ML20151L471

From kanterella
Jump to navigation Jump to search
Rev 0 to Special Test ST-88-17, Diesel Generator B Emergency Load Acceptance Test
ML20151L471
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/27/1988
From: Thomas Taylor
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18033A295 List:
References
ST-88-17, NUDOCS 8808040048
Download: ML20151L471 (134)


Text

_ _ _ _ _ _ _ _____

e Enclosure 9 1

l

  • 1,b Tennessee Valley Authority Form Page 1 of 2 Brcwns Ferry Nuclear Plant -

Site Director Standard Practice DEC 101987 rorm 505P-i6 .

505P-2.11 FCRM 505P-16 Unit Proceoure Tracting IM"EDIATE TEMP 0AARY CHANGE (!TC) litle gM Latest

_ No. QIES[( GE/v&mrg Rev.

fg g7 --80--I'7 OR * " "'" *&GI C coglete page 2 of this form. It any answer is 1E5, use Form 505P-l and 505P- b to process Gnange. .

[';4 (NRC/C] Second-person verification requirements of BF-3.11 satisfied. [HCO-86-0326-020).

CX] Screening review Form 505P 147 or Safety Evaluatirn co@leted and attached per SCSP-27.1 e (MA for procedures exermted by 505P-2.1, Attachment F or G. A screening review shall ta 3 performed if nuclear-safety related activities are added to these procedures.)

% (QA/C] Change is marked 's a current revision of procedure. ITC nurrber is written at the top of each affected page (CAR-87-0069] and beside vertical bars in right rnargin

~

identifying change.

! certify that every answer on page 2 is No, that this ITC is a NCH [NTENT CHANGE, and that I ani

. yop4,,knowledgable in the area affected by this change.

O iginator Y o h d ot e a c A ,__. Section_O *$V.',b4 Phne GM~) C Cate STATE REASCN FOR URGENCY: * *TO S t.al?) % 12*T*

STATE REA50He FOR REVISICH: '"?D CouS l--cJA Q 4 c~ cAPTA/WL 1*Et*T El C:Ec ~

w m.nras nn/2'unwr <5 W'Us>o i>F&JAA QC/2f4'6- #MEf w 2 r u a r -- w Expiration date if less than 10 days af ter approval: _,,_

LIST AFFECTED PAGES & FOMS: A A, APPROVALS:

fbL = mn f per Tsor

/ <* - 8h AM M4 Cate CNE (for DNE approved MAls only) Date

- for the Procedure Senior Reactor Ope'rator Date (SE or ASE, see section 6.4.2)

O!5TRIBUTICH BY ORIGINATOR AND FINAL REVIEW:

1 (M) Originator Center onirrmediately the first floor hand-carry of the planta copy of this office build form and revision to the plant Information fX,; Send a copy to Responsible Section Superv' -

].,

.gj,. .;-

." L K Originator ensures copies of th ccpies of the revise filed.

C s pled tb ,the(r> front the affected procedure and

.,the Shift Engi front of?[ CAR-87-0069) affected pages in m.{,0-** },, controlled manual a and y U1, 42,-& LI3 ontro'liroan cdpies, )s appilcable. List any other f g in

. .* c '

g@ g

2. n.. .

.) . c ,t, <y.."w .-

3 The following three (avtewsiuss.se accoglished bye if (14 days after iglementation date)

( ) Originator or RSPC obtain QAp9eu$nc f

~ ;- Paragraeh 5.4.4.3 t re (NOAM Par TIT Section 1.1,

~

( ) g @ ,

S.- ds . .

QA De g

( ) c Does this 505P-7.47 p(rocedure )Y ical Review per 505P-2,1, Attachment E. F, or G or

} NO (Technical Specification 6.8.1.3.d)If TES, originator or RSPC obtain Technical Review and attach c

( ) Does this proceoure require PORC review per 50$P-2.1, Attachment E l PMI-7.1? ) YES [ ] N0 ' F, or G or J IT'TET or(iginator Manager ~ approva l,,,

or RSPC coordinate with PORC secretaray to obtain PO (Technical Specification 6.8.1.3.c)

PORC Chairrrun Date

% (or PORC minutes no.) Plant Manager Date

( (or PORC minutes no.)

. )' Ifinitiate ITC aisCAQR. not approved,CAQR No. originator or Responsible Section Supervisor shall notify SPS and

[ (NA if not appilcable)

Hand-carry approved ITC package to 5Ps, Personnel Services Bldg. -

., [QA/C) SPS verify ITC is marked on a current revision.

i l

2I00p SP5 forward 505P-16 and revision to DCS for distribution (jf approved) [ CAR-87-00691 -

. . ~ .? .+ ~. '

8808040048 880727 '

C "T3.wnbfbk yNfI

]....GeneralRevision

.a g.

" ^" ca o" W ".

& n W M w a; m. gh' b I

. . . . .u.. _.~.

i i

Tennessee valley Authority Brewns Fe T f 5(uclear Plant Fom Page I of 1 Site 0,lrector Standard Practice OEC 101967 Fom 5057-3 Sc5P_z.ii (

FCRM 505P-1 PROCEDURE AND INSTRUCTICH REVIDd AND APPROVAL (for CCVER 575 SNEET Unit Proceoure No. 44 git use eniv)

)g Tracting 'Q_{ $ $ E (,,

intie Revisico 6 d/VE/24 7cg, Q No.

M @@-l] {g l._ O A O O C l. d 8 I N N C /-- "cr CHECI' A5 APPRCPRfATE: ( ) Permanent Change a O ,

l

( l Cancellation Qk New procecure j

( ] Terocrary c3ange (E.xpiration date if less than 120 days af ter approval

)

Criginator list affected pages & forms: 4 L (---

575 list pages affecte1 after woru precessing: Ce1 O '

, .L i ,

CRIGIMATCR; MN 1

pacy Su fga [cb C _your print NaNse. nya,s O , ,,, Phone d O M Hame or riesponsioie section Cate d bdMM it5ectioln ry). ,ex j

,, . y, V EFG 5 gnature Gate Technical Review recuireof Yes M. w1*/ov$1 No

  • E Responsione [) 5 /_section c OM . , . n $[ \

Initials of Responsible Section Supervisor -

mating cetermination: g v h supervisor ~5Ie ~, . l

..><e. ,,c , . u...,.., (signature AFTER any required Technical Review)

...A.

PRINCIPAL .*AfsAGEA5 CCNCLAAENCE iiGhAiLAE5;AiE MPECit0 EiiCN5 CGNCL ARENCE S IGM ibs t 5 ; Aid

} fy / N/ b/

Assistant to 5s te ulrector

4 * .. .'

  • rations tud bugt) _

.ite Planning 4 scr.couting ~

venoor Manuai Gooroinator site services canager ~

Pare Protection Engineer ~

U U- N Manager or site n.acensing snet 56747,15or 0  %

Project Management Manager U --

G ~ AA N M., g rvisor A

Project ingineer tsht) _ _

U A'%

5ecurttyw ,_

U

=4  %

.ioon t scations canager -

U '#% l

, PCRLJuog,rv i sor i e s a  ;

Materiais 4 Procurtment hvc3 .*gr frp 61 hupervisor C

PinaAClas Services danager U ../A // /.

Q. Manager: ' _

Q },.ection: Urv d /n t_ d e WY - N QA Review Required? en ze _A c.,

( Tes ( } No . d . h t,I.

g'y_j g

'i k"-> /

secti < ss n wm o ~_ -

k- / '* * # 3

$i te Quali ty Madager --

' cate M / [ O/ YA W Tate Prefcedures 5t for ins tructions aooreveo ey a section suoervisor.' mart the tollowing aporova o ,rvisor h.f,t PORC Re*

uir ! I(. "7 ( ) No -

U --

/ U AN AU PG~ -A n FDsG 11.Aat

~,

t,e Site Director (505Ps only) W U FT

, ' $ 'es No././p 4' /1~98 anager pf PQRC Minu 5 .

te/

  • R 21000 ention Period: Life tiste N- ^ n

I l

i

) ~7~ C. - S D S P - 2. !! ' 12 Tennessee Valley Authority Fom Page 2 of 2 Browns Ferty nuclear Plant

, Site Olrectcr Standard Practice g{Q@ rom SCSP 16 SCSP-2.11 FCR.M $0SP.!6

- IP EDIATE TEPPCRARY CHANGE (!TC)

Procedure No. 8 7 4~ - / ~) SPS Two Olgit Tracking No. --

, twwe0 TATE YEwpMARY CHANGE (tTC) cutCEttNES

.tm  ;<' -.<-  :;  ;. g , :;;,, :- u -a- "; ,,,_;,,,,, _ 1.

a u_. _ . , . . . . . . . .

_;- u-- -

, , , a , ,, , ; g a;; ,,, 3 _ ;g gg

, ,, , ; ; __ i

_ .my ..., . _ , ....,-. --y.- Ccrmlete the follcwing list of questions. If

' M*"i any of the questiert are answered YES, this change does NOT constitute an ITC and the change mst te

! .[ 9 s, processed in ace:rcance with 50571 and SCSP 15 as a TC or PC. YFS N0  :

Change in acceptance criteria! ( NO A'4, p a rt !!T. Teetion 1.1. 5.4.4.2.E.1) l

, k q Unapproved deletien or alteration of a QC holdpoint? (If change is approved by 4 Site Quality ."anager below as an ITC Change, chect NO.)

/ (NOAM. Part fit. Teetion 1.1, 5.4.J.? M )

i m 1 Site Quality M.anager approval Date I (if QC holdpoint is deleted or altered) )

NOTE:

\ The additlen of 4 QC holdpoint is cg.t an intent change.

Change to an E:nergency Operating Instructica!

N~

l s

Change in scope, techniove, or sequential order of instruction steps ..

that would affect the result or nuclear safety? (NOM. Part !!!.

Section 1.1. 5.4.4.2.E.4) ~

s l -.

' Change which irrelements a temporary alteration to operable CSSC without 4 TACE (e.g., if a change to a wortplan called for tewoorary removal j2;! .of an interfering hanger on arroperable system, the change rust be handled as intent! (NOM. Part !!f. SectiJM I.I. 5 d.d.2.M)

  • ~J.

-dit Change to either* the authority or responsibility for review and/or approval of the docunent or the results obtained by its 4 irplementation? (NOM. Part if f. Section 1.1. 5.4.4.2.E.6) *

. w .. Change to instruction which would violate the technical specifications or other licensing requirements? (NOM. Part tit. Teetion 1.1. 5.J.4.2.E.3)

Do the changes render the procedure difficult to read or cercrehend due to extensive strikeouts and/or added information!

e- *

.1 Retention Period: Lifetime Responsibility: Document Control J 2!000 ,

General Revision ' -

.o.. : . '

, .. . : 'M ' .

  • ak-Q$;%W Ib i
f. i[ *f ,[khhg,y

_ _ gg. . ; . ,. _u -

\

l

, T:T:.E : CONOCC"' 0F IST:NG f / )f ( * /. PMI-17 '-

Form FM*-e6 C! ASS: N -SAFI'"Y RE:.A'.ID *# ;'

w E 25 W *8' SPECIAL 2ST APPROVAL SHEE" PRE. PARED SY/0A 3 ECH/V C.,.g4SNAd2/V / /.//chTes: No. M Rev. __Q_

System Engineer Acere-)al /MJw b4 L /

'? !I $/ S ~$

,r

  • Date TEST OESCRI.MICN *
I 1
t. I Yes No NA "#lials ate Test Safety-Related X

]

Cereviewed Safety Ques:.cn A M6

  • /

NRC Approval Required A p @/ii/_tt, M l

j Ccncurrence/ Approval for USQCs Prepared by the CNE/CNP [Projec: i.ng i ne e r . ON E . 3 D

/

04:e *

~ ~

Approva!.'of Plant-Prepared 05QO k/h Plan: Manager

/ /h l Ja': e .

I Requirec ?."RC Approval Obtained /V/A /V/A

/

l Licensing Manager a:e r i

I Tinal Approval for Performing Tes:: ' '

I 1.

2.

All prerequisi:es to safety have been met (See USQD).

Requittc availaole.:e:porary cravings and installation instrue:icn are approvec and

3. '

ia.- ssu ance n:rols have eeen i. oT rated. f P#

W . ,__~ // ) ( Y j f Chai(=an af P Sup{rintenden ' :e 3 ,

t _ _ _ _ .

8 Final PORC Review of Special Tes: Resul t's PCRC Chairman ~ E: D e SF Special Tes: Complete l Plant Manager Date Retention:

. Period - Lifetime; Responsibility - Occument Control Supervisor 9

1 1713p ..

, PMI-17.1 I i n  ;

1 I

TITLE: DIESEL GENERATOR 3 EMIRGENCY LOAD ACCEPTANCE TEST V DDD0 CLASS: SAFETY RELATED SPECIAL TEST 38-17 TABLE OF CONTENTS .

Section , 231d 1.0 PURP0SE.................................. .. .. . .- - - .

2.0 RE TE RE N C E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.0 TEST SCOPE AND GENERAL TEST METH00............................

4.0 P RE C AUTIO NS AND LI MITAT I O NS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.0 SPECIAL TEST EQUIPMENT........................................

6.0 P RE RE Q U I S I T E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

i 7.0 TEST INSTRUCTIONS........................ ................... ,

1 7.1 Initial Conditions......................................

7.2 Core Spray System Alignment.............................

7.3 RHR System Align =ent....................................

7.4 4160V Shutdown Board B Alignment........................

7.5 480V Shutdown Board 2A Alignment........................

7.6 480V Reactor MOV Board A11gnment........................

7.7 l 480V Diesel Aux Board Alignment.........................

  • 7.8 Recorder Connections.................................... l i

7.9 Test P e r f o rm a n c e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7.10 Diesel Generator Shutdown...............................  ;

7.11 Core Soray System Shutdown.............................. '

7.12 RHR System Shutdown.....................................

7.13 4160V Shutdown Board B Return to No rmal . . . . . . . . . . . . . . . . .

7.14 480V Shutdown Board Re turn to Norma 1. . . . . . . . . . . . . . . . . . . .

7.15 480V Reactor MOV Board Retu rn to No rmal . . . . . . . . . . . . . . . . .

7.16 480V Diesel Aux Board A Return to No rmal. . . . . . . . . . . . . . . .

7.17 480V Diesel Aux Board B Return to No rmal. . . . . . . . . . . . . . . .

7.18 Recorder Disconnection..................................

7.19 R e t u rn t o S e r v i c e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8.0 ACCEPTANCE CRITERIA...........................................

Attachment 1 - Load Shed Tab 1e..................................

Attachment 2 ' Relay Contact, Layout.............................

Attachment 3 - Load Status Tab 1e................................

Page 1 of 114 '

1570b/LMS/Dk

l I

l TITLE:

CLASS:

. DIESEL GE:TERATOR B EMERGENCY LOAD ACCEPTANCE 0000 TESl SAFETY RILATED' SPECIAL TEST 3C.17 SIGNATURE LOG i

PRINTED PTAME gic;iATURE -

l ini tats l l 1

.i<

l l

. . . . - _ . .- . _ _ _ . _ j

, i l

i l

. )

l l

l 1

l i

Page 2 of 114 -

1570b/LMS/DK i

-. - . - - . . . . - - . . _ .- .. . . - . - . - . - - . - - . - , ~ - - - - . - - - , . - - -

t i l i i

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST S EV 0000 CLASS: SAFETY RELATED SPECIAL TEST 38-17 1.0 PURPOSE ..

This test is performed to determine and verify the capability of Diesel Generator B to accept its emergency loads in accordance with the requirements, DNE letters RIMS B22380225001 and B22380219032. Final review and acceptance of test data vill satisfy DNE test require =ents.

2.0 REFERENCES

1 2.1 Browns Ferry Nuclear Plant Technical Specification Unit 2 2.2 Browns Ferry Nuclear Plant Fina'l Safety Rep ( rt, Section 3.5, Standby A-C Power Supply and Distribution 2.3 PMI-17.1, Conduct of Testing  !

2.4 l OI-23, RHR Service, Water System l

2.5 01-24, Rav Cooling Water System 2.6 OI-26, High Pressure Fire Protection.

2.7 OI-30, Ventilating System 2.8 OI-31, Air Conditioning System 2.9 OI-32, Control Air System 2.10 OI-47, Turbine = Generator 2.11 OI-57, Unit Electrical Board Checklist 2.12 1-0I-63, Standby Liquid Control System Operating Instructions l 2.13 2-0I-63, Standby Liquid Control System Operating Instructions 2.14 0-0I-65, Standby Gas Treatment 2.15 OI-66, Off Gas System 2.16 OI-67, Emergency Equipment Cooling Water 2.17 OI-63, Reictor Recirculation System 2.18 OI-69, React,or Water Cleanup 2.19 OI-70, Reactor Building Closed Cooling Water Page 3 cf 114 1570 /LMS/DK

t i

1 j

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST BEV 0000 CLASS: SATETY RELATED SPECIAL *EST 38-17 1

I l

2.20 OI-74, Unit 2 Residual Heat Removal System , l 2.21 OI-75, Core Spray System 2.22 OI-78, Fuel Pool Cooling and Cleanup System 2.23 OI-82, Unit 1 and 2 Standby Diesel Generator 2.24 01-85, Control Rod Hydraulics 2.25 2-0I-99, Reactor Protection System Operating Instruction 2.26 MMI-6, Scheduled Maintenance - Standby Diesel Generators 2.27 Wiring Diagra=s 2.27.1 0-45E724-2, 4160V Shutdown Board B Single Line l

2.27.2 45N765, 4160V Shutdown Auxiliary Power Schematic Diagrams,  !

Sheets 2 through 11, 14, 15, 20, and 22 through 26 l l

2.27.3 45N1724, 4160V Shutdown Boards Connection Diagrams, Sheets <

1 through 4 l 2.27.4 2-45E749-3, 480V Shutdown Board 2A Single Line . l 2.27.5 45N779, 480V Shutdown Aux Power Schematic Diagrams, Sheets 1 through 23, 28 through 31, and 40 2.27.6 45N769, 480V Common Aux Power Schematic Diagrams, Sheet 10 2.27.7 45N2748, 480 Shutdown Board 2A Connection Diagrams, Sheets 1, 2, and 5 2.27.8 2-45E751, 480V Reactor MOV Bd 2A Single Line, Sheets 1 and 2 2.27.9 45N2749, 480V Reactor MOV Bd 2A Connection Diagrams, Sheets 1 through 27 2.27.10 0-45E732-2, 480V Diesel Auxiliary Bd a Single Line

~

2.27.1145N771, 480V Diesel Aux Power Schematic Diagrams, Sheets 1 through 6 2.27.12 45N785, 480V Diesel Aux Bd a Connection Diagrams, Sheets 1 thro' ugh 11 Page 4 of 114' 1570$/LMS/DK'

i I

TITLE: DIESEL GENERATOR B EMIEGENCY LOAD ACCEPTANCE TEST REF on a o CLASS: SAFETY RELATED SPECIAL TEST 83-17 2.27.13 0-45E721-3, 480V Diesel Aux Bd B Single Line .,

2.27.14 45N786, 480V Diesel Aux Bd B Connection Diagrams, Sheets 1 through 13 2.27.15 45N2641, Unit Control Boards Panel 9-3, Sheets 1 through 7

~~

2.27.1645N2646,UnitControlBoardsPanel9-8,Sheetslthriui.E3 2.27.17 55N626, Diesel Generators A & B Main Control Board Panel 7, Sheets 1 through 5 2.23 General Electric Company Drawings 2.23.1 791E489, Conn Diag Panel 9-3, Sheets 1 through 12 2.28.2 161F547, Conn Dias Panel 9-8, Sheets 1 through 6 2.28.3 730E930, Eles Diag Core Spray System, Sheets 11 through 20 2.23.4 791E440, Conn Diag Engineered Safeguard Subsystem I Relay Cabinet (Panel 9-32), Sheets 1 through 4 2.23.5 730E937, Elem'entary Diagram Residual Heat Removal System, Sheets 1 through 26 2.23.6 731E761, Elementary Diagram Emergency Equipment, Sheets 1 through 25 1

2.23.7 731E750, Elementary Diag 480V Logic Auxiliary Relay Panels25-42A, Sheets 1 through 3 2.23.8 731E735, Elementary Diagram 480V Logic Aux Relay Panel 25-44A-11 & 12, Sheets 1 through 9 3.0 TEST SCOPE AND GENERAL TEST METHOD This test describes the conditions necessary to support DRE requirments to qualify the diesels at Browns Ferry.

This test is conducted in two parts at the conclusion of Special Test 88-06. Part 1 vill setup all the required prerequisites to support Load Acceptance Test-including initial valve time tests on Loop I and II RHR Test Return Valves. Part 2 vill perform Load Acceptance test on B Diesel Generator with preselected loads.

Preselected loads vill be determined  ;

by RTP and DRE to best follov' the loading sequence from the Bechtel' Load j study.

Subject loads vill be documented within procedural steps and tables with appropriate verification, Upon test completion , complete l restor'ation vill be provided to allow operation to restore plant to normal as' required by operations or plant status, i Page 5 of 114 RPJ1 N

i I

TITLE: DIESEL GENERATOR 3 EMIRGENC'? LOAD ACCEPTANCE TEST REV 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 4.0 PoECAUTIONS AND LIMITATIO![S 4.1 Standard precautions for working around energi:ed electrical equipment shall be followed.

4.2 If maintenance other than what is provided in this Special Test becomes necessary, a Maintenance Request shall be generated.

4.3 Mechanical Maintenance personnel vill be required to support perfor=ance of this Special Test. Prior to test start they vill

~

manually roll the diesel engine one complete revolution with cylinder test valves open to eject excessive amcunts of water or fuel oil that may have accu =ulated in the cylinders.

4.4 DPSO personnel vill be required to support performance of this Special Test.

4.5 Any test deficiency identified which is not correcte(  ! the performance of this instruction shall be documented and dispositioned as required by PMI-17.1, Conduct of Testing.

4.6 Fast starts of the Diesel Generator after any shutdown must be acco=plished within fifteen (15) minutes or wait three (3) hours after shutdown.

4.7 (LER BFRO) EXTRIMI CAUTION should be taken when installing and

  • removing ju=pers and insulating boots. Any inadvertent movement a' t I the other contacts can automatically start the diesel generators and othet critical systems. Only BEN =anufactured HTA relay boots )

shall be used for booting of relay contacts. [LER BFR0 '

50-296/84010) 4.3 l Do not operate the Core Spray Pu=p for more than five (5) minutes (

on minimum flow. l 4.9 Do not exceed Core Spray Pump motor full load rating of 80 amps (steady state).

4.10 Normal RHR flow is 9000 GPM. Minimum flow valve FCV-74-30 vill open on flov less than or equal to 3500 GPM. Lov flow operation should be minimi:ed because of excessive system vibration during low flow operation.

4.11 Do not exceed RHR Pump ' motor full load rating of 255 amps (steady state). .

Page 6 of 114 1570b/LMS/DK' n

\

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST HEV 0000 CLASS: SAFETY RELATED SPECIAL TEST 33-17 4.12 Off Gas Stack Dilution fans =ust be operating when performing this test.

4.13 The Stack Fan Monitoring System must be operating when performing this test.

4.14 Perfor=ance of this test will de-energi:e the normal power source for Unit 2 RPS Bus A which may cause a half scram. If a half scram occurs it must be reset as soon as possible.

4.15 Performance of this test will de-energi:e I&C Bus A each time 480V Shutdown Board 2A de-energi:es. When this occurs Unit 2 Panel 9-9 normal supply vill be de-energi:ed and Panel 9-9 vill auto transfer to its alternate supply and Panel 25-323, 24V Battery Chargers Al-1 and A2-1, VHF Radio, Firt Protection Supervised and Unsupervised, and Fire Protection System 24V Battery Charger will be de-energi:ed. Upon restoration of power to 480V Shutdown Board 2A I&C Bus A vill be re-energized and Panel 9-9 vill auto transfer to its normal source and the other loads will be re-energi:ed.

4.16 Performance of this instruction vill auto start Standby Gas Treatment Trains A, B, and C. Steps should be taken to minimize dust loading and to prevent paint vapors, petroleum fumes, velding fumes, and other airborne contaminants reaching the EEPA filters and. charcoal absorbers. .

s .

4.17 Battery Chargers 1, 2A, and 2B will be de-energied by the load shed signal. Chargers may be manually returned to operation by Oper~atiops if desired.

5.0 TEST 200IP' DENT 5.1 Visicorders (approximately 9) with sufficient input modules for the inputs listed in Appenices C and D 5.2 Multimeter 5.3 Oscilloscope 5.4 Shunts - 4 ea 10A/100mV (Ratio is approximate and substitutions may be made when necessary.)

5.5 Kilowatt-Transducers, 4 ea 5.6 Clamp on current transformer, 1000:1 Ratio with 10 ohm resistor Page 7 of 114 15 Ob/LMS/DK

- - - . - ., - , . . ---c..

i l

1

'i T C 5i-6$-G-OQ '

TIT 1.E : DIESEL GE:rIRATOR 9 E:GF.GE: ICY LOAD ACCEPTAiCE TEST EEF 000o CLASS: SATETY PELATED SPECIAL TEST 23-17 6.0 PREREOUISITES  !

6.1 The personnel listed below are available to perform this i Surveillance Instruction. I 1.},& l 4

D1 lO1 2 ASOS 1 AUO 3 _ DPSD 4

' pr j d!

~

bIl 6 Ske%.Ea$m<e 6- 17 i w

'v~

Veuss[0Q.,,tDirector i l

Date

&&, '.~2 6 0r eR3 T$

c c <., 5 g mfit t %

c.c A o vcu ko fvaceed g7 g ,y , - .\

j 6.2 Test Director vill work with DPSO ersonnel to obtain recorders "*j required by Section 5.0.

/

Test Director Date 6.3 Test Director or his representative vill review this instruction with Operations, Electrical Maintenance, and DPSO personnel to ensure familiarity with instruction. .

/

Test Director Date 6.4 41607 Shutdown Board 3 is in nor=al operation per 0I-57 and a copy '

of the OI-57 checklist is attached to this instruction. 1 j

/  !

Test Director Date

?

6.5 480V Diesel Auxiliary Board A is functional with alternate feed breaker closed and a copy of the OI-57 checklist is attached to

,'f , this instruction. -

l Test Director Date

~~

6.3 480V Diesel Auxiliary Board B is functional per OI-57 and a copy of the OI-57 checklist is attached to this instruction.

/

Test Director Date 6.7 480V Shur.down Board 2A is in normal operation per OI-57 and a copy of the OI-57 checklist.is attached to this instruction.

/

, Test Director Date Page 8 of 114 1570b/t.MS/DK

' . c. .v . . r. . . ,%. , .

M* &

i TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST REV 00oo  ;

CLASS: SAFETY RELATED SPECIAL TEST 83-17 I i

i 1

6.0 PREREOUISITES i 6.1 The personnel listed below are available to perform this Surveillance Instruction.

EM 4 MM 2 ASOS 1 AUO 3 DPS0 4

/

Test Director Date 6.2 Test Director will work with DPSO personnel to obtain recorders required by Section 5.0.

l I

I Test Director Date l 6.3 Test Director or his representative vill review this instruction with Operations, Electrical Maintenance, and DPS0 personnel to g ensure familiarity with instruction. .

/

Test Director Date 6.4 4160V Shutdown Board B is in normal operation per OI-57 and a copy of the OI-57 checklist is attached to this instruction.

i i

/

Test Director Date .

6.5 480V Diesel Auxiliary Board A is functional with alternate feed breaker closed anc' a copy of the OI-57 ' checklist is attached to this instruction. -

/

Test Director Date 6.6 480V Diesel Auxiliary Board B is functional per OI-57 and a copy of the OI-57 checklist is attached to this instruction.

/- - - -

Test Director Date 6.7 480V Shutdown Board 2A is in normal operation per CI-57 and a copy.

4 of the 0I-57 checklist is attached to this instruction. -

/

Test Director Date Page 8 of 114- .

1570b/LMS/DK .-

___,_e- _

t '

I i

BEF 0000 TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST I l

CLASS: SAFETY RELATED SPECIAL TEST 88-17 l 1

1 j

6.8 480V Reactor MOV Soard 2A is in normal operation per OI-57 and a {

copy of the OI-57 checklist is attached to this instruction.

/

Test Director Date 6.9 Battery Board 2 is functional per OI-57 and a copy of the OI-57 checklist is attached to this instruction.

. /

Test Director Date 6.10 None of the Unit 1 & 2 Diesel Generators are operating.

/.

SOS Date or g

/

ASOS ,Date 6.11 Diesel Generator B is in standby readiness per OI-82.

/

Test Director Date 6.12 No testing or maintenance is being performed on Unit 2 Core Spray System, which could affect test results.

/

Test Director Date 6.13 Unit 2 Core Spray System Loop I is charged with pump 2C ready to  !

support full flow testing.

. i

/ l Test Director Date 6.14 No testing or maintenance is being perf'ormed on Unit 2 Residual Heat Removal System, which could affect test results.

/

Test Director Date Page 9 of 114 ,

1570b/LMS/DK - - - -

n

\

l i

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST "

)

CLASS: SAFETY RELATED l SPECIAL TEST 83-17 '

6.15 Unit 2 Residual Heat Removal System Loop I and II is charged with pump 2C ready to support full flow testing.

/ l Test Director Date 6.16 Unit 2 EECW System RHRSW Pu=p C1 is aligned for EECW and running.

{

/

Test Director Date 1 6.17 Standby Gas Treatment Train A is in standby readiness per 0-0I-65.

1 Test Director Date 6.13 Standby Gas Treatment Train 3 is in standby readiness per 0-0I-65.

/

, Test Director Date 6.19 Standby Gas Treatment Train C is in standby readiness per 0-0I-65.

. / I Test Director Date 6.20 2 RPS Channel A is in service per2-0I-99. 1 l

1

/ \

Test Director Date {

6.21 No testing or maintenance is baing performed on Common Accident Signal Channels A and B.

/

Test Director Date 6.22 No testing or maintenance is being performed on 480 volt Load Shed Logic System Channels A and B.

/

Test Director Date Page 10 of 114- .

1570b/LMS/DK . _ _ .

e

.r - - - - - - - -. . - _ , - _ , , , , e , , - - - - - + ,c--. -y , , -

I I

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST BEV 01100 CLASS: SAFETY RELATED SPECIAL TEST $8-17 6.23 Unit 1 Operator has been informed that this instruction .is to be perfor=ed and has been requested to not allow any testing or

=aintenance on Unit 1 Core Spray and RER Systems during perfor=ance of this instruction.

/

Test Director Date i 6.24 Mechanical Maintenance has manually rolled Diesel Generator B ene i co'=plete turn per MMI-6 to eject excessive a=ounts of water or fuel oil that may have accumulated in the cylinders. {

i

/ ,

Test Director Date i 7.0 TEST I?tSTRUCTION 7.1 Initial Conditions -

1

. I 7.1.1 Verify the following initial conditions are satisfied:

7.1.1.1 Precautions and~ limitations in Section 4.0 have l been reviewed. '

_ ._/

Test Director Date 7.1.1.2 Prerequisites listed in Section 6.0 are met,  !

j

/

Test Director Date 7.1.2 OBTAIN permission from the Shif t Supervisor (SS) to perform I this instruction.

/

Shift Supervisor Date

/ ___.

Test Director Date Page 11 of 114- _

1570b/LMS/DK -

~

\ l I

l 1

I

!!!LE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST BEV 0000 i t

CLASS: SAFITY RELATED SPECIAL TEST 38-17 7.1.3 (NRC/C] NOTIFY the Unit Operators (UO) before starting the performance of this instruction. (RTP 82016, LER 259/3232]

/

Unit Operator Date i

/  !

Test Director Date 7.1.3.1 Unit 1 Operator (see Attachment 2 for loads lost). l l

/

Unit Operator Date

/

Test Director Date 7.1.3.2 Unit 2 Operator (see Attachment 2 for loads lost).

1 i'

/

Unit Operator Date

/

Test Director Date l 7.1.3.3 Unit 3 operator (concerning operation of Off Gas Stack Dilution Air Fans 3A and 3B usin,g HS-66-29A and HS-66-31A on Panel 9-8).

/ l Unf.t Operator Date

  • /

Test Director Date i Page 12 of 114- ,

1570b/LMS/DK __

9 _ __. _ _ . _ . ..

i E

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST 00 CLASS: SAFETY RELATED SPECIAL TEST 58-17 7.1.4 Notify Shift Supervisor and Unit Operators that ESF actuation vill be given to start Diesel Generator B and that all Shed Loads and Auto Sequenced Load will be expected to operate unlesc otherwise noted.

/

Unit 1 Operator Date

/

Unit 2 Operator Date

/

Unit 3 Operator Date

/ -

Shift Supervisor Date

'/

Test Director Date 7.1.5 Test equipment connected in accordcace with Special Test 8806 Step 6.4 signature belov verifies all connections complete

/

Test Director Date

/

Second Verification Date 7.1.6 RHR System lined up in accordance with OI-74 vith the following exceptions 7.1.6.I Containment Spray Valve 2-FCV-74-58 tagged CLOSED (Loop I)

/

Test Director Date

/

Second Verification Date 7.1.6.2 Shutdown RHR Return Valve 2-FCV-74-52 tagged CLOSED (Loop I)

/

~

Test Director Date

' /

Second Verification Date Page 13 of 114 1570b/LMS/DK - -

- ~ ~ - - - ~ ~

t i

TITLE: DIESEL GENERATOR 3 EMERGENCY LOAD ACCEPTANCE TEST Sl EV 00G0 CLASS: SATETY RELATED srs0IAL TEST 88-17 7.1.6.3 RHR Injection Valve 2-FCV-74-60 tagged CLOSED

~

(Loop I)

/

Test Director Date

. . . . . . - - - . .. /

Second Verification Date 7.1.6.4 RHR Injection Valve 2-FCV-74-61 tagged CLOSED (Loop I)

/

Test Director Date

/

Second Verification Date 7.1.6.5 ContainmentSprayValve2-FCV-74-72taggedCLbSED (Loop II)

/

Test Director Date

/

Second Verification Date 7.1.6.6 Shutdown EHR Return Valve 2-FCV-74-66 tagged

, CLOSED (Loop II)

/_.___

Test Director Date

/

Second Verification Date 7.1.6.7 RHR Injection Valve 2-FCV-74-75 tagged CLOSED (Loop II)

./

Test Director Date

/

Second Verification Date .

Page 14 of 114 1570b/LMS/DK ..

TITLE: DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED 3PECIAL TEST SS-17 7.1.6.3 RHR Injection Valve 2-FCV-74-74 cagged CLOSED (Loop II) *

/

Test Director Date

/

Second Verification Date 7.1.6.S.1 Shutdown Cooling suction 2-FCV-74-47 tagged CLOSED.

/

Test Director Date Second Verification Data 7.1.6.9 Crosstie Valve 2-FCV-74-46 OPEN 5

/

Test Director Date

/

Second Verification Date

/

Shift Supervisor Date CAUTION The following steps vill operate RHR Pump 2C in an abnoraal configuration with flow via Loop I to Loop II crosstie.

amps as read from Control Room indication. Do not exceed 12000 GPM or 255 7.1.6.10 Verify or place RHR Pump 2C breaker in CONNECT position.

1 l

Test Director Date l t

/

Second Verification Date i

7.1.6.11 From Unit Control Boa'rd OPEN 2-FCV-74-57 with 2-HS-74.-57A (Loop I)

/

Test Director Date

/

Second Verification Date Page 15 of 114. l 1570b/LMS/DK

n f

TITLE:

DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST CLASS: SATETY RELATED 1 SPECIAL TEST 33-17 ,

7.1.6.12 From Unit Control Board OPEN 2-FCV-74-71 vith 2-HS-74 71A

/

Test Director Date ,

)

/

Second Verification Date CAUTION The next step vill start RHR Pump 2C. Within 10.5 seconds +.5 - 0 Seconds start opening test Return Valves 2-FCV-74-59 and 2-FCV-74-73.

i 7.1.6.13 From Unit Control Board START RHR Pump 2C.

i

. i

/

Test Director Date s

/

Second Verification Date 7.1.6.14 Within 10.5 seconds +.5 - O start opening Test  !

Loop Valves 2-PCV-74-59 and 2-FCV-74-73. (Stop opening valves when 12000 gpm/255 amps reached)

MTI# Cal Due I

/

Test Director Date

/

Second Verification Date l 7.1.6.15 VerifyRHRLoopIflowis(12000GPNgMCO ^7 FItt Flow ,$4.

gpm 't

/

" se Director Date

/

Second Verification Date Page 16 of 114.

1570b/LMS/DK

i 1

TITLE:

REV 0000 DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST {

CLASS: SAFETY RELATED SPECIAL TEST 88-17 1 7.1.6.16 Verify RHR Pump 2C motor amps is less than 255 Ind 3 Amps

/

Test Director Date

/

Second Verification Date 7.1.6.17 Allow system to stabilize at flov for approximately 3 minutes.

/

Test Director Date, CAUTION 00 NOT OPERATE ON MIN FLOW FOR MORE THAN 3 MINUTES. I 7.1.6.18 CLOSE 2-FCV-74-73 and record time for closure.,

See M& TE Cal Due

, /  !

Test Director Date j

_. /

Second Verification Date  !

7.1.6.19 CLOSE 2-FCV-74-59 and record time for closure.

See M& TE Cal Due '

i

/ \

Test Director Date

/ i Second Verification Date 7.1.6.20 From Unit Control Board STOP RHR Pump 2C

/

Test Director Date

/ ,

Second Verification Date Page 17 of 114 1570b/LMS/DK

_)

TI LE: DIESIL GEiERATOR 3 EMERGENCY LOAD ACCEPTANCE TEST HEV 0000  ;

CLASS: SAFETY RELATED SPECIAL TEST 88-17.'

72 Core Serav System Aliznment 7.2.1 VERITY Xeylock Test Status Switch 14A-S15A on Unit 2 Panel 9-32 is in the NORMAL position.

/ ,

Test Director Date W'

An"x" denotes continuity between pins and a blank denotes lack of j continuity.

7.2.2 VERITY the the ECCS Test Switch is operable in accordance 2 with Table 1, ECCS Test Switch Positions.

  • l TABLE 1 l j

ECCS TEST SWITCH POSITIONS j Pin Switch Position Initial '

(1) (2) (l&2)(3) (4)(3&4) .

OFF AB BC AC DE EF DF A-B X l B-C x J A-C X X D-E X E-F X  !

D-F X X i G-H X X X X X X X I-J  !

X X X X X X X 7.2.3 VERITY the ECCS Test Switch is in the OFF position.

/

Test Director Date

/

Second Verification Date Page 18 of 114" 1570b/LMS/DK ---

. a

I i i

i TITLE: DIESEL GE*iERATOR B EMIRGENCY LOAD ACCEPTANCE TEST bO CLASS: SAFITY RELATED SPECIAL TEST SS-17.

l 7.2.4 PLUG the ECCS Test Switch into Jack 14A-J1A on Unit 2 Panel 9-32. '

/

Test Director Date

/

Second Verification Date 7.2.5 VERITY Unit 2 Annunciator CORE SPRAY SYS I OR II IN TEST STATUS (panel 9-3, XA-55-3C, Windov 34) is in alarm.

/

Test Director Date

/

Second Verificacion Date 7.2.6 REQUEST Operations to perform the following: '

7.2.6.1 VERITY closed or CLOSE 2-FCV-75-25 vich ,

2-HS-75-25A System I Inboard injection Valve on Unit 2 Panel 9-3.

/

Test Director Date

/

Second Verification Date 7.2.6.2 VERITY closed of Close 2-FCV-75-23 with 2-HS-75-23A System I Outboard injection Valve on Unit 2 Panel 9-3.

/

Test Director Date

/

Second Verification Date 7.2.6.3 VERITY closed or CLOSE 2-FCV-75-22 with 2-HS-75-22A System I Test Valve on Unit 2 Panel 9-3.

/

Test Director Date

/ .

Seccnd Verification Date Pa'ge 19 of 114 ____

1570b/LMS/DK e- . - .

f TITLE: DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST REV 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17

  • 7.2.6.4 OPEN Breaker Core Sprety outboard Valve 2-FCV-75-23 on co=partment 13B of 480V'RMOV Board 2A.

--_ _ /

Test Director Date

/

Second Verification Dace 7.2.6.5 PLACE a Caution Order on the breaker.

/

Test Director Date LLO15 .

Contact layout for HFA and HGA relays are shown on Attach =ent 2.

NOTE The placement of Switch 14A-S13A. in the TEST position in the following step inhibits the auto start signal to Core Spray Pump 2C while Breaker 1616 is closed supplying 4160V Shutdown Board B from the normal source 4160V Jhutdown Bus 1. .

7.2.7 REQUEST Operations to PLACE keylock Switch 14A-S13A in the test position on Unit 2 Panel 9-32.

_/

Test Director Date NOTE The jumper installed in the following step simulates an auto start signal to Core Spray Pump 2C when Breaker 1822 closes supplying *160V Shutdown Board B power from Diesel Generator B.

7.2.8 INSTALL a jumper between contacts 3 and 4 on Relay 14A-X10A in Unit 2 Panel 9-32

/

Test Director Date

/

Second Verification Date Page 20 of 114

. 1570b'/LMS /DK'

n. -

gw a t

t .

l '

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SATETY RELATED SPECIAL TIST 88-17 E ,

The wire lifted in the following step simulates a common accident signal cancellation of UV Relay 27SB. This establishes the condition of a safety injection signal occurring in conjunction with a loss of offsite power when Breaker 1616 is tripped. -

7.2.9 TAG panel lead on Terminal LB6 in Panel 25-45B, LIFT the lead, and TAPE it with electrical tape.

/

Test Director Date

/

Second Verification Date E

The jumpers installed in Steps 7.2.10 through,7.2.15 simulate the 480V Lead Shed relay contact closures occurring from Core Spray System I accident signal logic in conjunction with closing of Diesel Generator A Breaker 1818.

7.2.10 INSTALL a jumper between Terminals GG-73 and GG-74 in Unit 2 Panel 9-32 f

Test Director Date Second Verification Date 7.2.11 INSTALL a jumper between Terminals GG-75 and GG-76 in Unit 2 Panel 9-32. i l

/

Test Director Date

/

Second Verification' Date e

Page 21 of 114 1570'b/LMS/DM

i i

TITLE:

HEV (n) e o DIESEL GEMERATOR B EMERGENCY LOAD ACCEPTAliCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.2.12 INSTALL a jumper between Terminals GG-77 and GG-78 in Unit 2 Panel 9-32.

/

Test Director Date

/

Second Verification Date 752.13 INSTALL a jumper between Terminals GG-79 and GG-80 in Unit 2 Panel 9-32.

/

Test Director Date

/

Second Verification Date 7.2.14 INSTALL a jumper between Terminals GG-81 and GG-82 in Unit 2 Panel 9-32.

/

Test Director Date

/

Second Verification Date -

7.2.15 INSTALL a jumper between Terminals GG-83 and GG-84 in Uni:

j! Panel 9-32.

/

Test Director Date

/

Second Verification Date 7.3 RHR System Aliznment 7.3.1 REQUEST Operations to perform the following:

Page 22 of 114 157b'b/LMS/DK

l-I TITLE:' DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 33-17 7.3.1.1 VERITY closed or CLOSE 2-FCV-74-53 vich 2-HS-74-53A RHR'Sys I Inbd Recire Loop' Valve on Unit 2 Panel 9-3.

/

Test Director Date l

/

Second Verification Date i I

l I

i l

I i

l 1

i

)

1 Page 23 of 114 1570$/LMS/DK' .

I I

l l

l TITLE: DIESEL GEiERATOR S EMERGENCY LOAD ACCEPTANCE TEST REV 0000 '

CLASS: SATETY RELATED SPECIAL TEST 88-17

-7.2.1.e VE2:TY le cu vr CL 5E ;-FCV-7;-;7 wi;h 2 -;IC -7 4-:7l. 2"? Sy4443 Supp t%e1-V+1ve 'on- Unit-2 l

- T ei.el M. -

/

.T :: Dir;-evi Da t r-' 5//

'C; v

-J e w + ..J is..."12sclan Date 7.3.1.7 VERITY closed or CLOSE 2-FCV-74-59 vith 2-HS-74-59A RHR System Test Valve on Unit 2 Panel 9-3.

l l

Test Director Date

/

Second Verification Date 7.3.1.8 OPEN Breaker RHR Containment Spray Valve 2-FCV-74-61 on Compartment 11E of 480V Reactor MOV Board 2A.

Test Director Date -

7.3.1.9 PLACE a Caution Order on the breaker.

1

. /

l rest Directo? Date

/

Second Verification Date 7.3.1.10 OPEN Breaker RHR Outboard Valve 2-FCV-74-52 on l compartment 2B of 480V Reactor MOV Board 2A.

/

Test Director Date 7.3.1.11 PLACE a Caution Order on the breaker.

/

Test Director Date

/

Second Verification Date Page 24 of 114 1570b/LMS/DK

I l

TITLE: DIESEL GENIRATOR B EMIRGENCY LOAD ACCEPTANCE TEST REV 00 r. o CLASS: SAFETY RELATED SPECIAL TEST 38-17 l

1 7.3.2 VERITY Keylock Switch 10A-S48A Diesel Power Men on Unit 2 Panel 9-32 is in the NORMAL position. *

/ <

Test Director Date

/

Second Verification Date EQ13 Contact layout for HTA and HGA relays are shown on Attachment 2.

ELTI The vire lifted in the following step simulates loss of normal auxiliary power to RHR Pump 2C.

7.3.3 TAG panel lead on Terminal LB122 in Panel 25-45B, LITT the lead, and TAPE it with electrical tape.

_ /

Test Director Date

/

Second Verification Date .

7.3.4 VERITY Relay 10A-X105C in Unit 2 Panel 9-32 is de-energized.

/

Test Director Date 1

NOTE The jumper installed in the following step simulates an auto start signal to RHR Pump 2C.  :

7.3.5 INSTALL a jumper between contacts 9 and 10 of Relay 10A-K9A l

in Unit 2 Panel 9-32.

/

Test Director . Date

/

t Second Verification Date i Page 25 of 114 1570S'/LMS/DK-

,_ _ _ _ --~e e e- -~ + ' ' '

t I l l

I TITLE: DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 I 7.4 4160V Shutdown Board B Aliznment .

7.4.1 REQUEST Operations to perform the following:

7.4.1'.1 RACK Fire Pump B Breaker in Compartment 11 of ,

4160V Shutdown Board B to the DISCONNECT position. l

- /

Test Director Date 7.4.2 To disable undervoltage Load Shed Logic lif t and tape lead {

terminacea at YXI Compartment il,.Five Pump B breaker.

/ i Test Director Date

/ \

Second Verification Date I i

7.4.3 REQUEST Operations to perform the following: 1 7.4.3.1 RACK Fire Pump B Breaker in Compartment 11 of 4160V Shutdown"Board B t'o"the CONNECT position.

/

Test Director Date -

l l

7.4.3.2 PLACE Handsvitch HS-26-2A Fire Pump B on Unit 1

_ Panel 9-20 to the START position.

i

/

Test Director 'uate l 7.4.4 VERITY Fire Pump B RUNNING.

/

i Test Director Date i 7.4.5 START or VERITY Fire Pump A is RUNNING.

! /

Test Director Date Page 26 of 114 1570b/LMS/DK

l TITLE: DIESEL GEITERATOR B EMERGENCY LOAD ACCEPTANCE0000 TEST EEV CLASS: SATITY RELATED SPECIAL TEST 33-17 7.5 480V Shutdown Board 2A Alinnment 7.5.1 REQUEST Operations to VERITY running or START th following equi;=ent:

7.5.1.1 MG Set 2DN.

/

Test Director Date 7.5.1.2 MG Set 2EA.

/

Test Director Date 7.5.1.3 Closed Cooling Water Pump 2A.

/

Test Director Date 7.5.1.4 Tuel Pool Cooling Pump 2A.

/

Test Director Date 7.5.1.5 Unit Preferred A-C MG Set 2. .

/

_ Test Director Date MII The position of the breaker in Step 7.5.2 is not verified by OI-57 i 1

and therefore must be verified in this instruction.  !

7.5.2 VERIFY breaker 250V Battery Charger 2A, Compartment 6D is l

CLOSED.

/

Test Director Date ,

7.5.3 VERITY the Normal AC Supply Breaker on 250 VDC Battery Charger 2A in Battery Board 2 is CLOSED. ,

/ \

Test Director Date Page 27 of 114 1570b/LMS/DM '

i i

I 1

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST BEV 0000 CLASS: SATETY RELATED SPECIAL TEST $8-17 7.5.4 VERITY 250 VDC Battery Charger 2A in Battery Board Room 2 is ON as shown by the yellow Power On Light on the charger l ILLUMINATED.

_/

Test Director Date 7.5.5 REQUEST Operations to PLACE or VERITY Control & Service Air co= pressor D operating on HAND and loading automatically through selector switch per OI-32.

/

Test Director Date 7.6 480V Reactor MOV Board Alienment 7.6.1 REQUEST Operations to VERITY running or START the following  !

equipment:

7.6.1.1 Shutdown Board Rooms Exhaust Fan 2A.

/

Test Director Date 7.6.1.2 Battery Charger SB-B.

/

Test Director Date 7.6.1.3 Reactor Protection System MG Set 2A.

/

Test Director Date 7.6.1.4 Dryvell Control Air Compressor 2A.

/

Test Director Date fl0IE The position of the treakers in Step 7.6.2 is not verified by 01-57 and therefore must be verified in this instruction, Page 23 of 114 157db/LMS/DK

i I

TITLE: DIESEL GENERATOR B EMIRGEMCY LOAD ACCEPTANCE TEST REV CO00 CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.6.2 VERITY the following breakers on 480V Reactor MOV Board 2A '

are OPEN with Caution Tag attached to each breaker:

7.6.2.1 Turbine Brg Lift Pumps, Assy A, Cc=partment ID.

/

Test Director . Date

/

Second Verification Date 7.6.2.2 Dryvell Equip Drain Sump Pump 2A, Compartment 4E. 3 I

Test Director Date

/

Second Verification Dage 7.6.2.3 Dryvell Floor Drain Sump Pump 2A, Compartment 4E.

/  !

3 Test Director Date .

/ l Second Verification Date 7.6.2.4 Dryvell Control Air Compressor 2A & Dryer 2A, Compartment 7B.

/

Test Director Date .

/

Second Verification Date 7.6.2.5 Primary Containment Purge Air Filter, Compartment 9Bl.

/

Test Director Date

/

Second Verification Date -

Page 29 of 114- ,

1570b/LMS/Di* --

_, , - - , , , - . - - --. --9,

\ '

I -

l TITLE: DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST EEV 0000 CLASS: SATETY RELATED SPECIAL TEST 88-17 l

i l

7.6.2.6 Standby Liquid Cent Trace Hts Normal Ckt, Cc=partment 12A. '

/

Test Director Date  !

/ l Second Verification Date 7.6.3 REQUEST Operations to VERITY open or OPEN the following:  !

7.6.3.1 RHR Heat Exchanger A Service Water Discharge Valve FCV-23-34 1

/

Test Director Date

/

Second Verification Dade 7.6.3.2 RHR Heat Exchanger C Service Water Discharger, Valve FC/-23-40.

_ . , , , /

Test Director .Date

/

Second Verification Date 7.6.4 REQUEST Operations to PLACE the 43 swi,tch on 480V Reactor MOV Board 2D in the MAN position'.

/

. Test Director Date 7.7 480V Diesel Aux Board Alignment 7.7.1 REQUEST Operations to perform the following:

7.7.1.1 VERITY running or ? TART Off Gas Dilution Fan 1A with Handswitch HS-:t'29A on Unit 2 Panel 9-8.

/

Test Director Date

/

Second Verification Date Page 30 of 114 1570b/LMS/DK ,

O

I I

TITLE:

DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST REY 0000 CLASS: SATETY RELATED SPEC'IAL TEST 88-17 7.7.1.2 VERkTY running or START off Gas Dilution Tan 2A with Handsvitch HS-66-29A on Unit 2 Panel 9-3.

/

Test Director Date

/

Second Verification Date 7.7.1.3 VERITY running or START Off Gas Dilution Tan 3A 1

vith Handsvitch MS-66-29A on Unit 3 Panel 9-8.

_ /

Test Director Date

/

Second Verification Date 7.7.1.4 VERITY or PLACE Off-Gas Dilution Tan 1B in auto-standby per OI-66 on Unit 1 Panel 9-8.

/

Test Director Date -

/

Second Verification Date 7.7.1.5 VERITY or PLACE Off-Gas Dilution Tan 2B in auto-standby per OI-66 on Unit 2 Panel 9-8.

i

/

Test Director Date

/

Second Verification Date 7.7.1.6 VERITY or PLACI off-Gas Dilution Tan 3B in )

auto-standby per CI-66 on Unit 3 Panel 9-8.

/ j t

Test Director Date i i

i

/

l Second Verification Date - 1 1

i Page 31 vf 114-1570b/LMS/DK

i l

l l

l I

TITLE: 3EV DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST 0000 )

CLASS: SATE!Y RELATED SPECIAL TEST 88-17 H2II .. I The jumpers installed in the following steps vill prevent the load

~

shed signal from tripping Diesel Gen A Compressor A Breaker on 480V Diesel Aux Board A.

7.7.2 INSTALL a jumper between Terminals 7 and 8 of Relay A501 in Panel 25-43A-1.

/

Test Director Date i

/

Second Verification Date 7.7.3 INSTALL a jumper between Terminals 7 and 8 of Relay B501 in Panel 25-438-1. I

/.

Test Director Date' l l

Secona Verification Date i H2II  !

I

'The jumperr installed in the following steps vill krevent the load sned signal from tripping Diesel Gen C Air compresser A Breaker on 480V Diesel Auy. Board A.

i 7.7.4 INSTALL a jumper between Terminals 7 and 8 of Relay A503 in Panel 25-43A-1.

/

Test Director Date

/

Second Verification Date 1

7.7.5 INSTALL a jumper between Terminals 7 and 8 of Relay B503 in i Panel 25-43B-1. '

/

. Test Director Date -

/ I Second Verification Date

' Page 32 of 114- .

1570b/LMS/DK -

a l l  !

i TITLE: DIESEL GENERATOR B EMERCENCY LCAD ACCEPTANCE TEST CLASS: SATETY RSLATID 'SPECIAL TEST 88-17 E .

The ju=pers installed in the folleving steps will prevent the load shed signal from tripping Diesel Gen-D Air compressor A Breaker on 480V Diesel Aux Board A.

7.7.6 INSTALL a jumper between Terminals 7 and 8 of Relay A505 in Panel 25-43A-1.

/

Test Director Date

, /

Second Verification Date 7.7.7 INSTALL a jumper between Terminals 7 and 8 of Relay B505 in Panel 25-43B-1.

i

/

, Test Director Date

/

Second Verification Date M

The ju=pers installed in the following steps vill prevent the load shed signal from tripping Diesel Gen A Air compressor B Breaker on 450V Diesel Aux Board B.

7.7.8 INSTAI.L a jumper between Terminals 7 and 8 of Relay A506 in i Panel 25-43A-2. '

/

Test Director Date

/ i Second Verification Date l 7.7.9 INSTALL a jumper between Terminals 7 and 8 of Relay B506 in Panel 25-438-2. "

/ ___._

Test Director Date *

  • / i Second Verification Date Page 33 of 114' .

, 1570b/LMS/DK --

r

i i

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST REV 0000 CLASS: SAFETY RELATID SPECIAL TEST 88-17 L&T5 The ju=pers installed in the following steps will prevent the load shed signal from tripping Diesel Gen C Air compressor B Breaker on 480V Diesel Aux Board B.

7.7.10 INSTALL a jumper between Terminals 9 and 10 of Relay A502 in Panel 25-43A-2.

/

Test Director Date

/

Second Verification Date 7.7.11 INSTALL a ju=per between Terminals 9 and 10 of Relay B502 in Panel 25-43B-2.

I

/

Test Director Date

/

Second Verification Date lLQT5 The ju=pers installed in the following steps vill prevent the load shed signal from tripping Diesel Gen D Air compressor B Breaker on 480V Diesel Aux Board B.

7.7.12 INSTALL a ju=per between terminals 7 and 8 of Relay A502 in Panel 25-43A-2.

/

Test Director Date

/

Second Verification Date 7.7.13 INSTALL a jumper between Termin'als 7 and 8 of Relay B502 in Panel 25-43B-2. .

/

Test Director Date .

/

Second Verification Date Page 34 of 114 1570b/LMS/DK

i l l

l l

TITLE:

DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST 1

CLASS: SATITY RILATED SPECIAL *EST 33-17 l

7.7.14 Align Balance of loads on Diesel Aux board A as indicated i on Pages and

  • l

/ \

Test Director Date

/

Second Verification Date 7.9 Test P e r fo rmanc e 7.9.1 ESTABLISH communications between Unit 2 Control Room, 4160V j Shutdown Board B, 480V Shutdown Board 2A, 480V Reactor MOV Board 2A, and Panel 25-42-A-2.

Test Director Date  !

7.9.2 VERITY all participating personnel have been briefed on Board location and cubical assignments to verify trip and l closure of breakers for 4160 volt and 480 volt loads being  !

' tested by this instruction. Completed Precest Briefing vhich covered Special Test 88-06, 88-17, and 2-BFN-RTP-082 {

SIGNATURIS authorizes test to proceed.

I

/ . i System Engineer Date

/

DNE Engineer Date

/

, Shif t Supervisor Date i

/ {

RTP Engineer Date  !

7.9.4 VERITY the following Annunciators are clear:

7.9.4.1 Unit 1 Annunciator 4160V SRTDN BD B DEGRADED VOLTAGE (Panel 9-23-7, XA-55-235, Windov 28).

Test Director Date Page 35 of 114 1570b/LMS/DK

_ . 1 _ - . _ . _ _

i I

TITLE:

DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST BEV 0000 CLASS: SAITTY RELATED SPECIAL TEST 88-17 7.9.4.2

  • Unit 2 Annunciator 480V SHTDN BD 2A UNDERVOLTAGE (Panel 9-23-7, XA-55-233, Window 19).

/

Test Director Date 7.9.4.3 Unit 2 Annunciator 4 KV SD BD B DEGRADED VOLTAGE (Panel 9-8, XA-55.-88, Windov 32).

/

. Test Director Date 7.9.4.4 Unit 2 Annunciator 480V SD BD 2A UV OR TRANS (Panel 9-8, XA-55-88, Windov 29).

/

Test Director Date 7.9.4.5 Unit 2 Annunciator 480V REACTOR MOV BD 2A OR 2D UV OR TRANS (Panel 9-8, XA-55-8C, Window 17).

/

Test Director '

Date 7.9.4.6 Unit 2 Annunciator DIESEL GEN B RUNNING (Panel 9-23-7, XA-55-23B, Window 1).

/

Test Director Date 7.9.4.7 Unit 2 Annunciator D!ESEL GEN B OVERSPEED TRIP (Panel 9-23-7, XA-55-2*tB, Windov 8).

/

Test Director Date CAUTION Performance of the next step vill de-energi:e the normal power source of RPS Bus A and may cause a half scram and close some isolation valves. Note the following step will cause EST start on ,

DG B.

g Steps 7.9.16.1 and 7.9.19.1 must be performed within 10.5 seconds after RHR Pb:np 2C breaker closes.

Page 36 of 114 1570b/LMS/DK

I I

l r

I REV 0000 .

TITLE: DIESEL GENIRATOR B EMERGENCY LOAD ACCEPTANCE TEST 1

CLASS: SATETY RELATED  :

SPECIAL TEST 88-17 l I

i 7.9.5 START ALL required recorder and REQUEST Operations to '

=anually TRIP Breaker 1616 on 4160V Shutdown Boa'rd B.

/

Test Director Date 7.9.6 VERITY Unit 1 Annunciator 4160V SRTDN BD B DEGRADED VOLTAGE (Panel 9-23-7, XA-55-238, Window 28) is in alarm.

. i

/

Test Director Date 7.9.7 VERITT Unit 2 Annunciator 480V SHTDN BD 2A UNDERVOLTAGE ,

(Panel 9-23-7, XA-55-235, Window 19) is in alarm.

/ i Test Director Date

7.9.8 i VERITY Unit 2 Annunciator 4 KV SD BD B DEGRADED VOLTAGE (

) Panel 9-8, XA-5-88, Window 32) is in alarm. '

/

Test Director Date 7.9.9 VERITY Unit 2 Annunciator 480V SD BD 2A UV OR TRANS (Panel 9-23-7, XA-55-8B, Window 29) is in alarm. .

1

/_

Test Director Date j 7.9.10 1 VERITY Unit 2 Annunciator 480V REACTOT: M0V BD 2A OR 20 UV l OR TRANS (Panel 9-8, XA-55-8C, Window 17) ic in alarm.

/

R Test Director Date 4 7.9.11 If a half scram occurs, REQUEST Operations to RESET the 1

, half scram per 2-0I-99.

{ /

Test Director Date i

7.9.12 After 4160V Shutdoen Board B de-enersizes, VERITY the followins Breakers remained CLOSED:

i Pase 37 of 114 *

! 157db/LMS/DK

l TITLE:

DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST.88-17 ,

7.9.12.1 Normal Supply to Transfor=er TS2A to 4,80V Shutdown Board 2A, Compartment 5..

/

Test Director Date

- - - - 7.9.12.2--Alternate Supply to Transformers TDE and TSIE to 480V Diesel Aux Bds A & B and 480V S/D Bds 1A and 13 Compartment 14 ,

/

Test Director Date 7.9.12.3 Fire Pump B Compartment 11.

/

Test Director Date 7.9.13 Af ter 480V Shutdown Board 2A de-energized, VERITY the following loads are TRIPPED:

7.9.13.1 By undervoltage:

l 7.9.13.1.1 Control and Service Air Compressor D, Compartment $A.

,- /

Test Director Date  !

7.9.14.2 By a load shed signal:

7.9.14.2.3 Close Cooling Water Pump 2A, Compartment 63.

l l

l Test Director Date 1 4 7.9.14.2.4 Normal A-C Input supply

. Breaker on 250V Battery

' Charger 2A (at Battery

Charger 2A).

_./

Test Director Date 2 .

Page 33 of 114 15 hob /LMS/DR r ,w _ , _ ,

, ,,- _ . , m ,c..- - -

- - - - w

i  !

I l TITLE: REV 0000 DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 l

7.9.15 After 480V Reactor MOV Board 2A is re-energi:ed by closure I j

of Breaker 1822, VERITY the following loads are TRIPPED by a load shed logic signal: '

l i

7.9.15.1 RWCU Demineralizer Holding Pump 2A, Compartment 1

llA.

/ \

Test Director Date  !

7.o.16 After RER Pu=p 2C start, REQUEST Operations to perform the l

, following: I l

7.9.16.1 OPEN test return line valves 2-FCV-74-59 and 2-FCV-74-73 10.5 sec.+ .5 .0 after RHR Pump 2C l breaker CLOSES.

M&TE# CAL DUE

/ l Test Director Date {

/ \

Fecond Verification Date  !

\

NOT' '

Time for valve opening on 2-FCV-74-59 and 2-TCV-74-73 from step i 7.1. 6.18 and 7.1. 6.19. .

7 . 9 .1' 7 VERIFY RHR flow as shown on FE-74-50 RHR Sys I Total Flow .

on Unit 2 Panel 9-3 is 12000 gpm, by opening 2-FCV-74-!9 for see and 2-FCV-74-73 for sec. l

_ / 1 Test Director Date i l _. _

. Second Verification Date  !

7.9.18 Verify RHR Pump C Motor Amps as shown on EI-7-16 'on Unit 2 Panel 9-3 does apa exceed 255 amps in a steady state condition.

/

Test Director Date

/

Second Verifi, cation Date 7.9.19 After Core Spray Pump 2C starts, REQUEST Operations to perform the following:

7.9.19.1 OPEN FCV-75-22 with 2-HS-75-22A System I Test Valve on Unit 2 Panel 9-3. START OPENINO VALVE 3.5 see after CS Pump 2C breaker closes.

/

, Test Director Date

/- - -

Page 39 of 114 Second Verification Date

h 1

1 I

i l

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.9.20 VERITY CSS flow as shown on 2-FI-75-21 Sys I Flow on Unit 2 l Panel 9-3 is 3200.gpm.

/

Test Director Date

/

Second Verification Date 7.9.21 VERITY CSS Pump C Motor Amps as shown on EI-75-14 on Unit 2 Panel 9-3 does agi exceed 80 amps in a steady state condition.

/

Test Director Datt

/

Second Verification Date 7.9.22 VERITY the following brea:cers on 480V Shutdown Board 2A reclose after Breaker 1822 closure:

  • 7.9.22.1 Close Cooling Water Pump 2A.

/

Test Director, Date 7.9.23 VERITY FIRE Pump B Running.

l

/ l Test Director Date 7.9.24 VERIFY Standby Gas treatment trains A, B, and C l auto-restart. l

/

Test Director Date 7.9.25 VERITY CREVS auto starts.

/

Test Director Date Page 40 of 114~ -

. 1570b/LMS/DK * - ~ - -

0 w - -r ,~ ~ , ,y- ,, -----, , , ,9 - - - --

1 s

TITLE: REV 0000 DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SATETY RELATED SPECIAL TEST 88-17 7.9.26 Allow Diesel Generator B to run for sufficient time to verify stable condition and that recorded data 'is adequate for review upon test completion, ,

t

/

DNE Engineer Date

__/

Test Director Date 7.9.26.1 Close Test Return Lit.e valve Loop II 2-FCV-74-73.

/

Test Director Date

/

Second Verification Date 7.9.26.2 CloseRHRLoopItoIICrosstievalve2-FCVh4-46.

/ ,

Test Director Date

/

Second Verification Date 7.9.26.3 Open RHR Test Return Line valve Loop I 2-FCV-74-59 until 9000 gpm flot is established.

/ '

Test Director Date

/

Second Verification Date 7.9.27 VERITY the following Annunciators are clear:

j 7.9.27.1 Unit 1 Annunciator 4160V SETDN BD B DEGRADED VOLTAGE (Panel 9-23-7,, XA-55-23B, Windov 28). I

l. \

Test Director Date  !

7.9.27.2 Unit 2 Annunciator 480V SHTDN BD 2A UNDERVOLTAGE (Panel 9-23-7, XA-55-23B, Window 19). I

/_

Test Director Date Page 41 of 114 - 1 1570b/LMS/DK __

i

\

l TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST 8EV 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.9.27.3 Unit 2 Annunciator 4 KV SD BD B DEGRADED VOLTAGE (Panel.9-8, XA-55-8B, Window 32). ~

/

Test Director Date 7.9.27.4 Unit 2 Annunciator 480V SD BD 2A UV OR TRANS (Panel 9-8, XA-55-8B, Window 29).

, /

Test Director Date 7.9.27.5 Unit 2 Annunciator 480V REACTOR MOV BD 2A OR 2D UV OR TRANS (Panel 9-8, XA-55-8C, Window 17).

/

Test Director Date E I d ahny The following steps will deconstrate 4KV Load Shed and Auto estart of RHR, CORE SPRAY, RHR SW and selected permantly connected oads under si=ualted LOCA cond.itions.

7.9.23 START ALL recorders and REQUEST Operations to manually TRIP Breaker 1822 on 4160V Shutdown Board B.

  • /

Test Director Date 7.9.29 VERITY Unit 1 Annunciator 4160V SETDy BD B DEGRADED VOLTAGE (Panel 9-23-7, XA-55-23B, Window 28) is in alarm.

~/

Test Director Date 7.9.30 VERITY Unit 2 Annunciator 480V SETDN BD 2A UNDERVOLTAGE (Panel 9-23-7, XA-55-23A, Window 19) is in alarm.

. /. j Test Director Date 7.9.31 VERIFY Unit 2 Annunciator 4 KV SD ED B DEGRADED VOLTAGE (Panel 9-8, XA-5-8B, Window 32) is in alarm.

/

Test Director Date 7.9.32 VERITY Unit 2 Annunciator 480V SD BD 2A UV OR TRANS (Panel -

9-8, XA-55-8B, Window 29) is in alarm.

=

/ {

. Test Director Date I

k I

i l

TITLE: B EV 0000 )

DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST i

CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.9.34.3 RHR Pump 2C.

9

/

Test Director Date I 7.9.35 Af ter 4160V Shutdown Board B de-energizes, VERITY the l following Breakers remained CLOSED: l 7.9.35.1 ionsal Supply to Transformer TS2A to 480V Shutdown Board 2A, Compartment 5.

l

/

Test Director Eate 7.9.35.2 Alternate Supply to Transformers TDE and TSIE to 480V Diesel Aux Bds A & B and 4ACV S/D Bds 1A and 1B, Compartment 14 I ,

l Test Director Date <

7.9.35.3 Fire Pump B.

. /

. Test Director Date 7.9.36 VERIFY Annunciator DIESEL GEN B RUNNING (Panel 9-23-7, XA-55-23B, Window 1) is still in alarm.

/

Test Director Date 7.9.37 VERIFY Annunciator DIESEL GEN B OVERSPEED TRIP (Panel 9-23-7, XA-55-23B, Window 8) is clear.

/

Test Director Date 7.9.38 Af ter 480V Shutdown Board 2A is..re-energized by closure of Breaker 1822, VERITY the following loads are TRIPPED:

7.9.38.1 Closed Cooling Water Pump 2A, Compartment 6B.

/ .

Test Director Date Page 43 of 114~ -

1570b/LMS/DK -

4

_ , , . . - . , . _ . . _ , ~ -. . _ , , . - _, . - - . . -

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SATETY RELATED SPECIAL TEST 88-17 7.9.37 VERIFY Annunc ator DIESEL GEN B OVERSPEED TRIP (Panel 9-23-7, XA-55-23B, Windov 8) is clear. --

/

Test Director Date 7.9.38 Af ter 480V Shutdown Board 2A is re-energized by c losure of Breaker 1822, VERITY the following loads are TRI/PCD:

7.9.38.1 Closed Cooling Water Pump 2A, Compartment 6B.

/

Test Director ._. Date 7.9.39 Af ter RHR Pu p 2C starts, REQUEST Operatio .s to perform the followina:

7.I.39.1 VERIFY open FCV-74-12 RHR Pump C Supp Pool Suction Valve on Unit 2 Panel 9-3. .

I

/

Test Director Date

/

Second Verification Date )

7.9.39.2 VERIFY open 2-FCV-74-59 RHR System I Test Valve l

on Unit 2 Panel 9-3 --

/

Iest Director Date

/

Second Verification Date 7.9.'40 VERITY RHR flow as s.3 vn on FI-74-50 RHR Sys I Total flow on Unit 2 Panel 9-3 1r. 9000 gpm.

/

Test Director Date 7.9.41 VERITY RHR Pump C Motor Amps as shown on EI-74-16 on Unit 2 Panel 9 3 does not exceed 255 amps in a steady state condition.

/

Test Director Date Page 44 2' 114 .

1570b/LMS/DK

,n ,--,y e cs -, .-s-r, --

-,,-vs -

r - - - - + -r-- - ,A,, s- v ----,r,r --

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.9.42 Af ter Core Spray Pump 2C starts, RIQUEST Operations to perform the following:

7.9.42.1 VERIFY open FCV-75-22 System I Test Valve on. Unit 2 Panel 9-3.

/

Test Director Date

. /

Second Verification Date 7.9.43 VERIFY CSS flow as shown or 2-FI-75-21 Sys I Flov on Unit 2 Panel 9-3 is 3200 gpm.

/

Test Director Date 7.9.44 i VERIFY CSS Pu=p C Motor Amps as shown on EI-75-14 on Unit 2 Panel 9-3 does not exceed 80 amps in a steady state condition. .

/

Test Director Date 7.9.45' VERIFY Fire Pump B running.

/

Test Director Date 7.9.46 Af ter auto start of SGI Filter Trains A and B, REQUEST Operations to PLACE SGT Filter Trair. C in auto-standby per 0-0I-65. l

/ .

Test Director Date l 7.9.47 VI.RITY the following breakers on 480V Shutdown Board

reclose after Breaker 1822 closure:

i 7.9.47.1 Closed Cooling Water' Pump 2A, Compartment 6B.

/

Test Director Date -

7.9.48 AfterDieselGeneratorBhasrunwithcontinuousemergencys4lyk, loads connected for a minimum of 5 minutes. Rehe-.te it. y,,. g

2-BFN-RTP-082 rejection test. for Unit 1 to 3 load share and full load

/

- Test Director Date Page 45 of 114 ~

.. . s - ~

l l

TITLE:

St E V 0000 DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST

~

CLASS: SAFETY RELATED SPECIAL TEST 88-17 l

l 7.10 Q13sel Generator Shutdown 7.10.1 REQUEST operations to perform the following at Panel 9-23-7 {

per 0I-82:

)

7.10.1.1 PLACE Breaker 1616 Synchronizing Switch to the ON position.

/

Test Director Da:e 7.10.1.2 PLACE Diesel Generator Mode Switch to the Parallel With System position.

/ l Test Director Date i

7.10.1.3 SYNCHRONIZE the Diesel Generator with the i

, Shutdown Bus.

/

Test Director Date 7.10.1.4 CLOSE Breaker 1616.

/

Test Director Date 7.10.1.5 UNLCAD the Diesel Generator.

_._./

Test Director Date 7.10.1.6 TRIP Breaker 1822.

/

Test Director Date 7.10.1.7 PLACE Breaker 1616 Synchronizing Switch to the OFF pos'ition.

/

Test Director Date

, 7.10.1.8 RESET Relay.43SB.

/

Test Director Date

. Page 46 of 114 -

1570b/LMS/0K 4

, - - - , , , -n- --n,-

TITLE:

DIESEL GENERATOR S EMERGENCY LOAD ACCEPTANCE TEST CLASS: SATITY RELATED SPECIAL TEST 83-17 7.10.1.9 PLACE Diesel Generator B Control Svite,h to the STOP position.

/

Test Director Date 7.10.2 VERITY Diesel Generator B idles between 440 and 460 rpm af ter receiving the stop signal as shown on the RPM Meter on the Engine Control Panel.

/

Te.tt Director Date 7.10.3 VERITY Diesel Generator B completes idle cycle and stops.

/

Test Director Date I

E9TI Acceptance of test data vill be based on DNE Engineer's evaluati~on of actual test data compared to diesel generator model and analysis.

l 7.10.4 DNE Engineer has reviewed initial data taken and has j grantec permission to restore systems to normal in l

accordance with Section 7.11. l

/

DNE Engineer Date

/

. (N/A IF DATA NOT WITHIN MODEL) Shift Supervisor D' ate 7.10.5 DNE Engineer has reviewed initial data and has requested additional loads to be connected to diesel generator B.

/

DNE Engineer Date

/

' Shift Supervisor Date

/.

(N/A IF DATA WITHIN MODEL) RTP Engineer Date Page 47 of 114 1570b/LMS/DK ,_ _ .

- - wr ,- e

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST 0000REV CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.10.6 Retest SPECIAL TEST 88-17 with load changes as specified by l DNE Engineer on Attachment 3. Loads (s) identified on Attachment 3 vill be placed in condition indicated to support retest sufficient information vill be contained on Attachment 3 to satisfy Shift Supervisor of safe equipment operation and restoration.

/

DNE Engineer Date

/ l Shift Supervisor Date f

/

(N/A IF DATA WITHIN MODEL) RTP Engineer Date 7.10.7 Retest required complete sections 7.11 and 7.12 to restore RHR and Core Spray pumps to as found condition. g 1

/ 1 RTP Engineer Date 1

/

(N/A IF DATA WITHIN MODEL) Shift Supervisor Date 7.10.8 Return to section 6.0 and retest ST-88-17 with additional loads as specified on Attachment 3 by DNE Engineer.

/

RTP Engineer Date

/

, (N/A IF DATA WITHIN MODEL) Shift Supervisor Date 7.10.9 Retest data has been reviewed by DNE Engineer and found to be within model and analysis with respect to preliminary l review. Permission is granted to operations to restore systems to normal in accordance with SPECIAL TEST 88-17.

/.

DNE Engineer Date

/

Shift Supervisor Date

/

(N/A IF STEP 7.10.4 COMPLETED)RTP Engineer Date' Page 48 of 114

, 1570b/LMS/DK ---

w ,

w ww .%-.- ~ Q v ww rg emy- -.- -

g

TITLE: DIESEL GE!TERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST SS-17 7.11 Core Sorav Svstem Shutdown 7.11.1 REMOVE ju=per between contacts 3 and 4 on Relay 14A-K10A in Unit 2 Panel 9-32 installed by Step 7.2.8.

l Test Director Date

/

Second Verification Date 7.11.2 REQUEST Operations to perform the following:

7.11.2.1 CLOSE 2-FCV-75-22 with Handsvitch 2-HS-75-22A System.1 Test Valve on Unit 2 Panel 9-3. .

/

Test Director -

Date

/

Second Verification Date 1

7.11.2.2 STOP Cere Spray Pump 2C vith Handsvitch 1 2-HS-75-14A Core Spray Pump C on Unit 2 Panel 9-3.

l Test Director Date

/

Second Verification Date 7.11.2.3 RESTORE Core Spray Pump 2C to standby readiness per OI-75. .

/

Test Director Date

/

Second Ve,rification Date 7.11.3 REQUEST Operations to PLACE Keylock Switch 14A-S13A in the normal position on Unit 2 Panel 9-32.

/.

Test Director Date

/

Page 49 of 114 Second Verification Date .

he==-

1570b/LMS/DK w -- e ~,ew ,

1 TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST HE9 0000 I CLASS: SAFETY RELATED SPECIAL TEST 88-17 1

i 7.11.4 REMOVE the tape from the lead tagged LB6, RELAND,,the lead on Terminal LB6 in Panel 25-45B, and REMOVE the tag from the lead.

/ -

Test Director Date -

7.11.5 REMOVE jumper between terminals GG-73 and GG-74 in Unit 2 Panel 9-32.

/

Test Director Date

/

Second Verification Date l

l 7.11.6 REMOVE jumper between terminals GG-75 and GG-76 in Unit 2 '

Panel 9-32.

)

/

Test Director Date Second Verification Date 7.11.7 REMOVE ' .per between terminals GG-77 and GG-78 in Unit 2 Panel .-32.

l

/

Test Director Date l

/

Second Verification Date 7.11'.8 REMOVE jumper between terminals GG-79 and GG-80 in Unit 2 Panel 9-32.

/

Test Director Date

/

Second Verification 'Date Page 50 of 114 * ,

1570b/LMS/DK -- - -

g

l TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17

\

l 7.11.9 REMOVE jumper between terminals GG-81 and GG-82 .in Unit 2 Panel 9-32. l

/

Test Director Date- i 1

/ \

Second Verification Date 1  :

7.11.10 REMOVE jumper between terminals GG-83 and GG-84 in Unit 2 Panel.

/

Test Director Date  !

/ i Second Verification Date l 7.11.11 REQUEST Operations to perform the following:

' 7.11.11.1 REMOVE the Caution Order from Core Spray .

Outboard Valve 2-FCV-75-23 Breaker on compartment 13B of 480V RMOV Board 2A placed by  ;

Step 7.2.6.5. . l

/ 1 Test Director Date l

Second Verification Date 7.11.11.2 CLOSE Core Spray Outboard Valve 2-FCV-75-23 Breaker.

/

Test Director Date

/ \

Second Verification Date 7.11.12 VERITY the ECCS Test Switch is in the OFF position.

/

. Test Director Date

  • /

Second Verification Date Page 51 of 114-1570b/LMS/DK ~~

e D

TITLE: 3EV 0000 DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 )

7.11.13 REMOVE the ECCS Test Switch from Jack 14A-J1A.

/

Test Director Date 1

Second Verification Date l

7.11.14 7ERITY Unit 2 Annunciator CORE SPRAY SYS I OR II IN TEST l STATUS (Panel 9-3, XA-55-3C, Window 34) is clear.

/

Test Director Date

/ \

Second Verification Date l 7.12 RHR System Shutdown 7.12.1 REMOVE the jumper between contacts 9 and 10 of Relay 10A-K9A in Unit 2 Panel 9-32 installed by Step 7.3.5.

/

s Test Director Date

/ \

Second Verification Date l

7.12.2_ REQUEST Operations to perform the following: l 7.12.2.1 CLOSE 2-FCV-74-59 with 2-HS-74-59A RHR System I Test Valve on Unit 2 Panel 9-3. 1

/

Test Director Date j

/ ,

Second Verification Date 7.12.2.2 STOP RHR . Pump 2C with Handswitch 2-HS-74-16A RHR Pump C Motor on Unit 2 Panel 9-3.

/

Test Director Date

/

Second Verification Date Page 52 of 114 157 b/LMS[DK

TITLE: REV 0000 DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.12.2.3 RESTORE RHR Pump 2C to standby readin.ess per OI-74

/ \

Iest Director Date l

/

Second Verification Date 7.12.2.4 REMOVE the Caution Order from RHR Containment Spray Valve 2-FCV-74-61 Breaker on Compartment 115 of 480V Reactor MOV Board 2A placed by Step 7.3.1.9.

)

1

/

Test Director Date

/

Second Verification Date i 1

7.12.2.5 CLOSE RHR Containment Spray Valve 2-FCV-74-61 I Breaker.

/

, Test Director Date s

/

Second Verification Date

~

7.12.2.6 REMOVE the Caution Order from RHR Outboard Valve 2-FCV-74-52 Breaker on compartment 2B of 480V Reactor MOV Board 2A placed by Step 7.3.1.11.

/

Test Director Date

/

Second Verification Date 7.12.2.7 CLOSE RHR O';tboard Valve 2-FCV-74-52 Breaker.

'- . /

Test Director Date

/

Second Verification Date Page 53 of 114 1570b/LMS/DN

HEV 0000 TITLE:

DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.12.3 REMOVE the tape from the lead tagged LB122, RELAND the lead on Terminals LB122 in Panel 25-45B lifted by Step 7.3.3, and REMOVE the tag from the lead.

/

Test Director Date

/

Second Verification Date 7.13 4160V Shutdown Board B Return to Normal 7.13.1 REQUEST Operations to perform the followinS:

7.13.1.1 STOP Residual Heat Removal Service Water Pump C1 with HS-23-8A RHRSW Pmp Cl Motor on Unit 1 Panel 9-3.

/

Test Director Date

/

. Second Verification Date i 7.13.1.2 STOP and RACK Fire Pump B Breaker in Compartment

~

11 of 4160V Shutdown Board B to the DISCONNECT position.

~

/

Test D,irector Date

/

Second Verification Date 7.13.2 Reterminate wire YX1 in Compartment 11 and remove tag from lead.

/

Test Director Date

/

- Second Verification Date 7.13.3 REQUEST operations to perform the following:

Page 54 of 114 1570/LMS/Dd

TITLE:

HEF 0000 DIESEL GE!ERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.13.2.1 RACK Fire Pump B Breaker in Compart=ent 11 of 4160V Shutdown Board B to the FULL CONTECT position.

/

Test Director Date

/

Second Verification Date 7.13.3.2 RESTORE RHR Servite Water System to normal operation per 0I-23.

/

Test Director Date

)

/  !

Second Verification Date (

7.13.3.3 RISTORE Fire Pump B to normal operation per l

i OI-26.  ;

l Test Director Date

/ i Second Verification Date  !

7.14 480V Shutdown Board Return to Normal 1

7.14.1 REQUEST Operaciens to. perform the following:

7.14.1.1 RE5 TORE 480V Shutdown-Board 1A to normal operating condition per OI-57.

/

Test Director Date I

\

Second Verification Date 7.14.1.2

~~ RESTORE Control Bay Water Chiller A to normal oper.ating condition per OI-31.

/

Test Director Date I

>. /

Second Verification Date i Page 55 of 114 1570,b/LMS/DK

HEV 0000  !

TITLE:

DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED l SPECIAL TEST 88-17 7.14.1.3 RESTORE Dryvell Blower LA-1 to normal, operating j condition per OI-30.

/

Test Director Date

/

Second Verification Date 7.14.1.4 RESTORE Dryvell Blower 1B-1 to normal operating condition per 0I-30.

/

Test Director Date

{

l Second Verification Date i 7.14.1.5 RESTORE Recirculation MG Set Oil Pump LA-1 to {

normal operating condition per OI-68. l l

/

Test Director Date l

/ j Second Verification Date 7.14.1.6 RESTORE Recirculation MG Set Oil Pump 1B-1 to normal operating condition per OI-68.

/

Test Director Date  ;

/ l Second Verification Date 7.14.1.7 RESTORE RWCU Recirculating Pump 1A to normal operating condition per OI-69.

./

Test Director Date

/

Second Verification Date Page 56 of 114

. ', 1570b/LMS/Dk m --- - ,r_.

l I

1 TITLE:

DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TES i

CLASS: SAFETY RELATED SPECIAL TEST 88-17 l

.+ j l

1 7.14.1.8 RESTORE Tuel Pool Cooling Pu=p 1A to n.ormal operating condition per OI-78. j

/ i Test Director Date l

/ ,

. Second Verification Date I 7.14.1.9 RESTORE 480V Shutdown Board 1B to normal operating condition per OI-57.

l

/

Test Director Date

/

Second Verification Date 7.14.1.10 RISTORE Control Bay Water Chiller B to normal operating condition per 0I-31.

/

Test Director Date

/

Second Verification Date -

7.14.1.11 RESTORE Dryvell Blower lA-2 to normal operating

_ condition per OI-30.

/

Test Director Date

/

Second Verification Date l 7.14.1.12 RESTORE Dryvell Blower 1B-2 to normal operating condition per OI-30.

/

Test Director Date

- /

Second Verification Date 7.14.1.13 RESTORE Recirculation MG Set Oil Pump 1A-2 to

~

normal operating condition per OI-68.

/

Test Director Date

/

  • Second Verification Date Page 57 of 114

- -. -. .-. . - . _ _ - . ~ . - . .

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST SE-17 7.14.1.14 RESTORE Recirculation MG Set Oil Pu=p 13-2 to nor=al op'erating condition per OI-68. ,

/

Test Director Date

/

Second Verification Date 7.14.1.15 RESTORE RWCU Recirculating Pump 1B to normal operating condition per 0I-69.

/

Test Director Date

/

Second Verification Date 7.14.1.16 RISTORI Fuel Fool Cooling Pump 1B to normal

, operating condition per OI-78.

/

' ~ ~ ~ " ' ' ' ~ ~ ~ ~ ~

Test Director Date

/

Second Verification Date -

7.14.1.17 RISTORE 480V Shutdown Board 2A to normal

_ operating condition per OI-57.

/

Test Director Date

/

Second Verification Date 7.14.1.18 RESTORE Dryvell Blower 2A-1 to normal operating condition per-0I-30.

/

Test Director Date p

Second Verification Date Page 58 of 114 1570$/LMS/DK' + -

, -- ~e- , , - , - , - , - - , - , , ,,

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST .

0000 CLASS: SAFETY RELATED SPECIAL TEST 33-17 7.14.1.19 RESTORE Dryvell Blover 2B-1 to normal operating condition per 0I-30. ' '

I Test Director Date t

I

/

Second Verification Date 7.14.1.20 RESTORE Recirculation MG Set Oil Pump 2A-1 to normal operating condition per OI-68.

/

Test Director Date

/ _ l Second Verification Date 7.14.1.21 RESTORE Recirculation MG Set Oil Pump 2B-) to l normal operating condition per OI-68.

/

Test Director Date

/ '

Second Verification Date -

7.14.1.22 RESTORE RWCU Recirculating Pump 2A to normal

_ operating conditio,n per OI-69. t

/

Test Director Dat5

/

Second Verification Date 7.14.1.23 RESTORE Fuel Pool Cooling Pump 2A to normal operating condition per OI-78.

/

Test Director Date

/

Second Verification Date l I

Page 59 of 114 i 1570b/LMS/DK

.- - +-4

i TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST HEV 0000 CLASS: SAFETY RELAfED SPECIAL TEST 88-17 7.14.1.24 RESTORE 250V Battery Charger 2A to normal operating condition.

/

Test Director Date

/

Second Verification Date 7.14.1.25 RISTORE 480V Shutdown Board 2B to normal operating condition per OI-57.

/

Test Director Date

/

Second Verification Date 7.14.1.26 RISTORE Recirculation MG Set Oil Pump 2A-2 to normal operating condition per OI-68.

/

Test Director Date

/

'Second Verification Date -

7.14.1.27 RISTORE Recirculation MG Set Oil Pump 23-2 to

_ nor=al operating condition per OI-68.

/

Test Director Date D

/

Second Verification Date 7.14.1.28 RESTORE Rav Cooling Water Booster Pump 2B to normal operating condition per 0I-24

/

Test Director Date

/

Second Verification Date Page 60 of 114 1570$/LMS/DK

TITLE: DIESEL GETERATOR B EMERGENCY LOAD ACCEPTANCE TEST REV 0000' CLASS: SAFETY RELATED SPECIAL TEST 38 17 7.14.1.29 RESTORE RWCU Recirculating Pn=p 23 to,nor=al operating condition per OI-69.

/

Iest Director Date

/

Second Verification Date 7.14.1.30 RESTORE Fuel Pool Cooling Pu=p 23 to normal operating condition per OI-78.

/

Test Director Date

/

Second Verification Date 7.14.1.31 RESTORE Dryvell Blower 2A-1 to normal operating condition per OI-30.

/

Test Director Date

/

Second Verification Date -

7.14.1.32 RESTORI Dryvell Blower 2B-1 to nor=al operating

_ condition per OI-30.

/

Test Director Date

/

Second Verification Date 7.15 480V Reactor MOV Board Return to Normal 7.15.1 REQUEST operations to perfor= the following:

. Page 61 of 114 1570b/LMS/DN

_ . - - _ m . _,-,,,y-- , - - . - ,_

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST HEV On00 CLASS: SATETY RELATED SPECIAL TEST 88-17 l

l 7.15.1.1 RESTORE Reactor MOV Board LA to normal operating l condition per OI-57.

/

Test Director Date l

/

Second Verification Date 1 7.15.1.2 RESTORI Shutdown Board Rooms Exhaust Fan lA to normal operating condition per OI-30.

/

Test Director Date

/

Second Verification Date 7.15.1.3 RESTORE RWCU Demineralizer Holding Pump 1A to normal operating condition per OI-69.

/

Test Director Date

/ .

Second Verification Date 7.15.1.4 RESTORE Dryvell Blower 1A-3 to normal operating

_ condition per OI-30.

/

Test Director Date

/.

Second Verification Date 7.15.1.5 RESTORE Dryvell Blower 1B-3 to normal operating condition per 01-30.

/

Test Director Date

/

Second Verification Date Page 62 of 114 1570b/LMS/Dd '

-- - - - - - , , . - - - -e -

,,- ~ - - - - . - . - - ---r - --,

l l

l

. 1 TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST HIV 0000 i CLASS: SAFETY RELATED- SPECIAL TEST 88-17 7.15.1.6 RISTORE Reactor MOV Board 1B to normal operating l condition per OI-57. l

/  !

Test Director Date l

/ \

Second Verification Date 7.15.1.7 RESTORE Dryvell Blower lA-4 to normal operating condition per OI-30.

l

/

Test Director Date l

/ \

Second Verification Date 1 7.15.1.3 RESTORE Dryvell Blower 1B-4 to normal operating condition per OI-30.

l

/

i Test Director Date  !

l

/

Second Verification Date

~

j 7.15.1.9 RESTORE Board Rooms Emergency Supply Tan 1B to I normal operating condition per OI-30. '

/

Test Director Date

/

Second Verification Date 7.15.1.10 RESTORE RWCU .Demineralizer Holding Pump 18 normal operating condition per OI-59. l

/

Test Director Date

/

Second Verification Date Page 63 of 114 1570b/LMS/Dk

. . - - - - . . - , ~ , , - -- , ,,,

i i

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST REF 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.15.1.11 RESTORE Reactor MOV Board 1C tenormal operating condition per 0I-57. '

/

Test Director Date

/

Second Verification Date 7.15.1.12 RISTORE Dryvell Blover 1A-5 to normal operating condition per 01-30.

{

/

Test Director Date J

1

/

Second Verification Date 7.15.1.13 RESTORI Dryvell Blower 1B-5 to normal operatidg condition per CI-30.

/

Test Director Date j

/

Second Verification Date 7.15.1.14 RESTORE Recirculation MG Set Oil Pump 1B-3 to normal operating condition per 0I-68.

/ .

Test Director Date

/

Second Verification Date 7.15.1.14.1 .

REMOVE CAUTION ORDER on the following breakers on RMOV Board 2A 7.15.1.14.1.a. Turbine Brg'. Lift Pumps Compt. 10

/

Test Director Date

/

Second Verification Date Page 64 of 114 1570b/LMS/DK __

O O A

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED

, SPECIAL TEST 88-17 7 .15 .1.14'.1. b DW Equipment. Drain Sump Pump 2A Compt. 4E - -

/

Test Director Date

/

Second Verification Date l

7.15.1.14.1.c CW Floor Drain Sump Pump 2A Compt. 4E l 1

1

/

Test Director Date

/ . \

Second Verification Date 7.15.1.14.1.e Pri. Control Puge Air Fitr. Compt. 9B e

/

Test Director Date,

/

Second Verification Date 7.15.1.14.1.f SLC Control Trace Her. Compt. 12A l

/

Test Director Date

/

Second Verification Date 7.15.1.15 RESTORE Reactor MOV Board 2A to normal operating condition per CI-57.

/

Test Director Date

. /.

Second Verification Date 7.15.1.16 KISTORE Dryvell blower 2A-3 to normal operating condition per CI-30.

/

Test Director Date Page 65 of 114 1570b/LMS/DK

- ~ - - - ' ~ ' *- ~ ~ '

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST BEV 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.15.1.17 RESTORE Drywell Blower 2B-3 to normal operating condition per 0I-30. l l

/ l Test Director Date l 1

/

Second Verification Date 1

7.15.1.13 RESTORE RWCU Demineralizer Holding Pucp 2A to normal operating condition per OI-69.

/

Test Director- Date

/ i Second Verification Date 7.15.1.19 RESTORE RPS Bus A to normal operating conditio'n per 2-0I-99.

/ l Test Director Date  !

/

Second Verification Date 7.15.1.20 RISTORE Reactor MOV Board 2B to normal operating )

condition per OI-57.  ;

1

/ l Test Director Date j

/

Second Verification Date 7.15.1.21 RESTORE Dryvell Blower 2A-4 to normal operating i condition per OI-30.

/

,, Test Director Date

/

Second Verification Date .

Page 66 of 114 .

1570b/LMS/DK -

, - - - - - - - ^ =

8EV 0000 TITLE: DIESEL GE!iERATOR B EMERGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELAT2D SPECIAL TEST 88-17 7.15,1.22 RESTdRE Dryvell Blower 2B-4 to normal operating condition per 2-0I-30. - -

I ---

Test Director Date.

/

Second Verification Date

. 7.15.1.23 RESTORE RWCU Demineralizer Holding Pump to normal operating condition per 0I-57.

Test Director Date

/_

Second Verification Date 7.15,1.24 RESTORE Reactor MOV Board 2C to normal operatihg condition per OI-30.

j Test Director Date

/

Second Verification Date.

7.15.1.25 RESTORE Dryvell Blower 2A-5 to ' normal operat?,ng condition per 2-0I-30.

/

Test Director Date

/

Second Verification Date 7.15.1.26 RESTORE Drywell Blower 2B-5 normal operating condition per 0I-30.

/

. Test Director Date

/

Second Verification Date ,

i.

j Page 67 of 114

! 1570b/LMS/DK --

4 B,-- -es-wws-w- ,- -~

- , , - - , - , , . , -- ---r.-,-- - , w- me , p- , ., --v , e ----, =y ,-m-,---v,- -w-t=

REV 0000 TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.15.1.27 RESTORE Recirculation MG. Set Oil Pump 2A-3 to normal operating condition per 0I-68. *

/

T e+t-Mree+c - "-t:

/

Second Verification Date 7.16 480V Diesel Aux Board A Return to Normal 7.16.1 REQUEST Operations to perform the following:

7.16.1.1 RESTORE 480V Diesel Aux Board A to normal ,

operating condition per OI-57. ,

/

Test Director Date

/

Second Verification Date, j 7.16.1.2 RESTORE Off Gas Dilution Fan lA to normal operating condition per 01-66. )

)

/ j Test Director Date (

/

Second Verification Date 7.16.1.3 RISTORE Off Gar. Dilution Fan 2A to normal operating condition per OI-66.

/

Test Director Date

/

Second Verification Date 7.16.1.4 RESTORE 0.ff Gas Dilution Fan 3A to normal operating condition per OI-66.

/ .

Test Director Date

/

Second Verification Date Page 68 of 114 ,

1570b/LMS/DK

- ,n.n , _.e -_. . - - - , - _ - - .

TITLE: DIESEL GEtiERATOR B EMIRGENCY LOAD ACCEPTANCE TEST EV 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.16.1.5 REST 0ltE SGT Filter Train A to standby readiness per 0-0I-65.

,/

Test Director Date

/.

Second Verification Date 7.16.2 REMOVE the ju=per from Terminals 7 and 8 of Relay A501 in Panel 25-43A-1.

/

Test Director Date

/

Second Verification Date 7.16.3 REMOVE the ju=per from Terminals 7 and8 of Relay B501 inI Panel 25-43B-1.

Test Director Date

/

Second Verification Date 7.16.4 REMOVE the jumper from Terminals 7 and 8 of Relay A5d3 in Panel 25-43A-1.

/

Test Director Date

/

Second Verification Date 7.16.5 REMOVE the ju=per from Terminals 7 and 8 of Relay B503 in Panel 25-43B-1.

9

/ _._

Test Director Dc.t e

/

Second Verification Date Page 69 of 114 . ,

1570b/LMS/DK . _ . . _

O

TITLE: DIESELGENhRATORBEMERGENCYLOADACCEPTANCETEST CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.16.6 REMOVE the jumper from Terminals 7 and 8 of Relay A505 in Panel 25-43A-1. *

/

Test Director Date

/

Second Verification Date 7.16.7 REMOVE the jumper from Terminals 7 and 8 of Relay B505 in Panel 25-43B-1.

/

Test Director Date

/

Second Verification Date 7.17 480V Diesel Aux Board B Return to Normal i 7.17.1 REQUEST Operations to perform the following: ,

. _ _ _ _ _ . _ . _ _ . _ . . _ 7.17.1.1 RISTORE 480V Diesel Aux Board B to normal operating condition per OI-57.

/

Test Director Date

/

Second Verification Date i

7.17.1.2 RISTORE Off Gas Dilution Fan 1B to nor=al  !

operating condition per CI-66.

/

Test Director Date

/

Second Verification Date 7.17.1.3 RISTORE Off Gas Dilution Fan 2B to normal operatin} condition per 0I-66.

/

Test Director Date

/

Second Verification Date Page 70 of 114 -

. 1570b/LMS/DK ~ ~ ~

l

_ . _ , _.._0.

TITLE: REV DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 7.17.1.4 RESTORE Off Gas Dilution Tan 3B to nor=al operating condition per 0I-66. --

/

Test Director Date

/

Second Verification Date 7.17.1.5 RESTORE SGT Tilter Train B to standby readiness per 0-0I-65. .

/

Test Director Date

/

Second Verification Date 7.17.2 REMOVE the jumper from Terminals 7 and 8 of Relay A506 in .

Panel 25-43A-2. .

/

Test Director Date

/

Second Verification Date .

7.17.3 REMOVE the jumper from Terminals 7 and 8 of Relay B506 in Panel 25-43B-2.

/

Test Director Date

/

Second Verification Date 7.17.4 REMOVE the jumper from Terminals 7 and 8 of Relay A502 in Panel 25-43A-2.

/

Test Director Date

/_

Second Verification Date Page 71 of 114

, 1570b/LMS/DK -

I TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST 0000 CLASS: SAPETY RELATED SPECIAL TEST 88-17 7.17.5 REMOVE the jumper from Terminals 7 and 8 of Relay B502 in Panel 25-43B-2. *

/

Test Director Date Second Verification Date 7.17.6 REMOVE the jumper from Terminals 7 and 8 of Relay A502 in Panel 25-43A-2.

/

Test Director Date

/

Second Verification Date 7.17.7 REMOVE the jumper from Terminals 7 and 8 of Relar B502 in Panel 25-43B-2.

/

Test Director Date

/

Second Verification Date ,

7.18 REMOVE all recording equipment installed in SPECIAL TEST 88-06.

~

/

Test Director Date

/

Second Verification Date 7.19 Return to Service 7.19.1 CLEAN the area of any debris.

/

Test Dir.ector Date 7.19.2 NO,IITY the Unit Operator this SPECIAL TEST is complete.

/

Test Director . Date Page 72 of 114

, 1570b/LMS/DK -

, . , , - , , - . - , , - - - -,, , y.,

i i

l TITLE: REV DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST 0000 CLASS: SAFETY RELATED SPECIAL TEST 88-17 .

l 7.19.3 NOTIFY the Shift Engineer this SPECIAL TEST'is comphte.

/

Test Director Date O

e e

4 s

I 1

9 4

4 0

Page 73 of 114

, 1570b/LMS/DK - I I

ll

- - . _ , ,. __ . . . , - - , _ _ _,m._ . _ . . . . _ , , , ,. , _ , . _,,m..

l l

l TITLE: DIESEL GENERATC'.- 4 EMIRGENCY LOAD ACCEPTANCE TEST BEV 0000 i l

l CLASS: CAFETY RELATED SPECIAL TEST 88-17 .

8.0 ACCEPTA!!CE CRITERIA 8.1 Diesel Generator B accepts and accelerates all permanently 1

I connected and auto sequenced loads with acceptable voltage )

and frequency transients. '

I i Test Director Date i l

8.2 DNE evaluation is complete and appended to this procedure j accepting test results and data provided, j

/

Test Director Date ILLUSTR ATIONS /ATTACIO'EffrS Attachment 1 - Load Shed Table j Attachment 2 - Relay Contact Layout Att achment 3 - Load Status Table i

l

. 1 1

I l

Page 74 of 114

. 1570b/LMS/DK -

4

,-3_,,_- . . . - . _. , _y - - - - - _ , - - .- .,

I TITLE: DIESEL GE!ERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 1 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 LOAD SNED TABLE BRD CMP COM SYS UV U1ACC U2ACC Load DWG recon -

after l

forty i see DGA 2A STACK FILTER CUBICLE EXHAUST FAN A 66 N N N N/A 45N785-5 DGA 2B CEICRAL DIESEL INTORMATION CENTER EXHAUST FAN 82 N N N N/A 45N771-1 DGA 2C DIESEL GENERATOR TPJJISTORMER TDA EXHAUST FAN 219 N N N N/A 45N771-3 DGA 2D DIESEL GENERATOR BUILDING FUEL OIL TR/JISTER PUMP 18 N N N N/A 45N771-3 l

DGA 2El C0!CROL BAY ELEVATOR 302 N N N N/A 45N785-9 DGA 2E2 GAGING STATION TRANSFORMER 219 N Y Y N 45N771-5 DGA 2F STANDBY GAS TREATMENT BUILDING 2 SUMP PUMP C 77 N N N N/A 45N3772-2 DGA 3A DIESEL GENERATOR A AIR COMPRESSOR A 82 N Y Y N 45N771-3 DGA 33 DIESEL GE!ERATOR A BATTERY EXHAUST FAN - 254 N N N N/A 45N771-1 DGA 3C DIESEL GE!ERATOR A ROOM HEATER 82 N Y Y N 45N771-3 l

DGA 3D DIESEL GENERATOR A EXHAUST FAN A 82 N N N N/A ASN771-3 DGA 3E DIESEL GENERATOR A LUBE OIL CIRCULATION PUMP 82 N N N N/A 45N771-3 DGA 3E DIESEL GENERATOR A WATER HEATER 82' N N N N/A 45N771-3

~

DGA 3F DIESEL GENERAT0R A BATTERY l CHARGER A EMERGENCY FEEDER 254 N N N N/A 45N771-4 l

l 1590b/LMS/DK Page 75 of 114 l

I

- -- c ---_ .__ _. , , -

_ , _ , . - _ _ , . _ ,- m__ . . __ , , _ - . . - _ , - - , - , - - , , . , w

TZTLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 2 of 40 CLASS: - SAFETY RELATED Special Test 88-17 REY 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon after

  • forty see DGA 4A DIESEL GENERATOR B AIR COMPRESSOR A 82 N Y Y N 45N771-3 DGA 4B DIESEL GENERATOR B BATTERY EXHAUST FAN 254 N N N N/A 45N771-1 DGA 4C DIESEL GENERATOR 8 ROOM. HEATER 82 N Y Y N 45N?71-3 DGA 4D DIESEL GENEP.ATOR B EXKAUST FAN A 32 N N N N/A 45N771-3 DGA 4E DIESEL GENERATOR B WATER EATER 82 N N N N/A 45tO71-3 DGA 4E DIESEL GE!ERATOR B LUBE OIL CIRCULATION PUMP 82 N N N N/A 45N771-3 DGA 4F DIESEL GENERATOR B BATTERY CHARGER A EMERGENCY TEEDER 254 N N N N/A 45N771-4 DGA SA 0FF GAS DILUTION FAN 1A 66 N LLQIE: AUTO START ~45N771-4 .

DGA SC OFF GAS DILUTION FAN 2A 66 N OF FANS IS BLOCKED 45N771-4 DGA SE OFF GAS DILUTION 1AN 3A 66 N BY LOAD SED SIGNAL 45N771-4 DGA 7A EMERGENCY EQUIPMENT C00LI!iG WATER EADER TRACE EATING 67 N N N N/A 45N771-5 DGA 7C STANDBY GAS TREATMENT BUILDING SUMP PUMP A 77 N N N N/A 45N771-1 DGA 7D STANDBY GAS TP.EATMENT BUILDING EATER A 219 N Y Y N 45N771-6 DGA 7E GE!ERATOR PURGING CO2 VAPORIZER IMMERSION 39 N Y Y N 45N771-5 DGA 7E GENERATOR' PURGING CO2 .

VAPORIZER SUPEREATER

Page 76 of 114

i i

l TITLE: DIESEL GENERATOR E EMIRGENCY LOAD ACCEPTANCE TEST Attachment 1 {

Page 3 of 40 1 CLASS: SAFETY RELATED Sgecpplgqstjaf-17 l l

1 LOAD SEED TABLE l

BRD CMP COM SYS UV U1ACC U2ACC Load DWG {

recon .

i after j forty '

see DGA SA DIESEL GENERATOR C AIR I COMPRESSOR A 82 N Y Y N 45N771-3 DGA SB DIESEL GENERATOR C l EXHAUST FAN B 82 N N N N/A 45N771-3 j DGA SD EMERGENCY FEEDER TO RESIDUAL HEAT REMOVAL SERVICE WATER AND EMERGENCY EQUIPMENT l COOLING WATER TRACE HEATER A 67 N N N N/A 35N720-6  !

DGA CE EMERGENCY FEEDER TO RESIDUAL l

HEAT REMOVAL SERVICE WATER I AND EMIRGENCY EQUIPMENT COOLING WATER TRACE HEATER D 67 N N N N/A 35N730-6 l l

DGA 8E 480V EVACUATION ALARM FUSE PANEL NORMAL FEEDER 9.44 N N N N/A DGA 8F DIESEL GENERATOR C BATTERY CHARGER A EMERGENCI FEEDER 254 N N N N/A 45N771-4 DGA 9A DIESEL GENERATOR D AIR COMPRESSOR L 82 N I

Y Y N 45N771-3 i DGA 9B DIESEI. GENERATOR D EXHAUST FAN B 82 N N N N/A 45N771-3 DGA 9E FEEDER TO 480V RADWASTE '

BOARD 1 - FLOOD PROTECTION '

EQUIPMENT 77 N N N ,N/A 45N785-3 DGA 9F DIESEL GENERATOR D BATTERY CHARGER A EMERGENCY FEEDER 254 N N N N/A 45N771-4 DGA 10A STANDBY GAS TREATMENT FILTER TRAIN A CHARCOAL HEATER 65 N Y Y Y 45 N771-2 DGA 10C STANDBY GAS TREATMEffr FILTER TRAIN HUMIDITY CONTROL HIATER 65 N Y .Y Y 45 N771-2 1590b/LMS/DK Page 77 of 114

t O

TITLE: DIESEL GENERATOR B EMERGE! ICY LOAD ACCEPTANCE TEST Attachment 1 Page 4 of 40 CLASS: SAFETY RELATED Special Test 88-17 SE2 0000 LOAD SHID TABLE BRD CMF COM SYS UV UlACC U2ACC Load DWG recon ~

after forty see DGA 10F1 EMERGENCY EQUIPMENI COOLING WATER STRAINER A 67 N N N N/A 45N771-5 DGA 10F2 EMERGENCY EQUIPMENT COOLING WATER STRAINER D 67 N N N N/A 45N771-5 DGA ilA STANDBY GAS TREATMENT FILTER TRAIN A SYSTEM FAN 65 N Y Y Y 45N771-2 DGA 12A VACUUM PRIMING' PUMP B 34 N N N N/A 45N777-8.

DGA 12C EMERGENCY EQUIPMENT COOLING WATER NORTH EADER SUPPLY VALVE (FCV-67-49) 67 N N N N/A 45N771-3 DGA 12E EMERGENCY EQUIPMENT COOLING WATER NORTH HEADER SECTIONALIZING VALVE DIESEL GENERATOR TO U1 (FCV-67-13) 67 N N N N/A 45N771-4

~

DGB 2A STACK FILTER CUBICLE EXHAUST FAN B 66 N N N N/A 45fD86-5 DGB 2B STACK SARPLING ROOM HEATER 219 N Y Y N 45N771-3 DGB 2C DIESEL GENERATOR AI'XILIARY TRANSFORMER TDB EXHAUST FAN 219 N N N N/A 45N771-3 DGB 2D DIESEL GENERATOR AUXILIARY TRANSFORMER TDE EXHAUST FAN 219 N N N N/A- 45fD71-3 DGB 2E SEWAGE TRIATMENT PLANT 301 N' Y Y N 45N771-5 DGB 2F1 CLOSED COOLING WATER DISCHARGE SAMPLING PUMPS. 70 N N N N/A 45N771-5 DGB 2F2 POWER OUTLETS._ 219 N Y Y N 45N771-5 1590b/LMS/DK Page 78 of 114 e

-- -e .- , , -,g-

l l

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 5 of 40 CLASS: SAFETY RELATED Special Test 88-17 ,

REN 0000 l LOAD SHED TABLE -

BRD CMP COM SYS UV UlACC U2ACC Load DWG recon -

after i forty see DGB 3A DIESEL GENERATOR D AIR COMPRESSOR B 82 N Y Y N 45N771-6 DGB 3B DIESEL GENERATOR D BATTERY EXHAUST FAN 254 N N N N/A 45 N771-1 DGB 3C DIESEL GENERATOR D '

ROOM HEATER 82 N Y Y N 4 5 N771-3 DGB 3D DIESEL GENERATOR D EXHAUST FAN A 82 N N N N/A 45N771-3 DGB 3E DIESEL GET???JO9 D WATER EEATER 82 N N N N/A 45N771-3 DGB 3E DIESEL GENERATOR D LUBE OIL CIRCULATION PUMP 82 N N N N/A 45N771-3 DGB 3F DIESEL GENERATOR D BATTERY CHARGER B 254 N N N N/A 45N771-4 .

DGB 4A DIESEL GENERATOR C AIR COMPRESSOR 5 82 N Y Y N 45N771-6 DGB 4B DIESEL GENERATOR C BAITERY EXHAUST FAN 254 N N N N/A 45N771-1 i l

DGB 4C DIESEL GENERATOR C l ROOM HEATER 82 N Y Y N 45N771-3 DGB 4D DIESEL GENERATOR C EXHAUST FAN A 82 N N N N/A 45N771-3 DGB AE DIESEL GENERATOR C WATER KEATER , 82 N N N N/A 45N771-3 DGB 4E DIESEL 'GENERATpR C LUBE OIL CIRCULATION PUMP 82 N N N N/A 45N771-3 I DGB 4F . DIESEL GENERATOR C BATTERY CHARGER B 254 N N N N/A 45N771-4 1590b/LMS/DK Page,79 of 114

_ --- ~ "

6 TITLE: DIESEL GEIERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 6 of 40 CLASS: SAFETY RELATED Special Test 88-17 RE7 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon -

after forty see DGB 5A 0FF GAS DILUTION FAN 1B 66 N E: AUTO START 45N771-4 DGB SC OFF GAS DILUTION FAN 2B 66 N OF FANS IS BLOCKED 45N771-4 DGB SE OFF GAS DILUTION FAN 3B 66 N BY LOAD SHED SIGNAL 45N771-4 DGB 7A EMERGENCY EQUIPMENT COOLING WATER HEADER TRACE HEATING 67 N N N N/A 45N771-5 DOB 7C STANDBY GAS TREATMENT BUILDING SUMP PUMP B 77 N N N N/A 45N771-1 DGB 7D STANDBY GAS TREATMENT BUILDING HEATER B 219 N Y Y N 45N771-6 DGB 7F1 CO2 STORAGE TANK, * '

REFRIGERATION UNIT 39 N Y Y N 45fD71-5 DGB 7F2 STACK LIGHTING i TRANSFORMER LC81 247 N Y Y N 45N771-5 ~

DGB 8A DIESEL GE!ERATOR B .

1 AIR COMPRESSOR B 82 N Y Y N 45N771-6 I DGB 8B DIESEL GE!EPETOR B EXHAUST FAN B 82 N N N N/A 45fD77-3 DGB 8E l ALTERNATE FEEDER TO 480V i EVACUATION ALARM FUSE PANEL 244 N N N N/A 45N786-12 DGB 8E EMERGENCY FEEDER TO RESIDUAL HEAT REMOVAL SERVICE WATER l AND EMERGENCY EQUIPMENT COOLING WATER TRACE I HEATER B AND C 67 N N N N/A

, 35N720-6 '

DGB 8F DIESEL GE!ERATOR B BATTERY CHARGER B 254 N N N N/A 45N771-4 -

l 1590b/LMS/DK Page 80 of 114 9

_ n. . < - , , .v --~v v~'

6 TITLE: DIESEL GE!ERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attaclwent 1 Page 7 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 LOAD SHED TABLE BRD CMP COM SYS UV U1ACC U2ACC Load DWG recon *

, after forty see DGB 9A DIESEL GE!ERATOR A '

AIR COMPRESSOR B 82 N Y Y N 45N771-6 DGB 9B DIESEL GE!ERATOR A EXHAUST FAN B 82 N N N N/A 45fD77-3 DGB 9E FEEDER TO 480V RADWASTE BOARD 2 FLOOD PROTECTION EQUIPME!C 77 N N N N/A 45fD86-3 DGB 9F DIESEL GENERATOR A BATTERY CHARGER B 254 N N N N/A 45!U71-4 DGB 10A STANDBY GAS TREATMENT . ,

FILTER TRAIN B ,

CHARCOAL HEATER 65 N Y Y Y 45tD71-2 DGB 10C  !

STANDBY GAS TREATME!C i

FILTER TRAIN B HUMIDITY CONTROL HEATER 65 N Y Y Y 45fD71-2 DGB 10F1 EMERGENCY EQUIPME!C C00LIliG WATER STRAINER B 67 N N N N/A 451071-5 DGB 10F2 EMERGENCY EQUIPMENT COOLING WATER STRAI!ER C 67 N N N/A N 45!U71-5 DGB llA STANDBY GAS TREATMENT FILTER TRAIN B SYSTEM FAN 65 N Y Y Y 45!U71-2 DGB 12A  !

DIESEL GENERATOR BUILDING SUMP PUMP B 40 N N N N/A 45N771-4 DGB 12B 0FF GAS STACK HOIST 111 N Y Y N 45!U71-5 DGB 12C EMERGENCY EQUIPME!C COOLING WATER SOUTH HEADER SUPPLY VALVE (FCV-67-48) 67 N N N N/A 45N771-3 DGB 12E EMERGENCY EQUIPMENT COOLING

. WATER SOUTH HEADER SECTIONALIZING VALVE DIESEL GENERATOR TO UNIT 1 (FCV-67-14) 67 N N N N/A 45N771-4 1590b/LMS/DK -

Page 81 of 114

w i

TITLE: DIESEL GENERATOR B EMERGENCY LOAD' ACCEPTANCE TEST Attachment 1 Page 8 of 40 CLASS: SAFETY RELATED Special Test 88-17 R ET 0000 LOAD SHED TABLE '

BRD CMP COM SYS UV UlACC U2ACC Load DWG recon after forty see R1A 1A SHUTDOWN BOARD ROOMS EXHAUST FAN 1A 31 N Y Y N 45fD69-10 R1A 1D TURBINE BEARING LIFT PUMPS; ASSEMBLY A 47 N N N N/A 45N602-6 RlA 2B TURBINE BUILDING EMERGENCY LIGHTING TRANSFORMER 247 N N N N/A 45N1749-13 RlA 2C RESIDUAL HEAT REMOVAL 1 OUTBOARD VALVE (FCV-74-52) 74 N N N N/A 45N779-22 RlA 4A RESIDUAL EAT REMOVAL PUMP 1A COOLER FAN 64 N N N N/A 45N779-16 R1A 4B RESIDUAL HEAT REMOVAL

  • PUMP 1A SUCTION VALVE (FCV-74-1) 74 N N N N/A 45N779-8 R1A AD RESIDUAL' EAT REMOVAL ,

EXCHANGER A SERVICE WATER DISCHARGE VALVE (FCV-23-34) 23 N N N N/A 45N779-10 RlA SA DRYWELL EQUI? MENT DRAIN SUMP PUMP 1A 77 N N N N/A 45N779-14 R1A SB RESIDUAL EAT REMOVAL PUMP IC SUCTION VALVE (FCV-74-12) 74 N N N N/A 45N779-8 R1A SD RESIDUAL EAT REMOVAL EXCHANGER C SERVICE WATER DISCHARGE VALVE (FCV-23-40) 23 N N N N/A 45N779-10 RlA 6A CORE SPRAY NORTHWEST ROOM COOLER FAN 75 N N N N/A 45N779-16 R1A 6B RESIDUAL HEAT REMOVAL -

CONTAINMENT SPRAY VALVE

-(FCV-74-60) -

74 N N N N/A 45N779-ll 1590b/LMS/DK Page 82 of 114 4

..- - . .. . ,_. - - - - - - y - -

i TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attach:nent 1 Page 9 of 40 CLASS: SAFETY RELATED Special Test 88-17 EM 0000 LOAD SED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon "

after forty see R1A 6C RESIDUAL EAT REMOVAL SHUTDOWN COOLING SUCTION VALVE (FCV-74-2) 74 N N N N/A 45N779-13 RlA 6E RESIDUAL HEAT REMOVAL DISCHARGE TO MAIN CONDENSER VALVE (FCV-74-62) 74 N N. N N/A 45N779-10 R1A 7A BREATHING AIR REFILL COMPRESSOR NORMAL FEEDER 49 N N N N/A 45N773-4' RlA 7B RESIDUAL EAT REMOVAL >

CONTAINMENT SPRAY VALVE I (FCV-74-61) 74 N N N N/A 45N779-ll l RlA 7C RESIDUAL EAT REMOVAL SHUTDOWN COOLING SUCTION l VALVE (FCV-74-13) 74 N N N ,

N/A 45N779-13 l Ria 7E RESIDUAL HEAT REMOVAL  !

SYSTEM 1 FLUSH VALVE (FCV-74-104) 74 N N N N/A 45N779-10 Rla 8B DRYWELL FLOOR DRAIN SUMP PUMP 1A 77 N N N N/A 45N779-15 RlA SC RESIDUAL EAT REMOVAL SHUTDOWN COOLING SUCTION l ISOLATION VALVE (FCV-74-48)* 74 N N N N/A 45N779-7 i RlA 8E RESIDUAL EAT REMOVAL SHUTDOWN COOLING EAD SPRAY ISOLATION VALVE (FCV-74-78) 74 N N N N/A 45N779-8 I 1590b/LMS/DK Page 83 of 114 SN~

G s't

TITLE: DIESEL GE!TERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 10 of 40 CLASS: SAFETY RELATED Special Test 88-17 l l

REV 0000 LOAD SHED' TABLE BRD CMP CCM SYS UV UlACC U2ACC Load DWG recon -

after ,

forty  !

see l RlA 9A BOARD ROOM EMERGENCY AIR CONDITIONER 31 N N N N/A 451069-10 R1A 9B PRIMARY CONTAINMENT PURGE AIR FILTER 64 N N N N/A 45!U79-19 RlA 9B2 FUEL POOL FILTER DEMINERALICER OUTBOARD ISCLATION VALVE (FCV-78-64) 78 N N N N/A 45N779-13 RlA 9D FUIL POOL FILTER {

DEMINERALI ER BYPASS VALVE (FCV-78-65) 78 N N N N/A 45N779-17 I

RlA SE REFUIL POOL FILTER ,

DEMINERALIZER ISOLATION OUTBOARD VALVE (FCV-78-67) 78 N N N N/A 45N779-13 RlA 10A MAIN TURBINE TURNING GEAR MOTOR 47 N N N N/A 45N602-6 R1A llA REACTOR WATER CLEANUP DEMINERALIZER HOLDING PUMP 1A 69 N Y Y N 45N1749-4 RlA 11B CORESPRANPUMP1ASUCTION VALVE (FCV-75-2) 75 N N N N/A 45N779-13 RlA 11C, RISIDUAL EAT REMOVAL SERVICE WATER COMPARTMENT A SUMP PUMP.A 23 N N N N/A 45N779-18 RlA 11D RESIDUAL EAT REMOVAL SERVICE j WATER COMPARTMENT C l SUMP PUMP A 23 N N N N/A 45N779-18 RlA llE RESIDUAL EAT REMOVAL PRESSURE

, SUPPRESSION CHAMBER ISOLATION VALVE (FCV-74-57) 74 N N ,

N N/A 45N779-ll RlA 12A STANDBY LIQUID CONTr0L PUMP 1A MOTOR EATER 63 N N N N/A 45N779-5 RlA 12A

  • STANDBY LIQUID CORtKOL  !

TRACE EATING 1A 63 N N N N/A 45N779-5 1590b/LMS/DK Page 84 of 114 I

_ )

l l

1 TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 11 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 LOAD SHED TABLE BRD CMP COM SYS UV U1ACC U2ACC Load DWG recon **

after forty RlA 12B CORE SPRAY PUMP 1C SUCTION VALVE (FCV-75-11) 75 N N N N/A -4 5N7 7 9-13 -----

RlA 12E RESIDUAL HEAT REMOVAL PRESSURE SUPPRESSION CHAMBER SPRAY VALVI (FCV-74-58) 74 N N N N/A 45N779-ll RlA 13A REACTOR PROTECTION SYSTEM MOTOR GENERATOR SET 1A 99 N N N N/A 4 5 N708 -2.

RlA 13B CORE SPRAY OUTBOARD VALVE (FCV-75-23) 75 N N N N/A 45N779-18 9

R1A 13C DRYWELL CONTROL AIR COMPRESSOR LA 32 N N N N/A 45N779-5 RlA 13E FUEL POOL MAKEUP FROM RESIDUAL HEAT REMOVAL OUTBOARD VALVE (FCV-78-62) 78 N N N N/A 45N779-6 RlA 14A RESIDUAL HEAT REMOVAL PUMP 1C COOLER FAN 64 N N N N/A 45N779-16 RlA 14B COPI SPRAY INBOARD VALVE (FCV-75-25) 75 N N N N/A 45 N779-10 R1A 14E COPI SPRAY SYSTEM 1 MINIMUM FLOW BYPASS VALVE (FCV-75-9) 75 N N N N/A 45N779-10 RlA 16A CORE SPRAY TEST VALVE ,

(FCV-75-22) 75 N N N N/A 45N779-8 ]

j RlA 16B REACTOR BUILDING EMERGENCY LIGHTING TRANSFORMIR 247 N N N N/A 45N1749-13 RlA 16C1 250V BATTERY CHARGER SB-A 248- N N N N/A 45E709-1 RlA 16E REACTOR WATER CLEANUP SYSTIM ISOLATION VALVE (FCV-69-1) 69 N N N 'N/A 45 N779-8 1590b/LMS/DX Page 85 of 114 ,'

TITLE: DIESEL GEtERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 12 of 40 CLASS: SAFETY RELATED Special Test 88-17 H EV 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon

  • after forty sec 9

RlA 17A DRTnTLL BLOWER 1A-3 70 N Y Y Y(U-2) 45N779-3 RETURNS IN 40 SECONDS WITH U2 ACCIDE!C RlA 17C MAIN STEAM DRAIN VALVE (FCV-1-55) 1 N N N N/A 45N779-12 RlA 17E HIGH PRESSURE C00LAlif INJECTION STEAM SUPPLY LI!E ISOLATION VALVE (FCV-73-2) 73 N N N -

N/A 45N779-13 i

R1A 18A DRTnTLL BLOWER 1B-3 70 N Y Y Y(U-2) 45N779-3 RETURNS IN 40 SECO$DS WITH U2 ACCIDEIC RlA 18E RAW SERVICE WATER HEAD TANK ISOLATION VALVE (FCV-25-70) 25 N N N N/A 45N779-23 R1A R10F ANALYEER SAMPLE RETURN PUMP 76 N N 3 N/A 45W676-4 RlA .R9A 250V SHUTDOWN BOARD BATTERY ROOM EXHAUST TAN 1A 31 N N N N/A 45N779-18 RlA R9B 250V SHUTDOWN BOARD BATTERY ROOM SUPPLY TAN 1A 31 N N N N/A 45N779-18 R1A R9D1 250V SHUTDOWN BOARD BATTERY ROOM DUCT HEATER 31 N N N N/A 45N779-18 R1A R9D2 TURBI!E EXHAUET VACUUM RILIEF REMOTE VALVE , .,

4 (TCV-71-59) 71 N N N N/A 45N779-12 1590b/LMS/DK Page 86 of 114 l g C -~

8

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST Attachment 1

, Page 13 of 40 CLASS: SATETY RELATED Special Test 88-17 REV 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon

  • after forty see R1B 1A DRYWELL TLOOR DRAIN SUMP PUMP 1B 77 N N N N/A 45N779-15 RIB 1B REACTOR BUILDING TLOOR DRAIN SUMP PUMP 1B 77 N N N N/A 45N779-16 R1B' 1C RESIDUAL IIEAT REMOVAL PUMP B '

SUCTION CROSSTIE VALVE (FCV-74-98) 74 N N N N/A 45N770-10, R1B 1E CORE SPRAY TEST VALVE (TCV-75-50) 75 N N N N/A 45N779-8 1

1 R1B 3A RESIDUAL HEAT REMOVAL OUTBOARD VALVE (TCV-74-66) 74 N N N N/A 45 N779-2,2 R1B 3T RESIDUAL HEAT REMOVAL SERVICE WATER COMPARTMENT A I SUMP PUMP B 23 N N N N/A 45N779-18 .

RlB 4A DRYWELL BLOWER 1A-4 70 N Y Y Y(U-2) 45N779-3 RlB 4C RESIDUAL HEAT REMOVAL PUMP 1B SUCTION VALVE '

(FCV-74-24) 74 N N N N/A 45N779-8 RlB 4E CORE SPRAY SYSTEM 2 MINIMUM TLOW BYPASS VALVE (TCV-75-37) 75 N N N N/A 45N779-10 R1B 5A CLOSED CIRCULATING WATER SECTIONALIZING VALVE (FCV-70-48) 70 N N N N/A 45 N779-6 VALVE CLOSES ON U1 OR U2

., ACCIDENT CAN BE OPERATED

, IFTER 40 SEC R1B SC2 RESIDUAL KEAT REMOVAL PUMP 1D SUCTION VALVI '

(FCV-74-35) 74 ' N N N N/A 45N779-8 1590b/LMS/DK Page 87 of 114 h-O 9

_ _ _ _ _ _ . _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . _ . _ _ _ . _ _ _ _ . _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ . _ _ _ _ . _ _ _ . _ R

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 14 of 40 CLASS: SAFETY RELATED Special Test 88-17 EEV 0000 LOAD SHED TABLE

. 1 BRD CMP COM SYS UV U1ACC U2ACC Load LWG recon '

after forty see R1B !E CORE SPRAY PUMP 13 SUCTION VALVE (FCV-75-30) 75 N N N N/A 45N779-13 R1B 6A CLOSED C00 LINO WATER 1

ISOLATION VALVE (FCV-70-47) 70 N N N N/A 45N779-8 l RlB 6C1 ANNUNCIATOR BATTERY CHARGER A 251 N N N N/A 1

l R1B 6C2 RESIDUAL HEAT REMOVAL SHUTDOWN COOLING SUCTION VALVE (FCV-74-25) 74 N N N N/A 45N779-13 R1B 6E CORE SPRAY PUMP 1D SUCTION I VALVE (FCV-75-39) 75 N N N N/A 45N779-13 '

R1B 7A PRESSURE SUPPRESSION CHAMBER WATER PUMP 1B 75 N N N N/A 45N779-19 {

RlB 7B RESIDUAL HEAT REMOVAL PUMP 1B COOLER FAN 64 N N N N/A 45N779-16 R1B 7C RESIDUAL WEAT REMOVAL SHUTDOWN COOLING SUCTION VALVE (FCV-74-36) 74 N N N N/A 45N779-13 RlB 7 CORE SPRAY INBOARD VALVE (FCV-75-53) 75 N N N N/A 45N779-10 R1B 8A HIGH PRESSURE COOLANT INJECTION BYPASS VALVE (FCV-73-81) 73 N N N N/A 45N779-43

. RlB BB CORE SPRAY NORTHEAST COOLER FAN 75 N N N N/A

, 45N779-16 RlB BC RESIDUAL HEAT REMOVAL DISCHARGE TIE VALVE (FCV-74-46) 74 N N N N/A 45N779-10 .

RlB 8E CORE SPRAY CUTBOARD VALVE (TCV-75-51) 75 N N N N/A 45N779-13 1590b/LMS/DK Page 88 of 114 9

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST At tach:nent 1 Page 15 of 40 CLASS: SAFETY RELATED Special Test 88-17 BEF 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon -

after forty see R1B 9A FUEL POOL MAKEUP FROM RESIDUAL HEAT REMOVAL THROTTLING INBOARD VALVE (FCV-78-61) 78 N N N N/A 451U79-6 R1B 9B FUEL POOL FILTER DEMI!ERALIZER INBOARD ISOLATION VALVE (FCV-78-63) 78 N N N N/A 45tO79-13 R1B 9D IVEL POOL FILTER DEMI!ERALIZER BYPASS VALVE (FCV-78-66) 78 N N N N/A 45!U79-17 I

RlB 9E IVEL POOL FILTER DEMINERALIZER INBOARD ISOLATION VALVE (FCV-78-68) 78 N N N N/A 45N779-13 R1B 10C "ESIDUAL HEAT REMOVAL C0!CAI!'ME!C SPRAY VALVE (FCV-74-74) . 74 N N N N/A 45N779-11 1 R1B 10E RESIDUAL HEAT REMOVAL

  • I CONTAINME!U SPRAY VALVE  !

(FCV-74-75) 74 N N ,N N/A 451079-11  !

RlB llA DRYVELL CONTROL COMPRESSOR 1B 32 N N N N/A 45N779-5 RlB llc RESIDUAL EAT REMOVAL PRESSURE SUPPRESSION CHAMBER CHAMBER ISOLATION VALVE (FCV-74-71) 74 N N N N/A 45N779-11 1

R1B llE RESIDUAL ESAT REMOVAL '

PRESSURE CHAMBER SPRAY VALVE (FCV-74-72) 74 N N N N/A 45N779-11 R1B 12B RESIDUAL EAT REMOVAL PUMP 1D COOLER FAN 64' N N N N/A 45N779-16 .

R1B 12E RESIDUAL HEAT REMOVAL DISCHARGE TO RADWASTE VALVE (FCV-74-63) 74 N N N N/A 45N779-10 1590b/LMS/DK Page 89 of 114 '

=

e . .

___ _ _- -

  • v-. --

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 16 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon after forty

. see RlB 13A REACTOR CORE ISOLATION COOLING STEAM SUPPLY ISOLATION VALVE (FCV-71-2) 71 N. N N N/A 45N779-12 RlB 13Cl REACTOR BUILDING EMERGENCY LIGHTING TRANSFORMER 247 N N N N/A 45N1750-7 R1B 13E RESIDUAL EAT REMOVAL SYSTEM 2 FLUSH VALVE .

(FCV-74-106) 74 N N N N/A 45N779-10 R1B 14A EMERGENCY EQUIPMER COOLING .

WATER SOUTH EADER 8 SECTIONALIZING VALVE

, (FCV-67-lS) 67 N N N N/A 45N779-$

R1B 14C1 REACTOR PROTECTION SYSTEM MOTOR GENERATOR SET 1B 99 N N N N/A 45N708-2 RlB 14C2 RESIDUAL EAT REMOVAL HEAT EXCHANGER B SERVICE WATER DISCHARGE VALVE (FCV-23-46) 23 *N N N N/A 45N779-10 R1B 15A DRYWELL BLOWER 1B-4 70 N Y Y Y(U-2) 45N779-3 RETURNS IN 40 SECONDS WITH U2 -

ACCIDE!C t

R1B 15C RESIDUAL EAT REMOVAL EAT EXCHANGER D SERVICE WATER

DISCHARGE VALVE (FCV-23-52) 23 N N N N/A 45N779-10 R1B 15E RESIDUAL HEAT REMOVAL SERVICE kATER COMPARTMENT C -

1 SUMP PUMP B 23 N N N N/A 45N779-18 1590b/LMS/DK Page 90 of 114 3 .

1

  • e

., , , ,- . - . _ , ,- , , . . -. w -. , , * -- -

i l

' l i

e TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1  !

Page 17 of 40 CLASS: .SAFITY RELATED Special Test 88-17 R F,V 0000 1

LOAD SHED TABLE BRD CMP CCM SYS UV UlACC U2ACC Load DWG l recon -

after 1 forty see R1B 17A BOARD ROOMS EMERGENCY SUPPLY FAN 1B 31 N Y Y N 45N769-7 R1B 1731 250V BATTERY CHARGER SB-C 248 N N N N/A 45N769-7 RlB 17B2 STANDBY LIQUID C0!CROL TRACE EATING 1B 63 N N N N/A 45N779-5 RlB 17C STANDBY COOLANT VALVE

, (FCV-23-57) 23 r N N N/A 45 N779-l'0 R1B 17E REACTOR WATER CLEAtMP SYSTEM ISOLATION VALVE (FCV-69-12) 69 N N N N/A 45N779412 R1B 1EA DRYWELL EQUIPMENT DRAIN '

SUMP PUM? 1B 77 N N N N/A 45N779-14 RlB 183 REACTOR BUILDING EQUIPMENT DRAIN SUMP PUMP 1B 77 N N N N/A 45N779-16 R1B 18D. REACTOR WATER CLEA!CP DEMINERALIZER HOLDING PUMP 13 69 N Y Y N 45N1750-6 RlB ISE BOARD ROOM EMERGENCY AIR CONDITIONER 31 N N N N/A 45 N769-10 I

R1B 18E2 TURBINE BEARING LITT PUMPS, ASSEMBLY B 47 N H N N/A 45N602-6 R1B 19A RESIDUAL EAT REMOVAL EAT EXCHANGER A-C DISCHARGE -

CROSSTIE VALVE (FCV-74-100) 74 N N F N/A 45N779-10 l 1

R1B 19C RESIDUAL EAT REMOVAL HEAT I EXCHANGER B-D DISCHARGE ,

I CROSSTIE VALVE (FCV-74-101) 74 N N N N/A 45N779-10. l R1B 19E RESIDUAL HEAT REMOVAL PUMP A SUCTION CROSSTIE VALVE (FCV-74-96) 74 N N N N/A 45N779-10  !

1590b/LMS/DK Page 91 of 114 '

1 I

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 18 of 40 CLASS: SAFETY RELATED Special Test 88-17 RE7 000o

, LOAD SHED TABLE BRD CMP CCM SYS UV UlACC U2ACC Load DWG recon -

after forty see R1B R10F ANALYCER SAMPLE RETURN FUMP 76 N N N N/A 45W676-4 RlB R6E RICIRCULATION PUMP IB SUCTION VALVE (FCV-68-77) 68 N N N N/A 45 N779-21 RlB R9A 250V SKUIDOWN BOARD BATTERY ROOM EXHAUST FAN 1B 31 N N N N/A 45N779-18 I RlB R9B 250V SKUTDOWN BOARD BATTERY ROOM SUPPLY FAN 1B 31 N N N N/A 45N779-18 RlC 1A DRYWELL BLOWER LA-5 70 N Y Y N 45N779-3 RlC IC CONTROL ROD DRIVE TIST HOLD EQUIPMENT HANDLING PLATFORM 0,UTLITS 111 N N N N/A 45N1751L9 R1C 1D RECIRCULATION MOTOR GENERATOR SET OIL PUMP IB-3 68 N Y Y N 45N779-2 RIC 3A CONTAINMINT ATMOSPHIRE DILUTION SYSTEM A FIED 84 N N N N/A 45N1635-39 l R1C 3B CONTROL R0D DRIVE WATER i TRANSFER VALVI (FCV-85-8A) 85 N N N N/A 45N779-8 i R1C 3C CONTROL R0D DRIVE RITURN LINE ISOLATION MOV (FCV-85-50) 85 N N N N/A 45N779-8 I

RlC 3E CONTROL ROD DRIVE WATER l PRESSURE CONTROL VALVE  !

, (FCV-85-23) 85 N N N N/A 45N779-7 R1C 4A REACTOR BUILDING CLOSED '

COOLING WATER SEAL WATER COLLECTION AND TRANSFER PUMP 70 N N N N/A 45N779-18 1

l 1590b/LMS/DK Page 92 of 114 l

^

1

, 1 i i TITLE: , DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 19 of 40 l

CLASS: SAFETY RELATED Special Test 88-17 )

BEV 0000 LOAD SKED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG l recon -

l after  !

forty see ,

RlC 4B REACTOR BUILDING EQUIPMENT DRAIN SUMP PUMP 1A 77 N N N N/A 45N779-16 R1C 4C EMERGENCY EQUIPMENT COOLING WATER NORTH HEADER SECTION

'I

)

VALVE (FCV-67-17) 67 N N N/A 45N779-8 l R1C 4E CONTROL ROD DRIVI COOLING WATER PRESSURE CONTROL VALVI (PCV-85-27) 85 N N N N/A 45N779-7' {

RlC 5B BUS EEAT EXCHANGER ALTERNATOR COOLER AND 1 EYDROGEN COOLING WATER  !

SKUTOFT MOV (FCV-24-25) 24 N N N N/A 45 N779-11 RlC SC CLOSED COOLING WATER SPARE PUMP SUCTION VALVI A  !

(FCV-70-13) 70 N N N N/A 45N779-6 l R1C 5E CONTROL ROD DRIVE PUMP l SUCTION SHUTOFF VALVE (FCV-85-56) 85 N N N N/A 45N779-17 l R1C R6B RECIRCULATION HEADER EQUALIZER VALVI (FCV-68-33) 68 N N N N/A 45N779-21 I l

R1C 6B STATOR LIQUID COOLING WATER SEUTOFT MOV (TCV-24-41) 24 N N N N/A 45N779-ll RlC 6C CLOSED COOLING WATER SPARI PUMP DISCHARGE VALVE A (TCV-70-14) 70 N N N N/A 45 N779-6 RIC 6E MAIN STEAM LINE DRAIN ..

VALVI (FCV-1-58) 1 N N N N/A 45N779-7 RlC 7A REACTOR BUILDING TLOOR DRAIN SUMP PUMP 1A 77 N N N N/A 45N779-16 RIC 7B PRIC00LER LIQUID COOLING WATER SKUTOFT MOV (TCV-24-57) 24 N N N N/A 45N779-11 -

1590b/LMS/DK Page 93 of 114 4 -

. i TITLE: DIESEL GE!ERATOR B EMERGEllCY LOAD ACCEPTANCE TEST Attachment 1 Page 20 of 40 CLASS: SATITY RELATED Special Test 88-17 REV 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon -

after. ,

forty see RlC R7B TEMPORARY EMERGENCY MAI!CENANCE TEED TO 480V REACTOR MOV BOARD 1D COMPARTME!C 5A 268 N N N N/A 45N1751-10 RlC 7C REACTOR WATER CLEANUP ,

BLOWDOWN VALVE (FCV-69-16) 69 N N N N/A 45N779-8 RIC R7E REACTOR WATER CLEANUP FILTER AND DEMI!ERALI ER SYSTEM BYPASS VALVE (FCV-69-8) 69 F N N N/A 45N779-lf RlC RSA RECIRCULATION PUMP 1A SUCTION VALVE (FCV-68-1) 68 N N N N/A ,45N779-21 RlC 8B TURBINE O L AND ELECTRICAL HYDRAULIC ColGROLS FLUID '

~ ~ '" '

C00LINC WATER SNUT0FF MOV (FCV-24-65) 24 N N N N/A 45N779-ll R1C SC REACTOR WATER CLEANUP DRAIN TO RADWASTE VALVE (FCV-69-17) 69 N N N N/A 45N779-8 RlC SE REACTOR WATER CLEANUP '

RESTRICTING ORIFICE BYPASS VALVI (FCV-69-14) 69 N N N N/A 45!U79-11 RIC R8E RECIRCULATION HEADER EQUALIZER VALVE (FCV-68-35) 68 N N N N/A 45N779-21 R1C 9B MAIN STEAM LINE DRAIN VALVE (FCV-1-57) 1 N N N N/A 45N779-7 R1C R93 TEMPORARY EMERGENCY TEED TO 480V REACTOR MOV BOARD lE 268 N N N N/A 45N1751-10

^

R1C 9E MAIN STEAM LINE DRAIN VALVE '

CONDENSER INLET (FCV-1-59) 1 N N N N/A 45N779-7 RIC 11A DRYWELL BLOWER 1B-5 70 N Y Y Y (U-2)45N779-3 R1C llc PRESSURE SUPPRESSION CHAMBER WATER HEAD TANK PUMP 1A 75 N N N N/A 45N779-19 1590b/LMS/DX Pa8e 94 of 114

  • n _, _ , , ,_ _ - _ _ _ _ - - - -

E TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 21 of 40 CLASS: SAFETY RELATED Special Test 88-17 HEV 0000 LOAD SHED TABLE BRD CMF SYS UV UlACC U2ACC Load DWG recon -

after forty see R2A 1A SELTDOWN BOARD ROOM EXHAUST FAN 2A 31 N N N N/A 45N769-10 R2A 1D TURBINE BUILDING LIFT PUMP,  !

ASSEMBLY A 47 N N N N/A 45N602-6 R2A 2B

R2A SA 250V BATTERY CHARGER SB-B 248 N N N N/A 45E709-1 R2A SC R2SIDUAL HEAT REMOVAL PUMP 2C SUCTION VALVE (FCV-74-12) 74 .N N N N/A 45N779-8 R2A SE DRYWELL FLOOR DRAIN SUMP

COOLING SUCTION VALVE i (FCV-74-2) 74 N N N N/A 45 N7'/9-13 l R2A 6E RESIDUAL HEAT REMOVAL DISCHARGE TO MAIN CONDENSER

. VALVE (FCV-74-62) 74 N N/A

(

.N N 451079-10 1590b/LMS/DK Page 95 of 114 6

I

' l i

l I

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1  !

Page 22 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 000^ l LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty see l R2A 7A TURBI!E BUILDING EMERGENCY LIGHTING TRANSFORMER 247 N N N N/A 45H2749-13 i l

R2A 7B DRT4 ELL CONTROL AIR COMPRESSOR 2A 32 N N N N/A 45N779-5 R2A 7B DRrdELL CONTROL AIR DRYER 2A 32 N N N N/A 45N779-5 R2A 7C RESIDUAL HEAT REMOVAL I SHUTDOWN COOLING SUCTION VALVE (FCV-74-13) 74 N N N N/A 45N779-13 -

I R2A 7E RESIDUAL HEAT REMOVAL SYSTLM  !

1 FLUSH VALVE (FCV-74-104) 74 N N N -

N/A 45tU79-10 l R2A 8C RESIDUAL HEAT RIMOVAL SHUTDOWN COOLING SUCTION ISOLATION VALVE (FCV-74-78) 74 N N N N/A 45!U79-7 02A 8E RESIDUAL HEAT REMOVAL l SHUTDOWN COOLING HEAD VALVE (FCV-74-78) 74 N N N N/A 45N779-8

~

R2A 9A BOARD ROOM EMERGENCY AIR CONDITIONER - 31 N N N N/A 45N769-10 R2A 9E1 PRIMARY CONTAINMEIC PURGE AIR FILTER 64 ,N N N N/A 45N779-19 l l

R2A 9B2 IVEL POOL FILTER -

l DEMINERALIZER OUTBOARD ISOLATION VALVE (FCV-78-64) 78 N N N N/A 45N779-13 R2A 9D FUEL POOL FILTER DEMINERALIZER BYPASS VALVE (FCV-78-65) 78 N N N N/A 451079-17 R2A 9E FUEL POOL FILTER DEMINERALIZER ISOLATION OUTBOARD

~

VALVE (FCV-78-67) 78 N N N N/A 451079-13 R2A R10F . PRIMARY C0!CAINMENT ATMOSPHERIC MONITORING SYSTEM lRALYZER SAMPLE RETURN PUMP 76 N N N N/A 45W676-4 1590b/LMS/DK Page 96 of 114

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attach:nent 1 Page 23 of 40 CLASS: SAFETY RELATED Special Test 88-17 R EV 0000 LOAD SHED TABLE '

BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty ,

see R2A R9A RESIDUAL HEAT REMOVAL SERVICE

-- ---- WATER COMPARTMENT B SUMP PUMP A 23 N N N N/A 45tD79-18 l R2A R9B RESIDUAL HEAT REMOVAL SERVICE l

, WATER COMPARTMENT D SUMP PUMP A 23 N N N N/A 45N779-18 R2A R9Cl 250V SHUTDOWN BOARD BACERY I ROOM DUCT HEATER 31 N N N N/A 45!U79-18 R2A R9C2 250V SHUTDOWN BOARD BATTERY ROOM EXHAUST FAN 2A 31 N N N N/A 451079-18 R2A R9E 250V SHUTDOWN BOARD BATTERY ROOM SUPPLY FAN 2A 31 N N N N/A 45fD79-18 R2A 10A MAIN TURBINE TURNING l GEAR MOTOR 47 - N N N N/A 45N602-6 l R2A 11A REACTOR WATER CLEANUP ~

l l

DEMINERALIZER HOLDING PUMP 2A 69 N Y Y N 45N2749-4 R2A llB CORE SPRAY RUMP 2A SUCTION VALVE (FCV-75-2) 75 N N N N/A 45H779-13 R2A llc RES10UAL HEAT REMOVAI, PRESSURE SUPPRESSION CHAMBER ISOLATION VALVE (FCV-74-57) 74 N N N N/A 45N779-ll R2A llE RESIDUAL HEAT REMOVAL CONTAINMENT SPRAY VALVE (FCV-74-61) 74 N N N N/A 4 F;'779-11

.R2A 12A STANDBY LIQUID CONTROL TRACE HEATING 2A , 63 N N N N/A 45!U79-5 R2A l'2A STANDBY LIQUfD CONTROL PUMP 2A MOTOR, HEATER 63 N N .N N/A 451U79-5 R2A 12B CORE SPRAY PUMP' 2C SUCTION VALVE (FCV-75-ll) 75 N N N N/A 45N779-13 1590b/LMS/DK 'Page 97 of 114

-y . , _ . .

'l g  !

TITLE: DIESEL CENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 24 of 40 CLASS: SAFETY RELATED Special Test 88-17 ilEY 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty Sec R2A 12E RESIDUAL EAT REMOVAL PRESSURE SUPPRESSION CHAMBER SPRAY VALVE (FCV-74-58) 74 N N N N/A 45N779-11 R2A 13A REACTOR PROTECTION SYSTEM MOTOR GENERATOR SET 2A 99 N N N N/A 45N708-2 R2A 13B CORE SPRAY OUTBOARD VALVE (FCV-75-23) 75 N N N N/A 45H779-18 R2A 13C RESIDUAL EAT REMOVAL i CONTAINMENT SPRAY VALVE (FCV-74-60) 74 N N N N/A 45N779-ll l

R2A 14A RESIDUAL HEAT REMOVAL '

PUMP 2C COOLER FAN 64 N N N N/A 45N779-16 R2A 14B CORE SPRAY INB0aRD VALVE (FCV-75-25) 75 N N N N/A 45N779-10 R2A 14E CORE SPRAY SYSTEM 1 MINIMUM

~

FLOW BYPASS VALVE (FCV-75-9) 75 N N N N/A 45N779-10 R2A 16A MAIN STEAM LHIE DRAIN VALVE (FCV-1-55) 1 N N N N/A 45N779-12

'R2A 16Cl REACTOR BUILDING EICRGENCY LIGHTING TRANSFORMER LS204 247 N N N N/A 45N2749-13 R2A 16E REACTOR WATER CLEANUP SYSTEM ISOLATION VALVE (FCV-69-1) 69 N N N N/A 45N779-8 R2A 17A DRYWELL BLOWER 2A-3 70 N Y Y Y(U-1) 45N779-3

. RETURNS IN 40 SECONDS WITH U1

- ACCIDENT R2A 17C RESIDUAL HEAT REMOVAL HEAT EXCHANGER A SERVICE WATER DISCHARGE VALVE (FCV-23-34) 23 N N N N/A 45N779-10 1590b/LMS/DK Page 98 of 114

-Q , , , . , . - , . -

e -

I I

TITLE: DIESEL GENERATOR B EMIRGENCY LOAD ACCEPTANCE TEST Attachment 1 l Page 25 of 40 l CLASS: SAFETY RELATED Special Test 88-17 l HEV 0000 LOAD SEED TABLE BRD CMP CCM SYS UV UlACC U2ACC Load DWG j recon ,  ;

after forty

]

see R2A 17E HIGH PRESSURE COOLANT INJECTION STEAM SUPPLY ISOLATION VALVE (FCV-73-2) 73 N N N N/A 45N779-13 R2A 18A DRYWELL BLOWER 2B-3 70 N Y Y Y(U-1) 45N779-3 RETURNS IN

. 40 SECONDS VITH U1 ACCIDENT l R2A 18C RESIDUAL HEAT REMOVAL HEAT 1

l EXCHANGER C SERVICE WATER I DISCHARGE VALVE (FCV-23-40) 23 N N N N/A 45N779-10 R2A 18E CORI SPRAY TEST VALVE (FCV-75-22) 75 N N N N/A 45N779-8 i

R2A 19A REACTOR CORE ISOLATION

- i COOLING TURBINE EXHAUST RELIEF '

VALVE (FCV-71-59) 71 N N N N/A 45N779-12 R2B 1A DRYWELL FLOOR DRAIN SUMP

  • PUMP 2B 77 N N N N/A 45N779-15 R2B 1B REACTOR BUILDING FLOOR DRAIN SUMP PUMP 2B 77 N N N N/A 45N779-16 R2B 1C RECIRCULATION STEAM SUPPLT ISOLATION VALVI (FCV-71-2) 71 N N N N/A 45N779-12 l

R2B lE CORE SPRAY TEST VALVE (FCV-75-50) 75 N N N N/A 45N779-8 R2B 3A RESIDUAL HEAT REMOVAL OUTBOARD VALVE (FCV-74-66) 74 N N N N/A 45N779-22 R2B 3E CORE SPRAY PUMP 2D SUCTION VALVE (FCV-75-39) 75 N N N N/A 45N779-13' R2B 4A DRYWELL BLOWER 2A-4 70 .N Y .Y Y(U-1) 45N779-3 RETURNS IN 40 SECCNDS FOR U1 ACCIDENT 1590b/LMS/DK .

. Page 99 of 114

l l

l TITLE: DIESEL GENERATCR B EMERGENCY LOAD ACCEPTANCE TEST Attachment'1 Page 26 of 40 CLASS: SAFETY RELATED Special T'est 88-17 R EV 0000 l

LOAD SHED TABLE i I

BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty see R2B 4C 250V BATTERY CHARGER SB-D 248 N N N N/A 45N709-1 l

R2d 4D CORE SPRAY PUMP 2B SUCTION VALVE (FCV-75-30) 75 N N N N/A 45N2750-12 R2B 4E CORE SPRAY SYSTEM 2 MINIMUM l FLOW BYPASS VALVE (FCV-75-37) 75 N N N N/A 451079-10 )

i R2B SA CLOSED COOLING WATER SECTIONALIZING VALVE (FCV-70-48) 70 N N N N 451079-6 VALVE CLOSES ON U1 OR U2 ACCIDENT CAN BE OPERATED l AFTER 40 SEC l 1

R2B SCl UNIT PREFERRED A-C REGULATING l

TRANSFORMER TUP 2 251 N N N N/A 45E702-2 )

R2B SE RESIDUAL EAT REMOVAL PUMP 2B -

SUCTION VALVE (FCV-74-24) 74 N N N N/A 45N779-8 I R2B 6A RFACTOR BUILDING CLOSED COOLING WATER ISOLATION VALVE (FCV-70-47) 70 N N N N/A 451U79-8 l R2B 6Cl A'iNUNCIATOR BATTERY CHARGER - SPARE 251 N N N N/A 55N2788-1 R2B 6C2 RESIDUAL HEAT REMOVAL ,

SHUTDOWN COOLING SUCTION VALVE (FCV-74-25) 74 N N N N/A 45N779-13 R2B 6E RESIDUAL HEAT REMOVAL PUMP 2D SUCTION VALVE (FCV-74-35) 74 N N N N/A 45N779-8 R2B 7A RESIDUAL HEAT ~ REMOVAL ,

DISCHARGE TO RADWASTE VALVE

.(FCV-74-63) ,

74 N N N N/A 45tG79-10 R2B 7B RESIDUAL HEAT REMOVAL PUMP 2B COOLER FA'i 64 N N N N/A 45N779-16 1590b/LMS/DK Page 100 of 114

I I l l

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 27 of 40 CLASS: SAFETY RELATED Special Test 88-17

. REV 00 D 0 i l

LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon , )

after forty see l

R2B 7C RESIDUAL EAT REMOVAL SHUTDOWN COOLING SUCTION VALVE (FCV-74-36) 74 N N N N/A 4Mi779-13 R2B 7E RESIDUAL HEAT REMOVAL HEAT EXCHANGER B SERVICE WATER DISCHARGE VALVE (FCV-23-46) 23 N N N N/A 45N779-10 l

R2B 8A BOARD ROOM EERGENCY AIR i CONDITIONER SHUTDOWN BOARD .

ROOM C 31 N N N N/A R2B 8B CORE SPRAY NORTHEAST COOLER FAN 75 N N N N/A 45N779-16 R2B 8C RESIDUAL HEAT REMOVAL DISCHARGE IIE VALVE (FCV-74-46) 74 N N N N/A 45 N779-10 R2B BE RESIDUAL HEAT REMOVAL HEAT EXCHANGER D SERVICE WATER l DISCHARGE VALVE (FCV-23-52) 23 N N N N/A 45N779-10 l R2B 9A STANDBY LIQUJD CONTROL l TRACE EATING . 63 N N N N/A 45H779-5 R2B 9B2 FUEL POOL FILTER DEMINERALIZER INBOARD ISOLATION VALVE (FCV-78-63) 78 N N N N/A 45N779-13 R2B 9D FUEL POOL FILTER DEMINERALIZER BYPASS VALVE (ICV-78-66) 78 N N N N/A 45N779-17 R2B 9E RIEL POOL FILTER DEMINERALIZER -

INBOARD ISOLATION VALVE -

(FCV-78-68) 78 N N N N/A 45N779-13 R2B 10B BOARD ROOM EM2RGENCY AUXILIARY HEATING UNIT SHUTDOWN BOARD .

ROOM D 31 N N N N/A 45N2750-7 1590b/LMS/DK Page 101 of 114

l l

TITLE: DIESEL GE!ERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 '

Page 28 of 40 CLASS: SAFETY RELATED Special Test 88-17  ;

REV 0000 LOAD SHED TABLE -

BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after i forty see R2B 10C RESIDUAL HEAT REMOVAL SERVICE l WATER COMPARTMENT B SUMP I PUMP B 23 N N N N/A 451079-16 i R2B 10D RESIDUAL HEAT REMOVAL SERVICE WATER COMPARTMENT D SUMP PUMP B 23 N N 'N N/A 451079-18 R2B 10E RESIDUAL HEAT REMOVAL l COIGAINMENT SPRAY VALVE (FCV-74-75) 74 N N N N/A 451079-11 1

R2B llA DRYWELL C0!UROL AIR I COMPRESSOR 2B 32 N N N N/A 45N779-5 R2B llA DRYWELL CONTROL AIR DRYER 2B 32 N N N N/A 451079-5 l R2B llB REACTOR WATER CLEANUP DEMINERALIZER HOLDING PUMP 2B 69 N Y Y N 45N27S0-4 R2B llD PRESSURE SUPPRESSION

~

CHAMBER WATER PUMP 2B 75 N N N N/A 45fG79-19 R2B llE RESIDUAL HEAT REMOVAL PRESSURE ,

SUPPRESSION CHAMBER SPRAY VALVE (FCV-74-72) 74 N N N N/A 45!U79-11 R2B 12A RESIDUAL HEAT REMOVAL SYSTEM 2 FLUSH VALVE (FCV-74-106) 74 N N N N/A 451079-10 R2B 12B RESIDUAL HEAT REMOVAL PUMP 2D COOLER FAN .64 N N N N/A 45N779-16 R2B 13A HIGH PRESSURE COOLANT INJECTION TURBINE EXHAUST RELIEF VALVE (FCV-73-64) 73 N N N N/A 45N779-12 R2B 13Cl REACTOR BUILDING EMERGENCY' -

, LIGHTING TRANSFORMER FOR LIGHTING CABINET LS200 247 N N N N/A 45N2750-7 1590b/LMS/DK . Page 102 of 114 e

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 29 of 40 CLASS: SAFETY RELATED Special Test 88-17

$EV 0000 LOAD SED TABLE 1

BRD CMP CCM SYS UV U1ACC U2ACC Load DWG recon . I after I forty ,

, sec l R2B 13E RESIDUAL EAT REMOVAL PRESSURE SUPPRESSION CHAMBER ISOLATION VALVE (FCV-74-71) 74 N N N N/A 45N779-11 1

R2B 14A EMERGENCY EQUIPMENT COOLING l WATER SOUTH EADER l SECTIONALIZING VALVE I

(FCV-67-22) 67 N N N N/A 45N779-8 l l

R2B 14Cl REACTOR PROTECTION SYSTEM MOTOR GENERATOR SET 23 99 N N N N/A 45N708-2 I R2B 14C2 BOARD ROOM EMERGENCY l AIR CONDITIONER 31 N N N N/A 45N769-10 l R2B 14D FUEL POOL MAKEUP ' TROM RESIDUAL EAT REMOVAL THROTTLING INBOARD VALVE (FCV-78-61) 78 N N N N/A 45N779-6 1

R2B 14E RESIDUAL EAT REMOVAL * '

CONTAINMENT SPRAY VALVE -

(FCV-74-74) 74 N N N N/A R2B 15A DRYWELLBL0bR2B-4 70 N Y Y Y(U-1) 45N779-3 RETURNS IN 40 SECONDS WITH U1 ACCIDENT R2B 15C CONTAINMENT INERTING SYSTEM MAKEUP VAPORIZER AFD POWER OUTLET 70 N N N/A N 151010-2 R2S ISD CORE SPRAY OUTBOARD VALVE (FCV-75-51) 75 N N N N/A 45tD79-18 R2B 15E CORE SPRAY IITBOARD VALVE *

(FCV-75-53) 75 N N .N N/A 45!U79-10 R2B 17A SHUTDOWN BOARD' ROOM EMERGENCY SUPPLY FAN 2B 31 N N N N/A 45N769-9 e

1590b/LMS/DK '-

. Page 103 of 114

t TITLE: DIESEL GENERATOR B EMI,RGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 30 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 .

LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon -

. after forty see R2B 17B REACTOR WATER CLEANUP SYSTEM ISCLATION' VALVE"(FCV-69-12) 69 N- N N N/A 45N779-12 i

)

R2B 17D RESIDUAL HEAT REMOVAL PUMP B SUCTION CROSSTIE VALVE (FCV-74-98) 74 N N N N/A 45H779-10 R2B 17E RESIDUAL HEAT REMOVAL PUMP D SUCTION CROSSTIE VALVE i (FCV-7,4-99) 74 N N N N/A 45N779-10 R2B 18A DRYWELL EQUIPMENT DRAIN SUMP PUMP 2B , , 77 N N N N/A 45N779-14 R2B 18B REACTOR BUILDING EQUIPMENT DRAIN SUMP PUMP 2A 77 N N N N/A 45N779-16 R2B 18D HIGH PRESSURE COOLANT INJECTION BYPASS VALVE (FCV-73-81) 73 N N N N/A 45N779-43 ,

R2B 18E TURBINE BEARING LIFT PUMP ASSEMBLY B .

47 N N N N/A 45N602-6 R2B 19A RESIDUAL HEAT REMOVAL PLHP A SUCTION CROSSTIE VALVE (FCV-74-96) 74 N N N N/A 451079-10 R2B 19C RESIDUAL HEAT REMOVAL PUMP C SUCTION CROSSTIE VALVE (FCV-74-97) 74- N N N N/A 45N779-10 R2B R10F PRIMARY CONTAINMENT ATMOSPEERIC MONITORING SYSTEM ANALYZER SAMPLE RETURN PUMP 76 N N N N/A 45W676-4 R2B R9A 250V SHUTDOWILBOARD BATTERY ROOM EXHAUST FAN 2B . 31 N N N N/A 45N779-18 R2B R9B 250'V SHUTDOWN BOARD BATTERY R00h SUPPLY FAN 2B 31 N N N N/A 45N779-18 1590b/LMS/DK Page 104 of 114

-, , ,h. -U, , , _ , , - - -:. -- - - - . , , , , - ,-

h TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST At tach:nent 1 Page 31 of 40 CLASS: SAFETY RELATED Special Test 88-17 R EV 0000 LOAD SHED TABL" BRD CMP COM SYS UV UlACC U2ACC Load DWG recon ,

after forty see R2C 1A DRYWELL, BLOWER 2A-5 70 N Y Y Y(U-1) 451079-3 RETURNS IN 40 SECONDS WITH U1 ACCIDE:C R2C IC CONTROL ROD DRIVE TEST HOIST EQUIPMENT HANDLING PLATFORM OUTLETS 111 N N N N/A R2C 1D RECIRCULATION MOTOR GENERATOR SET OIL PUMP 2A-3 68 N Y Y N 451079-2 R2C 3C C0fCROL ROD DRIVE RETURN LINE ISOLATION MOV (FCV-85-50) 85 N N N N/A 45fG79-8 R2C 3E CONTROL ROD DRIVE WATER PRESSURE CONTROL VALVE (FCV-85-23) 85 N N N N/A 45N779-7 R2C 4A REACTOR BUILDING CLOSED

(FCV-67-21) 67 N/A N N N 45N779-8 R2C 4E CONTROL ROD DRIVE COOLING WATER PRESSURE C0!CROL VALVE (FCV-85-27) 85 N N N N/A 45N779-7 R2C SB BUS HEAT EXCHANGER, ALTERNATOR COOLER AND HYDROGEN COOLING l

WATER SHUT 0FF MOV (FCV-24-25) 24 N N/A 45N779-ll N .N R2C SD CLOSED COOLING WATER SPARE PUMP SUCTION ISOLATION VALVE (FCV-70-67) 70 N N N N/A 45N779-6 1590b/LMS/DK Page 105 of 114

I ,

l l

l TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 I Page 32 of 40 CLASS: SAFETY RELATED Special Test 88-17 R EV 0000 l LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty R2C SE CONTROL ROD DRIVE PUMP 2A SUCTION ISOLATION VALVE i (FCV-85-65) 85 N N N N/A 45H779-17 l l

.R2B 6B STATOR LIQUID COOLING WATER l SHUT 0FF MOV (FCV-24-41) 24 N N N N/A 45N779-11 I R2C 6C CLOSED COOLING WATER SPARE PUMP DISCHARGE VALVE A

)

(FCV-70-68) 70 N N N N/A 45N779-6 R2C 6E MAIN STEAM LIFE DRAIN VALVE (FCV-1-68),

1 N N N N/A 451079-7 R2C 7A REACTOR BUILDING FLOOR DRAIN SUMP PUMP 2A 77 N N N N/A 45N779-16 R2C 7B PREC00LER LIQUID COOLING WATER SHUT 0FF MOV (FCV-24-57) 2,4 N N N N/A 451U79-11 l R2C 7C REACTOR WATER CLEANUP BLOWDOWN VALVE (FCV-69-16) 69 N N N N/A 451079-8 R2C 7E REACTOR WATER CLEANUP FILTER AND DEMINERALIZER SYSTEM BYPASS VALVE (FCV-69-8) 69 N N N N/A 45N779-11 l R2C 8B TURBINE OIL AND ELECTRICAL HYDRAULIC CONTROLS FLUID I COOLING WATER SHUT 0FF MOV (FCV-24-65) 24 N N N N/A 45N779-ll R2C 8C REACTOR WATER CLEANUP DRAIN TO RADWASTE VALVE (FCV-69-17) 69 N N N N/A 45tD79-8 l l

R2C BE REACTOR WATER CLEANUP RESTRICTING ORIFICE BYPASS VALVE (PCV-69-14) 69 N N N N/A 45N779-ll 1 R2C 9B MAIN STEAM LI!E DRAIN VALVE

.(FCV-1-57) , 1 N N N N/A 45N779-7 R2C 9E MAIN STEAM LINE DRAIN VALVE CONDENSER INLET (FCV-1-59) 1 N N N N/A 45N779-7 1590b/LMS/DK Page 106 of 114

l l l

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 33 of 40 l CLASS: SAFETY RELATED Special Test 88-17 l REV 0000 l l

LOAD SEED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG I recon .

after l

, forty I sec l R2C lla DRYWELL BLOWER 2B-5 70 N Y Y Y(U-1) 45N779-3 1 RETURNS IN 40 SECONDS l l

WITH U1 ACCIDENT l R2C llc CONTROL ROD DRIVE WATER , l TPANSTER VALVE (FCV-85-88) 85 N N N N/A 45N779-8 R2C RilA PRESSURE SUPPRESSION CHAMBER WATER HEADER TANK PUMP 2A 75 N N N N/A 45N779-19  :

1 R2C R6A RECIRCULATION KEADER EQUALIZER

R2C R6E RECIRCULATION PUMP 23 SUCTION ~

VALVE (FCV-68-77) 68 N N N N/A 45N779-21 R2C R7B TEMPORARY EMERGENCY MAINTENANCE FEED TO 480V '

REACTOR MOV BOARD 2D COMPARTMENT SA 268 N N N N/A 45N2751-10 R2C R8B RECIRCULATION PUMP 2A SUCTION VALVE (FCV-68-1) 68 N N N 'N/A 45 N779-21 R2C RAE RECIRCULATION EEADER EQUALIZER VALVE (FCV-68-35) 68 N N N N/A 45N779-21 R2C R9B TEMPORARY EMERGENCY MAINTENANCE TEED TO 480V REACTOR MOV BOARD 2E COMPARTMENT 4A 268 N. N N N/A SIA 2A CONTROL BAY WATER CHILLER A 31 Y Y Y N 45N769-9 MANUAL

,, RESTART AFTER 40 SEC SlA 2B 480' VOLT CONYROL BAY VENT A EMERGENCY FEEDER 266 Y Y Y N 45N779-3 CAN BE RETURNED ATTER 40 SEC 1590b/LMS/DK Page 107 of 114

~

  • w.-- m4s
  • l l

-TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 34 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 i LOAD SEED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty see i SlA 2C DRYWELL BLOWER 1A-1 70 N Y Y Y(U-2) 45N779-3 l RETURNS IN 40 SECORDS WITH U2 ACCIDENT ,

l SlA 2D DRYWELL BLOWER 1B-1 70 N Y Y Y(U-2) 45N779-3 RETURNS IN l 40 SECONDS l WITH U2 l ACCIDENT' I I

S LA 3A 480V REACTOR MOV BOARD 1A NORMAL FEEDER 268 N N N N/A 45N779-6 SlA 3B 480V REACTOR MOV BOARD 1B EMERGENCY FEEDER 268 N N N N/A 45N779-6 )

SlA 3C 480V REACTOR MOV BOARD 1C EMIRGENCY FEEDER 268 N N N N/A 45N779-17 1

SlA 3D INSTRUMENT AND CONTROL BUS A l TRANSFORMER 253 N N N N/A 45N641-2 SlA SA CONTROL AND SERVICE AIR COMPRESSOR A 32 Y Y .Y Y 45 N779-4 WITH LOW PRESSURE RETURNS IN 40 SECONDS SlA SB 480V REACTOR MOV BOARD 1D NORMAL FEEDER 268 N N N N/A 45N779-17 SlA SC' RECIRCULATION MOTOR GENERATOR SET OIL PUMP LA-1 , 68 Y Y Y N 45N779-2 SlA 5D RICIRCULATION MOTOR GENERATOR SET OIL PUMP 1B-1 68 Y Y Y N 45N779-2 SIA 6A 480 VOLT REACTOR MOV BOARD lE EMIRGENCY FEEDER 268- N N N N/A 45N1748-1 SlA 6B CLOSED COOLING WATER PUMP 1A 70 N Y Y Y 45N779-2 -

1590b/LMS/DK Page 108 of 114 A

h l

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1  ;

Page 35 of 40 CLASS: SATETY RELATED Special Test 88-17

)

)

REV 0000 l LOAD SHED TABLE I BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty SEC SlA 6C REACTOR WATER CLEANUP RECIRCULATING PUMP 1A 69 Y Y Y N 45N779-5 SlA 6D 250V BATTERY CHARGER 1 248 N N N N/A 45N779-5 l MANUAL RETURN 1 AFTER 40 SEC SIA 7B STANDBY LIQUID CONTROL PUMP 1A 63 Y N N N 45fG79-3 SlA 7C TUIL POOL COOLING PUMP 1A 78 Y Y Y N 45N779-2 l MANUAL I RESTART,

  • i AITER l 40 SEC I S1A 7D UNIT PREFERRED MOTOR '

GENERATOR SET 1 252 N N N N/A 45E701-1 SlB 2A CONTROL BAY WATER CHILLER B 31 Y Y Y N 471069-9 l S1B 2B 480V CONDENSATE DEMINERALIZER BOARD EMERGENCY TEEDER 270 N Y Y N 451U77-14  !

l S1B 2C DRYWELL BLOWER 1A-2 70 N Y Y Y(U-2) 45N779-3 RETURNS IN 40 SECONDS WITH U2 ACCIDENT SlB 2D DRYWELL BLOWER 1B-2 70 N Y Y Y(U-2) 45N779-3 RETURNS IN 1 40 SECONDS i WITH U2 ACCIDENT S1B 3A 480V REACTOR MOV BOARD 1A EMERGENCY FEEDER '268 N N N N/A 45N779-6 S1B 3B- 480V REACTOR MOV BOARD 1B NORMAL FEEDER 268 N N N 'N/A 45N779-6 SlB 3C 480V REACTOR MOV BOARD 1C NORMAL TEEDER 268 N N N N/A 45N779-17 1590b/LMS/DK Page 109 of 114 -

e

I TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 36 of 40 CLASS: SAFETY RELATED Special Test 88-17 R EV 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty see S1B 3D INSTRUMENT AND CONTROL BUS B TRANSFORMER TIC 1B AND UNIT PREFERRED TRANSFORMER TUP 1 253 N N N N/A 45N641-2 SlB SA 480V REACTOR MOV BOARD 1D 1 EMERGENCY FEEDER 268 H N N N/A 45N779-17 1

SlB SC RECIRCULATION MOTOR l GENERATOR SET OIL PUMP 1A-2 68 Y Y Y N 45N779-2

{

S1B SD RECIRCULATION MOTOR GENERATOR SET OIL PUMP 1B-2 68 Y Y Y N 45N779-2 SlB 6A CLOSED COOLING WATER PUMP 1C 70 N Y Y N 451079-2 MANUAL RESTART AFTER 40 SEC l S1B 6B CLOSED COOLING WATER PUMP 1B 70 N Y Y N 45N779-2 MANUAL

. RESTART

, AFIER 40 SEC S1B 6C REACTOR WATER CLEANUP RECIRCULATING PUMP 1B 69 Y Y ,

Y N 45N779-5 S1B 6D 480V REACTOR MOV BOARD lE NORMAL FEEDER 268 N N N N/A 45N779-17 S13 7A MAIN TURBINE TURNING GEAR OIL PUMP 47 Y Y Y N 45N602-5 51B 7B STANDBY LIQUID CONTROL PUMP 1B '63 Y N ,

N N 45N779-3 S1B 7C FUEL POOL COOL PUMP 1B 78 Y Y Y N 45N779-2 S2A 2B INSTRUMENT ANI). CONTROLS BUS A TRANSFORMER 253 N N N N/A 45N641-2 1590b/LMS/DX Page 110 of 114 e s w m-

_A ~ m- ~

I TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 37 of 40 CLASS: SAFETY RELATED Special Test 88-17 REV 0000 LOAD SHED TABLE BRD CMP COM SYS UV UlACC U2ACC Load DWG recon .

after forty sec j S2A 2C DRYWELL BLOWER 2A-1 70 N' Y Y Y(U-1) 45N779-3 I RETURNS IN 40 SECONDS 1 WITH U1 ACCIDENT

{

S2A 2D DRYWELL BLOWER 2B-1 70 N Y Y Y(U-1) 45!U79-3 RETURNS IN l 40 SECONDS WITH U1

  • ACCIDENT S2A 3A 480V REACTOR MOV BOARD 2A i l

NORMAL FEEDER 268 N N N N/A 45N779-6 S2A 3B 480V REACTOR MOV BOARD 2B '

l EMERGENCY FEEDER 268 N N N N/A 45!U79-6  !

1 S2A 3C 480V REACTOR MOV BOARD 2C EMERGENCY FEEDER 268 N N N N/A 45N779-17 S2A 3C 480V REACTOR MOV BOARD 2C NOPRAL FEEDER 268 N N N N/A 45N779-17 S2A SA CONTROL AND SERVICE AIR COMPRESSOR D 32 Y Y Y Y 45N779-4 S2A SB 480V REACTOR MOV BOARD 2D NOPRAL FEEDER 268 N N N N/A 45N779-17 S2A SC RECIRCULATION MOTOR GENERATOR SET OIL PUMP 2A-1 68 Y Y Y N 45N779-2 S2A SD RECIRCULATION MOTOR SET OIL

, 68 Y Y Y N 451079-2 S2A 6A 480V REACTOR MOV BOARD 2E EMERGENCY FEEDER 268 N N N N/A 45N779-17 S2A .6B CLOSED COOLING WATER PUMP 2A 70 N Y Y Y 45N779-2 1590b/LMS/DK Page 111 of 114 g---

4

,-Q , . - . . , . , -.. n _Q., ,

k TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 38 of 40 CLASS: SAFETY RELATED S g 1 g ,g8-17 LOAD SHED TABLE BRD CMP COM SYS UV U1ACC U2ACC Load DWG recon .

after forty see S2A 6C REACTOR WATER CLEANUP RECIRCULATION PUMP 2A 69 Y Y Y N 45N779-5 S2A 6D 250V BATTERY CHARGER 2A 248 N N N N/A 45!r779-5 MANUAL .

RETURN AFTER 40 SECONDS S2A 7B .CTANDBY LIQUID CONTROL PUMP 2A 63 Y N N N 45N779-3 i

S2A 7C IVEL POOL COOLING PUMP 2A 78 Y Y Y N 45N779-2 MANUAL RESTART AFTER 40 SEC S2A 7D UNIT PREFERRED A-C MOTOR GENERATOR SET 2 252 N N N N/A 45E702-1 S2B 2A 480V kEACTOR MOV BOARD 2E NORMAL TEEDER . 268 N N N N/A 45N779-17 S2B 2B 480V CONDENSATE AND DEMINERALIZER BOARD 2 EMERGENCY FEEDER 270 Y Y Y N 45N777-14 S2B 2C DRYWELL BLOWER 2A-2 70 N Y Y Y(U-1) 45N779-3 RETURNS IN 40 SECONDS WITH U1 ACCIDENT 1590b/LMS/DK Page 112 of 114 h.-=4 4

- - () . . - - . . ' _ , - - - , , , . , n. ,- , . - . . .-..a,,.--.

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 39 of 40 CLASS: SAFETY RELATED Special Test 88-1, )

BEV 0000 l LOAD SHED TABLE BRD CMP CCM SYS UV U1ACC U2ACC Load DWG recon ,

after forty see S2B 2D DRYWELL BLOWER 2B-2 70 N Y Y Y(U-1) 45N779-3 RETURNS IN 40 SECONDS WITH U1 ACCIDENT S2B 3A 480V REACTOR MOV BOARD 2A EMERGENCY FEEDER 268 N N N N/A 45N779-6 l 4

S2B 3B 480V REACTOR MOV BOARD 2B -

NORMAL FEEDER 268 N N N N/A 451079-6 ,

l S2B SB INSTRUME!C AND C0!CROL BUS B j TRANSTORMER TIC 2B 250 N N N N/A 45N641-2 S2B SB UNIT PREFERRED TRANSFORMER ,

TUP 2 252 N N N N/A 45N641-2 S2B SC RECIRCULATION MOTOR GE!ERATOR SET OIL PUMP 2A-2 68 Y Y Y N 45N779-2 S2B SD RECIRCULATION MOTOR GE!ERATOR SET OIL PUMP 2B-2 68 Y Y Y N 45N779-2 l

S2B 6A RAW COOLING WATER BOOSTER I PUMP 2B 24 Y Y Y N 45N779-3 I MANUAL )

RESTART l

, AFTER l 40 SEC S2B 6B CLOSED COOLING WATER PUMP 2B 70 N Y Y N

. l

e 1

TITLE: DIESEL GENERATOR B EMERGENCY LOAD ACCEPTANCE TEST Attachment 1 Page 40 of 40 CLASS: SAFETY RELATED Special Test 88-17

. HEV 0000 LOAD SHED TABLE BRD CMP COM '

SYS UV UlACC U2ACC Load DWG recon ,

after forty sec l

S2B 6D 250V BATTERY CEARGER 2B 248 N Y Y N 45N779-5 MANUAL i RETURN I AITER ,

40 SECONDS S2B 7A MAIN TURBINE TURNING GEAR OIL PUMP 47 N N N N/A 45N602-5 S2B 7B STANDBY LIQUID CONTROL .

PUMP 2B 63 Y N N N 45N779-3 S2B 7C WEL POOL COOLING PUMP 2B 78 Y Y Y N 45N779 ,2 S2B 7D 480V REACTOR MOV BOARD 2D EMERGENCY TEEDER 268 N N N N/A 45N779-17 l

l l

I i

l l

l

. l 1590b/LMS/DK Page 114 of 114

~~

, . . . - . _. -. - -_- i

t i

REV U17 0 0 l TITLE: DIESEL GEliERATOR B E.'GRGEIiCY LOAD ACCEPTANCE TEST A 7 /-C

,Ch'i.R)$Pl/4 E /< ~' E CLASS: SAFETY RELATED SPECIAL TEST 88-17.

RE'. Y CCNTAC"' LAYCCT

. 1 i

13 '

9 3

>> > > < m < l

/ =  ::  :: =

7=

O&

14 O~

10 & ~C 4 <

12 8 6 2 HFR RELAY l 1

(TRONT YlEW) ' ,

4 2 1 3 O O O O T T T C N oT C

H68 RELRY (FRONT YlEW)

@ est we-O e 0 .


,.-1 8

l l

1

'l

o C

40 Sun 8  %

M nm

  • 3 E~

en G Cw- l C , j e N w

. ev Q

    • @ @ musa
    • 9 C W 4Ae CC 4 ==

C.s >== e hh,5 ,- ---- . ... . _ _ , .

w-Z (

C O= wE D.* b (CC aw

@ QZ>

>= E Q C* MO ei= w MW N 2 L

w eZ

>= ZO e

C=.=.

m

- =.=B D (

w == v 0 0 C == Z 6 2 6 ==

sh Q == e=

D vEd V ww

=mJ > s.= .

C 4 l

- ->- l v-m C wEQ l w A(m JI: MA4 1

== 3 $

2 CTM i V wc w M N C>

M == >=

3= - - - . . . . _

O o

w ==

=.

C m3

=a d

N

==

C Q

(

l u i W I w - ,

VQO i OwT l 4 a= o l mvv i w se C6 e I 46N . l Od4C*

i I

8 a

e Q .

8 a

a a

_...A

1 Attachment 3 REV 0000 e.ge 2 on 4 Special Test 88-17 LOAD LOCATION REQD ALIGNM[NI CAUTION ORDER CAUTI'ON C0fftENIS INITIAL OFF BKR ON RUNNING N/A IF NOT ORDER AND REQD REMOVED DAIE STAND 8Y GAS FILTER IRAIN 11A /

3. SYST[M FAN 65-13 Ist 2nd VACUUM PRIMING PUMP 8 12A /

Ist 2nd DIESEL GEN TRANSFORMER TDA 2C /

j EXHAUST FAN Ist 2nd j DIESEL GENERATOR A 38 /

BATTERY EXHAUST FAN 1st 2nd DIESE'tGENERATOR A 3D /

EXHAUST FAN A - . Ist 2nd J

j CENTRAL DIESEL GENERATOR INFO 28 /

4 CENTER EXHAUST FAN ist 2nd

. EECW STRAINER A 10F1 /

1st 2nd

! EECW STRAINER 8 10F2 / -

f Ist 2nd DIESEL GENERATOR A LUBE OIL 3E / ...

CIRC PUMP Ist 2nd DIESEL GENERATOR D LUBE OIL 4E /

4 CIRC PUMP 1st 2nd I

i j

f 1  ;

4 9

7 _

1 8 L 8 A E IDT 3 t INA 4s IAD t e N nfT I eo l m 3a .

tc i aec t ge . _

t ap _

APS _

  • S I

N

[

) 1 t

( f g 0 C

g g -

y R N D d

n d

n d

n d

n d

n d

n d

n d

n d

n d

n j

( ORE 2 2 2 2 2 2 2 2 2 2 I I V T DO / / / / / / / / / /

URH -

AOE C R t t t t t t t t t t s s s s s s s s s s 1 1 I I 1 i i i i i _

R E

DT RO ON D

NFQ ~

OIE I R T A U/

AN C .

G N

I N

I N NU

[

1 R

r GN IO L

A DR QK -

EB R -

F .

F O ._ _ - _

N _

O _

I T l F F F F E A 8 D A f 3 4 8 9 8 C _

C 2 4 4 7 _

2 _

O _

L _

T -

S _

U T A _

S H P _

J X T N _

A E S U H U S _

X T A L E T H G A A A A E A X D R N E B E L O G G G G A L B T R R R R P C 8 8 _

A A A A A I T V H {

H H: M B R R A D E C O C C R U O O E A L A C T T R O E T T T T L A A T L T T T T A R R R Y A A A A E E E S -

A B B B B N T N N A B O L E E G L

A '8 C D I I G G _

T F Y O L L L L A L. L 8A R E E E E U KA E EA D T S S S S C C S S NP N E E E E A AN EN EN AM O I I I I V TA IA IA 1U C D D D D E SF DF DF $P -

i

. ! i

  • l ) Iji  ; l 1 ' i,! ' ' ;1I

At t aclwnent 3 Page 4 of 4 R)$V (Rl () () Special Test 88-17 LOAD LOCATION REQD ALIGNMENT CAUTION ORDER CAUTION COHHENIS INIIIAL Off BKR l ON RUNNING N/A IF NOT ORDER AND 4

REQ 0 REH0vtD DATE DIESEL GENERATOR BLDG SUMP 7F /

PUMP A ist 2nd DIESEL GENERATOR C EXHAUST 88 /

FAN 8 1st 2nd

J _

i

  • l DIESEL GENERATOR 0 EXHAUST 98 /

FAN 8 Ist 2nd j STAND 6Y GAS TREATMENT BLGD 2F /

2 SUMP PUNP C I5t 2nd SGT FTR TRAIN A HUMIDITY 10A /-

! CONTROL HIR 65-12 1st 2nd i

e .

J f

l 1

i i

3 e

I J

i _ _ . . _ _ _ . _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _

I f

INFORMAL TO: P.X. Guha, Lead Electrical Engineer, BFEP FROM: C.E. Anderson, Lead Mechanical Engineer, BFEP DATE: April 14, 1998 ,

SUEJECT: RESICUAL HEAT REMOVAL AND CORE SPRAY PUMP l FLOW AND BRAXE HORSEPOWER TRANSIENTS

Reference:

QIR EEESFNSOCS3 RO CRIMS No. B22 88.0329 005)

The purpcse of this memo is to transmit the preliminary results of our calculations performed i n re.cponse to the referenced CIR.

Calculation MD-02074-98091 for the Residual Heat Removal (RHR) pump  !

and calculation MD-02075-890SO fer the Core Spray (CS) pump ficu/  !

brake horse cwer transients have been prepared and checked.  !

Presently, ccmments made by the independent, reviewer are being '

inocepcrated in the calculations. The attached curves reflect the independent reviewer's comments.

Although the calculations which devoicped these curves have been prepared. checked and independently reviewed, the calculations will not be issued until the reviewer endorses the resolution of his comments. Our ccnfidence in these results is high considering the extent and nature of the comments. We expect to issue the calculations en Friday, April 15, 1988 and we will provide a QIR to fermally ransmit this information to you at that' time. The final curves to be released by OIR are not expected to be significantly different from the attached curves.

[d' d h fc(- i C.E. Ander on S

Concurrence by L0 a cc: P.J. Speidel h-

  • MI*

H.R. Gavankar '

W.F. Spader

'W.A. Eberly I 0/8

/

/

Bill Nelsun/EEB 9

e v w- - - - - ---e-------em y.--m. - -w --m---*w -v ~m ,

1 l I 8

I I

Ter.nsssse Vallsy Authority SDSP-27.1 3rowns Ferry Nuclear Plant Form SDSP-1!.3 Site Director Standard Practice OCY 0 91987 (Pase 1 of 1)

I 1

SAFETY EVALUATION RE7IEW AND APPROVAL FORM )

1 l

Tracking No. C2-T- Fdo IE )

Activity: Temporary Alteration (TACT No. ) l Special Test

'C (Special Test No. c T - '- - ' > 'd' )

Procedure Change (Procedure No. -

)

New Procedure (Procedure No. )

Other (Explain: ) l 1

Proposed cha:Ce g/ '

involves a USQ: Yes No A J Safety Evaluation prepared by: - M ' i. u v'd. , .

'I - Date: Y-/3')v,-

1 Sectica Supervisor: '.G - h "

// -

N' Date: #-i # [

System Engineer Review: L Date: 9 ~ ' I" I / l es R .. M Date: # /c " - ,

PCRC Review: *

/ Date: />

POR7'Chidf r.An l

/

/ /

Approved By:

Plan Datet k)

. . _ . ser( / '

Distributica: ,

. 1 Original - Document Control Section

  • Copy - Originating Document (if applicable)

Copy - NSRS Chair =an Copy - PORS Supervisor

__ Copy - Technical Support Services Superintendent

_ Copy - Shift Technical Advisor Supervisor Date: l PORC Secretary Retention Period: Lifetime Responsibility: DCS Supervisor 0 $

, 2000p e

4 Q. - - - . , . - . - - - - , . . , . . - . - . - , -, -- - - . - -~-

i 8

,. ...4.=

UNREVIEWED SAFETY QUESTION b

DETERMINATIOr To: J. G. Walker USC YES From: P. J. Spaldel NO Y Sheet * : 1 of 5 Identifier: SE9F9T990001 t, m ,. , . .. . ......, ..e.... .... ., .

n.. m n. .i .. o numm.

I L t i  ! I i I

'i', e 'Av I

l I i  :

'.A &@?fL4.'.Nm/M22 i i i i

'R8 0411101 l  !  ! I .

11 i t

  • I l i

, i i 1  !

I i  : 1 I I i i i l l t i I 1y . . i 1 t . '

?

l. i )  : i i i I i  : l
1 3 ?  ! . I I I i i  ! l  :

I I i 1 I I

,q . 1 l l  !

9 . .

i  :  ;

! I i I  ! l

g . .

1 i l 1 i

4 AD tr.aa. Iss.e a s hy;ve; *,y le g t;nt'it t

Project: E Affected Unit (s) _  ?

ECN N=.

_ Da t e ___

DCP NO . __ __Ca;e Yes/Mr S?eet Ne.

OtherJM

  • Sp50ial Re:;uirement(s).... Y13. Of 6 Data 3-1C-99_ P::tential Tech. Spec. Change NO

__S j

P e f e t"c.q,u 1

1.

Me.:ran:Lm ft:m P. J. Spoicel t= J. G.

Cualif :at:=n.15Se, Stantby Diesal 3en'erater Testing for L ac Capac.tyWa CRINS E22 B20225 0001)

F: n' Safet_ c clus;,2 c enort fFScP)

a. Se:::en S.S 3.

Se::: n 5.9 - Standtu Residual ACRem Heat P ver= and val SystemDistribution.

4. Sect: n (RHR). ,

S. Section 14.5 - analysis cf Abnormal Operational Transients.  !

14.5 - Analysis of Design Basis Accidents.

To:P tes! 9eecif; atices- i

5. Secti n 3/9.9.A -

7 Section 3/4.5.8 - Residual HeatAuxiliary Electr:=al System and Sases.

Rem: val System and Bases.

Deerri-t:em Of u crecsse a tivitu cCheece. Tast cr' E:. cer i ment '

Special Test 37-59-17 .

Ica: is being c=nducted as part ,w purpcse of this testcapacity cualift:atten f=r the station Diesel Generators CDG).of The the Br in crear diesel to accept = perform analysis which wzil verifyis To obtain system the capability of the 1&2 D3 response "B"

ctability as delinnated in Reference 1 above.emergen:W,1 cadslimits

~

and operate of within c7 'idi dt reil 3 E Ei '

~ ~ ~

' ' ~ ~ ~

t.!?!. S' h t t.

i 8

.s - .

t UNREVIEWED GAFETY GUESTION DETE,RMINATION Sheets 2 cf E o ran: .eoCuNe E*:Y NUCLEco "LaNT Id *t:"te -

3EE T U O903. . <.

Descr r ::" ef rt: sed ce tivitu :: "t:"ued? .

BT-99-17 s:mulatec a centurrent icss Of cffstte ==wer utth a unita::: cent signal experienced wh:=nbyu:11 the start CG. the heavies: automat:0 lead sequen:e that may ce alignac : For this 10 acing sequence, RHR pump EC is discharge suppress =n :::1 via L: p its maximum dest;n ficu rate (12.000 gam) to the 1 and L: p 11 RHR test return lines 09 cpening the :r:ss-:=nne:: valve, FCV-74-MS. betucen the tue RHR dis:narge hescers.

Test ca:a :s ::11seted and submitted 4

tests SI-BS-03 throu;h.ST-ES-13 uhlehto UNE along with cata fr:m spe : P1 Ele =tric.CO cang := perform a stat:1::y inaralgs turn isssubmitted en the D3st:res;cnsr General c..... <.. e.... ....e.- - ----- ..c,, agege- c Standbg cC ?:aer Su;;1 9 Systen: ,

Station Ctesel Genera: Ors unt: tNU Shutecun E ards i Res: val Hea: Rem = val System CRHR) <

1 Safett c uart  : r-r , i eg easte-e s s eye. ee E13;-tu 27 r .'e r e veelu c us e - ~

This systen previces a self-contained, h ;hly rellacle s:urce of ecuer to the E  ;:ncered can disable the =re Standby Safe varcs Systens so that ne single cred b]e event-auxiliaries. (Ref. 2, section C=B.S.1) cling functions or their supp=rt;ng Statica 0:es=!_Ge erster, .

The auto C:esel a::: ally Generaters function as prine mover /generat:r units to n: mai auxiliary p:uur. supply the scurce of standby AC pouer up:n less of (Ref. 2, see:1=n 8.5.3.2)

U :t 9xu 55utecun 3:eres_.

The 4KU shutdeun5bcards (One assigned to each Of the cgs) to safely shutdcun anddistribute the normal cr. standby ACfunction.tc power te all AC equ necessary cond:tions. eccidown the, plant ,

batusen Units It1,in possible, thrcugh breaker

~ under tres,accident cr non-accident c and 3 shutdeun beards to make cennecticns an 1 cad (Raf. 2, d:stribution and/c'r accommocation of inoperable'DGs.thus A11 cuing fo section 8.5.3.1) e 6

, , , , , r --, - . . - - - . ,...e - . . . . - . , , , -

1 l

s .

s.

UNREVIEWED SAFETY CUESTION DET.E.RMINATION i

\

Sheets 3 cf 6 l Ere e-t co?.ws EDDV NUOLEcu DLANT ldeat!Fier- CE"F"T0001 Safetu e u et tent s ' cf Suste~t s) of'erted- 00:*ti ued) -.

Residual went C = ~ r v31 c ut*=CA The RMR system functions to maintain ==clant inventcry in the react =r vessel after a less t.f ===lant a::Ident.

recuntant The RHR system acts as a conta;nment extenst=n cc:lin Of the 0=re Standby C= cling system by providing fcr f=11 cuing an ac=1 dent. Ortvides l=ng term c==11ng for the Core and bear:s in tne standby ACThis system may be powered fr m the shutdcun

=cuer system. (Ref. 3, section 9.9) 1 j

E*fects :- Esfetu i This sce=lal u.c t ecl1.9eates the ne= essa'ry system alignments and cperatinG se: Lences escuire:

to cbtain test data which will be used to perform during a a m:aue warn- cht hey ac:1 cnalysis dent On the leading sequence. diesel generat=r system response

. cath the taxct- The test is performed reacter van...< a c ld rhytdeun c=ndition uithcut fuel in the having fuel hut, any cdverse effects en plant safety due to 1.

'm etre sra eliminated.

Electrical laat the Snutdown F.:trcs. ng ef.the DG is achieved using normal plant 1: ads =n Systems p=uere: fr=m tnis test cperating instruct 1=nc.are ti.'.gnad and operated in ac =rdance uith approved pla! ,

Pre-selecte: 1:ats are specified by DNE in order to acnleve the re ulred Icading of the DG :? with:r the_ design f r the stability study. Maximum lcading the tes'.. 5.nce ::.~ 3 is icaded onlylimits of the DG for the entire durati n cf the C3, perf rming this test.there will he no advers= effects en the safety DG t:by whilesystems norm during performnnce This abncemal of this test ey opening Cecsstie RHR lineup ulll simulate ucts: -

-45.

Valv dy all: case loading flow of RHR Pump 2C thr ughLing both::test to discharge at its maximum design fl:u OnrouGM :.r.a ter. return lines on the tuo RHR discharge headers. rate of 12,000 gem (Normal return line is 9,000 gpm.)- Flow pump is restricted the dischet:a ef'the tc 12,000 pump. ppm design f1cu by an crifice installthrough the RHR Tcst ed on  ;-

RhR pump p;".1tect ir.n by instruction pec=edures provide additional pump flcu at er below the RHR pump u123 12,~000 gpm dur,ing performance of this test. requirin he operated uithin its design limits, no adverse Since affects will be incurred on this ccmponent. safety

-,..,3 - .- .

, . - - - - . _ , _ - . - - - ~ - - . - - , . . - . . _ . _ , ,

I 8

UNREVIEWED SAFETY CUESTION DET,K8MINATION Shee:M ' Of 5 Preseet coCEN9 FE?cY 'JUCL E A D D L c k.' T i

? d e t : F i e r _JEff.SLOS.*yl_ ..._

3.

1 W uld prev the prop 1=usly sed activity evalua:sd in the FSAR?increase the pr:babilley of an acci: ent i

Yes N: Y '

lust:"1:stt= -

j Siete this test is perf=rmed curing a plant rea :Or = Ore. the pr:ba:111ty of an FSAR is ggeraarea. shutdcan withcut fuci ir the '

accident prevacusly tvejuated in the l

2. Uculd Obe prop sed at:1v1:9 in=rease prev 1=usly evaluated in the F3RR? the consecuences Of an occident Yes ___ N: Y Just: Fire tion _

Sin =e this a:scial tes: 1s the consecuences of any a==perf rmed without deepseeeq. 1 dent previously evaluated in the .9 fuel in thw rac tt" "so.

3 at a

3. Would the prep = sed activity .

of equipment important t: increase the prcbabilitu cf a malfune:1:n safa'ty prev 1cusly evaluated in the f5An?

Yes ~__ Na -_ _Y_

Justif::at:en.

During perF design limits and Ormance Cf th1B test, 811 equip. tent IS Operated within operate. in a manner in uhich the equipment the test that There are no system modifications or lineups is intendec te specified by limits. would cause equipment to operate cutside any design 4.

Uculd the preposed activity cf equipment important increase the c=nsequences cf a irialfunctarn to safety previously evaluated in thu FSAR?

Yes ___ No E Justificetten. '

Since the reactor pressure and there is no fuel in the core, temperature vill be belev nI:rmal and malfunction as decrease'd_. the consequences of any equapment P

I.

.l '

,, UNAEVIEWED SAFETY CUESTION DELERMINATION Sheeta 5 Of 5 preinet.cocwNs  ??ov NUCLEcP DLcNT Identifier- SEEFSICCCI ;_

5. Would the prop =see activi V create a possibility fcr an acetdent of ,

a cafferent type than any prevleusly evaluated in the FSAR?

Yes NO ~

Y Justi'13t!O*-

This test cperates equipment and systems in their n rmal mcces arc within their design limits, therefore, no possibility for an aOGAdunt diffsrent than snu r-=via. iu v.sia :=e :n 03: ,c,,r ,, ,,,,,,g,

5. Uculd the pr==0 sed activ;ty create a possibility for a malfunct On cf e;uipment =f a different type than any evaluatec previously in the F59R?

Yes No X Justificat:ca-All sculpment operated curing this test is cperated in its ncrmel manner without additi nal enhancements er modifications ar d i n a : r:arce with apprcved pr==adures. Thus, the possibil t - "

a? .i malfunction =f equiceent of a different type than any pre *.O..ci..

evalue:ed in the FSAR is not , created.

7.

Uculd the pr : sed activity reduce any mar' gin of safety as Uaflued in the basis for any techn1=al spe Afication?

Yes __ N= _1_

Just*F stiea-The Technical Specification basis for testing the DGs is to assurn the cgs are encable of p9rforming their intendea safety function. This special test u111 cot firm the ability of the DG to perform in a stable manner unter ucest case ac=1 dent Iceding. Thus, any margin of safety provicec by the DG v111 be assured and n t reduced.

L M

v p e g_ _ _ _ _ . _ . . , -,--,e e- ~ * - - - " ~ ~ ~ ~ ~ ' ' ' ' ' - ~

I i  !

e UNREVLEWED SAFETY OUESTION DETERMINA720N i.

D Sheetw 5 of 5 \

l ro*ect: B R C'dN C FEPOV NUCLEcP PlcNT IdentjFier. ,e g cTAccOO-Cheet tel:. til tre ig:.ect f er this cate X  !:e::g r ;;;reernt(s) e :r Fre utionts). ,j X Sadetr Ival a t::1....................... Preperer:!M/M st / # /-// 5 ! 4 A::s t:: a! IM e sati:n. . . . . ... . . . . . . .. . . Revi ewer h g/iw ' g .< a. M

    • )

l S=eeial o ecuire .

ents a-2 e suriens- -

i Spe=lal test ST-SS-17 ccid shut :wn =9da: shall be condue ed with the Unit 2 plant :.n a 1:n and with no fuel in the react =r vessel. >

l i

Sefetu Evalust:e .

There is n=

speelal test un. reviewed

=ecause: safety questien invcived in performing this 1.

The fact that this tes:

001d : ndition and withoutis performed with the react;r shutdewn in a of fuel relate: accidents. fuel in the c=re eliminates the possibility 2.

The e:ulpm,ent c erated curing this test is operutHd per espnece=P. I Opera:Ing instruc 10ns and in all cases :lithits t he cr:r. r.cn of the ecu14 ment being cperated. ~ I. im 1 V 5

3. Operati~g systens within data n as constructed =cnfiguratiens willtheir design limits to obtain system respons

. effects 09 =verall plant safety. i nt rccu::s no t'eGativt:

l 1

G b

e M

e 9

G

_ _ , ,, ~- ---

___ _ _--w- - '

Attacnmsnt 1 Page 1 of 2 s )

.- s-

' SCREENING R5VIEV FORM FOR DOCUMENTING APPLICABILITY OF A IAFETT EVALUATI^.N -

. l This form is to be used to provide a' record of the review of each change to -

- an instruction, procedure, radwaste system or the facility and each test or 1 experiment an operating proposedlicense. for use at or incorporation in a TVA nuclete facility with i Document No. and Revision: (i.e., PMP, DCN No., procedure No. and revision, special test No., etc.) Serc/2/ ~7~ s t' S "f / 'F or experinent Description-of Le?) G>f %f proposed if 2 chang)e, test,

/ l es el G e'st e'rJ /or- 8 " -

Type of Activity (Chante. Test, or Eroerir ent) . _ -

1.

Does the proposed chan6e involve a change in the f acility (or plant openting characteristics) from that described in the FSARf ( lYesp.QNo If Yes, a Safety Evaluation is required.

FSAR sections researched 4.8 (A d '8 f' N f A I/ - /'/ 6 i --

( i Justification (as necessary) Jo e r /> m.r s h h -- .,l1 a ,Auer e de W ri/, /

_ ! A n u-tore ks Awest) 'Jsw is n ' Cwa M /

/

/ o # . , , ,

\

2.

Does the proposed change involve changes to instructions oce'ure. f.h s t )

are described in the PSAR or plant Tech...Specsf ( ) Yes

. . - - . . - . . No If Yes,.a Safety Evaluation is required. -

FSAR and Tech Spec sections researctied __ M $ 5 Y b ,b- 8d /O

_N& dea d~ne Xec% ! .? M 94 3 /4 S" 6 n d 3d H S ?,' M Justification (as'necessary) 4,4 chi cAu.o s si A JnmW ev 3.

Is the pro)osed test or experiment described in the FSAR or any liccase amendment issged by the NRC to authorite the test or equipmentt l

[ ] Yes (K No If No, the proposed test or experiment is not descelbed in the 7SAR and therefore a Safety Evaluation is required.

FSAR sections researched F, 6 5, '12

/

g, g / / , .5 _ ff 6 iustif f eation (as nocessary)__A1,ve s

,a/

.detcklhed i t, psu /,'u s we eu R N /f sef ~

^

e

~ - . .

G

  • NEP-6.6

.% Attachn. eat 1

) .

Page 2 of 2 6

a.

Does

[

the p[ op sed 1 Yes No chan$e !Dvolve a modificaLiva to a radwaste system?

If Yes, a Safety Evaluation is required. ~

PSAR sections researched

5. 1 Is a change to the T'echnical Speelfications.coquired for conducting or implementing the change, or test, or experiment as described in the ,

l d o cu.me n t t [ ] Tes No I l

If Yes, return the document to the originator for revision, modificatior., or initiation of a Ischnical Specific Jon chan a.

Tech Spec sections researched _ 3 ft _9, h// O/S e: S I W// . 4 . j< x.it Asset

/

Preparer:

A->M W _ _ , _

p g.: hs$-8I Approver requires additional justification /informettont I 1 Yes  !

No If yes, list appropriate reference docitments to bc. resoa'eched

.~

Approved by: * '

7 '

fMW duk~

,le,.

&Lu L ,ee: Og _ .

w 1

l S

pl.8  %

,w W

g

.M _.

  • e EPe me