ML20066G867: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML20066G867 | | number = ML20066G867 | ||
| issue date = 01/31/1991 | | issue date = 01/31/1991 | ||
| title = Monthly Operating Rept for Jan 1991 for Seabrook Station Unit 1 | | title = Monthly Operating Rept for Jan 1991 for Seabrook Station Unit 1 | ||
| author name = Feigenbaum T, Nardone P | | author name = Feigenbaum T, Nardone P | ||
| author affiliation = PUBLIC SERVICE CO. OF NEW HAMPSHIRE | | author affiliation = PUBLIC SERVICE CO. OF NEW HAMPSHIRE | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:, | ||
New' Hampshire Yankee =::t-Chief trewtive Offeer NYN 91024 - | |||
'Pebruary 14, 19911 United States Nuclear Regulatory Commission; Washington, DC 20555 Attention: Document Control Desk | |||
==Reference:== | |||
Facility Operating License NPF.86, Docket No. 50 443 F,ubject: Monthly Operating Report Gentlement Enclosed please find Monthly Operating Report 9101. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of; , | |||
January,1991 and is submitted in accordance with the requirements of Seabrook Station l Technical Specification 6.8.1.5. i i | |||
Very. truly yours, Ted C. Felgenbaum - l Enclosure (s) | |||
TCP:WJT/ tad. | |||
cc: - Mr. Thomas T. Martin Regional Administrat'or United States Nuclear- Regulatory Commission ~ ' | |||
Region 1 475 Allendale: Road King of Prussia,- PA 19406 Mr. Noel Dudley. | |||
.o NRC Senior. Resident faspector F,0. Box- 1149 ' | |||
l Seabrcok, NH 03874' l 9102200067 Y103:31 PDR ADOCK 05000443 h. | |||
R PDR -t I | |||
. New Hompshire Yankee Division of Public Service Company of New Hampshlre gpp j | |||
.1NOOfjf | |||
. P.O. Im 300 | |||
* Seabrook, NH 03874 | |||
* Telephone (603) 474 9521 ;- j | |||
:lll. | |||
l | |||
New llampshiro Yackee February 14, 1991 f | |||
ENCLOSUEt TO NYN 41024 1 | |||
OPERATING DATA REPORT DOCKET NO. $0-443 UNIT _Jenbrook 1 DATE 02/14/91 COMPl.ETED BY _f._Nardone TELEPHONE _(fW3) 474-952l (Ext. 4074) | |||
OPERATING STATUS | |||
: 1. Unit Haee: Seabrook Station Unit 1 | |||
: 2. Reporting Period JANUARY 1991 | |||
: 3. Licensed Thermal Power (HWt): 3411 | |||
: 4. Haneplate Rating (Gross HWe): 1197 | |||
: 5. Design Electrical Rating (Net M4e): 1146 | |||
: 6. Maximum Dependable Crpacity (Gross H'4e): 1200 | |||
: 7. Maximum Dependable Capacity (Net HWe): 11$0 . | |||
: 8. If Changus occur in Capacity Ratings (Items Number 3 Through 7)- | |||
Since Last Report, Give Reasons _._Not Aeolicable | |||
: 9. Power Level To Which Restricted, If Any: , None | |||
: 10. Reascne For Restrictions, If Any: NEL Aeolicable __ _ | |||
'this Month Yr..to-Date cumulative- | |||
: 11. Hourt In Reporting Period 744.0:_ 744.0_, 37633.0 | |||
: 12. Number Of Hours Reactor Was Critical _. 744.0 744,0 6463.3 | |||
: 13. Retictor Reserve Shutdown Houts 0.0 0.0 9534 1- | |||
: 14. Hour; Generator On-Line 74460 744.0__ 4871.4 | |||
: 15. Unit Ret rve Shutdown Hours 0_L ,,, 0.0 0.q . | |||
: 16. Gross Thermal Energy Generated (HWH) 2535476 253547_6__ _1}))5802 l | |||
: 17. Gross Elet. Energy Generated (HWH) | |||
~ | |||
889130 889130__ ,_5161047 | |||
: 16. Het Electrical Energy Conerated (HWH) 854774 354774__ 49B'171 | |||
*19. Unit Service Fatto' 100.0 ,__ 100.0 SM | |||
. ,__100.0 | |||
*20. Unit Availability factor 1004 9._ 8 8 ._2_ | |||
*21. Unit Capacity Factor (Using KDC Net) 99.9 99.R., 85.7, I *22. Unit Capacity Factor (Using-)ER Net) 100.1 100.1 85 0 l *23. Unit Forced Outage Rate 0.0 ._ | |||
0.0 11.8 | |||
: 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each): | |||
_ REFUELING. 07/27/91. 67 BAYS _ , , | |||
: 25. If Shut Down At End Of Report Pe'riod, Estimated Date Of StartNps Not Acolicable 1 | |||
i r | |||
* NOTE: Cr.aulative values based on hours storting-08/19/90, date Regular Full Power Operation began. | |||
1 of 5 L | |||
i | |||
_- _.x :. 1 | |||
. . AVE!.1GE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 UNIT Seabrook 1 DATE 02/14/91 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074) l MC N fl JANUARY. 1991 DAY 'VLtAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL ! | |||
(HWe-Net) (HWe-Net) L) 1 1148 16 1149 q l | |||
2 1150 37 1150 3 1151 A) 1151 4 _1149 19 1150 | |||
_ . _ , 1147 20 1152 6 lu9 | |||
.. 21 , , , . _ , 1151 7 | |||
. ..1149 22 _ ,, ,,_1149 8 1147 23 _ 1148 5 | |||
9 1146 24 1150 10 1149 25 1148 11 1147 .. 26 1148 l? ._ 1141 _ . 27 1150 13 1140 | |||
% 28- 1150 l 14 . J '( % 0, | |||
;_ 29 1150 q | |||
\ 15 laL _ | |||
30 1150 31 1150 INSTRUCTIONS on this tormat, list the tverage daily unit '.sover level in HWe-Net for each day in the reporting month. | |||
I Comput i te. the nearest v;ule megawatt. | |||
-.) i 2 of 5 5 - | |||
,' ; I | |||
50-443 .- | |||
' UNIT SHUTDOWNS'AND POWER REDUCTIONS DOCKET NO.- ,.z | |||
- UNIT Sm brook 1 " | |||
- DATE 02114191 .' | |||
REPORT MONTH ' JANUARY. 1991 COMPLETED BY P.'Nardone TELEPHONE-(603) 474-95211 (Ext. 4074) - | |||
No. 'Date : Type l . Duration Reasont Method of Licensee Cause & Corrective-(Hours). ' Shutting ' Event. Action to Prevent Recurrence | |||
~ | |||
Down Reactor3 : Report.d. | |||
Page 1 ef 1: | |||
1NO ENTRIE'S FOR THIS MONTH | |||
_ J | |||
:1 2-: -3. | |||
'' F : , Forced-, ~ Reason:' _ . ... | |||
: & thods-S: ' Scheduled A-Equipment: Failure .' (Explain) : Manual ~ | |||
'B-Maintenance-or Test ~. . 2-Manual' Scram'- | |||
C-RefuelingL L3-Automatic Scram | |||
'D-Regulatory,-Restriction ,, | |||
4- Continued ' front E-Operator Training & License Exantination ' ..' previous month' | |||
~ | |||
.F-Administrative ~ . | |||
5-Power Reduction- | |||
: G-Operational Error - (Explain) - ' | |||
. (Duration - 0) 7 H-Other.(Explain) %Other (Explain)) | |||
3 of.. 'S L | |||
~ | |||
: l. . ' .. .,_~ .L .a s -.~ . - - , . . -. . . . ~ . ~ - . . , L . - . - - - .- - - . - -- --- :- m -- | |||
2 DOCKET NO. 50-443 ., | |||
UNIT Seabrook 1 , | |||
f i | |||
DATE 02/14/91 _ | |||
CORRECTIVE MAINTENANCE | |||
==SUMMARY== | |||
FOR SAFETY RELATED EQUIPMENT COMPLETED BY P. Nardone | |||
.i JANUARY. 1991 ' | |||
REPORT MONTH TELEPHONE (603) 474-9521 (Ext. 4074) , | |||
- Page 1.of 1 DATE ' SYSTEM COMPONENT' MAINTENANCE ACTION | |||
:01/03/91 Reactors '.1-RC-P-1C Low flow detected on No. 1 seal leakoff. | |||
Coolant = Loop.3- . | |||
Replaced pump: seal.. assembly. | |||
~ | |||
Reactor Coolant ,. | |||
-Pump '[ | |||
01/08/91 Reactor Vessel' 1-MM-CP-486B . Microprocessor communication failure. | |||
Level' Indication Train B . . | |||
Replaced +5 VDC power supply.and memory i System! . Reactor VesselLLevel circuit board. | |||
Electronics Cabinet-01/10/91 Main Steam . 1-MS-V-92 - | |||
Valve failed to return to full open l Steam: Generator D- - position..following.10I valve closure - | |||
' Main Steam. ; surveillance. Hydraulic' pump cycling-Isolation Valve frequently.z Replaced' fast and slow. ; | |||
closure solenoids.and pump on. hydraulic | |||
: system.. | |||
.; 01/31/91 -Main Steam 1-MS-V-394 Valve not fully. closing during'surveillt.nce Train'AD testing because of misaligned valve plug.= wt | |||
-. Main' Steam' Replaced valve. trim. ' | |||
~ Supply. Valve to EFW Pump-t | |||
.j | |||
-4 of 5 - | |||
,s # , r , , .,-y - - ,wu. , .~ ' ~ . . | |||
-# ., ,a , % v. -.#......,,y., | |||
y DOCKET NO. 50 t,43 l | |||
+* | |||
. UNIT Seabrook 1 DATE 02/14/91 i COHPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074) | |||
REFUELING INFORMAjlpN RE011)lH, | |||
: 1. Name of facility: | |||
Seabrook Unit 1 ' | |||
: 2. Scheduled date for next refueling shutdown: 07/27/91 | |||
: 3. Scheduled date for restart following refueling: 10/02/91 | |||
: 4. Vill refueling or resumption of operation thereafter require a technical l specification change or other license amendment? | |||
Yes, the removal of the Residual Heat Removal System Autoclosure Interlock I | |||
: 5. Scheduled date(s) for submitting licensing action'and supporting. | |||
Information: | |||
New Hampshire Yankee Letter NYN-91011, submitted on January 24, 1991 | |||
: 6. Important licensing considerations associated with refueling, e.g., | |||
new or different fuel design or supplier..unreviewed design-or performance analysis methods, significant.changos in fuel design, new operating procedures: | |||
None I | |||
: 7. The number of fuel assemblies (a) in the core and-(b) in the spent fuel storage pools (a) In Core 193 (b) ___ 0 | |||
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
Present licensed capacity: 1236 No increase in storage capacity requested or planned. | |||
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | |||
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability. 1 The current licensed capacity is adequate until at least the year 2014. | |||
5 of 5 l | |||
__}} |
Latest revision as of 10:18, 21 December 2020
ML20066G867 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 01/31/1991 |
From: | Feigenbaum T, Nardone P PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NYN-91024, NUDOCS 9102200067 | |
Download: ML20066G867 (7) | |
Text
,
New' Hampshire Yankee =::t-Chief trewtive Offeer NYN 91024 -
'Pebruary 14, 19911 United States Nuclear Regulatory Commission; Washington, DC 20555 Attention: Document Control Desk
Reference:
Facility Operating License NPF.86, Docket No. 50 443 F,ubject: Monthly Operating Report Gentlement Enclosed please find Monthly Operating Report 9101. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of; ,
January,1991 and is submitted in accordance with the requirements of Seabrook Station l Technical Specification 6.8.1.5. i i
Very. truly yours, Ted C. Felgenbaum - l Enclosure (s)
TCP:WJT/ tad.
cc: - Mr. Thomas T. Martin Regional Administrat'or United States Nuclear- Regulatory Commission ~ '
Region 1 475 Allendale: Road King of Prussia,- PA 19406 Mr. Noel Dudley.
.o NRC Senior. Resident faspector F,0. Box- 1149 '
l Seabrcok, NH 03874' l 9102200067 Y103:31 PDR ADOCK 05000443 h.
R PDR -t I
. New Hompshire Yankee Division of Public Service Company of New Hampshlre gpp j
.1NOOfjf
. P.O. Im 300
- Seabrook, NH 03874
- Telephone (603) 474 9521 ;- j
- lll.
l
New llampshiro Yackee February 14, 1991 f
ENCLOSUEt TO NYN 41024 1
OPERATING DATA REPORT DOCKET NO. $0-443 UNIT _Jenbrook 1 DATE 02/14/91 COMPl.ETED BY _f._Nardone TELEPHONE _(fW3) 474-952l (Ext. 4074)
OPERATING STATUS
- 1. Unit Haee: Seabrook Station Unit 1
- 2. Reporting Period JANUARY 1991
- 3. Licensed Thermal Power (HWt): 3411
- 4. Haneplate Rating (Gross HWe): 1197
- 5. Design Electrical Rating (Net M4e): 1146
- 6. Maximum Dependable Crpacity (Gross H'4e): 1200
- 7. Maximum Dependable Capacity (Net HWe): 11$0 .
- 8. If Changus occur in Capacity Ratings (Items Number 3 Through 7)-
Since Last Report, Give Reasons _._Not Aeolicable
- 9. Power Level To Which Restricted, If Any: , None
- 10. Reascne For Restrictions, If Any: NEL Aeolicable __ _
'this Month Yr..to-Date cumulative-
- 11. Hourt In Reporting Period 744.0:_ 744.0_, 37633.0
- 12. Number Of Hours Reactor Was Critical _. 744.0 744,0 6463.3
- 13. Retictor Reserve Shutdown Houts 0.0 0.0 9534 1-
- 14. Hour; Generator On-Line 74460 744.0__ 4871.4
- 15. Unit Ret rve Shutdown Hours 0_L ,,, 0.0 0.q .
- 16. Gross Thermal Energy Generated (HWH) 2535476 253547_6__ _1}))5802 l
- 17. Gross Elet. Energy Generated (HWH)
~
889130 889130__ ,_5161047
- 16. Het Electrical Energy Conerated (HWH) 854774 354774__ 49B'171
- 19. Unit Service Fatto' 100.0 ,__ 100.0 SM
. ,__100.0
- 20. Unit Availability factor 1004 9._ 8 8 ._2_
- 21. Unit Capacity Factor (Using KDC Net) 99.9 99.R., 85.7, I *22. Unit Capacity Factor (Using-)ER Net) 100.1 100.1 85 0 l *23. Unit Forced Outage Rate 0.0 ._
0.0 11.8
- 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
_ REFUELING. 07/27/91. 67 BAYS _ , ,
- 25. If Shut Down At End Of Report Pe'riod, Estimated Date Of StartNps Not Acolicable 1
i r
- NOTE: Cr.aulative values based on hours storting-08/19/90, date Regular Full Power Operation began.
1 of 5 L
i
_- _.x :. 1
. . AVE!.1GE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 UNIT Seabrook 1 DATE 02/14/91 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074) l MC N fl JANUARY. 1991 DAY 'VLtAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL !
(HWe-Net) (HWe-Net) L) 1 1148 16 1149 q l
2 1150 37 1150 3 1151 A) 1151 4 _1149 19 1150
_ . _ , 1147 20 1152 6 lu9
.. 21 , , , . _ , 1151 7
. ..1149 22 _ ,, ,,_1149 8 1147 23 _ 1148 5
9 1146 24 1150 10 1149 25 1148 11 1147 .. 26 1148 l? ._ 1141 _ . 27 1150 13 1140
% 28- 1150 l 14 . J '( % 0,
- _ 29 1150 q
\ 15 laL _
30 1150 31 1150 INSTRUCTIONS on this tormat, list the tverage daily unit '.sover level in HWe-Net for each day in the reporting month.
I Comput i te. the nearest v;ule megawatt.
-.) i 2 of 5 5 -
,' ; I
50-443 .-
' UNIT SHUTDOWNS'AND POWER REDUCTIONS DOCKET NO.- ,.z
- UNIT Sm brook 1 "
- DATE 02114191 .'
REPORT MONTH ' JANUARY. 1991 COMPLETED BY P.'Nardone TELEPHONE-(603) 474-95211 (Ext. 4074) -
No. 'Date : Type l . Duration Reasont Method of Licensee Cause & Corrective-(Hours). ' Shutting ' Event. Action to Prevent Recurrence
~
Down Reactor3 : Report.d.
Page 1 ef 1:
1NO ENTRIE'S FOR THIS MONTH
_ J
- 1 2-: -3.
F : , Forced-, ~ Reason:' _ . ...
- & thods-S: ' Scheduled A-Equipment: Failure .' (Explain) : Manual ~
'B-Maintenance-or Test ~. . 2-Manual' Scram'-
C-RefuelingL L3-Automatic Scram
'D-Regulatory,-Restriction ,,
4- Continued ' front E-Operator Training & License Exantination ' ..' previous month'
~
.F-Administrative ~ .
5-Power Reduction-
- G-Operational Error - (Explain) - '
. (Duration - 0) 7 H-Other.(Explain) %Other (Explain))
3 of.. 'S L
~
- l. . ' .. .,_~ .L .a s -.~ . - - , . . -. . . . ~ . ~ - . . , L . - . - - - .- - - . - -- --- :- m --
2 DOCKET NO. 50-443 .,
UNIT Seabrook 1 ,
f i
DATE 02/14/91 _
CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT COMPLETED BY P. Nardone
.i JANUARY. 1991 '
REPORT MONTH TELEPHONE (603) 474-9521 (Ext. 4074) ,
- Page 1.of 1 DATE ' SYSTEM COMPONENT' MAINTENANCE ACTION
- 01/03/91 Reactors '.1-RC-P-1C Low flow detected on No. 1 seal leakoff.
Coolant = Loop.3- .
Replaced pump: seal.. assembly.
~
-Pump '[
01/08/91 Reactor Vessel' 1-MM-CP-486B . Microprocessor communication failure.
Level' Indication Train B . .
Replaced +5 VDC power supply.and memory i System! . Reactor VesselLLevel circuit board.
Electronics Cabinet-01/10/91 Main Steam . 1-MS-V-92 -
Valve failed to return to full open l Steam: Generator D- - position..following.10I valve closure -
' Main Steam. ; surveillance. Hydraulic' pump cycling-Isolation Valve frequently.z Replaced' fast and slow. ;
closure solenoids.and pump on. hydraulic
- system..
.; 01/31/91 -Main Steam 1-MS-V-394 Valve not fully. closing during'surveillt.nce Train'AD testing because of misaligned valve plug.= wt
-. Main' Steam' Replaced valve. trim. '
~ Supply. Valve to EFW Pump-t
.j
-4 of 5 -
,s # , r , , .,-y - - ,wu. , .~ ' ~ . .
-# ., ,a , % v. -.#......,,y.,
y DOCKET NO. 50 t,43 l
+*
. UNIT Seabrook 1 DATE 02/14/91 i COHPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)
REFUELING INFORMAjlpN RE011)lH,
- 1. Name of facility:
Seabrook Unit 1 '
- 2. Scheduled date for next refueling shutdown: 07/27/91
- 3. Scheduled date for restart following refueling: 10/02/91
- 4. Vill refueling or resumption of operation thereafter require a technical l specification change or other license amendment?
Yes, the removal of the Residual Heat Removal System Autoclosure Interlock I
- 5. Scheduled date(s) for submitting licensing action'and supporting.
Information:
New Hampshire Yankee Letter NYN-91011, submitted on January 24, 1991
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier..unreviewed design-or performance analysis methods, significant.changos in fuel design, new operating procedures:
None I
- 7. The number of fuel assemblies (a) in the core and-(b) in the spent fuel storage pools (a) In Core 193 (b) ___ 0
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability. 1 The current licensed capacity is adequate until at least the year 2014.
5 of 5 l
__