MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures ML20045G6831993-07-0202 July 1993 Application for Amends to Licenses NPF-4 & NPF-7 Modifying Table 4.4-1 of TS 4.4.5.1 to Reduce Minimum Number of SGs Required to Be Opened for Insp During First Insp (I.E.,Refueling Outage)Following SG Replacement 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures 1999-08-04
[Table view] |
Text
1 VIHOINIA 15LIOCTitIC ANI) l'OW10It COM1%NY H ICllM ON D, VIIMIINI A 202G1 June 9, 1994 i U.S. Nuclear Regulatory Commission Serial No.94-350 Attention: Document Control Desk NL&P/GSS Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY ,
NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES RELOCATION OF INSTRUMENT RESPONSE TIME LIMITS Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Operating License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. The proposed changes will relocate the Technical Specifications tables of the response time limits for the Reactor Trip System and the Engineered Safety Feature Actuation C, stem. These changes are considered line-item improvements as identified in NRC Generic Letter 93-08.
A discussion of the proposed Technical Specifications changes is provided in i Attachment 1. The proposed Technical Specifications changes are presented in Attachment 2. It has been determined that the proposed Technical Specifications changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. The basis for our determination that the changes do not involve a significant hazards consideration is provided in Attachment 3. The proposed Technical Specifications changes have been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee.
If you have any questions or require additional information, please contact us.
Very truly yours, i
l J. P. O'Hanlon Senior Vice President - Nuclear Attachments t
- a p c ,. E AslGUV f 940615033o 940609 t l PDR ADOCK 05000338 \
P PDR
cc: U.S. Nuclear Regulatory Commission Region il i 101 Marietta Street, N.W. l Suite 2900 1 Atlanta, Georgia 30323 :
Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station ,
Commissioner ,
Department of Health Room 400 109 Governor Street Richmond, Virginia 23219
+
f 7
r 1
l y-w-- r rw y -*1 y-3 m "w w'y'- r e >'-W =*e- c'e-- y -- ---
~
- e
)
COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Vice President - Nuclear Operations, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this h day of // h a .19#.
My Commission Expires: 3/ ,1992 6
/6Wk/bse Notary'Public (SEAL)
, l 4
Attachment 1 Discussion of Changes l
me
RISCUSSION OF CHANGES _
i BELOCATION OF INSTRUMENT RESPONSE TIME LIMITS NORTH ANNA POWER STATION UNITS 1 AND 2 l Introduction l On December 29,1993, the NRC issued Generic Letter 93-08 titled " Relocation of Technical Specification Tables of Instrument Response Time Limits." This generic l letter provides guidance for preparing a proposed license amendment to relocate the tables of response time limits for the Reactor Trip System (RTS) and the Engineered Safety Features Actuation System (ESFAS) instruments from Technical Specifications to station controlled documents. Consistent with the guidance of Generic Letter 93-08, we are requesting license amendments for North Anna Unit 1 and Unit 2 to relocate the RTS and ESFAS tables of instrument response time limits from Technical Specifications to station controlled documents.
Backaround The Reactor Trip System and the Engineered Safety Features Actuation System provides the signals needed to actuate the safety equipment necessary to mitigate accidents and transients. The measurement of response times of these instruments provides assurance that the action functions associated with each channel is completed within the time limit assumed in the accident analyses.
On December 29, 1993, the NRC issued Generic Letter 93-08 which provides guidance for relocating the RTS and ESFAS instrument response time limit tables to station controlled documents as a line-item Technical Specification improvement.
Relocating these tables to station controlled documents is advantageous to both the NRC and Virginia Electric and Power Company in that changes to these tables can be controlled in accordance with the provisions of 10 CFR 50.59 and the administrative controls for procedure changes as established in Technical Specifications Section 6.8
" Procedures and Programs" without the need to process a license amendment request.
Page 2 of 5 Relocating the RTS and ESFAS instrument response time limit tables to station controlled documents will not affect the safety function in that the operability and l surveillance requirements for these instruments specified in Technical Specifications will not change. A Technical Specification surveillance review for RTS and ESFAS instruments was completed in August,1993. This review verified that all surveillance requirements are satisfied by current plant procedures.
Specific Chan213 These Technical Specification changes apply to both Unit 1 and Unit 2. ;
Technical Specification 3.3.1.1, Limiting Condition for Operation. Delete "with RESPONSE TIMES as shown in Table 3.3-2." ,
- Surveillance Requirement 4.3.1.1.3. After the first sentence, add the following as required by Generic Letter 93-08: " Neutron detectors are exempt from response time testing. Response of the neutron flux signal portion of the channel time shall j be measured from the detector output or input of the first electronic component in the channel." Correct typographical error by changing " Table 3.3.1" to " Table 3.3- 1 1" on the last sentence.
Delete pages 3/4 3-10 and 3/4 3-11.
Technical Specification 3.3.2.1, Limiting Condition for Operation. Delete "and with RESPONSE TIMES as shown in Table 3.3-5."
- On Unit 1 delete pages 3/4 3-27 through 3/4 3-30.
On Unit 2 delete pages 3/4 3-29 through 3/4 3-32.
1 Page 3 of 5 The response time limits specified in the Technical Specifications are implemented by plant procedures and upon approval of amendments they will be incorporated into the next revision of the North Anna Power Station Technical Requirements Manual (NAPSTRM).
l The North Anna Power Station Technical Reauirements Manual (N APSTR M) i Although the generic letter describes relocating the affected tables to the UFSAR, it is alternately proposed to relocate them to a separate station controlled document, the .
North Anna Power Station Technical Requirements Manual (NAPSTRM). The NAPSTRM was developed as part of North Anna Power Station's effort to consolidate the references that are used by station support and operations personnel in j determining compliance with the various requirements that govern the safe operation of the station. Many of these requirements were formerly contained in Technical Specifications and, over the past several years, have been authorized for removal from Technical Specifications by the NRC through various license amendments. In the j past these requirements were relocated to the Updated Final Safety Analysis Report (UFSAR) or various plant administrative procedures. This previous relocation effort has proven to be inefficient in that numerous documents must be referenced by station support and operations personnel to determine the various requirements. This research process is time consuming and requires local storage facilities for numerous j documents.
The NAPSTRM was developed in response to this concern. The initial development and implementation of the NAPSTRM has been well received by station personnel.
The NAPSTRM, when fully developed, along with the Technical Specifications, will provide an easy reference for plant support and operations personnel to use in order ;
to make technically accurate decisions concerning the various requirements that l govern the safe operation of the station.
I Page 4 of 5 Changes to the NAPSTRM, including the addition or relocation of technical requirements, are in accordance with the provisions of Section 6.8 " Procedures and Programs" of the Administrative Controls section of Technical Specifications. In addition, all changes, additions, or relocation of technical requirements must satisfy the criteria established in 10 CFR 50.59 " Changes, Tests, and Experiments."
Subsequent changes to these limits in the NAPSTRM will be submitted to the NRC as part of the annual report required by 10 CFR 50.59 (b)(2). This report provides a summary description of the facility changes, tests and experiments including a summary of the safety evaluations that were conducted during the past year.
Safety Significance The proposed changes to the RTS and ESFAS Technical Specifications are consistent with the intent of Generic Letter 93-08, " Relocation of Technical Specification Tables of Instrument Response Time Limits," dated December 29,1993.
The proposed change will relocate the RTS and ESFAS response time limit tables to station controlled documents.
Relocating the RTS and ESFAS response time limit tables to station controlled documents does not affect the probability of occurrence or the consequences of the accidents in the UFSAR. The surveillance and technical requirements of the RTS and ESFAS instrument response times will not be affected. Therefore, the consequences of a postulated accident are not increased by this proposed change.
Relocating the RTS and ESFAS response time limit tables to station controlled documents will not increase the probability of a malfunction of the RTS or ESFAS instrumentation. Therefore, there is no effect on the ability of this instrumentation to perform its intended safety function. This relocation of the RTS and ESFAS response time limit tables to station controlled documents has been examined and accepted by the NRC staff in Generic Letter 93-08.
l
Page 5 of 5 Relocating the RTS and ESFAS response time limit tables to station controlled documents does not affect plant or RTS and ESFAS instrument operations. Therefore, no new accident precursors are being generated by these proposed changes.
The Technical Specifications operability requirements for the RTS and ESFAS instruments are not being changed. The surveillance testing requirements and response time limits are adequate to ensure that the RTS and ESFAS instruments will be capable of performing their intended safety function. Therefore, the relocation of the RTS and ESFAS instrument response time limits to station controlled documents does not reduce the margin of safety as described in the Technical Specifications.