{{#Wiki_filter:August 25, 2021 Mr. David Rhoades Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:Mr. David Rhoades Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
Line 21: Line 21:


==Dear Mr. Rhoades:==
==Dear Mr. Rhoades:==
In a conversation on August 19, 2021, between Mr. B. Bartlett, Senior Operations Engineer, the NRC lead inspector for this inspection, and Mr. D. Blair, Manager, Operations Training, final arrangements were made for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the LaSalle County Station. The inspection is planned for the week of October 18, 2021, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In a conversation on August 19, 2021, between Mr. B. Bartlett, Senior Operations Engineer, the NRC lead inspector for this inspection, and Mr. D. Blair, Manager, Operations Training, final arrangements were made for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the LaSalle County Station. The inspection is planned for the week of October 18, 2021, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. To assist in minimizing the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. To assist in minimizing the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.
Please furnish the items listed in the first group of the attached enclosure, needed to support the in-office inspection activities, to the NRC by October 6, 2021. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. D. Blair has been advised of this request.
Please furnish the items listed in the first group of the attached enclosure, needed to support the in-office inspection activities, to the NRC by October 6, 2021. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. D. Blair has been advised of this request.
Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9753 or via e-mail at Bruce.Bartlett@nrc.gov.
Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9753 or via e-mail at Bruce.Bartlett@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.August 25, 2021 This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely, Bruce L. Bartlett, Senior Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
D. Rhoades                                        This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Bartlett, Bruce on 08/25/21 Bruce L. Bartlett, Senior Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18


==Enclosure:==
==Enclosure:==
REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11) cc: Distribution via LISTSERV Signed by Bartlett, Bruce on 08/25/21


REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11) cc: Distribution via LISTSERV
D. Rhoades


D. Rhoades                                    Letter to David Rhoades from Bruce L. Bartlett dated August 25, 2021.
Letter to David Rhoades from Bruce L. Bartlett dated August 25, 2021.


==SUBJECT:==
==SUBJECT:==
LASALLE COUNTY STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
LASALLE COUNTY STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION
Jessie Quichocho Aaron McCraw RidsNrrDorlLpl3 RidsNrrPMLaSalle Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML21237A512 Publicly Available     Non-Publicly Available         Sensitive Non-Sensitive OFFICE       RIII:DRS/OB NAME         BBartlett:mb DATE         08/25/2021 OFFICIAL RECORD COPY
 
DISTRIBUTION:
Jessie Quichocho Aaron McCraw RidsNrrDorlLpl3 RidsNrrPMLaSalle Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Jamnes Cameron Allan Barker DRPIII DRSIII
 
ADAMS Accession Number: ML21237A512 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII:DRS/OB NAME BBartlett:mb DATE 08/25/2021 OFFICIAL RECORD COPY REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)


REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)
Please provide the following information on a CD/DVD, if possible, by October 6, 2021.
Please provide the following information on a CD/DVD, if possible, by October 6, 2021.
: 1. One complete version of a biennial requalification written examination administered during the training cycle.
: 1. One complete version of a biennial requalification written examination administered during the training cycle.
Line 50: Line 51:
: 5. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
: 5. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
: 6. A schedule of the licensees examination activities during the on-site inspection week.
: 6. A schedule of the licensees examination activities during the on-site inspection week.
Please have the following information available for U.S. Nuclear Regulatory Commission review on October 18, 2021.
Please have the following information available for U.S. Nuclear Regulatory Commission review on October 18, 2021.
: 1. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
: 1. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
Line 56: Line 58:
: 4. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
: 4. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
: 5. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.
: 5. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.
Enclosure
Enclosure
: 6. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.
: 6. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.
2}}
2}}

Latest revision as of 23:39, 19 November 2024

Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Reuqest for Information
ML21237A512
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/25/2021
From: Bruce Bartlett
Operations Branch III
To: Rhoades D
Exelon Generation Co
References
Download: ML21237A512 (5)


Text

Mr. David Rhoades Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Rhoades:

In a conversation on August 19, 2021, between Mr. B. Bartlett, Senior Operations Engineer, the NRC lead inspector for this inspection, and Mr. D. Blair, Manager, Operations Training, final arrangements were made for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the LaSalle County Station. The inspection is planned for the week of October 18, 2021, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. To assist in minimizing the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.

Please furnish the items listed in the first group of the attached enclosure, needed to support the in-office inspection activities, to the NRC by October 6, 2021. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. D. Blair has been advised of this request.

Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9753 or via e-mail at Bruce.Bartlett@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.August 25, 2021 This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Bruce L. Bartlett, Senior Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11) cc: Distribution via LISTSERV Signed by Bartlett, Bruce on 08/25/21

D. Rhoades

Letter to David Rhoades from Bruce L. Bartlett dated August 25, 2021.

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION

DISTRIBUTION:

Jessie Quichocho Aaron McCraw RidsNrrDorlLpl3 RidsNrrPMLaSalle Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Jamnes Cameron Allan Barker DRPIII DRSIII

ADAMS Accession Number: ML21237A512 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII:DRS/OB NAME BBartlett:mb DATE 08/25/2021 OFFICIAL RECORD COPY REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)

Please provide the following information on a CD/DVD, if possible, by October 6, 2021.

1. One complete version of a biennial requalification written examination administered during the training cycle.
2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by Title 10 of the Code of Federal Regulations, Part 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios selected from other weeks within the same training cycle.
3. Complete versions of the reference materials used to develop the administered written examinations and operating tests. (Refer to ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations, for additional examples and clarification.)
4. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems, which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training.

(These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.)

5. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
6. A schedule of the licensees examination activities during the on-site inspection week.

Please have the following information available for U.S. Nuclear Regulatory Commission review on October 18, 2021.

1. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
2. Licensed operator pass/fail statistics for any U.S. Nuclear Regulatory Commission-required requalification examinations that have been completed.
3. An overall schedule of the facility licensees requalification program since the last biennial inspection (cycle weeks, training topics, etc.).
4. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
5. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.

Enclosure

6. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.

2