ML20064K613: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:. .                  . _ _ .    . ._._. . . _ . _ _ _ . _ _ _ _ _ _ . . . _ _                                                              _ _ _      _            _            . _ . _ _ _        _ . __            _
s
.                                                                                                                                                                                                                                                  r k
                                                                                                                                . REVISION LOG SHEET t
Revision Date: PORC 12-06-82 (issued 01-05-83).
This log sheet must be retained as the last page of the Browns Ferry Implementing                                                                                                                                i Procedures Document.
f I
Inserted by:                                                                                                                Date Inserted:
Pages to be Removed-                                                                                    New Pages to be Inserted                                                              ;
Revision /                                                                              Revision /
Part                              Page Number                                            Date                      Part              Page Number                              Date List of Effective                                                                                                          List of Effective Pages                                    1 of 10                                  11/01/82                          Pages            1 of 10                          12/06/82 I                                        IP-1                                      10 of 11                                  10/19/82                          IP-1              10 of 11                          12/06/82 I
i 1
l l
l l
l F
l
?
lO I                            03o1100539 830113 PDR ADOCK 05000259 F                                          PDR                                                                                ,
 
BFN-IPD List of Effective Pages Page .1 of 10 12/06/82
    -(''}.
N' TENNESSEE VALLEY AUTHORITY 4
BROWNS FERRY NUCLEAR PLANT IMPLEMENTING PROCEDURES DOCUMENT, LIST OF EFFECTIVE PAGES i
                        'This List of Effective Pages must be retained with the Browns Ferry Nuclear Plant Implementing Procedures Documents.
3 Procedure                                                      Page Part      Number                          Subdivision                Number        Date/Rev. No.
:                              BFN                                    List of Effective l                                                                        Pages                        1 of.10            l'2/06/82 2 of 10            11/30/82 l
3 of 10            11/01/82 l                                                                                                    4 of 10            11/01/82 l                                                                                                    5 of .59          11/01/82 6 of 10-          11/01/82 7 of 10            11/01/82 8 of 10            11/01/82 9 of 10            11/30/82 10 of 10            11/01/82
          )                                                          Table of Contents                1 of 1            10/19/82 IP-1                                                        Coversheet-          10/19/82 Preface                        1 of 1-            10/19/82-1 IP-1                                                          1 of 11            10/19/82
;                                                                                                    2 of 11            10/19/82-3 of 11          .10/19/82 4 of 11            10/19/82 5 of 11            10/19/82 l                                                                                                    6 of 11            10/19/82 l                                                                                                    7 of 11            10/19/82
;                                                                                                    8 of 11            10/19/82 l
9 of 11            10/19/82 10 of 11            12/06/82 11 of 11            10/19/82 IP-2.                                                        Coversheet          06/15/82 1 of 2            04/22/82 2 of 2            10/19/82 s
i f                                                                                                              .  .
 
I (O)
                .,                                                                                                /.
x        \      *                                                                (1)                                                      _
                                                                          -TRIAXIAL OPERATION >0.013                            IP-2 NOTIFICATION OF AN                          -
                  $                                                                                                              UNUSUAL EVENT (Refer also g                                                                                                              to IP-24)-                                  ,.
o                      T.ARTHQUAKE-
                  %                *                                                                (2) 6                                                        -BIAXIAL OPERATION > G.18                              IP-3 ALERT (Refer also to _
IP-24)              .
n'
                  ,'g
                                                                          -RESERVOIR LEVEL E 561'                                IP-2 NOTIFICATION OF AN UNUSUAL EVENT FLOOD                            - RESERVOIR LEVELZ 563.5'                              IP-3 ALERT
                                                                          -RESERVOIR LEVEL 2 565'                                IP-4 SITE AREA DIERGENCY-NATURAL
                                                                            -REPORTED BY PLANT PERSONNEL                          IP-2 NOTIFICATION OF AN PHENOTENA UNUSUAL EVENT t
TORNADC
                                                                            -STRIKING PLANT                                        IP-3 ALERT      ,
HIGH WINDS                          SUSTAINED WINDS'>90 MPH                            IP-4 SITE AREA DiERGENCY .
LOW RESERVOIR LEVEL-BREACH OF WHEELER DAM IP-4 SITE AREA RfERGENCY
                              *    (1) Before initiating IP-2, confirm by noticeable building movement' and/or call National Earthquake Information Center at (303) 234-3994. See FSAR Figure 2 .5-7. -
Modified Mercalli Intensity IV.
                            *      (2) Before _ initfating IP-3, confirm by building movement, some damage to non-seismic structures. Call                                                                    '
National Earthquake Information Center at (303) 234--3994. See TSAR Figure 2.5-7, Modified Mercalli Intensity VII.
                                                                                                                                                                            %%2 m
OGIE OO
                                                                                                                                                                                  .m
                                                                                                                                                                  -}}

Latest revision as of 13:55, 6 January 2021

Public Version of Revised Pages to Emergency Plan Implementing Procedure IP-1
ML20064K613
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/05/1983
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20064K598 List:
References
IP-1, NUDOCS 8301180539
Download: ML20064K613 (3)


Text

. . . _ _ . . ._._. . . _ . _ _ _ . _ _ _ _ _ _ . . . _ _ _ _ _ _ _ . _ . _ _ _ _ . __ _

s

. r k

. REVISION LOG SHEET t

Revision Date: PORC 12-06-82 (issued 01-05-83).

This log sheet must be retained as the last page of the Browns Ferry Implementing i Procedures Document.

f I

Inserted by: Date Inserted:

Pages to be Removed- New Pages to be Inserted  ;

Revision / Revision /

Part Page Number Date Part Page Number Date List of Effective List of Effective Pages 1 of 10 11/01/82 Pages 1 of 10 12/06/82 I IP-1 10 of 11 10/19/82 IP-1 10 of 11 12/06/82 I

i 1

l l

l l

l F

l

?

lO I 03o1100539 830113 PDR ADOCK 05000259 F PDR ,

BFN-IPD List of Effective Pages Page .1 of 10 12/06/82

-(}.

N' TENNESSEE VALLEY AUTHORITY 4

BROWNS FERRY NUCLEAR PLANT IMPLEMENTING PROCEDURES DOCUMENT, LIST OF EFFECTIVE PAGES i

'This List of Effective Pages must be retained with the Browns Ferry Nuclear Plant Implementing Procedures Documents.

3 Procedure Page Part Number Subdivision Number Date/Rev. No.

BFN List of Effective l Pages 1 of.10 l'2/06/82 2 of 10 11/30/82 l

3 of 10 11/01/82 l 4 of 10 11/01/82 l 5 of .59 11/01/82 6 of 10- 11/01/82 7 of 10 11/01/82 8 of 10 11/01/82 9 of 10 11/30/82 10 of 10 11/01/82

) Table of Contents 1 of 1 10/19/82 IP-1 Coversheet- 10/19/82 Preface 1 of 1- 10/19/82-1 IP-1 1 of 11 10/19/82

2 of 11 10/19/82-3 of 11 .10/19/82 4 of 11 10/19/82 5 of 11 10/19/82 l 6 of 11 10/19/82 l 7 of 11 10/19/82
8 of 11 10/19/82 l

9 of 11 10/19/82 10 of 11 12/06/82 11 of 11 10/19/82 IP-2. Coversheet 06/15/82 1 of 2 04/22/82 2 of 2 10/19/82 s

i f . .

I (O)

., /.

x \ * (1) _

-TRIAXIAL OPERATION >0.013 IP-2 NOTIFICATION OF AN -

$ UNUSUAL EVENT (Refer also g to IP-24)- ,.

o T.ARTHQUAKE-

% * (2) 6 -BIAXIAL OPERATION > G.18 IP-3 ALERT (Refer also to _

IP-24) .

n'

,'g

-RESERVOIR LEVEL E 561' IP-2 NOTIFICATION OF AN UNUSUAL EVENT FLOOD - RESERVOIR LEVELZ 563.5' IP-3 ALERT

-RESERVOIR LEVEL 2 565' IP-4 SITE AREA DIERGENCY-NATURAL

-REPORTED BY PLANT PERSONNEL IP-2 NOTIFICATION OF AN PHENOTENA UNUSUAL EVENT t

TORNADC

-STRIKING PLANT IP-3 ALERT ,

HIGH WINDS SUSTAINED WINDS'>90 MPH IP-4 SITE AREA DiERGENCY .

LOW RESERVOIR LEVEL-BREACH OF WHEELER DAM IP-4 SITE AREA RfERGENCY

  • (1) Before initiating IP-2, confirm by noticeable building movement' and/or call National Earthquake Information Center at (303) 234-3994. See FSAR Figure 2 .5-7. -

Modified Mercalli Intensity IV.

  • (2) Before _ initfating IP-3, confirm by building movement, some damage to non-seismic structures. Call '

National Earthquake Information Center at (303) 234--3994. See TSAR Figure 2.5-7, Modified Mercalli Intensity VII.

%%2 m

OGIE OO

.m

-