. a.....:.
4 m
CC io A%0 i
I BROWN & ROOT, INC.
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE i
I MCP-1 4
08/01/84 I of to TITLE:
ORIGINATOR N
F8#
^
L/
Date t
GE*
$7 ],fy Of Date EC 1-C td Date N
\\ M 1 d. 46 D P,,/ ql Date j
r s
I o
/sr_tAcd i
U 1
1 t
1 1
h 2
N.
..L s r.sa a 2.2 NOIES 3.0 SPECIAL ITEMS AND GPERATIONS
/
4.0 PROCEDURE 4.1 GENERAL 4.2 INSTALLATION SEQUENCE GUIDE l
l 5.0 SUP20RTING INFORMATION
5.1 REFERENCES
l 5.2 ATTACHMENTS
)
1.0 INIRODUCTION 1.1 PURPOSE I.1.1 To establish a program for permanent plant mechanical equipment erection / installation and inspection.
P 1.2 3CUPE 1.2.1 Erection / installation of aLL ("Q" and "Non-Q") permament plant mechanical equipment and pertinent inspections by quality Control of "Q" and additionally specified items by the Owner. This pro-I cedure is not applicable to piping components e.g., valves, orifices.
l strainers, dampers, in-line fittars, etc.
\\
\\
l
\\1 h
s 8606120538 860604
_=-,- l A
=-
GARDE 86-A-20 PDR j%
m m
~
l o
i BROWN & RCOI, INC.
PRCCEDCRE EFFECIIV' CPSES NUMBER REVISION DATE PACE Jos 35-1195
\\
MCP-1 4
08/01/84 2 o f 10
!I 1.3 RESPONSIBILITIES 1.3.1 Field Mechanical Engineering - To provide the craft with technical assistance, procure materials, and perform verification activities as required.
1.3.2 Field Engineering Deoartment - Tc verify location and elevation 4
3 of mechanical equipment within tne scope of this procedure.
1.3. 3 ~
B&R General Mechanical Suoerintendent (GMS) - To implement
!l Mechanical Equipment installation / erection Travelers in accor-dance with CP-CPM 6.3.
1.3.4 B&R Quality Control Department - To monitor / verify / witness the
~
installation / erection activities for "Q" items to assure com-pliance to quality aspect of this procedure. Also perform non-destructive examination, as required, on all items (both "Q" and "Non-Q") welding inspections and coordinating Authorized Nuclear Inspection (ANI) Hold Points.
e 2.0 DEFINITIONS OF TERMS AND nares T
2.1 TERMS 2.1.1 Engineering - Field Mechanical Engineering.
2.1.2 Owner - Texas Utilities Services, Inc. or their authorized re-prese nta tive.
2.1.3 Mechanical Equipment - Refers to items which are detailed on the C&R equipment list, e.g.,
tanks, pumps, demineralizers, packaged systems, etc.
2.1.4 Mechanical Items - Used to denote both mechanical equipment and materials.
2.1.5 "Q" - Safety related items as defined in the Final Sa fety Analysis Report (FSAR).
2.1.6 Instalked Equipment - Equipment is considered installed when all appropriate steps described through Paragraph 4.2.11 have been l
completed.
1 I
i' I
i li
'- C q
B R oliN & R 0 0 r, I N C.
PROCEDURE EFFECTIVE l
CPSES hWEER REVISIGi DATE PAGE i
i Jos 35-1195 MCP-1 4
08/01/84 3 o f 10 2.1.7 Equipment Stored-In-Place - Equipment is considered " Stored-In-Place" when it is stored in the general or immediate area of its permanent location. Equipment may be preliminarily aligned and still be considered " Stored-In-Place".
2.1.8 Erected Equipment - Equipment which is' built on the jobsite, i.e.,
main condensers, field fabricated tanks, etc.
2.1.9 Angular (Tace to Face) Aligrrnent - The ceasure of angularity between the shafts of driver and driven units.
It is measured in terms of the maximum difference in the axial distance between j
the selected points on the faces of couplits halves when rotated as if coupled and readings taken at certain increment.
(Re ference I
sketch on Attachment 2).
2.1.10 Parallet (Rim to Rim) Alignment - The measure of eccentrity between the axis of shafts of driver and driven units.
It is measured in terms of the lateral distance between seleeced points on the rims of couplirg halves when rotated as if coupled and readings taken at certain increment. (Raference sketch on
, ).
r NUIE:
Titles, when used in this procedure, signify the specific person or his designee.
3.0 SPECIAL ITEMS AND OPERATIONS l
3.1 All tools, measuring devices or equipment which are supplied by the manufacturer for construction purposes shall be returned to the manufacturer or turned over to the Owner as appropriate.
3.2 Procurits special materials, e.g., bolts, nuts, gaskets, lubri-cants, etc., shall be coordinated by construction and Engineering.
i L
3.3 Electric horizontal motors drivirs rotatirs eachinery shall be set on the magnetic center for the coupling aligranent check and the couplits gap determination unless otherwise specified on the Traveler, or by vendor instructions. For motors equipped with anti-friction bearirigs, the motor is placed on a magnetic center at the time of motor installation.
)
I s
M_C lk I
- - - - - ~ ~ - - - -
.. ~ ~ - -
- -. -. ~ ~...- <._:..-...~-._.-,. _. _ _ _.,
ll BROWN & ROOr, INC.
PRCCEDURE EFFECTIVE ll CPSES NUMBER REVISICN DATE PAGE JOB 35-1195 i
MCP-1 4
08/01/84 4 of 10 4.0 PROCEDURE 4.1 GENERAL j
I, 4.1.1 The text of this procedure in conjunction with the vendor instru-ctions or manials will nor:aally contain sufficient guidance for the installation / erection of the majority of mechanical items.
-/, Travelers shall be initiated containing, or referencing, such instruct io ns.
Traveler shall include " Level, location / Elevation /
Orientation Record" for all equipment. "Aligratent Record" will be included for rotating equipment only. In general, as applicable f !
the followirqs attributes will be included in the traveler for QC/
Owner / Engineering (as appropriate) Verification:
1.
Relea se for installation 2.
Removal of temporary coating / preservative 3.
Location I
4.
Elevation l
5.
Orie nta tion 6.
Invelness l
7.
Preliminary Alignment 8.
Fastening bolts 9.
Grout Placement
- 10. Fine Alistament
- 11. Double Nut Installation
- 12. Recheck Alig usent p,13. Cleanliness and provision for any additional attributes.
Travelers shall be processed in accordance with CP-CPM 6.3..-
4.1.2 In the event the vendor manual / instructions are not available on site, the item may be stored in place, but will not be installed unless otherwise directed by the Owner. Engineering shall make I,
a written request to the Owner for veridor manuals / instructions.
i.
4.1.3 Where vendor instructions conflict with the general guidelines of this procedure, tl.e vendor instruction shall take precedence.
Where vendor instructions conflict with the requirements of the C6H specification 2323-M9-101, Engineericg shall request clarifi-
- ~'"
catic,a from the Owner.
9 l
..[
1
?
t BRCh"N & ROCT, INC.
PRCCEDURE EFFECIVE CPSES NUM3ER REVISION DATE PACE 9
J03 35-1195 MCP-1 4
08/01/84 5 o f 10 4.1.4 Vendor's Representative: Reque st for having vendor's represent-atives on site 'will be coordinated with the Owner.
All erection, installation, and testing shall be performed in accordance with I
the representative's instructions provided these instructions do not conflict with the equipment manual and applicable specifications.
In the event that the representative's instructions conflict with the equipment manual or specification, the PME will request the Owner to initiate the appropriate design change.
4.1.5 B&R will use the construction schedule in planning its required activitie s.
In the event early installation is deemed desirable, f
the craft superintendent shall inform Engineering as to the intended installatio'n date so appropriate instructions, etc.,
can be prepared.
Construction / Engineering will coordinate schedulirs interferences with project scheduler.
4.1.6 Equipment handling - All equipment shall be handled in accordance with B&R Construction Procedure No. 3 5-1195-CCP-2.4 and/or an appropriate traveler. Fo r ro t.r ing e~quipment, the coupling between the equipment and the dr ver shall be disconnected prior to the start of the following activities:
i' Handlitg of the item for change of position or location.
a.
b.
Any setting or leveling operation prior to baseplate grouting and/or securieg in position.
4.1.7 Coatings and Prepervatives - During installation, all coatings and preservatives applied to equipment for protection during shipment and temporary storage shall be completely removed unless otherwise directed by the vendor's instructions, the Owner, or as specified on the traveler.
I L:
4.1.8 Shims - Shims shall be located adjacent to all anchor bolts at su fficient intermediate points to assure complete alignment of equipme nt.
Shims between equipment bases or supports and struct-e ural steel foundations shall be carbon steel plate, cut k'
to suit the full beariq; surface beirs supported. Except where otherwise E
directed by the vendor's instructions, shim stock material shall k
be as follows:
Below the grout line all shim stock shall be I;
carbon steel. Above the grout line all shim material shall be carbon steet except when the shim material is thinner than 0.03' inches, in which case stainless ' steel shim material may be used.
s fh isW y
a hp> ;. L, i '& 6 W _:_ Q-.,p-.:f - @ N - M M p m % n w -
- '~
h e
+~ <
1 t
]
4 l
BRoliN & RCM, INC.
PRCCEDURE EFFEMIV' I
CFSES NUMBER REVISION DATE PACE 3
JOB 35-1195 1
i 1
5 MCP-1 4
08/01/84 6 o f 10 I
i 4.1.9 Equipment anchoring - Prior to final aligment and tightening, locking nuts or double. nuts shall be installed on all anchor i
bolts for rotating equipment unless otherwise specified by the t
I e ngineer. For equipment that may require a sliding end to allow i
for thermal expansion as shown on the vendor design or the engineer's design drawings, the bolts shall be located in the center of the slot + 1/16." The nuts on anchor bolts shall be brought to a hand tight condition. Anchor bolts on equipment that requires a sliding i
and shaLL also have double nuts or locking nuts installed if sufficient bolt projection exists.
If sufficient anchor bolt le ngth is not available for the instattation of the double or locking nut, the threads of the anchor bolt shall be upset or the bolt staked accordingly. Half nuts shall be considered adequate for locking or double nut.
Providirg locking out or double nut is not installed, a minimiss bolt projection of one and one-half threads past the top of the anchor bolt nut shall be required to provide adequate space fbr upsetting of anchor bolt threads or staking of the anchor bolt. For anchor bolts with locking nuts installed, anchor bolts as a minimum must be, flush with top of anchor bolt.
j E
NME:
Concrete expansion anchor bolts shall not be used for the installation of rotating equipment or for applications subject to vibratory loading that are within the scope of this procedure.
t 4.1.10 Bolt Torquing: Bolts and nuts, as required, shall be torqued in j.
accordance with vendor's manual / approved drawings / traveler, as appropria te.
l 4.1.11 The maximum tolerance values of the coupling aligment shall be 0.003 inches argular aligment and 0.003 inches parallet align-i ment (0.0015 inches centerline offset), ucless otherwise specified in the equipment manual / specifications / travelers.
l 4.1.12 Any equipment setting /alisment problems shall be reported to Engineerirs for resolution.
4.1.13 Calibrated tools and gauges shall be used for final measurements.
5 All calibrated tools shall be in secordance with B&R calibration procedures. The accuracy range of the calibrated tool used at l
j installation must be taken into consideration when a',igning and l
leveling the equipment to the allowances specified in,this pro-3 cedure. The identificatio'n number of the tool / gauges used shall be recorded on the appropriate form used for recording readings,.
ii.!
I
\\
5 I
L-EsMww twa n w
~
=
.m.
= ~
= -
I BROWN & RCC, INC.
PRCCEDURE IFFECIIVE CPSES NUM3ER REVISION DATE PACT JOS 35-1195 NCP-1 4
08/01/84 7 of 10 4.1.14 Owner Witness /Motificatica: Own6e sheLL be notified as follows; To check levelness. etc. Prior to grouting a.
- b., To witness recheck aligament.
B&R shall not proceed with any succeeding step until Owner appiroval l
1s received.
I 4.1.15 For Unit 1 all records pertaining to this procedure shaLL be asintained by the PFC in fireproof file cabinets. Upon completion i
of B&R construction responsibilities, they shall be forwarded to the Parar.nent Plant Records Vault or BOP Vault. As a minimum, the distribution shall be as follows: 2 cupies to the owner and original to QA vault (for "Q" itemis) and to BOP Vault (for "NoH" items).
For Unit 2, att records pertaining to this procedure shall be maintained and reocassed in accordance with CP-CPM 7.1.
4.1.16 QC Hold Points - Specific attributes are as provided in the Attach-seats #1 and #2 forms. Travelers shall have provisions for additional attributes.
4.1.'l7 Operation of Equipment - B&R shall not operate any permanent plant equipment, except as noted herein or instructed by the Cuner. The use of permanent plant cranes and hoists shall be subject to prior approval by the Owner and shall conform to ANSI B.30.20; operatica and testing shall conform to the requirements of B&R Procedure No.
l 35-1195-CCP-24. Unless otherwise directed, permanent installa tion j
l of coupling spacer and/or botting coupling halves v111 be completed
~
prior to turnover.
' 4.1.18 Rotation Check - Rotation Check for rotating equipment she11 be Ex-done by owner unless otherwise instructed by the owner.
captions will be coordinated with Completions.
4.2 INSTALLATION SEQUENCE CUIDE
' 4.i.1 Engineering / Construction will review vendor manuals, applicabla
~
drawings, and specifications. Travelers shaLL be initiated prior to performing the activity.
t 4.2.2.
Equipment foundations involvidg structural stect shall be cleaned and deburred at punched holes, sheerad edges, and irregularities to provide smooth and level bearing surfaces. Crafts, in conjunc-tion with QC will verify the structural integrity and clesaliness of the foundation prior to equipment installation.
X
EFFECTIVE 34CW & E00t, INC.
PROCDGE CPSES gggggg REVISIS DATE PAGE MCP-L 4
08/01/84 8 o f 10 4.2.3 The craft superintendent shell inforz QC and Engineering a min-tam of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to equipment installatio n.
Exceptions I
shall be coordinated amongst all involved discipt.tnes to assure f
equipment integrity.
)
4.2.4 The craft superintendent will requisition the item in accordance t
with CP-CPM 8.1.
The item will be moved from storage to the install-ation location and set in position or stored in place.
i I
l 4.2.5 Equipment shall be positioned, oriented and set to the elevation shown on the lavel/tocation/ Elevation / Orientation Record. Major j
nossle locations shall be used to determine proper equipment elevations. Lten lateral location adjust:nents are required, the equipment shall be located by ustry the theoretical coLisan lines and niajor nossle locations.
4.2.6 T.evelig - Equipment which requires shisairs to get it to proper elevation is indicated in Attachment 2.
IAveling details are as follows:
I Flat bottom and skirted tanks will be set using a carpenter's a.
[
level placed on the foundation; the bubble must be contained i.
between the two closest linee on the level. Tanks supported by legs und all other non-rotatig equipment which require shimming will be set using a carpenter's level placed on the erguipment base or machined surface as appropriate. Equipment which requires shiaming to elevation shall be shimmed so that I
the bubble is contained between the two closest lines on the level.
l b.
Rotating equipment shall be shimmed and Leveled to three thousandths of an inch per foot usirs precision hand or optical levels on available leveling surfaces.
If no leveling surface is furnished rotating equipment may be leveled to p
+ 1/4" and to end.
}
h Heat exchangers shall he leveled to + 1/4" and to end, using c.
j optical levels from the bottom of the shell. Side to side leveling may be performed using a carpenter's level placed on the base. It shall be shimmed so that the bubble is contained between the two closest lines on 'the level.
~ 4 2,7 preliminary Aligunent of Rotating E' uipment - The preliminary q
aligrunent ashall be completed prio'r' to gro' ting. This aliganent u
.e nay be done by the use of straight-edge pisced alorg the outer i
edges of the coupling halves and/or by using feater gauges be-tween halves. The acceptance criteria for this aligranent shall I
be as follows:
MM t
- ~ * * * =, ' = =
- y = = = *
\\l
. ~ ~. *
- a
t BROWN & ROOT, INC.
PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 MCP-1 4
08/01/84 9 of 10 Straight Edges - should have solid flat contact on both a.
coupling halves.
Bubble Inval - the bubble should be within the two closest b.
lines on the level indicator.
Feeler Cauges - the couplings shall be set with a +.020 c.
of an inch tolerance - face to face.
4.2.8 Grouting - The Owner shall be' notified prior to grouting. Equip-shall be grouted (if required) after it is set to proper ment orientation, location, elevation, leveled, securely fastaned to foundation and (if rotatics equipment) preliminary alisment has j
been completed and accepted. ALL grouting shall be performed in accordance with B&R Construction Procedure No. 3 5-1195-CCP-16, a space of one inch shall be provided at the points of utginum grout minimum clearance between the equipnent installation.
In areas adjacent to the equipment where other work is being performed, which the level shall be again may cause the movement of the equipment i
checked just prior to placing the grout.
Fine Aligreneut of Rotating Equipmeat - The fins aligruneat shaLL be J
4.2.9 completed after the base plates are grouted and bolted down but
~
prior to piping / duct connections. Prior to start of this work, aLL coupling and connectors shall be unbotted.
Permanent Connections - Hook-up of separately mounted motors shaLL 4.2.10 be in accordance with the appropriate manufacturer's instruction.
Connection of HVAC ducting shall be in accordance with the appro-priate HVAC installation procedure.
Connection of piping shall be I
in accordance with the applicable pipirg instattation procedure.
in writing that the Engineering will notify the piping department equipment is ready for pipits connection (s). A copy of the notice will be sent to the millwright department. For "Q" items, a copy wiLL also be sent to QC.
4 Recheck Aligranent of Rotating Equipment - The recheck aligrunent 4.2.11 shall be completed during or immediately af ter the connection of 1
the suction and discharge piping or ducting. The coupling align-ment readings shall be rechecked to determine if excessive strains are being imposed on the equipment so as to cause its misaligeraent.
the coup-If the pipits or ductics is misaligned to the equipment, shall normally be corrected by readjustment of ling misalignment the pipe or, ducting. The mir411grz:ent may be corrected by equip-i ment readjustment wit'h the Nner's concurrence. After any equip-the coupt'ings must meet tihe procedural /canufic-i ment adjustment, turer's requirements.
l
't J.*;_c___.-----,__.*A..~:--,~~-*----
- ~....
-..-~.
BROWN & ROOT, INC.
PROCEDURE EFFECTIVE CPSES NUMBER REVISICM DATE PAGE l
l I
JOB 35-1195 MCP-1 4
08/01/84 10 o f 10 4.2.12 Fine, recheck, or hot check alignment will be docianented on the Equipment Alignment Record (Attacluent 2).
The aligranent record will be prepared from the manufacturer's manual and/or Reference 1.
Where the two conflict, the more stringent of the two shall be used.
Only one aligreent check may be docuctented on a record. The aligtme nt shall be reviewed by either Quality Engineering for Q items or by Engineering for BOP items. After completion of the record, the record shall be distributed in accordance with Para-graph 4.1.15.
5.0 SUPPORTING INFORMATION
5.1 REFERENCES
i l
1.
G&H Mechanical Erection Specification 2323-MS-101 1
2.
B&R Construction Procedure 35-1195-CCP-16 " Grouting Base Plates, Bearing Plates & Equipment Bases" 3.
B&R Construction Procedure 3 5-1195-CCP-24., "Rigg ing" d
4.
B&R Construction Procedure CP-CPM 8.1, " Receipt, Storage, and i
Issuance of Items" f
s 5.
B&R Construction Procedure CP-CPM 6.9E " Pipe Fabrication and Installa tio n" 6.
B&R Construction Procedure CP-CPM 6.3 " Preparation, Approval, and Control of Operation Travelers" 5.2 ATTACHMENTS l
1.
Equipment level /Iacation/ Elevation / Orientation Record Forn i
2.
Rotation Equipment Aligrnent Record Form Ih 4
s a
>l
?
i:
-. - - - ~ ~ - - - - - -.
.'__;_; ; _,_ 3
^"
-. a a.- ~....... - - -.....
t BRolill & ROCT, INC.
PROQDURE EFFICTIVE CPSES NUMBER REVISIGE DATE PAGE JOB 35-1195 MCP-1 4
08/01/84 1 of 1 i
ATTACHMEhT I t
EQUIPMENT LEVEL / LOCATION /ELEVATICN/ORIDTATION RECCAD Traveler i Att.#
Item Cescription Ref: Ecuipment 'Ng.
Rev.
Item Spin / Tag f Location INg.
Rev.
j P.O. f Untt #
CQ other 4
Levelness Required Oacao SKETCH l
.(
l l
t Callb" rated Tools Used NOTE (0): Cesigned (8y Mech. Engr.)
(A - Actual (Sy Field Ence.1 CA!DTATICM/LCCAT!*M/ELEVt.T 0M U
LEVELMESS $
U!
i l
i Craft Fore:an
($fgn/04te) i Field Engr.
($fgn/Cate)'
(/\\l Ml f
CC(0)
($lgn/Cate) lll lll Mech.Enge. (.*lon.C) ($lge/Date) j llg jj
'5 - 54ttsfac*.ory "J - Unsatisfact:ry l.
' a t
l BROWN & ROcr, INC.
- PROCEDURE EFFECTIVE CFSES NUMBER REVISIGt DATE PAGE Jos 35-1195 MCP-1 4
08/01/84 1 of 1 ATTACHME!ft 2 RUTATING EQUIPMDff ALIGleENT RECORD FINE RECHECK HOT OfECK
. Drieinster
' Oste Re11ewed,8y Ca te SWA,odalPf
~
lt e Descrtulon Aef: Iteri Gwg. d Rev.
Oo Locatioa o se Re.
It s Spin / Tag #
P.0.#
Unit
- Onea-o etser e
rk b Aie to Rio
's A'
S'
's.
a Y
Coupling Alignment p t, x - (g -h
!.r. ?c -(t)
- t--
b4--
osai indienter 6*>98'ltlT Position t
e Eed*.
J csuenc peg -
a C'tA*
Face to Face I's s
,s CPLa. A. A ' A ' # '/8 ' 8 ' 8 ' 8 Reading coupling A11grutent g
2 3 4 1 2 3 4 Locations at approx. goe Ircrements.
- CTE: (1) Both Driver & Driven Units to be rotated t:getner in sace direction.
~
(2) Dial indicator to be set at 0 (Zero) for the first reading so the* the remaining readings will be with respect to "Zero* reading at one position.
(3) Straight edge. bubble level and feeler gauges say be used for preliainery alignment.
bY:
- TIE PARAlt!L fRto to Is#) Y N k e
t.
REA31NE Dial 15.
TAKEI VERIF!!D 4 ACCEPTID SY/SAit KEMARK5 LOC.
Ind.
REA0!NG SY/: ate GG LQ)
Gilar*
No.
(inca)
Enge.(Non-Q)
A,8, A8 2
A,83 AI 4A g
(f. mit*>e (fate to Face) At!3* '!'If TtMAtlect e
- TIS READIM DialkNO.
TAK1.1 Pas-Min lY R!FIED 1 A0:9*!3 SY/raff RD'/,RES Loc.
Ind.
RGO!!El OY/Date Reeding GC(F CuaT*
(inch)
Engr. (Nor.-Q)
No.
(inch)_
},5:
AS tt A 8, 3
A 5, 4
- Ar. ness a;is sent aniy.
- w o. -
.__ _ _