Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18039A8811999-09-28028 September 1999 Proposed Tech Specs Re Increased MSIV Leakage Rate Limits & Exemption from 10CFR50,App J ML18039A8241999-07-28028 July 1999 Proposed Tech Specs Providing TS for Operation of Oscillation PRM Upscale Trip Function in Aprm,Which Is Part of Power Range Neutron Monitoring Sys ML18039A8001999-06-0303 June 1999 Proposed Tech Specs,Reducing Allowable Value Used for Reactor Vessel Water Level - Low,Level 3 for Several Instrument Functions ML18039A6991999-02-22022 February 1999 Proposed Tech Specs & Bases Pages Incorporating NRC Approved TS Change 354,requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation ML18039A6601998-12-15015 December 1998 Proposed Tech Specs,Revising pressure-temp Curves to Extend Validity of Curves to 32 EFPY ML20206F8131998-12-0303 December 1998 Rev 12 to ODCM, for BFN ML18039A5041998-09-0808 September 1998 Proposed Tech Specs Providing TS for Operation of Oscillation Power Range Monitor Upscale Trip Function in Aprm,Which Is Part of Power Range Neutron Monitoring Sys ML18039A5001998-09-0404 September 1998 Proposed Tech Specs Re Use of Containment Overpressure for ECCS Pump Net Positive Suction Head Analyses ML18039A4791998-08-14014 August 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-33, DPR-52 & DPR-68 to Change Ts.Proposed Changes Decrease Frequency of once-per-cycle Instrument Calibrations by Substituting 24 Months for 18 Months ML18039A4611998-07-31031 July 1998 Proposed Tech Specs B 3.6-2,B 3.6-7 & B 3 3.7-2 for Power Uprate Operation Omitted Pages ML18039A4481998-07-17017 July 1998 Proposed Tech Specs,Adding LCO 3.4.10 & Accompanying TS Bases Provisions from Improved TS-362 Conversion Package as Adapted for Power Uprate Conditions ML18039A4091998-06-26026 June 1998 Proposed Tech Specs Section 3.4,allowing Units 2 & 3 to Operate at Uprated Power Level of 3458 Mwt ML18039A4021998-06-19019 June 1998 Proposed Tech Specs (TS) Converting from Existing Custom TS to Improved TS ML18039A3921998-06-12012 June 1998 Proposed Tech Specs Change 390,decreasing Frequency of once-per-cycle SRs by Substituting 24 Months for 18 Months in Affected TS SRs ML20249A5661998-06-10010 June 1998 Proposed Tech Specs Section 5.0,revising Administrative Controls ML20248C5151998-05-27027 May 1998 Proposed Tech Specs Section 3.8.1,revising AC Sources- Operating ML18039A3181998-04-16016 April 1998 Proposed Rev 2 to Tech Specs Section 3.6, Containment Systems, Converting from Current TS to Improved TS ML18039A2711998-03-16016 March 1998 Proposed Tech Specs Re Power Uprate Operation ML18039A2671998-03-13013 March 1998 Proposed Tech Specs,Converting to Improved Std Ts,Per NUREG- 1433,rev 1, Std TS for GE BWRs (BWR/4). ML18039A2641998-03-12012 March 1998 Proposed Tech Specs ITS Section 3.8 Re Electrical Power Sys. ML18039A2611998-03-0303 March 1998 Proposed Tech Spec Changes TS 393 Re Reactor Vessel Pressure Temperature Curves ML20199E8051998-01-23023 January 1998 Proposed Tech Specs Section 5.0 Re Administrative Controls ML18039A2401998-01-15015 January 1998 Bfnp Unit 2 Cycle 10 Power Ascension Test Program Start-Up Rept, for Period 970929-1105 ML18039A2221997-12-30030 December 1997 Proposed Tech Specs Re RHR SW Pumps Required for multi-unit Operation & Cold Shutdown ML18039A2151997-12-23023 December 1997 Proposed Tech Specs Section 3.7 Re Plant Sys ML18039A2181997-12-22022 December 1997 Proposed Tech Specs Section 3.8 Re Electrical Power Sys ML20217P5051997-12-0808 December 1997 Rev 10 to ODCM, Containing Markups to Rev 9 & 10 ML18039A2101997-12-0404 December 1997 Proposed Tech Specs Pages Re TS Change 362,suppl 7 Re ITS Section 3.1, Reactivity Control Sys. ML18039A2071997-12-0404 December 1997 Proposed Tech Specs Pages Re Suppl 9 to TS Change 362, Including Rev Pages to Improved TS Section 3.5 ML18039A2011997-12-0303 December 1997 Proposed Tech Specs Section 3.9 Re Refueling Operations & Section 3.10, Special Operations. ML18039A1981997-12-0303 December 1997 Improved Tech Specs Pages Re Section 5, Administrative Controls. ML20199D5471997-11-14014 November 1997 Proposed Tech Specs Section 3.0, Limiting Condition for Operation (LCO) Operability & Section 4.0, Design Changes ML20199E1361997-11-14014 November 1997 Proposed Tech Specs Section 3.4 Re Reactor Coolant Sys ML20198Q4521997-11-0505 November 1997 Proposed Tech Specs,Incorporating Improved TS (ITS) Bases Revs & Changes to Supporting Documentation Resulting from Responding to NRC Questions ML18038B9611997-10-0101 October 1997 Proposed Tech Specs,Allowing Bfn,Units 2 & 3,to Operate at Uprated Power Level of 3458 Mwt ML18038B9361997-08-15015 August 1997 Proposed Tech Specs,Extending Existing 7-day EDG Allowed Outage Time to Fourteen Days ML20210V1171997-07-29029 July 1997 Qualification Plan & Rept MIL-STD-462D,CS114,Conducted Susceptibility,Bulk Cable Injection Numac Reactor Bldg Vents Radiation Monitor TVA Bfn,Units 1,2 & 3 ML18038B9061997-06-19019 June 1997 Proposed Tech Specs Supporting one-time 14-day Limiting Condition for Operation for Each EDG to Accommodate Pending Vendor Recommended Maint Activities ML20138J3781997-05-0101 May 1997 Proposed Tech Specs,Revising TS-362 Amend for Section 3.8, Electrical Power Sys Which Addresses NRC Review Comments ML18038B8651997-04-24024 April 1997 Proposed Tech Specs,Submitting Revised BFN TS Bases Section 3.5.N, References, Reflecting Updated LOCA Analyses for Units 2 & 3 ML20137U1691997-04-11011 April 1997 Proposed Tech Specs Re Pr Neutron Monitor Upgrade W/ Implementation of Average Pr Monitor & Rod Block Monitor TS (ARTS) Improvements & Max Extended Load Line Limit Analyses ML18038B8341997-03-12012 March 1997 Proposed Tech Specs Re Extended EDG Allowed Outage Time ML20136F7851997-03-0606 March 1997 Proposed TS Supporting Planned Replacement of Current Power Range Monitoring Portion of Existing Nms W/Ge Digital Nuclear Measurement Analysis & Control Power Range Neutron Monitor Retrofit Design ML20134G5401997-02-0505 February 1997 Proposed Tech Specs Revising Bases Section 3.7.A/4.7.A, Primary Containment, to Delete Wording Re Maintaining Drywell to Suppression Chamber Differential Pressure Constant for Duration of Drywell to Suppression Chamber ML18038B8281997-01-31031 January 1997 Rev 1 to GE-NE-B13-01805-22, Internal Core Spray Line Flaw Evaluation Handbook for Browns Ferry Units 2 & 3. ML18038B8111997-01-22022 January 1997 Rev 0 to Browns Ferry Nuclear Plant,Surveillance Instruction,Inservice Insp Program,Unit 3. ML20132B7401996-12-11011 December 1996 Proposed Tech Specs 2.2.A Re Safety/Relief Valve Setpoint Requirements for Reactor Coolant Sys Integrity ML20117P3341996-09-15015 September 1996 Proposed Tech Specs to Change Unit 3 TS LCO 3.6.F.1 in Order to Perform Repairs & Maint Necessary to Return RCS Recirculation Loop a to Operations ML18038B7541996-09-0606 September 1996 Proposed Conversion from Current TSs to Improved STS Consistent w/NUREG-1433,rev 1 ML20117G7121996-08-30030 August 1996 Proposed Tech Specs Re License Condition on Compliance W/Thermal Water Quality Stds 1999-09-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206F8131998-12-0303 December 1998 Rev 12 to ODCM, for BFN ML20217P5051997-12-0808 December 1997 Rev 10 to ODCM, Containing Markups to Rev 9 & 10 ML18038B8281997-01-31031 January 1997 Rev 1 to GE-NE-B13-01805-22, Internal Core Spray Line Flaw Evaluation Handbook for Browns Ferry Units 2 & 3. ML18038B8111997-01-22022 January 1997 Rev 0 to Browns Ferry Nuclear Plant,Surveillance Instruction,Inservice Insp Program,Unit 3. ML20137H3251996-08-23023 August 1996 Rev 8 to ODCM for Bfn ML18038B8851996-08-14014 August 1996 Rev 8 to Surveillance Instruction 2-SI-4.6.G, ISI Program Unit 2. ML18038B7811996-04-26026 April 1996 Rev 7 to Surveillance Instruction 2-SI-4.6.G, ISI Program Unit 2. ML18038B6541995-08-12012 August 1995 Rev 7 to Odcm. ML18038B6531995-05-25025 May 1995 Rev 6 to Odcm. ML18037A8151993-11-19019 November 1993 Rev 3 to Odcm. ML18037A7681993-10-21021 October 1993 Rev 3 to Surveillance Instruction 1/3-SI-4.6.G, ISI Program Units 1 & 3. ML18037A7661993-10-21021 October 1993 Rev 2 to Surveillance Instruction 2-SI-4.6.G, ISI Program Unit 2. ML18037A8161993-10-0101 October 1993 Rev 14 to RETS Manual. ML20062L9321993-09-30030 September 1993 Test Plan GE102, Electromagnetic Interference & Susceptibility Test Plan for Rbvprm Part Number: 304A3718G001 ML18037A4471993-04-16016 April 1993 Emd Owners Group Procedure EMD9314, Recommended Maint Program. ML18036B1631993-02-16016 February 1993 Rev 1 to Surveillance Instruction 2-SI-4.6.G, ISI Program, Unit 2. ML18036B1521993-01-29029 January 1993 Rev 1 to Odcm. ML18036B1961993-01-27027 January 1993 Rev 2 to Nuclear Power Training Procedure TRN-31, Fire Brigade Training. ML20114D7161992-08-31031 August 1992 Inservice Testing Program for Pumps & Valves for Second 10-Yr Interval. Relief Requests Encl ML18036A8441992-06-30030 June 1992 Revised Odcm. ML18036A5911992-03-25025 March 1992 Rev 0 to Odcm. ML20086D5561991-11-14014 November 1991 Rev 6 to General Design Criteria BFN-50-C-7104, Design of Structural Supports ML20079C3431991-06-12012 June 1991 Design Criteria BFN-50-C-7100,Attachment F, Browns Ferry Nuclear Plant Detailed Design Criteria for Structrual & Miscellaneous Steel/Components for Class I & II Structures ML18033B6431991-02-28028 February 1991 Revised Browns Ferry Nuclear Plant Offsite Dose Calculation Manual,Jul-Dec 1990. ML18033B6121990-06-22022 June 1990 Rev 8 to Radiological Effluent Tech Spec Manual. ML18033A9191989-06-30030 June 1989 Changes to ODCM for Jan-June 1989. ML18033A6621989-03-0202 March 1989 Radioactive Effluent Release Rept Browns Ferry Nuclear Plant Rev of Process Control Program. ML20246P8801989-02-22022 February 1989 Rev 1 to Design Criteria BFN-50-C-7302, Operation Criteria for Evaluation of Lower Drywell Access Platforms ML20246H3521989-02-0101 February 1989 Maint Improvement Program, Books 1 & 2 ML18033A4391988-08-31031 August 1988 Rev 0 to Partially Deleted TVA-BCD-906N, Summary Rept for Browns Ferry Nuclear Plant,Unit 2,Cycle 6,Insp & Reconstitution Program. ML20151G7131988-07-20020 July 1988 Emergency Operating Instruction Procedures Generation Package ML18033A6611988-07-20020 July 1988 Semiannual Radioactive Effluent Release Rept Browns Ferry Nuclear Plant,Changes to Odcm. ML20153B3531988-07-0707 July 1988 Rev 1 to Ampacity Evaluation Program Plan ML18033A2701988-06-13013 June 1988 Rev 0 to Site Director Std Practice SDSP-12.7, Sys Preoperability Checklist (Spoc). ML20151B2871988-06-10010 June 1988 Safety Sys Functional Insp Plan ML18033A2801988-05-24024 May 1988 Operability Criteria for Miscellaneous Steel. ML18033A2771988-05-23023 May 1988 Operability Criteria for Evaluation of Lower Drywell Access Platforms - Browns Ferry. ML20151L4611988-05-13013 May 1988 Rev 0 to Special Test ST-88-16, Diesel Generator a Emergency Load Acceptance Test ML20151L4711988-04-27027 April 1988 Rev 0 to Special Test ST-88-17, Diesel Generator B Emergency Load Acceptance Test ML18033A2691988-04-18018 April 1988 Rev 2 to Site Director Std Practice SDSP-12.4, Return to Svc & Closure of Mods. ML20151L5051988-04-14014 April 1988 Rev 1 to Restart Test Program Test Instruction 2-BFN-RTP-082, Standby Diesel Generators ML18033A1961988-03-31031 March 1988 Rev 1 to Civil Engineering Branch Instruction CEB-CI 21.100, Brown Ferry Nuclear Class I HVAC Duct & Duct Support Seismic Qualification Interim Operability Acceptance Criteria. ML18033A1911988-03-31031 March 1988 Rev 1 to Civil Engineering Branch Instruction CEB-C1.102, Operability Criteria for Miscellaneous Steel. ML18033A1881988-03-31031 March 1988 Rev 1 to Civil Engineering Branch Instruction CEB-CI 21.97, Operability Criteria for Pipe & Pipe Supports on TVA Class I Seismic Piping - Browns Ferry. ML20148G6141988-03-25025 March 1988 ASME Section XI, Revised Pump & Valve Test Program ML18032A7391988-03-10010 March 1988 Procedure BFN 50 C 7100, Detailed Design Criteria for Structural Acceptance of Drywell Access Platforms. ML18033A1631988-03-0303 March 1988 Rev 0 to Civil Engineering Branch Instruction CEB-C1.102, Operability Criteria for Miscellaneous Steel. ML18033A1601988-02-25025 February 1988 Rev 0 to Civil Engineering Branch Instruction CEB-CI-21.100, Browns Ferry Nuclear Plant Class I HVAC Duct & Duct Support Seismic Qualification Interim Operability Acceptance Criteria. ML20150E3771988-02-22022 February 1988 Rev 4 to Design Baseline & Verification Program ML20151L4811988-01-28028 January 1988 Rev 1 to Restart Test Program Test Instruction 2-BFN-RTP-065, Secondary Containment 1998-12-03
[Table view] |