CAT \b                 AV--m BROWN & ROOT, INC.         PROCEDURE                         EFFECTIVE NUMBER         REVISION           DATE           PAGE CPSES l
CAT \\b AV--m BROWN & ROOT, INC.
CP-CPM 6.3                       11   08/08/84                 1 of 7 TITLE:                       ORIGINATOR                   MA                      MMM V                                             Date RIVIEWEDBY:hluAY Date KRQA
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE l
              ,      PREPARATION, APPROVAL,               jy/Scd       ,
CP-CPM 6.3 11 08/08/84 1 of 7 MA MMM TITLE:
[       f   [,. /' /- -     f.7.,fr/
ORIGINATOR V
AND CONTROL OF                                                                                Date
Date RIVIEWEDBY:hluAY Date KRQA PREPARATION, APPROVAL, jy/Scd
,          ,/                                                gt#[ (s *jTUGC0
[
                                                                          ,,        QA-[j
f
'                    OPERATION TRAVELERS                                                   ff APPROVED BT: [./l.4           /d .e &<s                   f-f-If CONSTRUCTION PROJECT MGR                 Date o.i           TABIE OF CONTENTS                                       ff                            ,
[,. /' /- -
I
f.7.,fr/
 
gt#[ (s *jTUGC0 QA-Date
==1.0          INTRODUCTION==
,/
AND CONTROL OF
[j ff OPERATION TRAVELERS APPROVED BT: [./l.4
/d.e &<s f-f-If CONSTRUCTION PROJECT MGR Date ff o.i TABIE OF CONTENTS I4 h,h4 lg[3
}nf


1.1           PURPOSE                                     4 h,h4 lg[3              }nf 1.2           SCOPE                                                           h 2.0           CENERAL 2.1           RESPONSIBILITY
==1.0 INTRODUCTION==
1.1 PURPOSE h
1.2 SCOPE 2.0 CENERAL 2.1 RESPONSIBILITY


==2.2           DESCRIPTION==
==2.2 DESCRIPTION==
OF AN OPERATION TRAVELER 2.2.1         General Traveler Information 3.0           PROCEDURE 3.1           BASIC PREPARATION SEQUENCE                           -
OF AN OPERATION TRAVELER 2.2.1 General Traveler Information 3.0 PROCEDURE 3.1 BASIC PREPARATION SEQUENCE 3.1.1 Traveler Development 3.1.2 Traveler content 3.1.3 Numbering Sequence 3.1.4 Initiation Authority 3.1.5 Traveler Approval 3.1.6 Distribution of Travelers 3.2 TRAVELER CONTROL 3.3 TRAVELER REVISIONS AND CHANCES 3.3.1 Revision Preparation 3.3.2 Field Revisions For Non-ASME Related Travelers 4.0 SUPPORTING MATERIALS 4.1 AFFECIED DOCUMENTS o.11 FIGURES l
3.1.1         Traveler Development                           ,
Figure 1 CONSTRUCTION OPERATION TRAVELER
3.1.2         Traveler content                                                       ,
3.1.3         Numbering Sequence 3.1.4         Initiation Authority 3.1.5         Traveler Approval                                                   ,
3.1.6         Distribution of Travelers 3.2           TRAVELER CONTROL 3.3           TRAVELER REVISIONS AND CHANCES 3.3.1         Revision Preparation
-                    3.3.2         Field Revisions For Non-ASME Related Travelers 4.0           SUPPORTING MATERIALS 4.1           AFFECIED DOCUMENTS o.11           FIGURES l                     Figure 1 CONSTRUCTION OPERATION TRAVELER Figure 2 CONSTRUCTION OPERATION TRAVELER CONTINUATION SHEET
(
(
v $' i -co-     ,,5G 8606120546 860604 PDR   FOIA GARyS6-A-20             PDR                           _        .                            g3g           ,
Figure 2 CONSTRUCTION OPERATION TRAVELER CONTINUATION SHEET v $' i
l
,, 5 G
-co-8606120546 860604 PDR FOIA GARyS6-A-20 PDR g3g


e                           .-  .
e
    't i
't i
BROWN & R00f, INC.                                                               PROCEDURE                     EFFECTIVE                           ;
BROWN & R00f, INC.
CPSES                                         NUMBER       REVISION         DATE       PAGE                 j JO3 35-1195 CP-CPM 6.3         11       08/08/84       2 of 7
PROCEDURE EFFECTIVE j
CPSES NUMBER REVISION DATE PAGE JO3 35-1195 CP-CPM 6.3 11 08/08/84 2 of 7


==1.0                                                   INTRODUCTION==
==1.0 INTRODUCTION==
 
1.1 FUPPOSE This procedure describes the preparation, approval, and control of Operation Travelers used at CPSES to control activites. The Operation Traveler provides sequential instructions on how to l
1.1                                                 FUPPOSE This procedure describes the preparation, approval, and control                                 !
perform a task, identifies the required inspection points, and specifies the docimentation for these activities. The specified sequence on the traveler should be followed; however, due to t
of Operation Travelers used at CPSES to control activites. The Operation Traveler provides sequential instructions on how to perform a task, identifies the required inspection points, and l
construction interferences and other constraints, deviation from the sequence, with QA/QC concurrence, may be allowed.
,                                                                                                          specifies the docimentation for these activities. The specified                           .
Additional controls in the form of supplementary instructions or other pro-cedures, may be used to meet the applicable requirements.
sequence on the traveler should be followed; however, due to                           !
1.2 SCOPE This procedure shall be used for safety-related and balance-of-plant activites. However, references to QA/QC do not apply to balance-of-plant activities and those inspection functions shall be accomplished by other departments.
t                                                                                                          construction interferences and other constraints, deviation from the sequence, with QA/QC concurrence, may be allowed.                 Additional controls in the form of supplementary instructions or other pro-                       -
i l
cedures, may be used to meet the applicable requirements.
2.0 GENERAL 2.1 RESPONSIBILITY Signature authority of an Operation Traveler shall be either the Construction Superintendents responsible for the work (or their designees) or the discipline engineers responsible for technical guidance. The B&R Site QA Manager is responsible for monitoring l
1.2                                                 SCOPE This procedure shall be used for safety-related and balance-of-plant activites. However, references to QA/QC do not apply to balance-of-plant activities and those inspection functions shall i
the implementation of the system through the assignnent of QC inspection points and consultation with the ANI for selection i
be accomplished by other departments.                                           _          _
of ANI inspection points for ASME-related activities, while 1
l                                                     2.0                                                   GENERAL 2.1                                                   RESPONSIBILITY                                       ,
TUGC0 QA is responsible for the assigranent of QC inspection points for non-ASME activities. Neither QA/QC or Engineering review are required for travelers of a repetitious nature that i
Signature authority of an Operation Traveler shall be either the Construction Superintendents responsible for the work (or their designees) or the discipline engineers responsible for technical guidance. The B&R Site QA Manager is responsible for monitoring l
have a standard format. When such reviews are not performed, the initial traveler number shall be entered in the " Reviewed By" i
the implementation of the system through the assignnent of QC i                                                                                                            inspection points and consultation with the ANI for selection 1                                                                                                          of ANI inspection points for ASME-related activities, while TUGC0 QA is responsible for the assigranent of QC inspection points for non-ASME activities. Neither QA/QC or Engineering i
block. The initial traveler should note the review waiver of
review are required for travelers of a repetitious nature that have a standard format. When such reviews are not performed, the initial traveler number shall be entered in the " Reviewed By" i                                                                                                           block. The initial traveler should note the review waiver of sub sequent travelers.
(
(
sub sequent travelers.
l Even though travelers of a repetitious nature do not require QA i
l Even though travelers of a repetitious nature do not require QA i
review of each individual traveler, ASME-related travelers of a
review of each individual traveler, ASME-related travelers of a repetitious nature shall be routed to QA so that ANI review may be performed on each individual traveler.
;                                                                                                            repetitious nature shall be routed to QA so that ANI review may
l rr -
!                                                                                                          be performed on each individual traveler.
.x M____--__-_-______________-____________-__-
l rr -   .x
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ .          _ _ - _ - _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - - - _                      _ _ - _ _      M____--__-_-______________-____________-__-


t PROCEDURE                    EFFECTIVE BROWN & ROCI, INC.                                                             PAGE NUMBER       REVISION       DATE CPSES JOB 35-1195 CP-CPM 6.3           11     08/08/84         3 of 7 The Operation Traveler (Figures 6.3-1 and 6.3-2) serves as a fabrication / installation / inspection checklist of operations necessary to achieve a tuality end product. Accordingly, the checklist details will vary depending on the complexity of the operatio n.
t BROWN & ROCI, INC.
2.2.1       General Traveler Information General information normally included on the Operation Traveler               g is as follows:                                                 .
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-CPM 6.3 11 08/08/84 3 of 7 The Operation Traveler (Figures 6.3-1 and 6.3-2) serves as a fabrication / installation / inspection checklist of operations necessary to achieve a tuality end product. Accordingly, the checklist details will vary depending on the complexity of the operatio n.
: 1. Part, serial, or tag number and material description (s),
2.2.1 General Traveler Information General information normally included on the Operation Traveler g
where applicable. Room number the item is in or will be               ,
is as follows:
installed in should also be provided.
1.
: 2. The department assigned the task to per form operation (s).
Part, serial, or tag number and material description (s),
: 3. Operation description, methods, procedures (instruction) by nLaber and revision and other information as required to successfully complete the operation in accordance with applicable requirements. Examination or test procedure /
where applicable. Room number the item is in or will be installed in should also be provided.
instruction numbers and revision shall also be recorded on
2.
'                                  the traveler or supplementing report for examination or testing activities.
The department assigned the task to per form operation (s).
: 4. All dLnensions and tolerances necessary to assure conpliance with applicable design drawings and specifications. This in-formation may be given by reference, provided persons perform-ing the work have access to the referenced material.
3.
: 5. Any needed offsite operations or processing is cited in the appropriate sequence with all other ' operation.
Operation description, methods, procedures (instruction) by nLaber and revision and other information as required to successfully complete the operation in accordance with applicable requirements. Examination or test procedure /
                  /         6. Necessary instructions for handling, cleaning, storing and I               preserviog items.
instruction numbers and revision shall also be recorded on the traveler or supplementing report for examination or testing activities.
: 7. Required QC/ ANI inspection, hold, or witness points, as applicable .
4.
1.0           PROCEDURE 3.1         BASIC PREPARATION SEQUENCE f-      - --        -                ~      ,      . . . MC_., , _ ,,_ _ , -                 ,
All dLnensions and tolerances necessary to assure conpliance with applicable design drawings and specifications. This in-formation may be given by reference, provided persons perform-ing the work have access to the referenced material.
5.
Any needed offsite operations or processing is cited in the appropriate sequence with all other ' operation.
'/
6.
Necessary instructions for handling, cleaning, storing and I
preserviog items.
7.
Required QC/ ANI inspection, hold, or witness points, as applicable.
1.0 PROCEDURE 3.1 BASIC PREPARATION SEQUENCE MC_.,, _,,_ _, -
f-
~


BROWN & ROCf INC.                             PROCEDURE                   EFFECTIVE CPSES                                     NUMBER       REVISION           DATE               PACE JOB 35-1195 CP-CPM 6.3       11         08/08/84             .4 of 7 l
BROWN & ROCf INC.
  )
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PACE JOB 35-1195 CP-CPM 6.3 11 08/08/84
3.1.1         Traveler Development I
.4 of 7 l
!                                                  The operation sequence and necessary detailed information on the l
)
traveler should be developed among the responsible construction
3.1.1 Traveler Development I
!                                                  personnel, the Discipline Engineers providing the technical guidance .and the cognizant QA Department representative responsible for the quality requirements. The Discipline Engineers or construc-tion personnel initiating the traveler shall obtain Westinghouse approval if the traveler involves NSSS equipment.
The operation sequence and necessary detailed information on the l
3.1.2         Traveler Content                                                                               h I'
traveler should be developed among the responsible construction personnel, the Discipline Engineers providing the technical guidance.and the cognizant QA Department representative responsible for the quality requirements. The Discipline Engineers or construc-tion personnel initiating the traveler shall obtain Westinghouse approval if the traveler involves NSSS equipment.
The traveler package shall contain, or may reference if normally available, the drawings, procedures, instruction, manufacturer's manuals /guidlines, etc., necessary to accomplish the activity.                               -
3.1.2 Traveler Content h
I' The traveler package shall contain, or may reference if normally available, the drawings, procedures, instruction, manufacturer's manuals /guidlines, etc., necessary to accomplish the activity.
Doctanents required for fabrication or installation activites may be i
Doctanents required for fabrication or installation activites may be i
issued for inclusion into a traveler package. The doctanent shall be identified as beira part of the traveler package and that it cannot be used independently of the traveler package by a stamp stat 'ag I                                                 "This doctament shall be used only in conjunction with Operati"n
issued for inclusion into a traveler package. The doctanent shall be identified as beira part of the traveler package and that it cannot be used independently of the traveler package by a stamp stat 'ag I
{                                                   Traveler #                           ".
"This doctament shall be used only in conjunction with Operati"n
{
Traveler #
i l
i l
It shall be the responsibility of the organization contro111ne, the package to ensure the current doctanent revision ntsaber is refarenced I                                               on and included in the package, and is being used to perform .he
It shall be the responsibility of the organization contro111ne, the package to ensure the current doctanent revision ntsaber is refarenced I
: t.                 activity. This verification shall be made each day the package is used.
on and included in the package, and is being used to perform.he t.
EXCLUSION: Traveler packages containing drawings which have weld ntsabers assigned by Welding Engineering, and all Hanger Packages, are excluded from the aforementioned j'                                                                       control alternative.
activity. This verification shall be made each day the package is used.
1 3.1.3         Nisaberina Sequence Except as described in paragraph 3.1.4, the controlling organization shall assign the utsaber to the traveler and provide records showits
EXCLUSION: Traveler packages containing drawings which have weld ntsabers assigned by Welding Engineering, and all Hanger Packages, are excluded from the aforementioned j '
control alternative.
1 3.1.3 Nisaberina Sequence Except as described in paragraph 3.1.4, the controlling organization shall assign the utsaber to the traveler and provide records showits
[
[
to whom the traveler was issued, and maintain records to indicate a history of all travelers generated and the activity covered by the f                                                     travelers. The traveler number should be the same as the item's identification utsaber when possible (e.g., hanger mark ntsaber,
to whom the traveler was issued, and maintain records to indicate a history of all travelers generated and the activity covered by the f
[ '
travelers. The traveler number should be the same as the item's identification utsaber when possible (e.g., hanger mark ntsaber,
equipment utsaber, etc.) . Alternatively a numbering sequence similar h                                                     to the followirg may be used:
[
equipment utsaber, etc.). Alternatively a numbering sequence similar h
to the followirg may be used:
h a
h a
Dow   A     oM4 gm
Dow A
* sAE       N         $ .'      $ wA.       V ' Ykm   4WWkW,         "$    me     C '* M ' a'   '1e%   Yo*+ 'G   kh     *
oM4 gm
* sAE N
$ wA.
V ' Ykm
: 4WWkW, me C '* M ' a'
'1e%
Yo*+
'G kh


          .                                                                                                                                      1 i
i BROWN & ROOT, INC.
BROWN & ROOT, INC.                   PROCEDURE                                       EFFECTIVE NUMBER                   REVISION               DATE             PACE CPSES JOB 35-1195 CP-CPM 6.3                             l '. 08/08/84             5 of 7 "MP90-001-02-5000" HP = Identification letters representing the craft department or engineerirqg discipline originati:qg the trapeler.
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PACE JOB 35-1195 CP-CPM 6.3 l '.
08/08/84 5 of 7 "MP90-001-02-5000" HP = Identification letters representing the craft department or engineerirqg discipline originati:qg the trapeler.
90 = The calendar year in which the traveler was written.
90 = The calendar year in which the traveler was written.
001 = The individual sequence ntaber identifying a particular traveler.
001 = The individual sequence ntaber identifying a particular traveler.
Line 117: Line 145:
5000 = The turnover (start-up) system nsaber for the activity l
5000 = The turnover (start-up) system nsaber for the activity l
described on the traveler.
described on the traveler.
                                                                                                                                              ~,
}
}                      3.1.4           Conduit Support Travelers The log discussed in paragraph 3.1.3 is not required for conduit support travelers. Accountability for these travelers is accomplished by QC walkdown of a conduit run with a subsequent verification that the required travelers are on file in the Permanent Plant Records Vault.
3.1.4 Conduit Support Travelers
l
~,
!                                      NorE:       Operations on generic travelers for conduit supports and cable tray supports may be worked out of sequence with-out being individually approved by QA/QC as required in
The log discussed in paragraph 3.1.3 is not required for conduit support travelers. Accountability for these travelers is accomplished by QC walkdown of a conduit run with a subsequent verification that the required travelers are on file in the Permanent Plant Records Vault.
'                                                  Paragraph 1.1.
l NorE:
3.1.5         Initiation Authority Travelers may be initiated by Engineering disciplines or Construction Superintendent .
Operations on generic travelers for conduit supports and cable tray supports may be worked out of sequence with-out being individually approved by QA/QC as required in Paragraph 1.1.
3.1.6         Traveler Approval QA shall review and approve the traveler by signing the " Reviewed By" block.
3.1.5 Initiation Authority Travelers may be initiated by Engineering disciplines or Construction Superintendent.
3.1.7         Distribution of Travelers After review by QA/ANI, as applicable, the traveler is returned to the controllirqs organization for recording and distribution.
3.1.6 Traveler Approval QA shall review and approve the traveler by signing the " Reviewed By" block.
3.1.7 Distribution of Travelers After review by QA/ANI, as applicable, the traveler is returned to the controllirqs organization for recording and distribution.
1 t
1 t
o     6 n       _ ; - a - _ --y _. = -                               ~=L                                 _
o 6
n
_ ; - a - _ --y
. = -
~=L


i
i s
* s PRCCEDURE                          EFFECTIVE BROWN & EOCE. INC.                                     REVISIO;;               DATE                     PACE               [
BROWN & EOCE. INC.
CPSES                              NUMBER                                                                            !
PRCCEDURE EFFECTIVE CPSES NUMBER REVISIO;;
$                                  J03 35-1195
DATE PACE
'.                                                                                            11            ,08/08/84                        6 of 7 CP-CPM 6.3 3.2           TRAVELER CONTROL Traveler packages shall be issued to craft personnel as they are
[
: l.                                              needed for work. The traveler package shall remain in the work j
J03 35-1195 6 of 7 CP-CPM 6.3 11
area until the work has been completed and accepted by QA/QC or until the end of the shift, whichever is first. Unit 2 Travelers
,08/08/84 3.2 TRAVELER CONTROL l.
,                                              shall be issued in accordance with G-CPM 7.1.
Traveler packages shall be issued to craft personnel as they are needed for work. The traveler package shall remain in the work j
Travelers shall be completely maintained throughout the construction process. Each complate operation requires the signature and date of j j
area until the work has been completed and accepted by QA/QC or until the end of the shift, whichever is first. Unit 2 Travelers shall be issued in accordance with G-CPM 7.1.
i
Travelers shall be completely maintained throughout the construction j
* the person completirgr, the task. This shall be accomplished at the completion of each operation and prior to moving parts or assemblies to the next scheduled operation.                                                                            .
Each complate operation requires the signature and date of j process.
the person completirgr, the task. This shall be accomplished at the i
completion of each operation and prior to moving parts or assemblies to the next scheduled operation.
All identifed hold points shall be honored and work shall not proceed beyond that point until acceptance of the hold point is shown by l
All identifed hold points shall be honored and work shall not proceed beyond that point until acceptance of the hold point is shown by l
i the QA/QC/ANI representative's signature and date opposite the hold
the QA/QC/ANI representative's signature and date opposite the hold i
'                                                po int. The results of the QA/QC inspection shall be recorded in the QA/QC Eng column.
po int. The results of the QA/QC inspection shall be recorded in the QA/QC Eng column.
f QC inspections may also be doctanented on inspection
f I
                                  ~
~
I                                                Note reports. These inspection reports should remain with the traveler.
Note QC inspections may also be doctanented on inspection reports. These inspection reports should remain with the traveler.
Upon completion of all the steps listed on the traveler, the traveler shall be returned to the controlling organization for l                                                 further processing, as required. ASME completed travelers shall be forwarded to B&R QA while non-ASME completed travelers shaLL be forwarded to TUCCO QA for review and subsequent filing in the i
Upon completion of all the steps listed on the traveler, the traveler shall be returned to the controlling organization for l
Permanent Plant Records Vault or Interim Records Vault.
further processing, as required. ASME completed travelers shall be forwarded to B&R QA while non-ASME completed travelers shaLL be forwarded to TUCCO QA for review and subsequent filing in the Permanent Plant Records Vault or Interim Records Vault.
'                                                Travelers governing non-Q activities shall be forwarded to the
Travelers governing non-Q activities shall be forwarded to the i
'                                                BOP office for maintenance.
BOP office for maintenance.
I 3.3         TRAVELER REVISION AND CHANGES
I 3.3 TRAVELER REVISION AND CHANGES
                                ^
^
3.3.1     Revision Preparation Except as provided below all changes, regardless of their signific- l acce, must be doctanented on the traveler, indicating the operations
3.3.1 Revision Preparation Except as provided below all changes, regardless of their signific-l acce, must be doctanented on the traveler, indicating the operations The
(
(
affected, description of the change, and QA/QC's concurrence.
~
~
affected, description of the change, and QA/QC's concurrence.                                    The f.
f.
revision number and a description of the change will be noted below i
revision number and a description of the change will be noted below i
i
i


(         -
(
EFFECTIVE BROWN & R00I, INC.             PROCEDURE REVISION       DATE       PACE CPSES                        NUMBER JOB 35-1195 CP-CPM 6.3         11     08/08/84     y of 7 the last traveler operation, or on a continuation sheet. The item being changed shall reference the user to the described change.
BROWN & R00I, INC.
Exception:       Changes of a referenced document to a higher revision level where holdpoints are neither added or deleted, do not reqnire rerouting for QA/QC co ncurre nce. If holdpoints are added or deleted, the traveler revision mus.t recieve the same approvals as required for the original traveler.
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PACE JOB 35-1195 CP-CPM 6.3 11 08/08/84 y of 7 the last traveler operation, or on a continuation sheet. The item being changed shall reference the user to the described change.
Exception:
Changes of a referenced document to a higher revision level where holdpoints are neither added or deleted, do not reqnire rerouting for QA/QC co ncurre nce.
If holdpoints are added or deleted, the traveler revision mus.t recieve the same approvals as required for the original traveler.
Completed operations may be repeated if documented on the traveler.
Completed operations may be repeated if documented on the traveler.
Operations which have been completed but which require reworking may be added to the traveler provided:
Operations which have been completed but which require reworking may be added to the traveler provided:
: 1. The added operation is the same as the original operation;
1.
: 2. The added operation includes the reason for the addition (e.g. pump unbolted due to inter ference);
The added operation is the same as the original operation; 2.
: 3. The same holdpoints are provided far the additional operation as the original operation.
The added operation includes the reason for the addition (e.g. pump unbolted due to inter ference);
The adding of this operation will not ef fect a revision or require the traveler go back through the entire review cycle. However, travelers reviewed by the ANI shall be r~es6bmitted to the ANI for review. Other revisions shall be routed for the same approvals required for the original traveler.
3.
,                3.3.2    Field Revi'sions for N n-ASME o      Related Travelers Where it is not feasible or practical to route the traveler revision, the QA/QC representative in the field who is familiar
The same holdpoints are provided far the additional operation as the original operation.
The adding of this operation will not ef fect a revision or require the traveler go back through the entire review cycle. However, travelers reviewed by the ANI shall be r~es6bmitted to the ANI for review.
Other revisions shall be routed for the same approvals required for the original traveler.
Field Revi'sions for N n-ASME Related Travelers 3.3.2 o
Where it is not feasible or practical to route the traveler revision, the QA/QC representative in the field who is familiar
{
{
j with the task being performed may approve a revision to the l
with the task being performed may approve a revision to the j
traveler provided the following provisions are met:
l traveler provided the following provisions are met:
: 1. The revision is not a significant departure from the original l                                 concep t;
1.
'                          2. The responsible Quality Engineer is made aware of this re-vision at the first available opportunity by the QA/QC rep-resentative ;
The revision is not a significant departure from the original l
: 3. The revision is signed by the responsible Construction Super-intendent, or responsible ecgineer.
concep t; 2.
i The QA/QC representative signs and dates the traveler showing
The responsible Quality Engineer is made aware of this re-vision at the first available opportunity by the QA/QC rep-resentative ;
;                            approval of the revision described above.
3.
The revision is signed by the responsible Construction Super-intendent, or responsible ecgineer.
i The QA/QC representative signs and dates the traveler showing approval of the revision described above.
i
i
\                 _
\\
4       _
4
}                                                             ~
}
~


9         +
9
l f
+
BROWN & ROOr, INC.                         PROCEDURE                                         EFFECIIVE NUMBER                     REVISION               DATE             PAGE CPSES JOB 35-1195 CP-CPM 6.3                               11               08/08/84         1 of 2 FIGURE 6.3-1 CONSTRUCTION OPERATION TRAVELER censrAccricM :stearica rar.c:.rm :s- iss                                       I g 74Avst.En MQ.                     GEcuaPweef MQ,               QuhiT ma GGWANTITY Qpagg,gp]
f BROWN & ROOr, INC.
!                                            g.acviTTQE3cAIPT10M                                           G AEFERENCE OAewlNGS gsmpeccsLM. instr.                   [@ GCA7tcm                           $3YSTEM                               j PetPaAC SY                           CATE                               CEPT REVIEwt3SY                           OA?E AMI stvite                           CATE eates l08 ist CEPP.
PROCEDURE EFFECIIVE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-CPM 6.3 11 08/08/84 1 of 2 FIGURE 6.3-1 CONSTRUCTION OPERATION TRAVELER censrAccricM :stearica rar.c:.rm :s-iss I
                                              -                09 tut *N                                                                     g n4L aus N
g 74Avst.En MQ.
GEcuaPweef MQ, QuhiT ma GGWANTITY Qpagg,gp]
g.acviTTQE3cAIPT10M G AEFERENCE OAewlNGS gsmpeccsLM. instr.
[@ GCA7tcm
$3YSTEM j
PetPaAC SY CATE CEPT REVIEwt3SY OA?E AMI stvite CATE eates l08 ist CEPP.
09 tut *N g n4L aus N
i e
i e
h meee.       . . . _
h meee.
__ w ..                         .          ..    .-
w..


a BROWN & R00I, INC.                       PROCEDURE                                       EFFECIIVE NUMBER               REVISION                   DATE               PACE
a BROWN & R00I, INC.
  ;                              CPSES L
PROCEDURE EFFECIIVE CPSES NUMBER REVISION DATE PACE L
                            . JOB 3 5-1195 CP-CPM 6.3                             11                 08/08/84           2 of 2 FIGURE 6.3-2 CONSTRUCTION OPERATION '.' RAVEL 2R C0!CI!!UATICII CONSTRUCtCN CPtitAftCM f2AvtLER CCNT:NUailCN f
. JOB 3 5-1195 CP-CPM 6.3 11 08/08/84 2 of 2 FIGURE 6.3-2 CONSTRUCTION OPERATION '.' RAVEL 2R C0!CI!!UATICII CONSTRUCtCN CPtitAftCM f2AvtLER CCNT:NUailCN f
l                                       T#MELEN %                   ACTNffT CE3CAIPT10N                                               .
l T#MELEN %
ACTNffT CE3CAIPT10N
_ cv _ !
_ cv _ !
7487&At3 SY                             CATE REVf EWED BY                             OAft ANI RivtEW                               gg?g                                                             ,
7487&At3 SY CATE REVf EWED BY OAft ANI RivtEW gg?g f
f c     we a ge i'
i' c
l
we a ge l
/                                                               .
/
I b._     ,T -
I b._
_ . _ _ _;._ . . = _ .                           . .                                                                         .}}
,T -
_. _ _ _;._.. = _.
..}}

Latest revision as of 08:48, 10 December 2024

Rev 11 to Procedure CP-CPM 6.3, Preparation,Approval & Control of Operation Travelers
ML20199A628
Person / Time
Site: Comanche Peak, 05000000
Issue date: 08/08/1984
From:
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML17192A346 List:
References
FOIA-85-313, FOIA-85-59, FOIA-86-A-20 CP-CPM-6.3, NUDOCS 8606120546
Download: ML20199A628 (9)


Text

.

CAT \\b AV--m BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE l

CP-CPM 6.3 11 08/08/84 1 of 7 MA MMM TITLE:

ORIGINATOR V

Date RIVIEWEDBY:hluAY Date KRQA PREPARATION, APPROVAL, jy/Scd

[

f

[,. /' /- -

f.7.,fr/

gt#[ (s *jTUGC0 QA-Date

,/

AND CONTROL OF

[j ff OPERATION TRAVELERS APPROVED BT: [./l.4

/d.e &<s f-f-If CONSTRUCTION PROJECT MGR Date ff o.i TABIE OF CONTENTS I4 h,h4 lg[3

}nf

1.0 INTRODUCTION

1.1 PURPOSE h

1.2 SCOPE 2.0 CENERAL 2.1 RESPONSIBILITY

2.2 DESCRIPTION

OF AN OPERATION TRAVELER 2.2.1 General Traveler Information 3.0 PROCEDURE 3.1 BASIC PREPARATION SEQUENCE 3.1.1 Traveler Development 3.1.2 Traveler content 3.1.3 Numbering Sequence 3.1.4 Initiation Authority 3.1.5 Traveler Approval 3.1.6 Distribution of Travelers 3.2 TRAVELER CONTROL 3.3 TRAVELER REVISIONS AND CHANCES 3.3.1 Revision Preparation 3.3.2 Field Revisions For Non-ASME Related Travelers 4.0 SUPPORTING MATERIALS 4.1 AFFECIED DOCUMENTS o.11 FIGURES l

Figure 1 CONSTRUCTION OPERATION TRAVELER

(

Figure 2 CONSTRUCTION OPERATION TRAVELER CONTINUATION SHEET v $' i

,, 5 G

-co-8606120546 860604 PDR FOIA GARyS6-A-20 PDR g3g

e

't i

BROWN & R00f, INC.

PROCEDURE EFFECTIVE j

CPSES NUMBER REVISION DATE PAGE JO3 35-1195 CP-CPM 6.3 11 08/08/84 2 of 7

1.0 INTRODUCTION

1.1 FUPPOSE This procedure describes the preparation, approval, and control of Operation Travelers used at CPSES to control activites. The Operation Traveler provides sequential instructions on how to l

perform a task, identifies the required inspection points, and specifies the docimentation for these activities. The specified sequence on the traveler should be followed; however, due to t

construction interferences and other constraints, deviation from the sequence, with QA/QC concurrence, may be allowed.

Additional controls in the form of supplementary instructions or other pro-cedures, may be used to meet the applicable requirements.

1.2 SCOPE This procedure shall be used for safety-related and balance-of-plant activites. However, references to QA/QC do not apply to balance-of-plant activities and those inspection functions shall be accomplished by other departments.

i l

2.0 GENERAL 2.1 RESPONSIBILITY Signature authority of an Operation Traveler shall be either the Construction Superintendents responsible for the work (or their designees) or the discipline engineers responsible for technical guidance. The B&R Site QA Manager is responsible for monitoring l

the implementation of the system through the assignnent of QC inspection points and consultation with the ANI for selection i

of ANI inspection points for ASME-related activities, while 1

TUGC0 QA is responsible for the assigranent of QC inspection points for non-ASME activities. Neither QA/QC or Engineering review are required for travelers of a repetitious nature that i

have a standard format. When such reviews are not performed, the initial traveler number shall be entered in the " Reviewed By" i

block. The initial traveler should note the review waiver of

(

sub sequent travelers.

l Even though travelers of a repetitious nature do not require QA i

review of each individual traveler, ASME-related travelers of a repetitious nature shall be routed to QA so that ANI review may be performed on each individual traveler.

l rr -

.x M____--__-_-______________-____________-__-

t BROWN & ROCI, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-CPM 6.3 11 08/08/84 3 of 7 The Operation Traveler (Figures 6.3-1 and 6.3-2) serves as a fabrication / installation / inspection checklist of operations necessary to achieve a tuality end product. Accordingly, the checklist details will vary depending on the complexity of the operatio n.

2.2.1 General Traveler Information General information normally included on the Operation Traveler g

is as follows:

1.

Part, serial, or tag number and material description (s),

where applicable. Room number the item is in or will be installed in should also be provided.

2.

The department assigned the task to per form operation (s).

3.

Operation description, methods, procedures (instruction) by nLaber and revision and other information as required to successfully complete the operation in accordance with applicable requirements. Examination or test procedure /

instruction numbers and revision shall also be recorded on the traveler or supplementing report for examination or testing activities.

4.

All dLnensions and tolerances necessary to assure conpliance with applicable design drawings and specifications. This in-formation may be given by reference, provided persons perform-ing the work have access to the referenced material.

5.

Any needed offsite operations or processing is cited in the appropriate sequence with all other ' operation.

'/

6.

Necessary instructions for handling, cleaning, storing and I

preserviog items.

7.

Required QC/ ANI inspection, hold, or witness points, as applicable.

1.0 PROCEDURE 3.1 BASIC PREPARATION SEQUENCE MC_.,, _,,_ _, -

f-

~

BROWN & ROCf INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PACE JOB 35-1195 CP-CPM 6.3 11 08/08/84

.4 of 7 l

)

3.1.1 Traveler Development I

The operation sequence and necessary detailed information on the l

traveler should be developed among the responsible construction personnel, the Discipline Engineers providing the technical guidance.and the cognizant QA Department representative responsible for the quality requirements. The Discipline Engineers or construc-tion personnel initiating the traveler shall obtain Westinghouse approval if the traveler involves NSSS equipment.

3.1.2 Traveler Content h

I' The traveler package shall contain, or may reference if normally available, the drawings, procedures, instruction, manufacturer's manuals /guidlines, etc., necessary to accomplish the activity.

Doctanents required for fabrication or installation activites may be i

issued for inclusion into a traveler package. The doctanent shall be identified as beira part of the traveler package and that it cannot be used independently of the traveler package by a stamp stat 'ag I

"This doctament shall be used only in conjunction with Operati"n

{

Traveler #

i l

It shall be the responsibility of the organization contro111ne, the package to ensure the current doctanent revision ntsaber is refarenced I

on and included in the package, and is being used to perform.he t.

activity. This verification shall be made each day the package is used.

EXCLUSION: Traveler packages containing drawings which have weld ntsabers assigned by Welding Engineering, and all Hanger Packages, are excluded from the aforementioned j '

control alternative.

1 3.1.3 Nisaberina Sequence Except as described in paragraph 3.1.4, the controlling organization shall assign the utsaber to the traveler and provide records showits

[

to whom the traveler was issued, and maintain records to indicate a history of all travelers generated and the activity covered by the f

travelers. The traveler number should be the same as the item's identification utsaber when possible (e.g., hanger mark ntsaber,

[

equipment utsaber, etc.). Alternatively a numbering sequence similar h

to the followirg may be used:

h a

Dow A

oM4 gm

  • sAE N

$ wA.

V ' Ykm

4WWkW, me C '* M ' a'

'1e%

Yo*+

'G kh

i BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PACE JOB 35-1195 CP-CPM 6.3 l '.

08/08/84 5 of 7 "MP90-001-02-5000" HP = Identification letters representing the craft department or engineerirqg discipline originati:qg the trapeler.

90 = The calendar year in which the traveler was written.

001 = The individual sequence ntaber identifying a particular traveler.

02 = Unit nsaber may be included, but is not required.

5000 = The turnover (start-up) system nsaber for the activity l

described on the traveler.

}

3.1.4 Conduit Support Travelers

~,

The log discussed in paragraph 3.1.3 is not required for conduit support travelers. Accountability for these travelers is accomplished by QC walkdown of a conduit run with a subsequent verification that the required travelers are on file in the Permanent Plant Records Vault.

l NorE:

Operations on generic travelers for conduit supports and cable tray supports may be worked out of sequence with-out being individually approved by QA/QC as required in Paragraph 1.1.

3.1.5 Initiation Authority Travelers may be initiated by Engineering disciplines or Construction Superintendent.

3.1.6 Traveler Approval QA shall review and approve the traveler by signing the " Reviewed By" block.

3.1.7 Distribution of Travelers After review by QA/ANI, as applicable, the traveler is returned to the controllirqs organization for recording and distribution.

1 t

o 6

n

_ ; - a - _ --y

. = -

~=L

i s

BROWN & EOCE. INC.

PRCCEDURE EFFECTIVE CPSES NUMBER REVISIO;;

DATE PACE

[

J03 35-1195 6 of 7 CP-CPM 6.3 11

,08/08/84 3.2 TRAVELER CONTROL l.

Traveler packages shall be issued to craft personnel as they are needed for work. The traveler package shall remain in the work j

area until the work has been completed and accepted by QA/QC or until the end of the shift, whichever is first. Unit 2 Travelers shall be issued in accordance with G-CPM 7.1.

Travelers shall be completely maintained throughout the construction j

Each complate operation requires the signature and date of j process.

the person completirgr, the task. This shall be accomplished at the i

completion of each operation and prior to moving parts or assemblies to the next scheduled operation.

All identifed hold points shall be honored and work shall not proceed beyond that point until acceptance of the hold point is shown by l

the QA/QC/ANI representative's signature and date opposite the hold i

po int. The results of the QA/QC inspection shall be recorded in the QA/QC Eng column.

f I

~

Note QC inspections may also be doctanented on inspection reports. These inspection reports should remain with the traveler.

Upon completion of all the steps listed on the traveler, the traveler shall be returned to the controlling organization for l

further processing, as required. ASME completed travelers shall be forwarded to B&R QA while non-ASME completed travelers shaLL be forwarded to TUCCO QA for review and subsequent filing in the Permanent Plant Records Vault or Interim Records Vault.

Travelers governing non-Q activities shall be forwarded to the i

BOP office for maintenance.

I 3.3 TRAVELER REVISION AND CHANGES

^

3.3.1 Revision Preparation Except as provided below all changes, regardless of their signific-l acce, must be doctanented on the traveler, indicating the operations The

(

affected, description of the change, and QA/QC's concurrence.

~

f.

revision number and a description of the change will be noted below i

i

(

BROWN & R00I, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PACE JOB 35-1195 CP-CPM 6.3 11 08/08/84 y of 7 the last traveler operation, or on a continuation sheet. The item being changed shall reference the user to the described change.

Exception:

Changes of a referenced document to a higher revision level where holdpoints are neither added or deleted, do not reqnire rerouting for QA/QC co ncurre nce.

If holdpoints are added or deleted, the traveler revision mus.t recieve the same approvals as required for the original traveler.

Completed operations may be repeated if documented on the traveler.

Operations which have been completed but which require reworking may be added to the traveler provided:

1.

The added operation is the same as the original operation; 2.

The added operation includes the reason for the addition (e.g. pump unbolted due to inter ference);

3.

The same holdpoints are provided far the additional operation as the original operation.

The adding of this operation will not ef fect a revision or require the traveler go back through the entire review cycle. However, travelers reviewed by the ANI shall be r~es6bmitted to the ANI for review.

Other revisions shall be routed for the same approvals required for the original traveler.

Field Revi'sions for N n-ASME Related Travelers 3.3.2 o

Where it is not feasible or practical to route the traveler revision, the QA/QC representative in the field who is familiar

{

with the task being performed may approve a revision to the j

l traveler provided the following provisions are met:

1.

The revision is not a significant departure from the original l

concep t; 2.

The responsible Quality Engineer is made aware of this re-vision at the first available opportunity by the QA/QC rep-resentative ;

3.

The revision is signed by the responsible Construction Super-intendent, or responsible ecgineer.

i The QA/QC representative signs and dates the traveler showing approval of the revision described above.

i

\\

4

}

~

9

+

f BROWN & ROOr, INC.

PROCEDURE EFFECIIVE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-CPM 6.3 11 08/08/84 1 of 2 FIGURE 6.3-1 CONSTRUCTION OPERATION TRAVELER censrAccricM :stearica rar.c:.rm :s-iss I

g 74Avst.En MQ.

GEcuaPweef MQ, QuhiT ma GGWANTITY Qpagg,gp]

g.acviTTQE3cAIPT10M G AEFERENCE OAewlNGS gsmpeccsLM. instr.

[@ GCA7tcm

$3YSTEM j

PetPaAC SY CATE CEPT REVIEwt3SY OA?E AMI stvite CATE eates l08 ist CEPP.

09 tut *N g n4L aus N

i e

h meee.

w..

a BROWN & R00I, INC.

PROCEDURE EFFECIIVE CPSES NUMBER REVISION DATE PACE L

. JOB 3 5-1195 CP-CPM 6.3 11 08/08/84 2 of 2 FIGURE 6.3-2 CONSTRUCTION OPERATION '.' RAVEL 2R C0!CI!!UATICII CONSTRUCtCN CPtitAftCM f2AvtLER CCNT:NUailCN f

l T#MELEN %

ACTNffT CE3CAIPT10N

_ cv _ !

7487&At3 SY CATE REVf EWED BY OAft ANI RivtEW gg?g f

i' c

we a ge l

/

I b._

,T -

_. _ _ _;._.. = _.

..