|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures ML20045G6831993-07-0202 July 1993 Application for Amends to Licenses NPF-4 & NPF-7 Modifying Table 4.4-1 of TS 4.4.5.1 to Reduce Minimum Number of SGs Required to Be Opened for Insp During First Insp (I.E.,Refueling Outage)Following SG Replacement 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures 1999-08-04
[Table view] |
Text
_ - - - . - -- - -.
l i .- .
. Ik VINGINIA ELECTHIC AND PownH COMPANY Hicnwowo,VIHOINIA 20261 November 20, 1995 U.S. Nuclear Regulatory Commission Serial No.95-601 l Attention: Document Control Desk NLOS/ETS:
Washington, DC. 20555 Docket Nos. 50 338 '
50-339 License Nos. NPF-4 NPF-7 Gentlemen: i VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE 10 CFR 50 APPENDIX J OPTION _R PERFORMANCE-BASED CONTAINMENT LEAKAGE RATE TESTING Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests amendments, in the form of a change to the Technical Specifications, to Facility Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2.
The proposed Technical Specifications change will permit the use of 10 CFR 50 Appendix J, Option B, Performance-Based Containment Leakage Rate Testing.
A discussion of the proposed Technical Specifications change for North Anna is provided in Attachment 1. The proposed Technical Specifications changes for Units 1 and 2 are provided in Attachments 2 and 3, respectively. It has been determined that the proposed Technical Specifications change does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. The basis for our determination that the change does not involve a significant hazards consideration is provided in Attachment 4. The proposed 1 Technical Specifications change has been reviewed and approved by the Station i Nuclear Safety and Operating Committee and the Management Safety Review ,
l Committee.
To take advantage of the performance-based containment leakage rate testing option of 10 CFR 50 Appendix J, we request your prompt review and approval of the proposed change prior to the next refueling outage. This refueling outage is currently l scheduled to begin in February of 1996. )
i I
Should you have any questions or require additional information, please contact us.
Very truly yours, im p James P. O'Hanlon Senior Vice President - Nuclear Attachments (,
9511290177 951120 PDR ADOCK 05000338
,P ,m. , ___ PDR,,_
b cc:- U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station Commissioner ;
Department of Radiological Health Room 104A 1500 East Main Street Richmond, Virginia 23219 t
9 9
9 1
3 s
J
,- , . - - - , - . - . - , . . . . - . , e
e.
l COMMONWEALTH OFVIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to' execute and file the foregoing document in behalf of that Company, and the statements in the
' document are true to the best of his knowledge and belief.
Acknowledged before me this b day of /lh,ds .19ff.
v My Commission Expires: dm 8/ ,1988_. l 0 ,
/ Irk S#w, Notary Putilic ;
1 (SEAL) i
t t
Attachment 1 Discussion of Change North Anna Power Station 1
1
i !
) _ .
DISCUSSION OF CHANGES INTRODUCTION l
The Nuclear Regulatory Commission has amended its regulations to provide a .
- performance-based option for leakage rate testing of containments. This testing j option (designated Option' B) is available in lieu of compliance with the present J
prescriptive requirements contained in Appendix J regulations. In order to implement !
- the performance-based leakage rate testing option, the Technical Specifications must {
- be changed to eliminate reference to the present prescriptive Appendix J l j requirements. Therefore, Virginia Electric and Power Company (Virginia Power) is -
! proposing a change to the North Anna Technical Specifications to eliminate the ;
! existing prescriptive testing requirements for leakage rate testing of the containment i and instead reference Option B of 10 CFR 50 Appendix J and NRC Regulatory Guide !
1.163, " Performance-Based Containment Leak-Test Program," dated September 1995. This change will permit use of the performance-based leakage rate testing.
t The operation and operability requirements of the containment and containment j penetrations are not affected by the proposed Technical Specification change. ;
increasing the leakage rate test interval for the containment and containment ,
- penetrations does lead to a slight increase in the probability of a malfunction of ?
t equipment important to safety. Due to the longer intervals between tests, the proposed !
l- change will increase the overall accident risk to the public by approximately 0.7% and
- 2.2% for changes in the frequency of Type A tests and Type B and C tests, i respectively. However, this increase in the probability of a malfunction has been i judged by Virginia Power to be insignificant. This increase in risk has been reviewed l 3 and judged to be acceptable by the NRC as documented in NUREG-1493, ;
- " Performance-Based Containment Leakage-Test Program," and the recent changes to l l 10 CFR 50 Appendix J. i i
l The proposed change does not involve any physical modifications to the plant or 1
- i. modification in the methods of plant operation which would could cause an accident or i i event of a different type than previously analyzed. The operational leakage criteria for i t the containment and the containment penetrations are not affected by the proposed l change. The accident analysis assumptions are not altered by the proposed change l In containment surveillance frequency. Thus, the margin of safety for design basis l accidents is unaffected by the proposed change. Therefore, the proposed change to
- the surveillance intervals for the containment and the containment penetrations do not
- result in an unreviewed safety question or a significant hazards consideration. l i
l BACKGROUND i
- Current Desian and Licensina Basis - Annendix J
~ ~
! Appendix J to 10 CFR 50, " Primary Reactor Containment Leakage Testing for Water- l d- Cooled Reactors," became effective in March 1973. The safety objective of reactor i
, - containments is stated in 10 CFR 50, Appendix A, " General Design Criteria for Nuclear Power Plants," Criterion 16, " Containment Design." GDC Criterion 16 mandates "an ;
! essentially leak-tight barrier against the uncontrolled release of radioactivity to the i
' environment." Appendix J to 10 CFR 50 implements, in part, GDC 16 and specifies ,
containment leakage-testing requirements, including the type of test required. For each type of test required, Appendix J specifies how the test should be conducted, the !
! page 1 of 5 e
S
. . - frequency of testing, and reporting requirements. Appendix J requires the following type of containment leakage tests:
- Measurement of the containment integrated leakage rate (Type A tests).
[ The current test requirement is three tests approximately equally spaced over
' the 10 year inservice inspection interval. The third test must be performed
- when the unit is shutdown for the 10 year inservice inspections.
!
- Measurement of the leakage rate across each pressure containing or l leakage limiting boundary for various primary reactor containment i penetrations (Type B tests).
I- Except for airlocks, the current test requirement is testing during every reactor shutdown for refueling, or other convenient interval, but in no case at intervals greater than 2 years. Airlocks are tested every six months and after each use.
- Measurement of the containment isolation valve leakage rates (Type C tests). s 3
The current test requirement is testing during every reactor shutdown for <
refueling, but in no case at intervals greater than 2 years. ;
4 1~
l DISCUSSION The recent NRC conclusions on containment leak rate testing, as documented in L
- NUREG-1493, are based on two fundamental components. First is the insight gained i through the use of probabilistic risk assessment techniques. This insight allows the
- NRC to better assess and apply the relative significance of systems important to safetj The second is the significant data base of practical, hands-on experience regarding -
- containment leakage-rate testing gained since 1973, when Appendix J became ,
i effective. This operating and testing experience provides solid evidence of the need !
- and activities necessary to conduct Appendix J testing and the cost of those activities ;
! both in resources and occupational radiation exposure.
1 I
The new risk-based regulation is based on the performance history of components !
l (containment, penetrations, and valves) as a means to justify an increase in the l
- interval for Type A, B, and C tests. The new regulation requires tests to be conducted !
L on an interval based on the performance of the containment structure, penetrations, ,
y and valves without specifying the interval in the regulation. .
. s Allowable Leakage Rate The extensive operations and testing experience show that risk to the general population is generally ~ insensitive to changes in the allowable ~ leakage rate. Specific :
i findings include: :
The rallowable containment leakage can be increased by approximately two orders of magnitude with marginal impact on population dose estimates from i
. reactor accidents.
] ,
i page 2 of 5 t 1
4
~ .
- Calculated population risks are several orders of magnitude below the NRC's' Safety Goals as documented in its policy statement " Safety Goals for Operation of Nuclear Power Plants," dated August 4,1986.
Leakaae Rate Test Interval Reducing the Type A test frequency from the current three tests every ten years to one test every ten years as endorsed by the rulemaking leads to a marginal increase in risk. However, this marginal increase is insignificant relative to the current risk estimates.
Specific findings include:
Tyos A Reducing the frequency of Type A tests from the current three every ten years to one every twenty years as documented in NUREG-1493 was found to lead to an imperceptible increase in risk. The estimated increase in risk is very small because Type A tests identify only a few potential containment leakage paths that cannot otherwise be identified by Type B and C testing. Furthermore, operating experience shows that leaks found by Type A tests have only marginally exceeded existing requirements. Given the insensitivity of risk to containment leakage rate and the small fraction of leakage paths detected solely by Type A testing, increasing the interval between Type A tests is possible with minimal impact on public risk.
Although still below previously stated NRC safety goals, decreasing the frequency of testing to one in ten years as endorsed by the rulemaking decreases the timeliness of finding those leaks and, thus, increases the expected overall population risk by 0.7 percent.
Tyos B and C Type B and C tests detect a very large fraction, over 97 percent, of containment leakage paths. Since leakage through Type B penetrations is infrequent and small (less thar.1% of the allowable leakage rate) changing the test frequency to coincide with the Type A test schedule is not estimated to result in any change in the overall risk.
Virtually all leakage paths (greater than 97%) are identified by Type C tests of containment isolation valves. Based on the model of component failure, it has
' been found that performance-based Type C testing alternatives are feasible without significant risk impacts. Although still below previously stated NRC safety goals,'for Type ~B and C testing, the pop'ulation risk for a performance-based testing schedule would increase overall accident risk by 2.2 percent per year. This increase is considered marginal by the NRC. q The NRC's safety objective established for the Appendix J rulemaking initiative was to .
allow licensees more flexibility in the allocation of resources while maintaining a high degree of assurance of containment integrity. The performance-based containment leakage testing program endorsed by Regulatory Guide 1.163, " Performance-Based ,
Containment Leak-Test Program," and NEl 94-01, " Industry Guidelines for j page 3 of 5 L _ _ __ _ __._ __ -.____ _ _ _ _ -. - - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a
~
. Implementing Performance-Based Containment Option of 10 CFR 50, Appendix J,"
me'ets this objective.
SPECIFIC CHANGES Specification 3/4.6 Containment
- Soecification 4.6.1.1.a " Verifying" is being spelled correctly in the surveillance l requirement for both Units. 1 1
- Soecification 4.6.1.1.c - Replace the current leakage verification requirement l with the following:
"Results shall be evaluated against the criteria of Specification 3.6.1.2.b in accordance with 10 CFR 50 Appendix J, Option B, as modified by approved I exemptions and Regulatory Guide 1.163." l
- Soecifications 4.6.1.2.a through d - Replace the current prescriptive testing requirements with the following:
"The containment and containment penetrations leakage rates shall be demonstrated by performing leakage rate testing in accordance with 10 CFR 50 Appendix J, Option B, as modified by approved exemptions and Regulatory Guide 1.163. The provisions of Specification 4.0.2 are not applicable."
- Soecifications 4.6.1.3.a (and footnote) and b - Replace the current prescriptive testing requirements with the following:
"a. By performing leakage rate testing in accordance with 10 CFR 50 Appendix J, Option B, as modified by approved exemptions and Regulatory Guide 1.163. The provisions of Specification 4.0.2 are not applicable."
- Soecification 4.6.1.3.b - Change the frequency from "once every 18 months during shutdown" to "once per refueling outage."
This is consistent with removing the prescriptive testing requirements for leak rate testing from the remaining Technical Specifications.
- Soecifications 4.6.1.6.1 and 2 - Replace the current prescriptive testing requirements with the following:
" Containment Surfaces - The structural integrity of the exposed accessible interior and exterior surfaces of the containment, including the liner plate, shall be determined by performing visual examinations in accordance with 10 CFR !
50 Appendix J, Option B, as modified by approved exemptions and Regulatory l Guide 1.163. The provisions of Specification 4.0.2 are not applicable."
The Unit 1 Specification is changing from inspection of just the liner plate to reflect the Unit 2 inspection requirements, which include the accessible interior and exterior surfaces of the containment.
page 4 of 5
j
.' Specification 6.9.2, Special Reports
- Specification 6.9.2.r. and 6.9.2.q for Units 1 and 2, respectively - This
! containment structural Integrity inspection reporting requirement is being l deleted. Option B requires specific recordkeeping for leakage rate testing in lieu of reporting.
i SAFETY.. . SIGNIFICANCE 1 .
The proposed Technical Specifications change is necessary to permit the use of
- Option B, of the revised 10 CFR 50, Appendix J . Option 8 permits performance-based
- testing of the containment and containment penetrations. Performance based testing e will significantly reduce the' amount of testing and personnel exposure for each i- outage. The proposed change has been reviewed against the criteria of 10 CFR 50.59
- and it has been determined that an unreviewed safety question does not exist for the
' followin'g reasons:
Plant systems and components will not be operated in a different manner as a
- result of the proposed Technical Specifications change. The proposed change permits a performance-.b ased approach to determining the leakage-rate test frequency for the containment and containment penetrations (Type A, B, and C 4 tests). There are no plant modifications, or changes in methods of operation. ,
~
1 Therefore, the changes in testing intervals for the containment and containment penetrations have no affect on the probability of occurrence of a LOCA. The :
Limiting Conditions for Operation and the leakage-rate acceptance criteria are not being changed. Therefore, the design base consequence of a LOCA are not being !
- increased by the proposed changes in leak rate test interval.
- Plant systems and components will not be operated in a different manner as a ;
, result of the proposed Technical Specifications change. Changing the test interval l
for the containment and containment penetrations does not create any new i accident precursors or methods of operation. Therefore, the possibility for an accident of a different type than was previously evaluated in the Safety Analysis 1 Report is not created by the proposed Technical Specifications change.
l The proposed change increases the probability of a malfunction due to the longer l l intervals between leakage tests. It has been estimated that the longer test intervals j will increase the overall accident risk to the public by approximately 0.7% and 2.2%
p (for changes in the frequency of Type A tests and Type B and C tests, respectively).
i This increase has been reviewed and found to be acceptable by the NRC as
! documented in NUREG-1493 and the recent rulemaking to 10 CFR 50 Appendix J.
We also agree that this increase in accident risk is insignificant.
i l
- Plant systems and components will not be operated in a different manner. The l
! Limiting Conditions for Operation for the containment and the containment 3 4 penetrations are not changed as a result of the proposed Technical Specifications '
change. Therefore, the accident analysis assumptions for design basis accidents l are unaffected and the margin of safety is not decreased by the proposed -
Technical Specifications change.
i page 5 of 5
.-. - . .- .. .. . . . . . .. _ . . - - . . . = . .- -
1 4
l b
i 4
i 4
i a
i i
4 Attachment 2 i
Technical Specifications Change i
North Anna Power Station - Unit 1 3 ,
1 i
i I.
I i
5 i
s, i
t t
i
..