Text
l'.
L3 24 j
O PS f
' Public Service j
Electric and Gas Company l
Tl NRC ENFORCEMENT CONFERENCE E
i i
FIREWATCH l
PROGRAM m
l
~ APRIL 6,1993
_s l
.i l
SALEM HOPE CREEK l
GENERATING STATION GENBtATM0 STA TION l
I l
!Id in s's "a" a esi i I
44 d
d 4\\
T 9701310163 970124 EI 6-351 PDR
ta j
i FIREWATCH PROGRAM AGENDA
"~I i
)
i i
i rTT -
INTRODUCTION J. J. HAGAN
,1 FIRE WATCH PROGRAM J. F. KERIN i
j i
INCIDENT AND INVESTIGATION L. A. REITER i.
CORRECTIVE ACTIONS J. F. KERIN 1
l SAFETY SIGNIFICANCE J. F. KERIN j
1990 ALLEGATIONS L. A. REITER i
BROADER ASSESSMENT J. J. HAGAN i
CONTROL OF CONTRACTORS J. J. HAGAN L,_,.
I l
REGULATORY ASSESSMENT F. X. THOMSON 1
i
SUMMARY
S. E. MILTENBERGER 4
1 83EC1-3 l
1 J
+A i
i
l-I n.
!I~
FIREWATCH PROGRAM i
l 4
MEETING OBJECTIVES i
[
e REVIEW THE NRC FINDINGS e DESCRIBE THE FIREWATCH PROGRAM AT PSE&G l
- DISCUSS THE MISSED ROVES AND PSE&G'S INVESTIGATIONS i
e DISCUSS PSE&G'S CONTROL OF CONTRACTORS e DEMONSTRATE MINIMAL SAFETY SIGNIFICANCE
- DEMONSTRATE THAT ESCALATED ENFORCEMENT IS NOT WARRANTED 93EC131
l l
FIREWATCH PROGRAM
SUMMARY
OF NRC FINDINGS i
i
[
i e POTENTIAL VIOLATION l
j
- FIRE WATCHES FAILED TO COMPLETE THElR ASSIGNED l
ROUNDS l-l
- COMPLETED LOGS TO INDICATE THAT THE ROUNDS l
HAD BEEN SATISFACTORILY PERFORMED, WHEN IN FACT, THEY HAD NOT BEEN PERFORMED
,f i
i' 1'
1 si 93EC12
l Fl.REWATCH PROGRAM FIRE PROTECTION ORGANIZATION VICE PRESEMNT NUCt. EAR OPERATIONS f
GENERAL MANAGER NUCLEAR SGMCES I
StTE PROTECTION I
-,.E I.
,ROTECTiON SUP MSOR B
B Al>MMETRATIVE CUMK PMTECTKW TECHNOLMY OFF-StrE t
I 1
F.E PROTECTION FTl PTl SUPERVISORS PROGRAM MANAGER TECHNICAL SPEC 1AUST (5i (1)
(1)
FIRE PRO TCTION Fft OPERATOR - NUCLEAR SHWT SUPGMSOR (25)
(8) 0 ASST. SUPGMSOR (FELD)
(3)
FWIEWATCH (35)
NOTE: 24 HOUR PER DAY NGFT OPERATION DEDICATED INDUSTRIAL FERE DEPARTMBfT (BlWGADE)
F.W. 3 FIXED SHETS - 2 SUPBMSOfts PER SHFT JULY 1992 STAFF 980 LEVELS 93EC136
~
FIREWATCH PROGRAM FIRE PROTECTION ORGANIZATION e SURVEILLANCE TEST PROGRAM e EMERGENCY SERVICES
- FIRE RESPONSE
- EMERGENCY MEDICAL
- SPILL RESPONSE
- RESCUE e IMPAIRMEP.',,1GNITION SOUF i TRACKING e FIREWATCH PROGRAM (PTI)
- COMPENSATION MEASURES FOR FIRE PROTECTION SYSTEM OUT OF SERVICE
- OVERSIGHT BY PSE&G 93EC126
l FIREWATCH PROGRAM i
l FIREWATCH SURVEILLANCE i
1 i
i i
e SCHEDULED SURVEILLANCE -JULY 1992 l
- SALEM 96 AREAS / HOUR t
10 AREAS / HOUR j
- HOPE CREEK e REASONS FOR PERFORMING SURVEILLANCES i
- GOOD PRACTICE rL
-f.4GURANCE
- TECHNICAL SPECIFICATIONS e 9 SUPERVISORS AND 35 FIREWATCHES ON 3 SHIFTS
- 2 SUPERVISORS /12 FIREWATCHES PER SHIFT
- 8 HOURS PER SHIFT /24 HOURS PER DAY e ROVES PER SHIFT
- SALEM 3 ROVE AREAS -
1 A - UNIT 1 RCA 1B - UNIT 2 RCA 1.
II - UNIT 1&2 COMMON AREAS 30 ROVES / SHIFT = 960 AREAS / SHIFT
- HOPE CREEK - 1 ROVE AREA 10 ROVES / SHIFT = 100 AREAS / SHIFT 93EC1-32
,n
l.
I i*
i FIREWATCH PROGRAM PATROL SURVEILLANCE DUTIES I
e IDENTIFY OBVIOUS ACTIVITIES BY PLANT PERSONNEL THAT
[l COULD INCREASE FIRE HAZARDS IN THE AREA i
e IDENTIFY CONDITIONS LIKELY TO CAUSE A FIRE I
e IDENTIFY CONDITIONS LIKELY TO ADVERSELY AFFECT FIRE PROTECTION I
e IMMEDIATELY REPORT EVIDENCE OF SMOKE OR FIRE e REPORT ALL OTHER APPARENT ABNORMALITIES
'l
-1 e DUTIES ARE DOCUMENTED
- POST ORDERS
- PTI PROCEDURES
- TRAINING PROGRAM l
93EC118
Il FIREWATCH PROGRAM i
INCIDENT & IMMEDIATE ACTIONS il I
e INCIDENT
SUMMARY
- 7/1/92
- PTl SUPERVISOR IDENTIFIES MISSED ROVE
- FIREWATCH ADMITS TO MISSING SEVERAL POSTS AND FALSIFICATION OF ASSOCIATED LOGS g
- PSE&G AND PTl MANAGEMENT INFORMED e IMMEDIATE ACTIONS
- PTl INVESTIGATION INITIATED - 7/2/92 I
- PTl ISSUES LETTER TO ALL FIREWATCHES - 7/2/92
- REVIEWED WITH NRC RESIDENTS - 7/6/92
- PSE&G QA INITIATES SPOT CHECKS - 7/6/92
- PSE&G CORPORATE SECURITY INVESTIGATION a
INITIATED - 7/13/92
- PSE&G QA INVESTIGA7lOtl INITIATED - 7/13/92
- LER ISSUED - 7/30/92 0
93EC1-4 L
I
\\-
FIREWATCH PROGRAM i
CONTRACTOR INVESTIGATION l
ePURPOSE I
- DETERMINE EXTENT OF IMPROPER PERFORMANCE OF FIREWATCH ROUNDS l
j l
e SCOPE
- EVALUATE PERFORMANCE OF FIREWATCH EMPLOYEES
.FOR A 7 DAY 100% SAMPLE PERIOD IN JUNE 1992, FOLLOW UP WITH INTERVIEWS OF INVOLVED EMPLOYEES e TEAM
- NINE PTl MANAGEMENT AND SUPERVISORY PERSONNEL 1
e APPROACH
- CARDREADER HISTORY CHECKS
- FIREWATCH INTERVIEWS / STATEMENTS
- FIREWATCH SUPERVISORY INTERVIEWS 93EC1-6 e
e
l, FIREWATCH PROGRAM PSE&G CORPORATE SECURITY INVESTIGATION oPURPOSE
[
- DETERMINE KNOWLEDGE OF PTl AND PSE&G PERSONNEL REGARDING FALSIFICATION OF FIREWATCH LOGS l.
- SCOPE
]
- PTl FIREWATCH PERSONNEL, SUPERVISION, AND MANAGEMENT
- PSE&G SITE PROTECTION SUPERVISORS AND OPERATIONS SUPERVISORS 1
e TEAM
- THREE INVESTIGATORS WITH PREVIOUS LAW.
ENFORCEMENT EXPERIENCE
- APPROACH
- INVESTIGATIVE PLAN AND FORMAL QUESTIONS
'l DEVELOPED WITH QA INPUT
- 53 CONFIDENTIAL INTERVIEWS 93EC17 t
l a
FIREWATCH PROGRAM I
PSE&G QA REVIEW
- PURPOSE r
t
- VALIDATE PTl'S INVESTIGATION RESULTS
- EVALUATE PERFORMANCE OF FIREWATCH PERSONNEL FOR 2 SAMPLE PERIODS IN ORDER TO SUBSTANTIATE RESULTS OF PTI'S INVESTIGATION AND ASCERTAIN IF THIS IS A RECENT PROBLEM l.
- SCOPE
- PTl INVESTIGATION EFFORT
- SAMPLE PERIODS, FEBRUARY 16-23,1992 AND APRIL 12-19,1992 l;
- TEAM
- TWO EXPERIENCED QA LEAD' AUDITORS WITH ONE ASSISTANT o APPROACH a
- WITNESS PTl VERIFICATION OF ROVE LOGS
- WALKDOWN SAMPLE OF 2 ROVE ROUTES FOR FAMILIARIZATION
- COMPARE ROVE LOGS WITH SECURITY ACCESS
[
RECORDS
- COMPARE PSE&G RESULTS WITH PTI'S RESULTS 03EC18 L
ll hREWATCH PROGRAM
SUMMARY
OF INVESTIGATION FINDINGS
[i FINDINGS FOR THREE INVESTIGATIONS WERE CONSISTENT 1
l e REPORT ISSUED TO NRC - 10/28/92 g-
)
i l
e 19 OF 35 FIREWATCH PERSONNEL DID NOT C.OMPLETE
]
THEIR ASSIGNED ROUNDS AND COMPLETED LOGS TO l
INDICATE THAT THE ROUNDS HAD BEEN COMPLETED
[
]
SATISFACTORILY, WHEN IN FACT THEY HAD NOT a
i
, \\
I 1
4 4
93EC127
.I 6
I
~
FIREWATCH PROGRAM
SUMMARY
OF INVESTIGATION FINDINGS I
ADDITIONAL FINDINGS OF INVESTIGATIONS e CORPORATE INVESTIGATION
- CONTRIBUTING FACTORS (WEATHER, LOCATION, BOREDOM, SELF-ESTEEM)
[
- SUPERVISORS HAD NO KNOWLEDGE OF THE MISSED CHECKS
- POOR COMMUNICATIONS BETWEEN PTl MANAGEMENT AND SUPERVISION O PSE&G CORPORATE SECURITY INVESTIGATION
- EMERGENT WORK LED TO LAPSES IN SUPERVISION
- EXPECTATIONS NOT CLEARLY COMMUNICATED AND MINIMAL REINFORCEMENT e PSE&G QA REVIEW
- INSUFFICIENT DIRECT SUPERVISION
- INADEQUATE PERIODIC AUDITS AND SPOT CHECKS
- 16 OF 35 FIREWATCH PERSONNEL HAD UNBLEMISHED RECORDS 1
93EC1-38 j
i l
I 1-4l' FIREWATCH PROGRAM l
ROOT CAUSE CATEGORIES i
i e LESS THAN ADEQUATE SUPERVISION OF PERSONNEL BY PTl
- POOR ROVE ROUTE DESIGN l
- LESS THAN ADEQUATE FIELD SUPERVISION
- EMERGENT WORK COVERED BY FIELD SUPERVISION i
- PROGRAM MANAGER PERFORMANCE ISSUES i
- l.,
i l
e LESS THAN ADEQUATE PERFORMANCE OF FIREWATCH PERSONNEL 4
- POOR TRAINING PRACTICES i
t
- EXPECTATIONS NOT REINFORCED
- LOW SELF-ESTEEM e LESS THAN ADEQUATE OVERSIGHT BY PES &G
^l
- FIREWATCH OVERSIGHT WAS LOW PRIORITY OF PSE&G j
SUPERVISOR RELATIVE TO OTHER DUTIES
- QA OVERSIGHT NOT STRUCTURED TO IDENTIFY THE PROBLEM
- ASSIGNMENT OF EMERGENT WORK TO PTl 93EC128
l FIREWATCH PROGRAM I
CORRECTIVE ACTIONS f
IMPROVED SUPERVISION OF FIREWATCH PERSONNEL BY PTl e POLICY LETTER ISSUED ENCOURAGING FIREWATCH TO SUGGEST HUMAN FACTORS BASED ROVE ROUTE DESIGN ENHANCEMENTS
{
e QUARTERLY AFTER-HOUR INSPECTIONS e WEEKLY RANDOM CARD HISTORIES OF A MINIMUM OF ONE FIREWATCH PERSONNEL, PER SHIFT e QUARTERLY RANDOM CARD HISTORIES OF A MINIMUM OF
[
THREE FIREWATCH PERSONNEL e ROVE CHALLENGE PROGRAM USED A MINIMUM OF ONCE A WEEK FOR ALL SHIFTS e TELEPHONE CALL-INS FROM ISOLATED ROVE AREAS 1.
e ADDITIONAL FIREWATCH PERSONNEL ADDED DURING PERIODS OF EMERGENT WORK e REPLACEMENT OF PT1 PROGRAM MANAGER
- STRONG LEADERSHIP BACKGROUND
- EX.PECTATIONS CLEARLY DEFINED
- OPEN LINE OF COMMUNICATION WITH PSE&G MANAGEMENT 93EC1-20 s.
4
I i.
h
FIREWATCH PROGRAM i
l CORRECTIVE ACTIONS i
i I
i l
lMPROVED PERFORMANCE BY FIREWATCH PERSONNEL
)
l e STANDARD 12ED FIREWATCH INDOCTRINATION TRAINING PROGRAM WITH FOCUS ON PERFORMANCE EXPECTATION
- ANNUAL REFRESHER TRAINING i
i e PTl CORPORATE STAFF-CONDUCTED SUPERVISORY l
TRAINING FOCUSED ON SUPERVISOR / EMPLOYEE RELATIONS SKILLS, QUALITY POST INSPECTIONS, COMMUNICATIONS, AND QUALITY CIRCLES l
- ANNUAL SUPERVISORY SKILL,S TRAINING l
1 e GENERAL EMPLOYEE TRAINING REVISED TO STRESS THE l
lMPORTANCE OF THE FIREWATCH PROGRAM i
i i
i.
i s3EC1 19 i
i 4
l FIREWATCH PROGRAM CORRECTIVE ACTIONS r
IMPROVED OVERSIGHT BY PSE&G r
e RENFORCED PSE&G'S FIRE PROTECTION SU'PERVISION AND i
MANAGEMENT RESPONSIBILITIES FOR ULTIMATE PERFORMANCE OF PROGRAM e ENHANCED FACE-TO-FACE COMMUNICATION - PSE&G AND PTl SUPERVISION RELOCATED TO SAME BUILDING
[.
e RENFORCED PTI'S ACCOUNTABILITY FOR PROGRAM IMPLEMENTATION e ON-GOING EVALUATION OF FIRE PROTECTION PROGRAM TO IDENTIFY IMPROVEMENTS e ENHANCED QA MONITORING OF FIREWATCH ROVE PERFORMANCE 1.
- REVISED QA AUDIT PLAN FOR FIRE PROTECTION TO INCLUDE FIELD VERIFICATION OF ROVES AND SAMPLE COMPARISON OF ROVE LOGS WITH SECURITY DOOR TRANSAC'i10N RECORDS 1
e ADDITIONAL FIREWATCH PERSONNEL ADDED DURING PERIODS OF EMERGENT WORK 93EC121
j I
i FIREWATCH PROGRAM i
i OTHER PROACTIVE ENHANCEMENTS I
i i
1 l
II
- CONTINUING SUPERVISORY (LEADERSHIP / MANAGEMENT) j SKILL TRAINING j
4 l
l e QUARTERLY " SAFETY / HEALTH / ACCOMMODATION
[. I l
MEETING". PTl SITE MANAGEMENT, FIREWATCH j
PERSONNEL, PSE&G SAFETY COORDINATOR AND SENIOR i
FIRE PROTECTION SUPERVISOR 4
l
[
o PLACEMENT OF SIGN-IN SHEETS FOR ROVE AREAS WHERE l
PHONES ARE NOT AVAILABLE i
e THE EFFECTIVENESS OF THE CORRECTIVE ACTIONS WILL BE
.1 MONITORED AND ADJUSTED AS NECESSARY J
d 93EC122 1
i
I i
l FIREWATCH PROGRAM i
i CURRENT PERFORMANCE i
i t
i e OVERALL INCREASE IN MORALE
- NO DISCREPANCIES IDENTIFIED DURING RANDOM WEEKLY CARD READER VERIFICATIONS
- SATISFACTORY QA SURVEILLANCE REPORTS e BASED ON A SAMPLING OF CARD READOUTS, FIREWATCH PERSONNEL FULFILLED RESPONSIBILITIES DURING MARCH SNOW STORM l
e PTl UTILIZING CONFIDENTIAL EMPLOYEE OFINION SURVEYS TO MAINTAIN AWARENESS OF EMPLOYEE MORALE 93EC123
1l i
4 j
i FIREWATCH PROGRAM i
l CURRENT PERFORMANCE 1
1 i
i l
e OVERALL INCREASE IN MORALE i
l l
e NO DISCREPANCIES IDENTIFIED DURING RANDOM WEEKLY CARD READER VERIFICATIONS
-l l
l 1
e SATISFACTORY OA SURVEILLANCE REPORTS l
e BASED ON A SAMPLIP;G OF CARD READOUTS, FIREWATCH i
PERSONNEL FULFILLED RESPONSIBILITIES DURING MARCH l
SNOW STORM a
i
- PTl UTILIZING CONFIDENTIAL EMPLOYEE OPINION SURVEYS 4
i TO MAINTAIN AWARENESS OF EMPLOYEE MORALE l
I I
l 93EC123 l
i 4
l FIREWATCH PROGRAM FACTORS MINIMlZING SAFETY SIGNIFICANCE i
AREAS REQUIRED BY TECHNICAL SPECIFICATIONS / FIRE PROTECTION PROGRAM e COMPENSATING FACTORS
- SALEM SWITCHGEAR ROOMS A EARLY WARNING DETECTION A FIRE SUPPRESSION SYSTEM
- HOPE CRE5K REFUELING FLOOR A NO SAFE SHUTDOWN EQUIPMENT A OPERATOR ROUNDS
- SALEM BAILING & STORAGE AREA A EARLY WARNING DETECTION IN AREA ON OPPOSITE SIDE OF OPEN PENETRATION
- MISCELLANEOUS AREAS L
A EARLY WARNING DETECTION e NO FIRES HAVE GONE UNDETECTED AS THE RESULT OF THE MISSED FIREWATCH ROVES e CONCLUSION
- BASED ON THE ABOVE FACTORS, FIREWATCH ROVE DEFICIENCIES HAVE MINIMAL SAFETY SIGNIFICANCE 93EC137
I l
FIREWATCH PROGRAM
'1 1
AUGUST 10,1990 ALLEGATIONS I
l l
l ALLEGATIONS FORWARDED TO PSE&G BY NRC I-l e 7/18/90 i
j
- HOURLY PATROL OF ZONE 1B MISSED BY 17 MINUTES l
- SUPERVISOR KNEW AND INFORMED WATCH NOT TO l
WORRY
[
l
- ROVING LOG REDONE TO INDICATE ALL TOURS WERE i
. PERFORMED ON HOUR i
l e 6/1/90 t
- FIREWATCH FOUND ASLEEP ON POST AND TERMINATED
{
- ONE PATROL EXCEEDED ONE HOUR BY 20 MINUTES l.
- ROVING LOG REDONE TO INDICATE ALL TOURS WERE PERFORMED ON THE HOUR l
e AREA REQUIRING FIREWATCH WAS NOT ON ROUNDS SHEET (CLOSED BY NRC LETTER 7/2/92) l i
- BAILING STORAGE AREA NOT ON ROUNDS UNTIL INCIDENT REPORT IN 1989
- NOT PROPERLY REPORTED TO NRC
)
e THREE PTl EMPl.OYEES MAY HAVE KNOWLEDGE OF i
PROBLEMS 93EC1-18 i
1
ll l
i i
FIREWATCH PROGRAM i
l INVESTIGATION OF AUGUST 10,1990 ALLEGATIONS l
i I
i i
f e INITIALLY INVESTIGATED BY QUALITY ASSURANCE. NONE OF THE ALLEGATIONS WERE SUBSTANTIATED
- SUBMITTED TO NRC - 9/28/90
- REVIEWED SECURITY DOOR RECORDS AGAINST ROVE LOGS I
- PERFORMED DETAILED DOCUMENT REVIEWS
- INTERVIEW INVOLVED PTl AND PSE&G PERSONNEL
- ALL FIREWATCH ROVE REQUIREMENTS WERE MET l
e REINVESTIGATED BY CORPORATE SECURITY INVESTIGATOR IN SUMMER,1991. NONE OF THE ALLEGATIONS WERE SUBSTANTIATED
- SUBMITTED TO NRC 9/27/91 a
93EC1 15
g FIREWATCH PROGRAM INVESTIGATION OF AUGUST 10,1990 ALLEGATIONS
,e CORPORATE SECURITY INVESTIGATION - SUMMER 1991
- 20 PEOPLE INTERVIEWED: ALL ASKED FOLLOWING
['
QUESTIONS l
- DO YOU HAVE KNOWLEDGE OF ANYONE FALSIFYING OR ALTERING OF THE ROVE FIREWATCH LOGS?
- DO YOU HAVE KNOWLEDGE OF ANYONE SLEEPING WHICH WAS COVERED UP?
- DO YOU HAVE KNOWLEDGE OF ANY NRC VIOLATIONS?
- DO YOU HAVE KNOWLEDGE OF ANY WRONG DOING BY ANY PSE&G OR OTHER CONTRACT EMPLOYEES?
- ARE THE SIGNATURES AND INITIALS ON THE FIREWATCH LOGS YOURS7 93EC138
- l.
FIREWATCH PROGRAM INVESTIGATION OF AUGUST 10,1990 ALLEGATIONS e INCIDENTS IN ALLEGATIONS WERE APPROPRIATELY I
DOCUMENTED BY CONTRACTOR. CARD READER LOG REVIEWS CONFlRMED PEOPLE COVERING ROVE WERE IN AREAS NOTED ON LOGS ll e NONE OF THE ALLEGATIONS WERE ASSOCIATED WITH FIREWATCH PERSONNEL SYSTEMATICALLY SKIPPING POSTS AND SUBSEQUENTLY. FALSIFYING LOGS TO INDICATE COMPLETING POSTS
{
e CORPORATE SECURITY INVESTIGATION INTO JULY 1,1992 INCIDENT FOUND NO TIES TO 1990 ALLEGATIONS
.i e PSE&G MAINTAINS THAT THE ALLEGATIONS WERE NOT SUBSTANTIATED AND WOULD NOT HAVE REASONABLY PROVIDED AN OPPORTUNITY TO IDENTIFY THIS CONCERN e3EC140 n
v
-vr--
T r
l FIREWATCH PROGRAM l
ASSESSMENT OF BROADER IMPLICATIONS I
[
l l
e QA SURVElLLANCE OF EQUIPMENT OPERATOR ROUNDS
- MARCH - APRIL,1992 PERFORMED RANDOM HISTORICAL CHECKS
[
- NO EVIDENCE OF MISSED ROUNDS OR FALSIFIED LOGS l
e QA SURVElLLANCE AND SPOT CHECKS - CURRENTLY BEING PERFORMED QUARTERLY
['
- FIREWATCHES
- EQUIPMENT OPERATORS
- SECURITY WATCHES
- NO EVIDENCE OF MISSED ROUNDS OR FALSIFIED LOGS
[:.
e NO EVIDENCE OF BROADER IMPLICATIONS 93EC129 L
1
Il FIREWATCH PROGRAM CONTROL OF CONTRACTORS i
I
[
e ALL CONTRACTORS ARE ACCOUNTABLE TO A DESIGNATED PSE&G EMPLOYEE e NEW NUCLEAR DEPT. ADMINISTRATIVE PROCEDURE
- NAP-68, " CONTROL OF ON-SITE CONTRACTOR
[
PERSONNEL"
- SPECIFIES REQUIRED CONTRACTOR TRAINING FOR EACH CONTRACT
- lSSUED JUNE 1,1992 I
e CONTRACTOR CONTROL TRA!NING
- EMPHASIS ON PERFORMANCE EXPECTATIONS AND ACCOUNTABILITY
- COMPLETED AUGUST 3 - SEPTEMBER 12,1992 2
e CONTRACTS CONTAIN WORK STANDARD REQUIREMENTS e IMPROVING TREND IN PERFORMANCE t
93EC135
I f
FIREWATCH PROGRAM REGULATORY ASSESSMENT I
[
- PSE&G DOES NOT DISPUTE THE VIOLATION e MINIMAL SAFETY SIGNIFICANCE f.
- SEVERAL MITIGATION FACTORS APPLY
- SELF IDENTIFIED
- THREE PROMPT, INDEPENDENT, PROACTIVE AND
{
i COMPREHENSIVE INVESTIGATIONS
- COMPREHENSIVE AND PROMPT CORRECTIVE ACTIONS
- PROMPT NOTIFICATION OF NRC
- FALSIFICATION OF LOGS ISSUE ISOLATED TO d-FIREWATCHES
- 1990 ALLEGATIONS WOULD NOT HAVE PROVIDED AN OPPORTUNITY TO IDENTIFY
\\
l l
e PSE&G BELIEVES THAT ESCALATED ENFORCEMENT SHOULD NOT BE APPLIED TO THIS ISSUE 93EC1 13 t
1
I'
.c
\\
FIREWATCH PROGRAM
SUMMARY
- THREE PROMPT, INDEPENDENT, PROACTIVE AND COMPREHENSIVE INVESTIGATIONS
- 1990 ALLEGATIONS WOULD NOT HAVE PROVIDED AN OPPORTUNITY TO IDENTIFY e COMPREHENSIVE CORRECTIVE ACTIONS e DEMONSTRATED COMMITMENT TO STRONG FIRE
. PROTECTION PROGRAM - VIEWED AS AN INDUSTRY LEADER e MINIMAL SAFETY SIGNIFICANCE
- RECOGNIZED SAFETY CULTURE e ESCALATED ENFORCEMENT NOT WARRAP3TED S3EC1 14
.