power range neutron flux high setpoints with one or more main steam safety valves (MSSVs) inoperable during two loop and three loop operation. The proposed changes provide more conservative power range neutron flux high setpoints calculated utilizing the Westinghouse Electric Corporation ;
(Westinghouse) recommended methodology and delete the information for setpoints for two loop operation. The proposed changes also revise the Technical Specifications Bases to reflect the methodology used to establish the new setpoints, and delete the Limiting Condition for Operation Action Statement and the Technical Specifications Bases for two loop operation.
The proposed changes do not affect the design, operation, or failure modes of the main steam system. The Loss of Load / Turbine Trip accident analysis is not revised as a result of these changes and remains bounding. The revised trip setpoints ensure that the heat addition rate to the secondary system remains below the heat removal capability of the remaining operable MSSVs, and thus the accident analysis consequences are unaffected. To ensure that the revised setpoints are used, if necessary, pending approval of this Technical Specifications change, North Anna has established additional administrative controls (i.e., Standing Order) directing that the revised setpoints be implemented in the event entry into the Action Statement is required. The current Technical Specifications provide this flexibility because the Technical Specifications are expressed in terms of the maximum permissible setpoints. Implementing setpoints less than the maximum does not conflict with the existing Technical Specification requirement. Finally, the proposed changes involve no unreviewed safety question or significant hazards consideration.
Page 1 of 9
l Spekgiound 4 Westinghouse issued Nuclear Safety Advisory Letter NSAL-94-001, " Operation at Reduced Power Levels with inoperable MSSVs" dated January 20,1994 which !
identified a potential concern for plant operations with the existing Technical Specifications setpoints with inoperable main steam safety valves. It was identified that the current Westinghouse methodology used for reducing the power range neutron flux high trip setpoints was potentially inadequate for protecting the main steam system from an overpressure condition. A deficiency was identified which involved the assumption that the maximum allowable initial power level was a linear function of the available Main Steam Safety Valve (MSSV) relief capacity. This '
assumption was determined invalid by Westinghouse.
An evaluation performed by Westinghouse concluded that this deficiency did not represent a substantial safety hazard. However, Westinghouse determined that it was a condition which required further review by each affected licensee for impact on its site specific licensing bases. Based upon the results of our review of the Westinghouse Nuclear Safety Advisory Letter with supporting recommendations, it was determin66 that additional calculations were required. By using the more conservative methodology recommended by Westinghouse, new setpoints have been calculated and are being submitted for NRC review and approval. In the interim, a Standing Ccc'er had been issued to ensure that conservative setpoints consistent with the accident analyels would be used in the event entry into the Action Statement of Technical Specifications 3.7.1.1 was required.
Current Licensing Basis The existing Technical Specifications for the Main Steam Safety Valves were issued as part of the original operating licenses for North Anna Units 1 and 2 dated April 1, 1978 and August 21,1980 respectively. The specified valve lift settings and relieving capac)hes are in accordance with the requirements of Section 111 of the ASME Boiler and Pressure Vessel Code,1971 Edition. '
(
The main steam safety valves are discussed in Section 10.3 of the North Anna Power Station Updated Final Safety Analysis Report. The Loss of Load / Turbine Trip is Page 2 of 9
f 1 discussed in Section 15.2.7 of the North Anna. Power Station Updated Final Safety
] Analysis Reporti -
Current Design Basis ;
i- .
I
- One of the functions of the Main Steam System is to remove heat from the Reactor i Coolant' System steam generators via the decay heat release valve, the safety valves, ,
) atmospheric dump valves, and/or the steam dump vaives. The five main steam safety ;
valves provided for each ' steam generator are designed to protect the integrity of the l
- main steam piping frorn overpressurization. In the event one or more MSSVs are
. Inoperable, the Reactor Protection System power range neutron flux high trip setpoints 4 are reduced to ensure that the Main Steam System is not overpressurized as a result ;
of various transients. -l f
l l
Discussion ;
- j i
L Westinghouse identified a potential concern in its Nuclear Safety Advisory Letter NSAL-94-001 regarding plant operation within the limits established in Technical
[
[, Specifications. Table 3.7-1 allows the plant to operste at reduced power levels with a l reduced number of operable main steam safety valves. Westinghouse identified that the current method used for. reducing the neutron flux high trip setpoints was potentially inadequate for protecting the main steam system from an overpressure condition following certain design transients. The assumption that the maximum ;
! allowable initial power level is a lirsl@ function of the available MSSV relief capacity ,
{ was determined invalid by Westinghouse. Although it has not been directly shown that l I the reduced neutron flux high trip setpoints generated by this assumption would result ,
I in an overpressure condition of the main steam system, the potential exists due to the non-conservative nature of the assumption. .
A detalied analysis performed for a Loss of Load / Turbine Trip (LOllTT), as part of the - l UFSAR Chapter 15 for a full power condition with all MSSVs operable, determined I
that no overpressure condition would occur. The LOL1TT event was analyzed in the l UFSAR to show that core protection margins (e.g., DNBR) are maintained, the RCS l 4
-will not overpressurize, and the main steam system will not dverpressurize. ;
i- Secondary side overpressure protection is provided by actuation of the MSSVs, which l t t Page 3 of 9
are designed to relieve at least full power nominal steam flow. The analysis verifies !
that the MSSVs capacity is sufficient to prevent secondary side pressure from l exceeding 110 percent of the design pressure.
However, the UFSAR only analyzes the LOUTT transient from the full power initial j condition, with cases examining the effects of assuming primary side pressure control j and different reactivity feedback conditions. With fully operational MSSVs, it can be demonstrated that overpressure protection is provided for all initial power levels.
Technical Specifications Table 3.7-1 allows operation with a reduced number of j operable MSSVs at a reduced power level as determined by resetting the power !
range neutron flux high trip setpoints. This Technical Specifications requirement was not based upon a detailed analysis, but rather based upon the assumption that the maximum allowable initial power level is a linear function of the available MSSV relief -
capacity. Therefore, a subsequent detailed analysis for the LOUTT event for individual !
cases of inoperable MSSVs was not performed at that time since the original full power analysis was determined to bound such an event. This was based upon the invalid assumption that a linearly reduced neutron flux high trip setpoint would limit the heat addition rate below the removal capacity of the remaining operable MSSVs.
1 l Since Westinghouse has determined this assumption invalid, Virginia Electric and j- Power Company performed new calculations to support the proposed conservative
! setpoints. In lieu of a detailed analysis using Technical Specification Table 3.7-1 l power range neutron flux setpoint trip values to determine whether a true overpressure l
condition would result with one or more MSSVs inoperable, calculations were t l performed such that the maximum power level allowed for operation with inoperable MSSVs is below the heat removing capability of the operable MSSVs. This is based l
~
upon Westinghouse's recommendation and represents the most conservative methodology by setting the power range neutron flux high setpoint to this level, thus i ensuring that the actual power level cannot exceed this value. Additionally, the
- information in Table 3.7-1 and the Limiting Condition for Operation Action Statement l associated with two loop operation have been deleted since Virginia Electric and j l Power Company is prohibited by the license from operating in this configuration.
1 in order to calculate these new setpoints, the governing equation is the relationship i q = m Ah, where q is the heat input from the primary side, m is the steam flow rate, and L
! Page 4 of 9 l
- Ah is the heat of the vaporization at the steam relief pressure. Therefore, the equation ,
i used in defining the revised Technical Specifications Table 3.7-1 setpoint values is: !
- Hi $ = L1001 x (Wa hva N) ,
O K l
l t
. Where: l Hi $ = Safety analysis power range high neutron flux setpoint, percent i
O = Nominal NSSS power rating of the plant (including reactor coolant pump heat, MWt)
K = Conversion factor,947.82 (Btu /sec)
MWt .
i wg = Minimum total steam flow rate capability of the operable MSSVs on any one steam generator at the highest MSSV operating pressure including tolerance and accumulation, as appropriate, Ibm /sec.
hig - Heat of vaporization for steam at the highest MSSV opening pressure including tolerance and accumulation, as appropriate, Btu /lbm.
+
N = Number of loops in plant The resulting values calculated from this equation were reduced by 9% power to account for instrument and channel uncertainties. With the revised values, the l maximum plant operating pcwer level would be lower than the reactor protection ;
system setpoint by an appropriate operating margin. These revised values, by the use of this equation, resolves the issue identified by the Westinghouse Nuclear Safety Advisory Letter by enabling us to re-calculate and establish more restrictive power range neutron flux high setpoints as listed in the proposed changes in Technical Specifications Table 3.7-1.
l Page 5 of 9
Specific Changes The following specific Technical Specifications changes apply to both Units 1 and 2.
Change Section 3.7.1.1, " Limiting Condition for Operation" Action item "a" by deleting "With 3 reactor coolant loops and associated steam generators in operation and" ;
and begin the sentence by capitalizing "With".
Delete the following Section 3.7.1.1, "Umiting Condition for Operation" Action item "b" T
- "With 2 reactor coolant loops and associated steam generators in operation and I with one or more main steam line code safety valves associated with an f operating loop inoperable, operation in MODES 1, 2, and 3 may proceed l provided. that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or the Power Range Neutron Flux High Setpoint trip is reduced per Table 3.7-1; otherwise, be in at 13ast HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />." !
Change Section 3.7.1.1, " Limiting Condition for Operation" Action item "c" to Action l Item "b" f Make the following changes to Table 3.7-1:
- Delete "During 3 Loop Operation" from title of table
- Change the Maximum Allowable Power Range Neutron Flux High Setpoint l (Percent of RATED THERMAL POWER) for one inoperable safety valve in Table
! 3.7-1 from "87" to "52"
~
- Change the Maximum Allowable Power Range Neutron Flux High Setpoint !
l (Percent of RATED THERMAL POWER) for two inoperable safety valves in Table l 3.7-1 from "65" to "37"
. . Change the Maximum Allowable Power Range Neutron Flux High Setpoint l (Percent of RATED THERMAL POWER) for three inoperable safety valves in !
! Table 3.7-1 from "44" to '21" l 4
Page 6 of 9 l
}
^1
- - Delete all information which discusses two Loop Operation Make the following changes.to the Technical Specifications Bases 3/4.7.1.1:
1
- Delete the following reactor trip setpoint reduction calculations with supporting definitions:
i For 3 loop operation with stop valves closed gp ,, (X) - (Y)(U) x jog X
For 2 loop operation with stop valves closed SP =, (X) - M(U) x 71 X
i For 2 loop operation with !
stop valves open sp o (X) - (Y)(U) x 66 ,
X
- Replace the last sentence in the third paragraph with the following information and j add the supporting calculation with supporting information:
... The reactor trip setpoint reductions are derived from the following conservative calculation such that the maximum power level allowed for operation with inoperable MSSVs is below the heat removing capability of the operable MSSVs:
In order to calculate these setpoints, the governing equation is the relationship: q = m Ah,'where q is the heat input from the primary side, m is the steam flow rate, and Ah is the heat of the vaporization at the steam relief pressure. Therefore, the equation used in defining the revised setpoint values is* ;
Page 7 of 9 j
l i
Hi $ = L100.l~ x (WMDaN) !
O K. i Where:
Hi $ .= Safety analysis power range high neutron flux setpoint, percent r O - Nominal NSSS power rating of the plant (including reactor coolant pump !
heat, MWt) !
K = Conversion factor,947.82 (Btu /sec)
I wg - Minimum total steam flow rate capability of the operable MSSVs on any - j one steam generator at the highest MSSV operating pressure including tolerance and accumulation, as appropriate, Ibm /sec.
hig = Heat of vaporization for steam at the highest MSSV opening pressure i
including tolerance and accumulation, as appropriate, Btu /lbm.
t N = Numberofloopsin plant f
i F
The resulting values calculated from this equation are reduced by 9% power to ;
account for instrument and channel uncertainties. With the revised values, the maximum plant operating power level would be lower than the reactor i
protection system setpoint by an appropriate operating margin.
4 b
l Safety Significance L
o .
. Virginia Electric' and Power Company has reviewed these proposed Technical l Specifications changes and determined that the changes do not involve an ,
unreviewed safety question.
. +
- 1. The proposed changes do not increase the probability of occurrence or the
- consequences of an accident or mallunction of equipment important to safety ~
i !
Page 8 of 9 i
previously evaluated in the safety analysis report. The proposed changes have no adverse impact upon probability or consequences of any accident previously evaluated. The proposed changes will provide conservative power range neutron flux high trip setpoints such that the maximum power level allowed for operation with inoperable MSSVs is below the heat removing capability of the remaining operable MSSVs. No new or unique accident precursors are introduced by this change.
- 2. The proposed changes do not create the possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report.
Since the implementation of the proposed change to setpoints would require no hardware modifications (i.e., alterations to plant configuration), operation of the facilities with these proposed Technical Specifications does not create the possibility for any new or different kind of accident which has not already been evaluated in the Updated Final Safety Analysis Report (UFSAR).
The proposed revision to the Technical Specifications will not result in any physical citeration to any plant system, nor would there be a change in the method by which any safety-related system performs its function. The design and operation of the main steam system is not being changed. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. The proposed changes do not reduce the margin of safety as defined in the basis
, for any Technical Specifications. The design and operation of the main steam system is not being changed. In addition, the results of the accident analyses which are documented in the UFSAR bound operation under the proposed changes, so that there is no safety margin reduction. Therefore, the proposed change does not involve a reduction in a margin of safety.
Based on the above evaluation, the proposed changes to the Technical Specifications will not adversely affect the safe operation of the piant. Therefore, the proposed change request for North Anna Units 1 and 2 does not result in an unreviewed safety question as defined in the criteria of 10 CFR 50.59.
Page 9 of 9
I 1
l 1
ATTACHMENT 2 1 i
4 l
l PROPOSED TECHNICAL SPECIFICATIONS CHANGES NORTH ANNA UNITS 1 AND 2 i
VIRGINIA ELECTRIC AND POWER COMPANY i
{
! J I l l
l
. .,