ML17252A320: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17252A320
| number = ML17252A320
| issue date = 11/23/1977
| issue date = 11/23/1977
| title = LER 77-047/03L-0 For Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation Of T.S.1.0.CC.b Maximum Combined Interval Time By 3.5 Days For HPCI Monthly Valve And Pump Operability
| title = LER 77-047/03L-0 for Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation of T.S.1.0.CC.b Maximum Combined Interval Time by 3.5 Days for HPCI Monthly Valve and Pump Operability
| author name = Stephenson B B
| author name = Stephenson B B
| author affiliation = Commonwealth Edison Co
| author affiliation = Commonwealth Edison Co

Revision as of 22:46, 1 March 2018

LER 77-047/03L-0 for Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation of T.S.1.0.CC.b Maximum Combined Interval Time by 3.5 Days for HPCI Monthly Valve and Pump Operability
ML17252A320
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/23/1977
From: Stephenson B B
Commonwealth Edison Co
To: Keppler J G
NRC/RGN-III
References
BBS Ltr #1095-77 LER 77-047/03L-0
Download: ML17252A320 (3)