ML20147B094: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:~ . _ . _ _ _
{{#Wiki_filter:~. _. _ _ _
BOPE CREEK GENERATING STATION EC.IC-GP.ZZ-0008(Q) - Rev. 10
BOPE CREEK GENERATING STATION
(
(
MAINTENANCE TROUBLESEOOTING AND KNOWN C00tPONENT PROBLENS CATEGORY: I Romarks/ Reason for Revision:                                 This revision performs the following:
EC.IC-GP.ZZ-0008(Q) - Rev. 10 MAINTENANCE TROUBLESEOOTING AND KNOWN C00tPONENT PROBLENS CATEGORY: I Romarks/ Reason for Revision:
: 1. Relocates the Maintenance Troubleshooting Plan continuation sheet to the second sheet of Attachment 1.
This revision performs the following:
: 2. Adds additional direction in section 5.2 for the Job Supervisor possibility and        to to determine obtain theif Maintenance        there is a reactor                       Manager  trip / Engineer concurrence. This is additional direction enhanncing the                                                                                                 I procedure and is editorial.                                                                                                                               )
1.
Relocates the Maintenance Troubleshooting Plan continuation sheet to the second sheet of Attachment 1.
2.
Adds additional direction in section 5.2 for the Job Supervisor to determine if there is a reactor trip / Engineer possibility and to obtain the Maintenance Manager concurrence.
This is additional direction enhanncing the procedure and is editorial.
a -
a -
i a       \
i a
* s^                 ,
\\
                                                                                            !_                                                                      l Approved:
s^
V
l
                          /          Ah Mainte                 ce Manager - HCO
/
                                                                                                                                          /
b3 Approved:
Date b3 9701290366 970124 PDR FOIA O'NEILL96-351
/
              ~~
Ah V
PDR
Mainte ce Manager - HCO Date 9701290366 970124 PDR FOIA O'NEILL96-351 PDR
: u.                                                                                                                        -. , - -                            . ,--.
~~
u.


  --  -      -                            _ . _  _ . - - - - . . - =               -      . ~ - - - . ._ ._ _.
_. - - - -.. - =
E f .
. ~ - - -.._._ _.
EC . IC- GP . ZZ - O'.'0 3 (Q)
E f
MAINTENANCE TROUBLESEOOTING AND KNOWN COKPONENT PROBLT3tS TABLE OF CONTENTS SECTION     TITLE                                                                   PAGE 1.0       PURPOSE........................................                           2 2.0       PREREQUISITES.............._....................                           2 3.0       PRECAUTIONS AND LIMIT AT IONS . . . . . . . . . . . . . . . . . . . .     3 4.0       EQUIPMENT REQUIRED.............................                           5 5.0       PROCEDURE....................       ...... ..........                    6 5.1 De-energized Trouble.ihooting..............                           6 l
EC. IC-GP. ZZ - O'.'0 3 (Q)
5.2 Energized Troubleshooting....               ............              8
MAINTENANCE TROUBLESEOOTING AND KNOWN COKPONENT PROBLT3tS TABLE OF CONTENTS SECTION TITLE PAGE 1.0 PURPOSE........................................
2 2.0 PREREQUISITES.............._....................
2 3.0 PRECAUTIONS AND LIMIT AT IONS....................
3 4.0 EQUIPMENT REQUIRED.............................
5 5.0 PROCEDURE....................
6 5.1 De-energized Trouble.ihooting..............
6 l
5.2 Energized Troubleshooting....
8


==6.0       REFERENCES==
==6.0 REFERENCES==
.....................................                            10 ATTACHMENTS Attachment.1, MD Troubleshooting Record................                             11 a     .
10 ATTACHMENTS Attachment.1, MD Troubleshooting Record................
Attachment 2, MD Troubleshooting Independent                                                         .
11 a
Verification Record....................................                             15 l         Attachment 3, Temporary Modification...................                             18 l
., MD Troubleshooting Independent Verification Record....................................
l         Attachment 4, Job Information Tag......................                             19 l
15 l, Temporary Modification...................
Attachment 5,   Relay Department Jumper Log..............                           20 Attachment 6, Agastat Relay Known Problems.............                             22
18 l
l,
Job Information Tag......................
19 l, Relay Department Jumper Log..............
20, Agastat Relay Known Problems.............
22
(
(
1 l
1 l
EOPE CREEK                     1 of 22                                           Rev. 10 l
EOPE CREEK 1 of 22 Rev. 10 l


EC.IC-GP.ZZ-0008(Q) 1.0         PURPOSE 1.1           The purpose of this procedure is to provide Maintenance
EC.IC-GP.ZZ-0008(Q) 1.0 PURPOSE 1.1 The purpose of this procedure is to provide Maintenance
(                                             personnel with administrative troubleshooting widance that interfaces with station procedures and policies.
(
1.2           To provide administrative controls to ensure compliance with NC.NA- AP.ZZ- 0013 (Q) by providing Attachment 2 to document temporary modificat_ ions made IAN other procedures.
personnel with administrative troubleshooting widance that interfaces with station procedures and policies.
1.3           This procedure is not required provided that the                                                   !
1.2 To provide administrative controls to ensure compliance with NC.NA-AP.ZZ- 0013 (Q) by providing Attachment 2 to document temporary modificat_ ions made IAN other procedures.
troubleshooting is limited to the measurement of                                                   '
1.3 This procedure is not required provided that the troubleshooting is limited to the measurement of parameters NOT requiring jumpers or lif ted leads.
parameters NOT requiring jumpers or lif ted leads.
1.4 To provide a source of current information via component attachment sheets on known component problems.
1.4           To provide a source of current information via component attachment sheets on known component problems.                                                                                         ;
2.0 PREREQUISITES 2.1 Administrative 2.1.1 The Job Supervisor has verified that the-individual assigned to perform this procedure is qualified to do so IAN HC.MD-AP.ZZ-0014 (Q), e Maintenance Qualification and Training Program.
2.0         PREREQUISITES 2.1           Administrative 2.1.1     The Job Supervisor has verified that the-individual assigned to perform this procedure is qualified to do so IAN HC.MD- AP.ZZ-0014 (Q) , e                                   -
2.1.2 The Senior Nuclear Shift Supervisor / Nuclear Shif t Supervisor (SNSS/NSS) has granted administrative authority for the performance of this procedure.
Maintenance Qualification and Training Program.
2.1.3 If applirsble, a Radiation Work Permit (RWP) has been obtained.
2.1.2     The Senior Nuclear Shift Supervisor / Nuclear Shif t Supervisor (SNSS/NSS) has granted administrative authority for the performance of this procedure.
2.1.4 The work package has been reviewed by the Job l
2.1.3     If applirsble, a Radiation Work Permit (RWP) has been obtained.
2.1.4     The work package has been reviewed by the Job l
Supervisor for completeness and any special administrative prerequisites have been noted and addressed.
Supervisor for completeness and any special administrative prerequisites have been noted and addressed.
2.1.5     Applicable personnel and equipment safety precautions have been complied with IAN station administrative procedures.
2.1.5 Applicable personnel and equipment safety precautions have been complied with IAN station administrative procedures.
2.1.6     Working copies of documents used shall be validated and st g ed by the Job Supervisor IAW NC.NA-AP.ZZ-0003(Q).
2.1.6 Working copies of documents used shall be validated and st g ed by the Job Supervisor IAW NC.NA-AP.ZZ-0003(Q).
2.2           System CD-588A                   2.2.1     If applicable, ensure the NCO resets any existing half scram prior to the start of any l                                                         troubleshooting.
2.2 System CD-588A 2.2.1 If applicable, ensure the NCO resets any existing half scram prior to the start of any l
h                                               2.2.2     Consideration shall be given to Technical
troubleshooting.
:                                                          Specification repirements such as minimum i                                                         channels required to be OPERABLE, or NOT TRIPPED.
h 2.2.2 Consideration shall be given to Technical Specification repirements such as minimum i
BOPE CREEK                                                           2 of 22                             Rev. 10
channels required to be OPERABLE, or NOT TRIPPED.
BOPE CREEK 2 of 22 Rev. 10


l                                                                                                                                l l
l l
BC.IC-GP.ZZ-0008(Q)
BC.IC-GP.ZZ-0008(Q) 2.2.3 Circuits shall be analyzed for inadvertent
.                                      2.2.3                       Circuits shall be analyzed for inadvertent
}
}                                                                   e pipment operation and the initiation of trip               i 2
e pipment operation and the initiation of trip i
signals caused by the placement of jumpers, or
2 signals caused by the placement of jumpers, or
(                                                               lifting leads prior to their use.
(
2.3               Definitions Test               -
lifting leads prior to their use.
A controlled set of plant operations intended to verify that the systems, structures or components function in accordance with predetermined specifications. Such tests would be of significance to the degree that they should be described in the SAR, could affect safe operation of the plant, could degrade the margins of safety during normal operations or anticipated transients, or degrade the adequacy of structures, systems or components used to prevent accidents or mitigate accident conditions. This may include operation of systems or components outside their normal configuration or addition of new components or               l systems not described in the SAR.
2.3 Definitions Test A controlled set of plant operations intended to verify that the systems, structures or components function in accordance with predetermined specifications. Such tests would be of significance to the degree that they should be described in the SAR, could affect safe operation of the plant, could degrade the margins of safety during normal operations or anticipated transients, or degrade the adequacy of structures, systems or components used to prevent accidents or mitigate accident conditions. This may include operation of systems or components outside their normal configuration or addition of new components or systems not described in the SAR.
Experiment - A controlled set of plant operations intended to establish characteristics not previously known. Such experiments would be of             '
Experiment - A controlled set of plant operations intended to establish characteristics not previously known. Such experiments would be of significance to the degree that they should be described in the SAR, could affect safe operation of the plant, could degrade the margins of safety during normal operations or anticipated transients, or. degrade the adequacy of structures, systems or components used to prevent accidents or mitigate accident conditions. This may include operation of systems or components outside their normal configuration or addition of new components or systems not described in the SAR.
significance to the degree that they should be described in the SAR, could affect safe operation of the plant, could degrade the margins of safety during normal operations or
3.0 PRECAUTIONS AMD LIMITATIONS 3.1 Ensure that the Nuclear Control @erator (NCO) is instructed as to which specific alarms and indications will be affected by the performance of this procedure.
  ,                                                                anticipated transients, or. degrade the adequacy of structures, systems or components used to prevent accidents or mitigate accident conditions. This may include operation of systems or components outside their normal configuration or addition of new components or systems not described in the SAR.
3.2 Ensure that M&TE used is set to the proper function and range prior to its use.
3.0     PRECAUTIONS AMD LIMITATIONS 3.1               Ensure that the Nuclear Control @erator (NCO) is instructed as to which specific alarms and indications will be affected by the performance of this procedure.
3.3 IE it is suspected that the test epipment may not be performing properly, THEN a comparison check shall be performed with a similar device QR the device shall be checked for calibration against a standard.
3.2               Ensure that M&TE used is set to the proper function and range prior to its use.
This shall be done prior to taking any other corrective action.
3.3               IE it is suspected that the test epipment may not be performing properly, THEN a comparison check shall be performed with a similar device QR the device shall be checked for calibration against a standard. This shall be done prior to taking any other corrective action.
3.4 Ensure that all Measuring and Test Equipment (M&TE) has a current calibration sticker, and is controlled IAh NC.NA-AP. ZZ- 0022 (Q).
3.4               Ensure that all Measuring and Test Equipment (M&TE) has a current calibration sticker, and is controlled IAh NC.NA- AP. ZZ- 0022 (Q) .
3.5 If appropriate, ensure that a manufacturer recommended warmup period is provided for all instrumentation and M&TE.
3.5               If appropriate, ensure that a manufacturer recommended warmup period is provided for all instrumentation and M&TE.
BOPE CREEK 3 of 22 Rev. 10
BOPE CREEK                                                             3 of 22                     Rev. 10


  -  m _       .  . _ . . _ _ _ . _ _ _ ._.          _.m   _ _ _ _.      _ . _ _ _ _ . . _ _ _ . _ _              _    _ _ _ _ _ . . _
m _
t                                                                                                        EC. IC-GP.ZZ- 000 8 (Q) 3.6         If venting and/or draining an instrument, or instrument line, contain and dispose of all liquids IAW the RWP or established safety practices.                                                                  .
_.m t
3.7         Discrepancies noted during the performance of this procedure shall be documented IAW NC.NA-AP.ZZ-0020(Q).
EC. IC-GP.ZZ- 000 8 (Q) 3.6 If venting and/or draining an instrument, or instrument line, contain and dispose of all liquids IAW the RWP or established safety practices.
3.8         Devices installed using torque paint on mounting bolts, etc. shall not be removed for bench calibration. In addition, the ASME pressure boundary shall not be compromised. The ASME pressure boundary is identified on drawing 10855-J-G-1010-3.
3.7 Discrepancies noted during the performance of this procedure shall be documented IAW NC.NA-AP.ZZ-0020(Q).
3.9         Second party (independent - an individual different from the person making the change) verification shall be required for each Q, F or R listed lifted lead, pipe l                                               disconnected, jumper (wire, staple, etc.), or
3.8 Devices installed using torque paint on mounting bolts, etc. shall not be removed for bench calibration.
!                                              instrument valve repositioned under this procedure.
In addition, the ASME pressure boundary shall not be compromised.
i l                                               3.9.1   All leads     shall be marked (ie - color coded, I                                                       conductor     number and/or permanent label. IE the leads are     not marked in this manner, IEEN a temporary     marker shall be installed. The temporary     marker shall be removed when the lead is re-connected, a -
The ASME pressure boundary is identified on drawing 10855-J-G-1010-3.
l CD-596F                   3.9.2   All Relay Department personnel shall fill out Attachment (s) 5 for each listed lifted lead or jumper (wire, staple,'etc..) not listed in HC.RL-PM.ZZ-00011Q).
3.9 Second party (independent - an individual different from the person making the change) verification shall be required for each Q, F or R listed lifted lead, pipe l
CD-326G                   3.9.3   The number of wires on a terminal post shall be determined, documented, and independently verified prior to altering the wiring configuration on that terminal. The number of wires shall be verified to be correct after restoration of wiring on an affected terminal post. The column provided on Attachment 2 (5 for relay department) shall be used for this purpose.
disconnected, jumper (wire, staple, etc.), or instrument valve repositioned under this procedure.
3.10 When a difference between the installed epipment and CD-136A                   the documents being used for troubleshooting exists,
i l
                                              , resolution shall be obtained from the Job Supervisor before proceeding with the troubleshooting effort.
3.9.1 All leads shall be marked (ie - color coded, I
3.11 Only the materials and solvents approved by NC. NA- AP. ZZ- 0038 (Q) may be used in the performance of this procedure.
conductor number and/or permanent label. IE the leads are not marked in this manner, IEEN a temporary marker shall be installed. The temporary marker shall be removed when the lead is re-connected, a
l CD-596F 3.9.2 All Relay Department personnel shall fill out Attachment (s) 5 for each listed lifted lead or jumper (wire, staple,'etc..) not listed in HC.RL-PM.ZZ-00011Q).
CD-326G 3.9.3 The number of wires on a terminal post shall be determined, documented, and independently verified prior to altering the wiring configuration on that terminal. The number of wires shall be verified to be correct after restoration of wiring on an affected terminal post. The column provided on Attachment 2 (5 for relay department) shall be used for this purpose.
3.10 When a difference between the installed epipment and CD-136A the documents being used for troubleshooting exists,
, resolution shall be obtained from the Job Supervisor before proceeding with the troubleshooting effort.
3.11 Only the materials and solvents approved by NC. NA-AP. ZZ- 0038 (Q) may be used in the performance of this procedure.
3.12 When appropriate, equipment shall be properly tagged IAW NC.NA-AP.ZZ-0015(Q) prior to perfo M ng any work.
3.12 When appropriate, equipment shall be properly tagged IAW NC.NA-AP.ZZ-0015(Q) prior to perfo M ng any work.
3.13 Jumpers or lifted leads which must remain at the completion of the work QR if the work activity is stopped for more than two shifts shall be administratively controlled IAW NC.NA-AP.ZZ-0013(Q).
3.13 Jumpers or lifted leads which must remain at the completion of the work QR if the work activity is stopped for more than two shifts shall be administratively controlled IAW NC.NA-AP.ZZ-0013(Q).
i l
i l
EOPE CREEK                                         4 of 22                                         Rev. 10
EOPE CREEK 4 of 22 Rev. 10


  --.. ..            . . -        _- - ._ __- - _.    ._.  . ~ -  - _ - . - -          .  . - . . - -
. ~ -
HC.IC-GP.ZZ-0008(Q) 3.14 The use of grounded M&TE shall be limited to CD-691A       applications where isolation from power supply           grounds are possible unless determined that the M&TEs use will
HC.IC-GP.ZZ-0008(Q) 3.14 The use of grounded M&TE shall be limited to CD-691A applications where isolation from power supply grounds are possible unless determined that the M&TEs use will
(                     not produce adverse effects on the circuits under test.
(
not produce adverse effects on the circuits under test.
3.15 Whenever possible, steps shall be taken to troubleshoot in-plant equipment in the de-energized state.
3.15 Whenever possible, steps shall be taken to troubleshoot in-plant equipment in the de-energized state.
3.16 Lifted leads must be suitably insulated from other circuits and electrical grounds. Exposed electrical leads must be taped or insulated when left unattended.
3.16 Lifted leads must be suitably insulated from other circuits and electrical grounds. Exposed electrical leads must be taped or insulated when left unattended.
l 3.17 Electrical jumper cables must be of sufficient length and contrasting color to stand out from other cables.
l 3.17 Electrical jumper cables must be of sufficient length and contrasting color to stand out from other cables.
l The use of " alligator clips", clamps or other l                         attachments subject to inadvertent disconnecting is discouraged.
l The use of " alligator clips", clamps or other l
3.18 Mechanical jumpers must be marked uniquely to stand out from other hoses or pipes. The temporar
attachments subject to inadvertent disconnecting is discouraged.
!                          tag may be sufficient for this purpose.y However,   modification in
3.18 Mechanical jumpers must be marked uniquely to stand out from other hoses or pipes. The temporar tag may be sufficient for this purpose.y modification However, in some cases, additional marking may be needed (additional tags at regular intervals for long jumpers).
;                          some cases, additional marking may be needed (additional tags at regular intervals for long jumpers).
3.19 Cogonent attachment sheets must be reviewed for applicability in the course of troubleshooting.
3.19 Cogonent attachment sheets must be reviewed for                         '
4.0 EQUIPMENT REQUIRED The test equipment used in the performance of this procedure 1
applicability in the course of troubleshooting.
shall be as needed.
4.0   EQUIPMENT REQUIRED The test equipment used in the performance of this procedure shall be as needed. The M&TE used shall be documented on 1
The M&TE used shall be documented on 1
1 the associated work order.
the associated work order.
l l
l l
l l
l l
t EOPE CREEK                               5 of 22                           Rev. 10
t EOPE CREEK 5 of 22 Rev. 10


EC.IC-GP.ZZ-0008(Q) 5.0 PROCEDURE NOTE 5.1
EC.IC-GP.ZZ-0008(Q) 5.0 PROCEDURE NOTE 5.1
{
{
Attachment 1 is optional for de-energized troubleshooting.
* is optional for de-energized troubleshooting.
5.1     De-eneraized Troubleshootina-CD-302G                                                                                                                     ,
5.1 De-eneraized Troubleshootina-CD-302G Troubleshooting shall be considered to be de-energized troubleshooting only when it is performed under conditions where the equipment, channel, component, etc. is isolated to the point where its active functions (trip / isolation signals, equipment operation, etc.) are inhibited from affecting plant ep ipment or operations. Troubleshooting shall be considered l
Troubleshooting shall be considered to be de-energized troubleshooting only when it is performed under conditions where the equipment, channel, component,                                                               I etc. is isolated to the point where its active functions (trip / isolation signals, equipment operation, etc.) are inhibited from affecting plant ep ipment or
energized when it affects electrical, electronic, pneumatic or hydraulic parameters on equipment, systems t
.                                  operations. Troubleshooting shall be considered l                                 energized when it affects electrical, electronic, t
or components which are not isolated from service.
pneumatic or hydraulic parameters on equipment, systems or components which are not isolated from service.                                                               i Normal routine isolation of epipment where the process                                                           I is not expected to be affected (eg. operation of instrument isolation valves on non-sensitive racks) is exempted from this definition. Isolation will normally be accomplished via test / bypass switches, electrical                                                       ,
i Normal routine isolation of epipment where the process is not expected to be affected (eg. operation of instrument isolation valves on non-sensitive racks) is exempted from this definition. Isolation will normally be accomplished via test / bypass switches, electrical breaker operation, fuse removal and/or isolation IAW HC.SA-AP.ZZ-0015(Q).
breaker operation, fuse removal and/or isolation IAW HC.SA-AP.ZZ-0015(Q).                                                                                           -
5.1.1 Ensure all prerequisites have been satisfied.
5.1.1             Ensure all prerequisites have been satisfied.
5.1.2 Copies of all c e leted Attachments shall be affixed to the validated work document.
5.1.2             Copies of all c e leted Attachments shall be affixed to the validated work document.
(Planned Work Order, Work Request) 5.1.3 When using M&TE, insure the Work Order number is recorded in the MAINTENANCE TROUBLESHOOTING RECORD.
(Planned Work Order, Work Request) 5.1.3             When using M&TE, insure the Work Order number is recorded in the MAINTENANCE TROUBLESHOOTING RECORD.
5.1.4 Notify the NCO that the troubleshooting activity is starting.
5.1.4             Notify the NCO that the troubleshooting activity is starting.
5.1.5 Troubleshoot, under the following precepts, the equipment to identify the cause of the malfunction.
5.1.5             Troubleshoot, under the following precepts, the equipment to identify the cause of the malfunction.
A. Attachment 2 shall be used to identify all wiring, piping and valve position changes made during troubleshooting.
A. Attachment 2 shall be used to identify all wiring, piping and valve position changes made during troubleshooting.                                                             ,
CD-675X B.
CD-675X                         B. Perform any independent verification                                                       I required.                                                                                 l C. Use sound, logical troubleshooting techniques.                                                                               l D. The work order, associated procedures and validated documents shall be used at the work location.
Perform any independent verification required.
BOPE Cazar                                     6 of 22                                             Rev. 10
C. Use sound, logical troubleshooting techniques.
D. The work order, associated procedures and validated documents shall be used at the work location.
BOPE Cazar 6 of 22 Rev. 10


    ._____      _-.._ _ .-          -. _    ~.   . _ . _ _ _ . _ . _ _ _ _ _ _ . _ - - . _ _ _ _ _ _ -_
~.
NC JC-GP.ZZ- 0 00 8 (Q) 5.1.5 E. The Job Suparvicor and the NCO should be kept informed as to the status of in-plant work progress.
NC JC-GP.ZZ- 0 00 8 (Q) 5.1.5 E. The Job Suparvicor and the NCO should be kept informed as to the status of in-plant work progress.
5.1.6 The Job Supervisor shall determine whether the troubleshooting effort is to be continued to l
5.1.6 The Job Supervisor shall determine whether the troubleshooting effort is to be continued to problem resolution or component replacement.
problem resolution or component replacement.
l l
l                             5.1.7 Notify.the NCO as to the equipments status
5.1.7 Notify.the NCO as to the equipments status (i.e., operable or i~noperable).
!                                    (i.e., operable or i~noperable).
5.1.8 IE the equipment is HQI to be reworked at this time, IHEN address all testing modifications as follows; OTHERNISE proceed to step 5.1.9.
5.1.8 IE the equipment is HQI to be reworked at this
I l
,                                  time, IHEN address all testing modifications as I
A. Remove all modifications (jumpers, etc. ) not transferred to the administrative control of l
follows; OTHERNISE proceed to step 5.1.9.
by NC.NA-AP.ZZ-0013(Q).
A. Remove all modifications (jumpers, etc. ) not                                                       l transferred to the administrative control of l                                         by NC.NA-AP.ZZ-0013(Q).
CD-461E B. Modifications that could remain installed I
CD-461E               B. Modifications that could remain installed I                                         greater than 8 hours or if work activity                                                         !
greater than 8 hours or if work activity will be unattended for greater than 8 hours should be posted with a Job Information Tag,. The Job Information Tag may be removed if administrative control is i
will be unattended for greater than 8 hours should be posted with a Job Information Tag,                                                     1 Attachment 4. The Job Information Tag may be removed if administrative control is                                                             i transferred to NC.NA- AP.ZZ-0013 (Q) .                                                   '      ;
transferred to NC.NA-AP.ZZ-0013 (Q).
C. Modifications that remain installed'at the c w letion of the work activity or if the work activity is stoppd for more than 16 hours, shall have a M nistrative control transferred to NC.NA- AP.ZZ-0013 (Q) .
C. Modifications that remain installed'at the c w letion of the work activity or if the work activity is stoppd for more than 16 hours, shall have a M nistrative control transferred to NC.NA-AP.ZZ-0013 (Q).
CD-427F               D. If it is determined that modifications will CD-492F                     will be transferred to the administrative control of NC.NA- AP.ZZ-0013 (Q) , the SNSS/NSS shall complete Attachment 3 and notify appropriate Maintenance Planning and System Engineering personnel.
CD-427F D.
E. Perform any independent verification                                                                 l required (i.e. another technician,                                                               ;
If it is determined that modifications will CD-492F will be transferred to the administrative control of NC.NA-AP.ZZ-0013 (Q), the SNSS/NSS shall complete Attachment 3 and notify appropriate Maintenance Planning and System Engineering personnel.
supervisor, etc. ) .
E.
l
Perform any independent verification required (i.e. another technician, supervisor, etc. ).
                            .      F. Clean the area, close all cabinet drawers,                                                           I panel doors, etc.
F. Clean the area, close all cabinet drawers, I
;                                  G. Complete all appropriate attachments to this procedure. Attachment 1 is required.
panel doors, etc.
H. Notify the NCO that the equipment is not                                                             ,
G. Complete all appropriate attachments to this procedure. is required.
          .                              operdle and Technical Specification consequences may be applicable.
H. Notify the NCO that the equipment is not operdle and Technical Specification consequences may be applicable.
l                                   I. Submit all work documents - Work Order,
l I. Submit all work documents - Work Order, attachments to this procedure, etc. - to the Job Supervisor for processing.
!                                        attachments to this procedure, etc. - to the
EOPE CREEK 7 of 22 Rev. 10
:                                        Job Supervisor for processing.
 
EOPE CREEK                             7 of 22                                                                 Rev. 10
HC o IC-GP. ZZ- 0008 (Q) l l
5.1.8 J. The Job Supervisor shall review the Work i
documents for completeness, signing where appropriate, then process IAW
(
HC. SA-AP. ZZ- 0009 (Q).
Rework the equipment considering the following


l HC o IC-GP . ZZ- 0008 (Q) l                          5.1.8        J. The Job Supervisor shall review the Work i                                                  documents for completeness, signing where appropriate, then process IAW
====5.1.9 guidelines====
(                                                HC. SA- AP. ZZ- 0009 (Q) .
5.1.9         Rework the equipment considering the following guidelines:
A. Use only approved replacement parts.
A. Use only approved replacement parts.
Substitutions may only be used with Site Engineering approval.
Substitutions may only be used with Site Engineering approval.
B. Use sound material replacement techniques.
B. Use sound material replacement techniques.
C. Parts tickets, tags, etc. shall be retained and attached to the work order.
C.
Parts tickets, tags, etc. shall be retained and attached to the work order.
D. Notify the Job Supervisor and the NCO when the rework is completed.
D. Notify the Job Supervisor and the NCO when the rework is completed.
5.1.10       Perform any independent verification required.
5.1.10 Perform any independent verification required.
5.1.11       Perform the necessary recalibration, retest activities to verify proper equipment operation after rework.
5.1.11 Perform the necessary recalibration, retest activities to verify proper equipment operation after rework.
e 5.1.12       Clean the work area, close all cabinet doors, panel drawers, etc. IE work war performed on high voltage switch gear, THEh ensure that a thorough close out inspection is performed.
e 5.1.12 Clean the work area, close all cabinet doors, panel drawers, etc. IE work war performed on high voltage switch gear, THEh ensure that a thorough close out inspection is performed.
5.1.13       Notify the NCO that the equipment is released from testing or Temporary Modifications are installed.
5.1.13 Notify the NCO that the equipment is released from testing or Temporary Modifications are installed.
5.1.14       Ceinplete Attachment 1 if applicable, and submit all other work documents to the Job Supervisor for processing.
5.1.14 Ceinplete Attachment 1 if applicable, and submit all other work documents to the Job Supervisor for processing.
5.2   Enercized Troubleshootino                                                                                       l Troubleshooting shall be considered to be energized troubleshooting when it does NOT meet the requirements defined in step 5.1.
5.2 Enercized Troubleshootino Troubleshooting shall be considered to be energized troubleshooting when it does NOT meet the requirements defined in step 5.1.
5.2.1         Perform step 5.1.1 through 5.1.4.
5.2.1 Perform step 5.1.1 through 5.1.4.
l i
l i
I l
I l
EOPE CREEK                                                   8 of 22                                           Rev. 10 1
EOPE CREEK 8 of 22 Rev. 10 1
+.-
e
--+


EC.IC-GP.EE-0008(Q)
EC.IC-GP.EE-0008(Q)
NOTE 5.2.2 The SNSS/NSS shall act as the Job Supervisor for the Shift Electrician or the Shift Technician when a Maintenance Supervisor is not available.
NOTE 5.2.2 The SNSS/NSS shall act as the Job Supervisor for the Shift Electrician or the Shift Technician when a Maintenance Supervisor is not available.
5.2.2   Using Attachment 1, the Job Supervisor shall prepare a detailed outline of the intended troubleshooting process. The outline shall include such items as what points will be jumpered, leads lifted, staple jumpers moved, valves or switches repositioned, etc. and the expected results of each test.
5.2.2 Using Attachment 1, the Job Supervisor shall prepare a detailed outline of the intended troubleshooting process.
5.2.3   After preparing the plan, determine if the plan       l could cause an ESF system actuation or there is a reactor trip possibility and sign in the spces provided on Attachment 1, and review it (in detail) with the on-shift STA.
The outline shall include such items as what points will be jumpered, leads lifted, staple jumpers moved, valves or switches repositioned, etc. and the expected results of each test.
5.2.4   The STA will determine if the plan constitutes' the performance of a test or experiment.
5.2.3 After preparing the plan, determine if the plan l
5.2.5   IE the STA has determined that the plan is a test or experiment, 22iEN the plan should be.
could cause an ESF system actuation or there is a reactor trip possibility and sign in the spces provided on Attachment 1, and review it (in detail) with the on-shift STA.
rejected or modified such that it is not a test or experiment; OTHERWISE the plan will fall under the jurisdiction of NC.NA-AP.ZZ-0008(Q)
5.2.4 The STA will determine if the plan constitutes the performance of a test or experiment.
'                  and a Test and Experiment DCP shall be prepared.
5.2.5 IE the STA has determined that the plan is a test or experiment, 22iEN the plan should be.
5.2.6   IE the STA has determined that the plan is not a test or experiment, THEN after the STA reviews the plan and signs Attachment 1, the STA shall obtain the SNSS/NSS acknowledgment of the Job Supervisors determination of an ESF system actuation or reactor trip possibility and approval for the work to proceed.
rejected or modified such that it is not a test or experiment; OTHERWISE the plan will fall under the jurisdiction of NC.NA-AP.ZZ-0008(Q) and a Test and Experiment DCP shall be prepared.
NOTE 5.2.7 The NCO shall be notified before performing any steps that could cause an ESF system actuation or reactor trip.                                 l 5.2.7 After approval, the Job Supervisor will review the plan with the Technicians performing the work, pointing out any steps tht could cause an ESF system actuation or reactor trip and       l sign on Attachment 1, step 2a.
5.2.6 IE the STA has determined that the plan is not a test or experiment, THEN after the STA reviews the plan and signs Attachment 1, the STA shall obtain the SNSS/NSS acknowledgment of the Job Supervisors determination of an ESF system actuation or reactor trip possibility and approval for the work to proceed.
BOPE CREEK                     9 of 22                       Rev. 10
NOTE 5.2.7 The NCO shall be notified before performing any steps that could cause an ESF system actuation or reactor trip.
_m
l 5.2.7 After approval, the Job Supervisor will review the plan with the Technicians performing the work, pointing out any steps tht could cause an ESF system actuation or reactor trip and l
sign on Attachment 1, step 2a.
BOPE CREEK 9 of 22 Rev. 10 m


h BC.IC-GP.ZZ-0008(Q) 5.2.8   The Job Supervisor may proceed with the troubleshooting IAW the approved plan.
h BC.IC-GP.ZZ-0008(Q) 5.2.8 The Job Supervisor may proceed with the troubleshooting IAW the approved plan.
Deviations, except AC or DC voltage fi                              measurements, are not allowed without first providing     a modification to the plan IAW steps 5.2.1 through 5.2.7.
Deviations, except AC or DC voltage f
5.2.9   From this point onward, steps 5.1.4 through 5.1.16 shall apply. .
measurements, are not allowed without first i
providing a modification to the plan IAW steps 5.2.1 through 5.2.7.
5.2.9 From this point onward, steps 5.1.4 through 5.1.16 shall apply..


==6.0   REFERENCES==
==6.0 REFERENCES==
 
6.1 NC. NA-AP. ZZ- 0013 (Q), Control of Temporary Modification.
6.1 NC . NA- AP . ZZ- 0013 (Q) , Control of Temporary Modification.
[
[                   6.2 HC.SA- AP. ZZ-002 2 (Q) , Control of Calibrated Measuring and Test Equipment.
6.2 HC.SA-AP. ZZ-002 2 (Q), Control of Calibrated Measuring and Test Equipment.
6.3 Closing Document CD-588A, INPO OEMR-9.
6.3 Closing Document CD-588A, INPO OEMR-9.
6.4 Closing Document CD-136A, NRC IE Circular 79-07.
6.4 Closing Document CD-136A, NRC IE Circular 79-07.
6.5   Closing Document CD-691D, INPO OB 1253.
6.5 Closing Document CD-691D, INPO OB 1253.
6.6   Closing Document CD-675X, FSAR sec. 1.10.2.
6.6 Closing Document CD-675X, FSAR sec. 1.10.2.
6.7   FSAR Chapter 6, Engineered Safety Features.                               '
6.7 FSAR Chapter 6, Engineered Safety Features.
6.8   Closin Document CD-492F, NRC Inspection Report 50-354 89-02 6.9   Closing Document CD-427F', Unauthorized Modification 6.10 Closing Document CD-596F, Unauthorized Lifted Lead 6.11 Closing Document CD-302G, Primary Containment Penetration Inop 6.12 Closing Document CD-326G, Loss of Puel Pool Inventory HOPE CREEK                         10 of 22                                     Rev. 10
6.8 Closin Document CD-492F, NRC Inspection Report 50-354 89-02 6.9 Closing Document CD-427F', Unauthorized Modification 6.10 Closing Document CD-596F, Unauthorized Lifted Lead 6.11 Closing Document CD-302G, Primary Containment Penetration Inop 6.12 Closing Document CD-326G, Loss of Puel Pool Inventory HOPE CREEK 10 of 22 Rev. 10


EC.IC-GP.ZZ-0008(Q)
EC.IC-GP.ZZ-0008(Q)
;                                                        ATTACEMENT 1                                                             1 MAINTENANCE TROUBLESEOOTING RECORD
ATTACEMENT 1 1
(*       1.       PLAN PREPARATION (Energized work only, optional for De-energized work) 4 EQUIPMENT ID                                         WORK ORDER
MAINTENANCE TROUBLESEOOTING RECORD
                                                                          ~
(*
1.
PLAN PREPARATION (Energized work only, optional for De-energized work)
EQUIPMENT ID WORK ORDER 4
PROBLEM  
PROBLEM  


==SUMMARY==
==SUMMARY==
Component Attachment Sheets Reviewed for Applicability Yes                       N/A                       No (explain below) i TROUBLESHOOTING PLAN                                                                               '
~
1 I
Component Attachment Sheets Reviewed for Applicability Yes N/A No (explain below) i TROUBLESHOOTING PLAN 1
                      ~
I
I                                                                                                                                  ;
~
i i
i i
i l
i l
l I
I HOPE CREEK 11 of 22 Rev. 10
HOPE CREEK                                           11 of 22                                       Rev. 10


EC.IC-GP.ZZ-0008(Q)
EC.IC-GP.ZZ-0008(Q)
ATTA M 1 MAINTENANCE TROUBLESHOOTING PLAN
ATTA M 1 MAINTENANCE TROUBLESHOOTING PLAN WORK ORDER NO:
,        WORK ORDER NO:                                         PAGE 2 of l
PAGE 2 of l
TROUBLESHOOTING PLAN (Continued):
TROUBLESHOOTING PLAN (Continued):
l l
l l
Line 239: Line 276:
i e
i e
l l
l l
l 1
BOPE CREEK 12 of 22 Rev. 10
l l
BOPE CREEK                 12 of 22                                       Rev. 10 l


EC.IC-GP.ZZ-0008(Q) l ATTu'wnT 'l MADTTENANCE TROUBLESEOOTING RECORD
EC.IC-GP.ZZ-0008(Q) l ATTu'wnT 'l MADTTENANCE TROUBLESEOOTING RECORD
( 2. PLAN REVIEW / APPROVAL (Required for Energized work, optional for De-energized work)                                                           l ESF Actuating possibility             Yes         No                           l 1
(
Reactor Trip possibility               Yes         No                         l ;
2.
i l
PLAN REVIEW / APPROVAL (Required for Energized work, optional for De-energized work)
Submitted by.
ESF Actuating possibility Yes No Reactor Trip possibility Yes No l
Job Svoervisor                     Date                   l Reviewed by:
i Submitted by.
STA                         Date Concurrence:
Job Svoervisor Date Reviewed by:
(See Note 1)   Maintenance Manager / Engineer           Date Approved by:
STA Date Concurrence:
SNSS/NSS                       Date 2a. Plan reviewed with Performing Parsonnel and on duty NCO.             e NCO Notification prior to steps leading to possible ESF or reactor trip.
(See Note 1)
I Job Supervisor Note 1 - Concurrence from the Maintenance Manager or Maintenance Engineer is required only if the Reactor Trip possibility is checked YES. This concurrence may be made by phone if the Maintenance Manager and Maintenance Engineer are not present at Hope Creek.
Maintenance Manager / Engineer Date Approved by:
l l
SNSS/NSS Date 2a. Plan reviewed with Performing Parsonnel and on duty NCO.
e NCO Notification prior to steps leading to possible ESF or reactor trip.
I Job Supervisor Note 1 - Concurrence from the Maintenance Manager or Maintenance Engineer is required only if the Reactor Trip possibility is checked YES.
This concurrence may be made by phone if the Maintenance Manager and Maintenance Engineer are not present at Hope Creek.
l l
l l
EOPE CREEK                     13 of 22                           Rev. 10
l EOPE CREEK 13 of 22 Rev. 10


EC.IC-CP.ZZ-0008(Q)
EC.IC-CP.ZZ-0008(Q)
ATTE M 1 MAINTENANCE TROUBLESEOOTING RECORD
ATTE M 1 MAINTENANCE TROUBLESEOOTING RECORD 3.
: 3. PLAN PERFORMANCE Cause/ Explanation of Failure:
PLAN PERFORMANCE Cause/ Explanation of Failure:
l l
l l
l Rework Required:
l Rework Required:
Independen.t Verification Record Required (attachment 2)
Independen.t Verification Record Required (attachment 2)
Yes               N/A               No (explain below)
Yes N/A No (explain below)
Operations Department Requested Modification           Yes       No (Attachment 4, if required) 1 1
Operations Department Requested Modification Yes No (Attachment 4, if required)
Technician / Mechanic           Date
Technician / Mechanic Date 4.
: 4. PLAN CLOSEOUT Independent verifications Completed Yes               N/A               No (explain below)
PLAN CLOSEOUT Independent verifications Completed Yes N/A No (explain below)
Equipment Configured to Support Plant Operations Yes               N/A               No (explain below) l i
Equipment Configured to Support Plant Operations Yes N/A No (explain below) l i
l   EOPE Camur                     14 of 22                         Rev. 10 1
l EOPE Camur 14 of 22 Rev. 10 1
                                                                            /.
/.


HC.IC-CP.ZZ-003otQ)
HC.IC-CP.ZZ-003otQ)
ATTarwumeT 2 MAINTENANCE TROUBLESHOOTING INDEPENDENT YERIFICATION RECORD LIFTED LEADS /DISCORDMCTED PIPING Lifted /Restoved Verified By
ATTarwumeT 2 MAINTENANCE TROUBLESHOOTING INDEPENDENT YERIFICATION RECORD LIFTED LEADS /DISCORDMCTED PIPING Lifted /Restoved Verified By
* Wire N/     8 of                   Location                                                                                                             Restored By     Verified By By Initial /Date Initial /Date piping ID/   wires on             (cabinet,                                                                                                           Initial /Date       Initial /Date part       terminal               'IBS, rack                                                                                                                                 .*
* Wire N/
                                  ..            .          ...            etc.)
8 of Location Restored By Verified By By Initial /Date Initial /Date piping ID/
* Ensure that ALL wires are marked
wires on (cabinet, Initial /Date Initial /Date part terminal
        **  O or F listed only
'IBS, rack etc.)
        ***  Number of wires on terminal prior to lifting any wi{es (step 3.9.3)
Ensure that ALL wires are marked O or F listed only Number of wires on terminal prior to lifting any wi{es (step 3.9.3)
HOPE CREEK                                   15 of 22                                                                                                                                                         Rev. 10
HOPE CREEK 15 of 22 Rev. 10


A HC. IC-CP. ZZ- 0008 (Q)
A HC. IC-CP. ZZ- 0008 (Q)
ATTE N 2
ATTE N 2 MAINTENANCE M LESBOOTING
                                                                                                                                                                                                                    ~
~
MAINTENANCE M LESBOOTING INDEPENDENT VERIFICATIGil RECORD
INDEPENDENT VERIFICATIGil RECORD JtBEPERS Installed By Verified By From To Removed By Verified By Initial /Date Initial /Date Initial /Date Initia Date i
                                            ,                                                                                                                      JtBEPERS Installed By Verified By                                                                   From                                                         To Removed By         Verified By Initial /Date                                                                                                                                 Initial /Date       Initial /Date Initia Date       **                                                                                                                                                                  **
I I
i
Q or F listed only g
**  Q or F listed only g
HOPE CREEK 16 of 22 Rev. 10
HOPE CREEK                                                                                                                                                     16 of 22                                   Rev. 10


    )
)
0 Q
0 Q
(                                   1 yet
1
(
_ 80 8
_ 80 8
0 B a dD                 e v
yet B
0                                   R
a v
    -              ie/.
0 dD e
Z                  l.
0 e/.
f ia i
R l.
Z.               rti P                 e C
i a
Vn I C
Z f i Z.
I.
rt i
C                ye B                   t Ba d D
i e
_                    e/
P Vn C
r la oi t t si e
I C
R In D
I.
R GO          dn N C         eo I E         ri T R         ot ti
CB ye t
_        O     .
B a D
ss O E       S eo               g B C       E RP 2 S   I     V E T       L
de/
_        L A       A                     2 B C       V                     2 U I     :
l r a o i t t s
F   o T    e
i e n R I DR G O dn N C eo I E ri T R ot O
  ~
ti ss O E S
NO E
eo g
T R I T R N E V E   r e
B C E
N E
RP S
M U
I V
yt Ba d/
2 E T L
el D
L A A
f o
NO 2
7 1
B C V
T C      d ga A N T     r T ni A N     O S at N E       N hi Cn E D       I T
U I
N E N kr        I                    _
2 F
I P     o                            _
T o
A E     W MD                      d N                   e           _
e f
n I                                _
R I T R N N
o       ]
yt o
ti           t st.       l ei Ts e
E Ba
o       r P       h T.
~
dn             .
M D
no ui         T ot Fi.           ,
E r
s     d ey so AP         sl on S
E E V U
lo C. d
d/
                          .        .e   K o         .t   E N       Xs     E e
7 T
i R v        ,l   C
C R
-                        l       n a       eF   E V         p     P r O O. o   H
el 1
                                    .Q O
e T
d ga A
N T r
T ni A N S
at O
N E N
hi E D I
Cn T N k I
r N E o
I P W
A E M D d
N e
I n
o
]
ti t
st.
l ei e
Ts r
o P
h T.
dn no T
ui ot Fi.
s d
so ey AP slon lo S
C. d
.e K
o
.t E
N Xs E
i R
e
,l C
v l
n a
eF E
V p
P r
O O. o H
.Q O


l                                                                 HC . IC - GP . ZZ - 0 0 0 8 (Q)
l HC. IC - GP. ZZ - 0 0 0 8 (Q)
ATTACEMENT 3 l
ATTACEMENT 3 l
  ,                                      TEMPORARY MODIFICATION l0 l
l0 TEMPORARY MODIFICATION l
(
(
l     Purpose of Modification:
l Purpose of Modification:
l                                                                                 __
l Descriotion of Modification (Include location of all modifications ie, torminal points, staple location, mechanical component) r Authorization:
Descriotion of Modification (Include location of all modifications ie, torminal points, staple location, mechanical component) r Authorization:                                                       /
/
CD-427F CD-492F                   SNSS/NSS                   Date/ Time Modifications installed and logged (attachment 2)
CD-427F CD-492F SNSS/NSS Date/ Time Modifications installed and logged (attachment 2)
Technician                         Date Verifiar                           Date SNSS/NSS has made the following notifications to KEY PLANT PERSONNEL:
Technician Date Verifiar Date SNSS/NSS has made the following notifications to KEY PLANT PERSONNEL:
Maintenance:                                                     /
Maintenance:
Name                       Date/ Time Planning:                                                       /
/
Name                       Date/ Time System Engr:                                                     /     -
Name Date/ Time Planning:
Name                       Date/ Time Signature (SNSS/NSS)             Date l
/
Name Date/ Time System Engr:
/
Name Date/ Time Signature (SNSS/NSS)
Date l
l k
l k
EOPE CREEK                           18 of 22                           Rev. 10
EOPE CREEK 18 of 22 Rev. 10


  - . _ . - .      .-  . ~ .   - - . . - . .                  . _ -  -    . .  ..    . . . _ . -    - -  .-  .. ._. . .-
. ~.
t EC. IC-GP.ZZ- 0 0 08 (Q)
t EC. IC-GP.ZZ- 0 0 08 (Q)
ATTACEh M ~4 J.Q E._ I M F_Q E M A r I O N T A G
ATTACEh M ~4 J.Q E._ I M F_Q E M A r I O N T A G
                        /8(j)                                 JOB DFORMATION TAC L                                             _
/8(j)
3
JOB DFORMATION TAC L
                                                "    a'                                               -
3 0
0                w~             _
a' w~
os,.             w LL l                                               Work Order Nun k                                       4 W
os,.
Procedure w                                                           .
w LL l
z Supv.                               Ph:no Name                               Ext.               h N                                                                                                       !
Work Order Nun k 4
l l
W Procedure w z
l 1
Supv.
                                                                                                                      #        I 1
Ph:no h
Name Ext.
N l
1 i
i l
i l
i l
HOPE CREEK 19 of 22 Rev. 10
HOPE CREEK                                   19 of 22                                         Rev. 10


                                        ;*      .. l' ifi?:           ? l
l' ifi?:
    )
?
Q                           e _                                    0
l
(                      Y    t                                       1 B    a
)Q e
0 Y
t 1
(
. n0 0
. n0 0
0                           d                                           .
B a
D /                                             v
0 d
-  0                    E*l                                             e
D /
    -                    I*     a                                       R
v 0
1                     F     t 1                     I      t D     R i P             E     E     n G             V     V     I
E*l e
    -             O                          ,
I*
C             M             e E           t I.             R     Y     a
a R
-  C                    B D E                           /
1 F
D l E     a V i O     t
t 1
-                        M i E     n R I
D R i I
.                              e Y     t                                             _
t P
B     a                                           _
E E
D                                            _
n G
D E*/
V V
I*la
I O
              )           F i                                                 _
-C M
Y    D     I     t L   E     R i                                                 .
e E
N    L     E     n                                             _
t I.
O    L     V     I                                   g A
R Y
5      T   T                                                         _
a C
r M N     S Y    e                                            _
B D E
c   E   N     B    t a                             _
/
2 M
D l
T I      n     D 2
E a
R.   /
V i O
R               l                                        f NLeA T t T J D A
t M i E
P E
n R I e
T-T A i T t S i N n a
Y t
0 2
B a
o Y.         I     I A
D DE*/
L E                .
I*l a
R
)
(              M.
F i Y
R N          EO O   O      TN I    T                                   }
D I
T            .K A         MC C         RC O         EL L         ".B
t L
                    '        M.
E R i N
R E                                    y g        T@
L E
                                .K l
n O
n o
L V
MC                                 d RO                                   e EL                                 t TB                                   s i       r l       a RR                                                 m EE                                         R       a PB                                                 C MM                                           r UU                                           o     E JN                   _
I g
P
A 5
_.                  _ F       O H
r T
Q
T Y
e M N S
B t
NLeA l
f c
E N
a 2
M I
n D
2 T
R.
/
R T
T a
o P
A i E
T t
0 T
t T J D S i 2
A N
n Y.
I I
ALE R
M.
(
REO NO O
TN T
}
IT
.K A
MC C
RC O
EL L
".B M.
R ET@
g y
lno
.K MC d
RO e
EL t
TB s
i r
l a
RR m
EE R
a PB C
MM r
UU o
E JN P
F O
H Q


        '                              I ih     ! . i i ,'         .[
I ih i
    )
i,'
Q                                                                   0
.[
_    (                                                                   1 0
)
D    e 0                           t                                        .
Q 0
0                      E a                                           v I d                                           e 0                     FY/
(
IB l                                         R E               D R
1 e
E a  i E.             E T
0 D
V ti P             C               n
t 0
_    G             Et I           i
E a v
      -            e C             O t
0 I d e
C I.            E R       D     t e
0 FY/
C                    E a E                     T D CY /l EB I
IB R
G ai O
l R a E
O t C i                                 )
D E
E n                                 3 R     I                               .
i E.
9 e                           3 D     t E     a                             p             _
E V t T
I                                                 _
i P
FY   D                             e IB    /                             t             _
C n
G E
I i
t e
t C
O I.
CE e
C R
D t
E a E
T D CY /
E B l IG a O
i O t C i
)
E n 3
R I
9 e
3 D
t E
a p
I D
e FY /
IB t
l R
s a
)
D E
(
T E
V i
L T
t E
C i
s I
n g C M
e I
O r
5 o
T O
I i
L T
N C
w E
S D e 2
N t E
I E
t y
2 E
c I
D T a n
M e
T D
a f
R C Y/
E n
E A
lB o
C n P e
g la A
o E O i n
1 t
T c
T s D C t i
2 S i t
A i I
n f
Y D I D
E i
L l
E L
R A
o N.
t
(
IMO M
r R
do E
ei N
T O
kr I
rp T
a L
ml A
S A E
E M a
R en ri g
o am r
r 6
se et 9
r pA f-in wo
;1-htK Ls IC Le IED Ar R
I RE B i
tw T
a m
hf to a
E' er C
R re I
uh E
W sm P
nu O
EN H
l
l
                )          R      a                            s            _
D        E T E        V    i t
(            _
L T E
I C            i n                            s g C  M              I                              e      %
O                                            r 5    o T  I O                                            i L  N C                                            w T      E S        D e                                          2 N t    E I        E                                    y        2 E    c  I T D        T t
aD                              n M    e  R          C                                    a        f E    n  A          lBY/
E                                            o C    n P          e    l a                            g A    o                                                  n c E t
O i                                            1 T                  C t                                i        2 T    s D          S i n
t A i    Y          I D I f
D  E                                              i L                                              l E          L                                    o R          A t
(          N.
I MO R M r
E                                do N        T                                ei O                                          kr I                                          rp T          L a
A                                          ml SA                                  a E  M E
R                                en ri g
r            o                          am r
6 se 9
et
                  -                                        r pA f-                                    in 1-wo h
tK IC Ls I                                Le ED R
I                              Ar R                                  i EB                                tw T                                a hf to          m a
E'                                    er          C R                                    re I
W                                    uh          E sm          P nu          O EN          H


EC. IC-CP . EE- 0 008 (Q)
EC. IC-CP. EE- 0 008 (Q)
ATTACEMENT 6 Agastat Relay Known Problems
ATTACEMENT 6 Agastat Relay Known Problems 1.
: 1. GP, TR, FGP. or FTR series relay has been increased in height       by"0.06 to 0.12 inch. This increased height may cause di iculty in seating a locking clip made for pre-May l
GP, TR, FGP. or FTR series relay has been increased in height by"0.06 to 0.12 inch.
l                     1983 relea.                           If there is difficulty in seating clip or if a j                     GP, TR, 3CP, or FTR series relay _ requires replacement, a new l
This increased height may cause di iculty in seating a locking clip made for pre-May l
lockin i
l 1983 relea.
used. g This  clip, Ag&       is especiallystat (A348) part true     number if the intendedCR0070    replacement should be relay   has a 83g8 or later date code (date code breakdown:
If there is difficulty in seating clip or if a j
8318 is the 18 week of 1983). The new style clip may be used on relays with a date code earlier that 8318.
GP, TR, 3CP, or FTR series relay _ requires replacement, a new lockin used. g clip, Ag& stat (A348) part number CR0070 should be l
: 2. Locking clips are only used with GP, TR, PGP, and FTR series relays.                 The BGP/ETR relays mus' use a locking strap (a wide steel band screwed to the relay base).
i This is especially true if the intended replacement relay has a 83g8 or later date code (date code breakdown:
: 3. The acceptable criteria for locking spring engagement using either the old or new style locking clip is as follows:
8318 is the 18 week of 1983).
A. Locking clip is fully engaged at relay base.
The new style clip may be used on relays with a date code earlier that 8318.
B. Locking clip shall have two contact points on the flat, top part of the relay away from the curved edge.,                                                         "
2.
C. No gap between the relay base and socket.                                                           t i
Locking clips are only used with GP, TR, PGP, and FTR series relays.
g 1... _ -
The BGP/ETR relays mus' use a locking strap (a wide steel band screwed to the relay base).
1'         c         r
3.
                                                      ,      J' l
The acceptable criteria for locking spring engagement using either the old or new style locking clip is as follows:
IOPE CREME                                                   22 of 22                                         Rev. 10}}
A.
Locking clip is fully engaged at relay base.
B.
Locking clip shall have two contact points on the flat, top part of the relay away from the curved edge.,
C.
No gap between the relay base and socket.
t i
g 1...
1' c
r J'
l IOPE CREME 22 of 22 Rev. 10
<}}

Latest revision as of 13:46, 11 December 2024

Rev 10 to Procedure HC.IC-GP.ZZ-0008(Q), Maint Troubleshooting & Known Component Problems
ML20147B094
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/13/1993
From:
Public Service Enterprise Group
To:
Shared Package
ML20147B009 List:
References
FOIA-96-351 HC.IC-GP.ZZ, HC.IC-GP.ZZ-000, NUDOCS 9701290366
Download: ML20147B094 (23)


Text

~. _. _ _ _

BOPE CREEK GENERATING STATION

(

EC.IC-GP.ZZ-0008(Q) - Rev. 10 MAINTENANCE TROUBLESEOOTING AND KNOWN C00tPONENT PROBLENS CATEGORY: I Romarks/ Reason for Revision:

This revision performs the following:

1.

Relocates the Maintenance Troubleshooting Plan continuation sheet to the second sheet of Attachment 1.

2.

Adds additional direction in section 5.2 for the Job Supervisor to determine if there is a reactor trip / Engineer possibility and to obtain the Maintenance Manager concurrence.

This is additional direction enhanncing the procedure and is editorial.

a -

i a

\\

s^

l

/

b3 Approved:

/

Ah V

Mainte ce Manager - HCO Date 9701290366 970124 PDR FOIA O'NEILL96-351 PDR

~~

u.

_. - - - -.. - =

. ~ - - -.._._ _.

E f

EC. IC-GP. ZZ - O'.'0 3 (Q)

MAINTENANCE TROUBLESEOOTING AND KNOWN COKPONENT PROBLT3tS TABLE OF CONTENTS SECTION TITLE PAGE 1.0 PURPOSE........................................

2 2.0 PREREQUISITES.............._....................

2 3.0 PRECAUTIONS AND LIMIT AT IONS....................

3 4.0 EQUIPMENT REQUIRED.............................

5 5.0 PROCEDURE....................

6 5.1 De-energized Trouble.ihooting..............

6 l

5.2 Energized Troubleshooting....

8

6.0 REFERENCES

10 ATTACHMENTS Attachment.1, MD Troubleshooting Record................

11 a

., MD Troubleshooting Independent Verification Record....................................

15 l, Temporary Modification...................

18 l

l,

Job Information Tag......................

19 l, Relay Department Jumper Log..............

20, Agastat Relay Known Problems.............

22

(

1 l

EOPE CREEK 1 of 22 Rev. 10 l

EC.IC-GP.ZZ-0008(Q) 1.0 PURPOSE 1.1 The purpose of this procedure is to provide Maintenance

(

personnel with administrative troubleshooting widance that interfaces with station procedures and policies.

1.2 To provide administrative controls to ensure compliance with NC.NA-AP.ZZ- 0013 (Q) by providing Attachment 2 to document temporary modificat_ ions made IAN other procedures.

1.3 This procedure is not required provided that the troubleshooting is limited to the measurement of parameters NOT requiring jumpers or lif ted leads.

1.4 To provide a source of current information via component attachment sheets on known component problems.

2.0 PREREQUISITES 2.1 Administrative 2.1.1 The Job Supervisor has verified that the-individual assigned to perform this procedure is qualified to do so IAN HC.MD-AP.ZZ-0014 (Q), e Maintenance Qualification and Training Program.

2.1.2 The Senior Nuclear Shift Supervisor / Nuclear Shif t Supervisor (SNSS/NSS) has granted administrative authority for the performance of this procedure.

2.1.3 If applirsble, a Radiation Work Permit (RWP) has been obtained.

2.1.4 The work package has been reviewed by the Job l

Supervisor for completeness and any special administrative prerequisites have been noted and addressed.

2.1.5 Applicable personnel and equipment safety precautions have been complied with IAN station administrative procedures.

2.1.6 Working copies of documents used shall be validated and st g ed by the Job Supervisor IAW NC.NA-AP.ZZ-0003(Q).

2.2 System CD-588A 2.2.1 If applicable, ensure the NCO resets any existing half scram prior to the start of any l

troubleshooting.

h 2.2.2 Consideration shall be given to Technical Specification repirements such as minimum i

channels required to be OPERABLE, or NOT TRIPPED.

BOPE CREEK 2 of 22 Rev. 10

l l

BC.IC-GP.ZZ-0008(Q) 2.2.3 Circuits shall be analyzed for inadvertent

}

e pipment operation and the initiation of trip i

2 signals caused by the placement of jumpers, or

(

lifting leads prior to their use.

2.3 Definitions Test A controlled set of plant operations intended to verify that the systems, structures or components function in accordance with predetermined specifications. Such tests would be of significance to the degree that they should be described in the SAR, could affect safe operation of the plant, could degrade the margins of safety during normal operations or anticipated transients, or degrade the adequacy of structures, systems or components used to prevent accidents or mitigate accident conditions. This may include operation of systems or components outside their normal configuration or addition of new components or systems not described in the SAR.

Experiment - A controlled set of plant operations intended to establish characteristics not previously known. Such experiments would be of significance to the degree that they should be described in the SAR, could affect safe operation of the plant, could degrade the margins of safety during normal operations or anticipated transients, or. degrade the adequacy of structures, systems or components used to prevent accidents or mitigate accident conditions. This may include operation of systems or components outside their normal configuration or addition of new components or systems not described in the SAR.

3.0 PRECAUTIONS AMD LIMITATIONS 3.1 Ensure that the Nuclear Control @erator (NCO) is instructed as to which specific alarms and indications will be affected by the performance of this procedure.

3.2 Ensure that M&TE used is set to the proper function and range prior to its use.

3.3 IE it is suspected that the test epipment may not be performing properly, THEN a comparison check shall be performed with a similar device QR the device shall be checked for calibration against a standard.

This shall be done prior to taking any other corrective action.

3.4 Ensure that all Measuring and Test Equipment (M&TE) has a current calibration sticker, and is controlled IAh NC.NA-AP. ZZ- 0022 (Q).

3.5 If appropriate, ensure that a manufacturer recommended warmup period is provided for all instrumentation and M&TE.

BOPE CREEK 3 of 22 Rev. 10

m _

_.m t

EC. IC-GP.ZZ- 000 8 (Q) 3.6 If venting and/or draining an instrument, or instrument line, contain and dispose of all liquids IAW the RWP or established safety practices.

3.7 Discrepancies noted during the performance of this procedure shall be documented IAW NC.NA-AP.ZZ-0020(Q).

3.8 Devices installed using torque paint on mounting bolts, etc. shall not be removed for bench calibration.

In addition, the ASME pressure boundary shall not be compromised.

The ASME pressure boundary is identified on drawing 10855-J-G-1010-3.

3.9 Second party (independent - an individual different from the person making the change) verification shall be required for each Q, F or R listed lifted lead, pipe l

disconnected, jumper (wire, staple, etc.), or instrument valve repositioned under this procedure.

i l

3.9.1 All leads shall be marked (ie - color coded, I

conductor number and/or permanent label. IE the leads are not marked in this manner, IEEN a temporary marker shall be installed. The temporary marker shall be removed when the lead is re-connected, a

l CD-596F 3.9.2 All Relay Department personnel shall fill out Attachment (s) 5 for each listed lifted lead or jumper (wire, staple,'etc..) not listed in HC.RL-PM.ZZ-00011Q).

CD-326G 3.9.3 The number of wires on a terminal post shall be determined, documented, and independently verified prior to altering the wiring configuration on that terminal. The number of wires shall be verified to be correct after restoration of wiring on an affected terminal post. The column provided on Attachment 2 (5 for relay department) shall be used for this purpose.

3.10 When a difference between the installed epipment and CD-136A the documents being used for troubleshooting exists,

, resolution shall be obtained from the Job Supervisor before proceeding with the troubleshooting effort.

3.11 Only the materials and solvents approved by NC. NA-AP. ZZ- 0038 (Q) may be used in the performance of this procedure.

3.12 When appropriate, equipment shall be properly tagged IAW NC.NA-AP.ZZ-0015(Q) prior to perfo M ng any work.

3.13 Jumpers or lifted leads which must remain at the completion of the work QR if the work activity is stopped for more than two shifts shall be administratively controlled IAW NC.NA-AP.ZZ-0013(Q).

i l

EOPE CREEK 4 of 22 Rev. 10

. ~ -

HC.IC-GP.ZZ-0008(Q) 3.14 The use of grounded M&TE shall be limited to CD-691A applications where isolation from power supply grounds are possible unless determined that the M&TEs use will

(

not produce adverse effects on the circuits under test.

3.15 Whenever possible, steps shall be taken to troubleshoot in-plant equipment in the de-energized state.

3.16 Lifted leads must be suitably insulated from other circuits and electrical grounds. Exposed electrical leads must be taped or insulated when left unattended.

l 3.17 Electrical jumper cables must be of sufficient length and contrasting color to stand out from other cables.

l The use of " alligator clips", clamps or other l

attachments subject to inadvertent disconnecting is discouraged.

3.18 Mechanical jumpers must be marked uniquely to stand out from other hoses or pipes. The temporar tag may be sufficient for this purpose.y modification However, in some cases, additional marking may be needed (additional tags at regular intervals for long jumpers).

3.19 Cogonent attachment sheets must be reviewed for applicability in the course of troubleshooting.

4.0 EQUIPMENT REQUIRED The test equipment used in the performance of this procedure 1

shall be as needed.

The M&TE used shall be documented on 1

the associated work order.

l l

l l

t EOPE CREEK 5 of 22 Rev. 10

EC.IC-GP.ZZ-0008(Q) 5.0 PROCEDURE NOTE 5.1

{

  • is optional for de-energized troubleshooting.

5.1 De-eneraized Troubleshootina-CD-302G Troubleshooting shall be considered to be de-energized troubleshooting only when it is performed under conditions where the equipment, channel, component, etc. is isolated to the point where its active functions (trip / isolation signals, equipment operation, etc.) are inhibited from affecting plant ep ipment or operations. Troubleshooting shall be considered l

energized when it affects electrical, electronic, pneumatic or hydraulic parameters on equipment, systems t

or components which are not isolated from service.

i Normal routine isolation of epipment where the process is not expected to be affected (eg. operation of instrument isolation valves on non-sensitive racks) is exempted from this definition. Isolation will normally be accomplished via test / bypass switches, electrical breaker operation, fuse removal and/or isolation IAW HC.SA-AP.ZZ-0015(Q).

5.1.1 Ensure all prerequisites have been satisfied.

5.1.2 Copies of all c e leted Attachments shall be affixed to the validated work document.

(Planned Work Order, Work Request) 5.1.3 When using M&TE, insure the Work Order number is recorded in the MAINTENANCE TROUBLESHOOTING RECORD.

5.1.4 Notify the NCO that the troubleshooting activity is starting.

5.1.5 Troubleshoot, under the following precepts, the equipment to identify the cause of the malfunction.

A. Attachment 2 shall be used to identify all wiring, piping and valve position changes made during troubleshooting.

CD-675X B.

Perform any independent verification required.

C. Use sound, logical troubleshooting techniques.

D. The work order, associated procedures and validated documents shall be used at the work location.

BOPE Cazar 6 of 22 Rev. 10

~.

NC JC-GP.ZZ- 0 00 8 (Q) 5.1.5 E. The Job Suparvicor and the NCO should be kept informed as to the status of in-plant work progress.

5.1.6 The Job Supervisor shall determine whether the troubleshooting effort is to be continued to problem resolution or component replacement.

l l

5.1.7 Notify.the NCO as to the equipments status (i.e., operable or i~noperable).

5.1.8 IE the equipment is HQI to be reworked at this time, IHEN address all testing modifications as follows; OTHERNISE proceed to step 5.1.9.

I l

A. Remove all modifications (jumpers, etc. ) not transferred to the administrative control of l

by NC.NA-AP.ZZ-0013(Q).

CD-461E B. Modifications that could remain installed I

greater than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or if work activity will be unattended for greater than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be posted with a Job Information Tag,. The Job Information Tag may be removed if administrative control is i

transferred to NC.NA-AP.ZZ-0013 (Q).

C. Modifications that remain installed'at the c w letion of the work activity or if the work activity is stoppd for more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, shall have a M nistrative control transferred to NC.NA-AP.ZZ-0013 (Q).

CD-427F D.

If it is determined that modifications will CD-492F will be transferred to the administrative control of NC.NA-AP.ZZ-0013 (Q), the SNSS/NSS shall complete Attachment 3 and notify appropriate Maintenance Planning and System Engineering personnel.

E.

Perform any independent verification required (i.e. another technician, supervisor, etc. ).

F. Clean the area, close all cabinet drawers, I

panel doors, etc.

G. Complete all appropriate attachments to this procedure. is required.

H. Notify the NCO that the equipment is not operdle and Technical Specification consequences may be applicable.

l I. Submit all work documents - Work Order, attachments to this procedure, etc. - to the Job Supervisor for processing.

EOPE CREEK 7 of 22 Rev. 10

HC o IC-GP. ZZ- 0008 (Q) l l

5.1.8 J. The Job Supervisor shall review the Work i

documents for completeness, signing where appropriate, then process IAW

(

HC. SA-AP. ZZ- 0009 (Q).

Rework the equipment considering the following

5.1.9 guidelines

A. Use only approved replacement parts.

Substitutions may only be used with Site Engineering approval.

B. Use sound material replacement techniques.

C.

Parts tickets, tags, etc. shall be retained and attached to the work order.

D. Notify the Job Supervisor and the NCO when the rework is completed.

5.1.10 Perform any independent verification required.

5.1.11 Perform the necessary recalibration, retest activities to verify proper equipment operation after rework.

e 5.1.12 Clean the work area, close all cabinet doors, panel drawers, etc. IE work war performed on high voltage switch gear, THEh ensure that a thorough close out inspection is performed.

5.1.13 Notify the NCO that the equipment is released from testing or Temporary Modifications are installed.

5.1.14 Ceinplete Attachment 1 if applicable, and submit all other work documents to the Job Supervisor for processing.

5.2 Enercized Troubleshootino Troubleshooting shall be considered to be energized troubleshooting when it does NOT meet the requirements defined in step 5.1.

5.2.1 Perform step 5.1.1 through 5.1.4.

l i

I l

EOPE CREEK 8 of 22 Rev. 10 1

+.-

e

--+

EC.IC-GP.EE-0008(Q)

NOTE 5.2.2 The SNSS/NSS shall act as the Job Supervisor for the Shift Electrician or the Shift Technician when a Maintenance Supervisor is not available.

5.2.2 Using Attachment 1, the Job Supervisor shall prepare a detailed outline of the intended troubleshooting process.

The outline shall include such items as what points will be jumpered, leads lifted, staple jumpers moved, valves or switches repositioned, etc. and the expected results of each test.

5.2.3 After preparing the plan, determine if the plan l

could cause an ESF system actuation or there is a reactor trip possibility and sign in the spces provided on Attachment 1, and review it (in detail) with the on-shift STA.

5.2.4 The STA will determine if the plan constitutes the performance of a test or experiment.

5.2.5 IE the STA has determined that the plan is a test or experiment, 22iEN the plan should be.

rejected or modified such that it is not a test or experiment; OTHERWISE the plan will fall under the jurisdiction of NC.NA-AP.ZZ-0008(Q) and a Test and Experiment DCP shall be prepared.

5.2.6 IE the STA has determined that the plan is not a test or experiment, THEN after the STA reviews the plan and signs Attachment 1, the STA shall obtain the SNSS/NSS acknowledgment of the Job Supervisors determination of an ESF system actuation or reactor trip possibility and approval for the work to proceed.

NOTE 5.2.7 The NCO shall be notified before performing any steps that could cause an ESF system actuation or reactor trip.

l 5.2.7 After approval, the Job Supervisor will review the plan with the Technicians performing the work, pointing out any steps tht could cause an ESF system actuation or reactor trip and l

sign on Attachment 1, step 2a.

BOPE CREEK 9 of 22 Rev. 10 m

h BC.IC-GP.ZZ-0008(Q) 5.2.8 The Job Supervisor may proceed with the troubleshooting IAW the approved plan.

Deviations, except AC or DC voltage f

measurements, are not allowed without first i

providing a modification to the plan IAW steps 5.2.1 through 5.2.7.

5.2.9 From this point onward, steps 5.1.4 through 5.1.16 shall apply..

6.0 REFERENCES

6.1 NC. NA-AP. ZZ- 0013 (Q), Control of Temporary Modification.

[

6.2 HC.SA-AP. ZZ-002 2 (Q), Control of Calibrated Measuring and Test Equipment.

6.3 Closing Document CD-588A, INPO OEMR-9.

6.4 Closing Document CD-136A, NRC IE Circular 79-07.

6.5 Closing Document CD-691D, INPO OB 1253.

6.6 Closing Document CD-675X, FSAR sec. 1.10.2.

6.7 FSAR Chapter 6, Engineered Safety Features.

6.8 Closin Document CD-492F, NRC Inspection Report 50-354 89-02 6.9 Closing Document CD-427F', Unauthorized Modification 6.10 Closing Document CD-596F, Unauthorized Lifted Lead 6.11 Closing Document CD-302G, Primary Containment Penetration Inop 6.12 Closing Document CD-326G, Loss of Puel Pool Inventory HOPE CREEK 10 of 22 Rev. 10

EC.IC-GP.ZZ-0008(Q)

ATTACEMENT 1 1

MAINTENANCE TROUBLESEOOTING RECORD

(*

1.

PLAN PREPARATION (Energized work only, optional for De-energized work)

EQUIPMENT ID WORK ORDER 4

PROBLEM

SUMMARY

~

Component Attachment Sheets Reviewed for Applicability Yes N/A No (explain below) i TROUBLESHOOTING PLAN 1

I

~

i i

i l

I HOPE CREEK 11 of 22 Rev. 10

EC.IC-GP.ZZ-0008(Q)

ATTA M 1 MAINTENANCE TROUBLESHOOTING PLAN WORK ORDER NO:

PAGE 2 of l

TROUBLESHOOTING PLAN (Continued):

l l

l i

i e

l l

BOPE CREEK 12 of 22 Rev. 10

EC.IC-GP.ZZ-0008(Q) l ATTu'wnT 'l MADTTENANCE TROUBLESEOOTING RECORD

(

2.

PLAN REVIEW / APPROVAL (Required for Energized work, optional for De-energized work)

ESF Actuating possibility Yes No Reactor Trip possibility Yes No l

i Submitted by.

Job Svoervisor Date Reviewed by:

STA Date Concurrence:

(See Note 1)

Maintenance Manager / Engineer Date Approved by:

SNSS/NSS Date 2a. Plan reviewed with Performing Parsonnel and on duty NCO.

e NCO Notification prior to steps leading to possible ESF or reactor trip.

I Job Supervisor Note 1 - Concurrence from the Maintenance Manager or Maintenance Engineer is required only if the Reactor Trip possibility is checked YES.

This concurrence may be made by phone if the Maintenance Manager and Maintenance Engineer are not present at Hope Creek.

l l

l EOPE CREEK 13 of 22 Rev. 10

EC.IC-CP.ZZ-0008(Q)

ATTE M 1 MAINTENANCE TROUBLESEOOTING RECORD 3.

PLAN PERFORMANCE Cause/ Explanation of Failure:

l l

l Rework Required:

Independen.t Verification Record Required (attachment 2)

Yes N/A No (explain below)

Operations Department Requested Modification Yes No (Attachment 4, if required)

Technician / Mechanic Date 4.

PLAN CLOSEOUT Independent verifications Completed Yes N/A No (explain below)

Equipment Configured to Support Plant Operations Yes N/A No (explain below) l i

l EOPE Camur 14 of 22 Rev. 10 1

/.

HC.IC-CP.ZZ-003otQ)

ATTarwumeT 2 MAINTENANCE TROUBLESHOOTING INDEPENDENT YERIFICATION RECORD LIFTED LEADS /DISCORDMCTED PIPING Lifted /Restoved Verified By

  • Wire N/

8 of Location Restored By Verified By By Initial /Date Initial /Date piping ID/

wires on (cabinet, Initial /Date Initial /Date part terminal

'IBS, rack etc.)

Ensure that ALL wires are marked O or F listed only Number of wires on terminal prior to lifting any wi{es (step 3.9.3)

HOPE CREEK 15 of 22 Rev. 10

A HC. IC-CP. ZZ- 0008 (Q)

ATTE N 2 MAINTENANCE M LESBOOTING

~

INDEPENDENT VERIFICATIGil RECORD JtBEPERS Installed By Verified By From To Removed By Verified By Initial /Date Initial /Date Initial /Date Initia Date i

I I

Q or F listed only g

HOPE CREEK 16 of 22 Rev. 10

)

0 Q

1

(

_ 80 8

yet B

a v

0 dD e

0 e/.

R l.

i a

Z f i Z.

rt i

i e

P Vn C

I C

I.

CB ye t

B a D

de/

l r a o i t t s

i e n R I DR G O dn N C eo I E ri T R ot O

ti ss O E S

eo g

B C E

RP S

I V

2 E T L

L A A

NO 2

B C V

U I

2 F

T o

e f

R I T R N N

yt o

E Ba

~

M D

E r

E E V U

d/

7 T

C R

el 1

e T

d ga A

N T r

T ni A N S

at O

N E N

hi E D I

Cn T N k I

r N E o

I P W

A E M D d

N e

I n

o

]

ti t

st.

l ei e

Ts r

o P

h T.

dn no T

ui ot Fi.

s d

so ey AP slon lo S

C. d

.e K

o

.t E

N Xs E

i R

e

,l C

v l

n a

eF E

V p

P r

O O. o H

.Q O

l HC. IC - GP. ZZ - 0 0 0 8 (Q)

ATTACEMENT 3 l

l0 TEMPORARY MODIFICATION l

(

l Purpose of Modification:

l Descriotion of Modification (Include location of all modifications ie, torminal points, staple location, mechanical component) r Authorization:

/

CD-427F CD-492F SNSS/NSS Date/ Time Modifications installed and logged (attachment 2)

Technician Date Verifiar Date SNSS/NSS has made the following notifications to KEY PLANT PERSONNEL:

Maintenance:

/

Name Date/ Time Planning:

/

Name Date/ Time System Engr:

/

Name Date/ Time Signature (SNSS/NSS)

Date l

l k

EOPE CREEK 18 of 22 Rev. 10

. ~.

t EC. IC-GP.ZZ- 0 0 08 (Q)

ATTACEh M ~4 J.Q E._ I M F_Q E M A r I O N T A G

/8(j)

JOB DFORMATION TAC L

3 0

a' w~

os,.

w LL l

Work Order Nun k 4

W Procedure w z

Supv.

Ph:no h

Name Ext.

N l

1 i

i l

HOPE CREEK 19 of 22 Rev. 10

l' ifi?:

?

l

)Q e

0 Y

t 1

(

. n0 0

B a

0 d

D /

v 0

E*l e

I*

a R

1 F

t 1

D R i I

t P

E E

n G

V V

I O

-C M

e E

t I.

R Y

a C

B D E

/

D l

E a

V i O

t M i E

n R I e

Y t

B a

D DE*/

I*l a

)

F i Y

D I

t L

E R i N

L E

n O

L V

I g

A 5

r T

T Y

e M N S

B t

NLeA l

f c

E N

a 2

M I

n D

2 T

R.

/

R T

T a

o P

A i E

T t

0 T

t T J D S i 2

A N

n Y.

I I

ALE R

M.

(

REO NO O

TN T

}

IT

.K A

MC C

RC O

EL L

".B M.

R ET@

g y

lno

.K MC d

RO e

EL t

TB s

i r

l a

RR m

EE R

a PB C

MM r

UU o

E JN P

F O

H Q

I ih i

i,'

.[

)

Q 0

(

1 e

0 D

t 0

E a v

0 I d e

0 FY/

IB R

l R a E

D E

i E.

E V t T

i P

C n

G E

I i

t e

t C

O I.

CE e

C R

D t

E a E

T D CY /

E B l IG a O

i O t C i

)

E n 3

R I

9 e

3 D

t E

a p

I D

e FY /

IB t

l R

s a

)

D E

(

T E

V i

L T

t E

C i

s I

n g C M

e I

O r

5 o

T O

I i

L T

N C

w E

S D e 2

N t E

I E

t y

2 E

c I

D T a n

M e

T D

a f

R C Y/

E n

E A

lB o

C n P e

g la A

o E O i n

1 t

T c

T s D C t i

2 S i t

A i I

n f

Y D I D

E i

L l

E L

R A

o N.

t

(

IMO M

r R

do E

ei N

T O

kr I

rp T

a L

ml A

S A E

E M a

R en ri g

o am r

r 6

se et 9

r pA f-in wo

1-htK Ls IC Le IED Ar R

I RE B i

tw T

a m

hf to a

E' er C

R re I

uh E

W sm P

nu O

EN H

l

EC. IC-CP. EE- 0 008 (Q)

ATTACEMENT 6 Agastat Relay Known Problems 1.

GP, TR, FGP. or FTR series relay has been increased in height by"0.06 to 0.12 inch.

This increased height may cause di iculty in seating a locking clip made for pre-May l

l 1983 relea.

If there is difficulty in seating clip or if a j

GP, TR, 3CP, or FTR series relay _ requires replacement, a new lockin used. g clip, Ag& stat (A348) part number CR0070 should be l

i This is especially true if the intended replacement relay has a 83g8 or later date code (date code breakdown:

8318 is the 18 week of 1983).

The new style clip may be used on relays with a date code earlier that 8318.

2.

Locking clips are only used with GP, TR, PGP, and FTR series relays.

The BGP/ETR relays mus' use a locking strap (a wide steel band screwed to the relay base).

3.

The acceptable criteria for locking spring engagement using either the old or new style locking clip is as follows:

A.

Locking clip is fully engaged at relay base.

B.

Locking clip shall have two contact points on the flat, top part of the relay away from the curved edge.,

C.

No gap between the relay base and socket.

t i

g 1...

1' c

r J'

l IOPE CREME 22 of 22 Rev. 10

<