ML22039A199: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML22039A199
| number = ML22039A199
| issue date = 02/16/2022
| issue date = 02/16/2022
| title = Summary of January 26, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-591, Revise Risk Informed Completion Time (Rict) Program
| title = Summary of January 26, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program
| author name = Honcharik M
| author name = Honcharik M
| author affiliation = NRC/NRR/DSS/STSB
| author affiliation = NRC/NRR/DSS/STSB

Latest revision as of 16:18, 6 February 2024

Summary of January 26, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program
ML22039A199
Person / Time
Site: Technical Specifications Task Force
Issue date: 02/16/2022
From: Michelle Honcharik
NRC/NRR/DSS/STSB
To: Victor Cusumano
NRC/NRR/DSS/STSB
M Honcharik NRR/DSS 415-1774
Shared Package
ML22039A200 List:
References
TSTF-591
Download: ML22039A199 (5)


Text

V. Cusumano February 16, 2022 MEMORANDUM TO: Victor G. Cusumano, Branch Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation FROM: Michelle C. Honcharik, Senior Project Manager Signed by Honcharik, Michelle Technical Specifications Branch on 02/16/22 Division of Safety Systems Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF JANUARY 26, 2022, MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE REGARDING DRAFT TRAVELER TSTF-591, REVISE RISK INFORMED COMPLETION TIME (RICT) PROGRAM On January 26, 2022, an Observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Technical Specifications Task Force (TSTF). The meeting was a pre-submittal teleconference to discuss draft traveler TSTF-591 Revise Risk Informed Completion Time (RICT) Program" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21316A237). The meeting notice is available in the ADAMS at Accession No. ML22024A453. A list of attendees is enclosed.

NRC staff provided the following observations on the draft traveler:

1. For the proposed Technical Specification (TS) 5.6.8.c, RICT Program Upgrade Report, any language proposed must be clear and avoid any ambiguity for the use of a Newly Developed Method (NDM) in the RICT program. The TSTF clarified that any non-closed Findings and Observations (F&Os) on the method itself would require NRC approval before use. NRC staff further clarified that there are two peer reviews for NDMs: (1) the technical review of the method and (2) the review for implementation of the method. For the NDM to be acceptable for use in the RICT program, there can be no open F&Os resulting from the technical peer review, however an NDM can be used for the RICT program with open F&Os from the implementation peer review.

CONTACT: Michelle C. Honcharik, NRR/DSS 301-415-1774

V. Cusumano 2. To avoid conflict with use of the word approach as defined in the glossary of terms in the Regulatory Guide 1.200, Revision 3, the NRC staff recommended the TSTF consider alternate language.

3. For the proposed TS 5.6.8, a timeliness factor must be included for submittal of the RICT Program Upgrade Report. The draft traveler TSTF-591 does not provide a timeframe for when the report must be submitted to the NRC.

The TSTF agreed to address comments 1 and 2 when submitting the traveler for review. The NRC staff and TSTF agreed that comment 3 can be addressed during the review of the traveler and may require requests for additional information.

The public had no comments.

Project No. 753

Enclosure:

As stated cc: See next page

Package: ML22039A200; Meeting summary: ML22039A199; Meeting notice: ML22024A453; Draft Traveler: ML21316A237

  • concurred via e-mail NRR-106 OFFICE NRR/DSS/STSB NRR/DSS/STSB/BC NRR/DSS/STSB NAME MHoncharik VCusumano MHoncharik DATE 02/16/2022 02/16/2022 02/16/2022 LIST OF ATTENDEES NRC staff Honcharik, Michelle Weerakkody, Sunil Pascarelli, Robert Brown, Adrienne Markley, Michael Russell, Andrea Cusumano, Victor Khanna, Meena West, Khadijah Miller, Ed Industry and public Mann, Brian Mann (Excel Services)

Lueshen, Kevin:(Exelon Nuclear)

Richards, Drew Allen, Nicholas Linthicum, Roy R.:(Exelon Nuclear)

Vanover, Donald Loyd, Suzanne:(Exelon Nuclear)

Gullott, David M.:(Exelon Nuclear)

DeMoss, Gary (PSEG)

Couture, Phil Joyce, Ryan M.

Jacobson, Ron Stewart, Glenn H:(Exelon Nuclear)

Szews, Heather Davis Lipetzky, Andrew Charles Isbell, Robert W De Rego, Christopher Morgen X. Bruce Mironenko, Artur N Scott, Sara Boatwright, Walter J Anderson, Victoria Walls, William Vaughan, Jordan L Rishel, Robert I Bergman, Jana Enclosure

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 Wadsworth, TX 77483 Email: amrichards@stpegs.com Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 Email: kevin.lueshen@constellation.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 Email: wasparkm@southernco.com