05000259/FIN-2012002-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Adequately Implement Impaired Fire Barrier and Detector Controls | ||
| docket = 05000259, 05000260, 05000296 | | docket = 05000259, 05000260, 05000296 | ||
| inspection report = IR 05000259/2012002 | | inspection report = IR 05000259/2012002 |
Latest revision as of 20:44, 20 February 2018
Site: | Browns Ferry |
---|---|
Report | IR 05000259/2012002 Section 1R05 |
Date counted | Mar 31, 2012 (2012Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | C Fletcher C Stancil E Guthrie K Korth L Pressley P Niebaum R Carrion |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |