New' Hampshire Yankee
=::t-Chief trewtive Offeer NYN 91024 -
'Pebruary 14, 19911 United States Nuclear Regulatory Commission; Washington, DC 20555 Attention:
Document Control Desk
Reference:
Facility Operating License NPF.86, Docket No. 50 443 F,ubject:
Monthly Operating Report Gentlement Enclosed please find Monthly Operating Report 9101. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of; January,1991 and is submitted in accordance with the requirements of Seabrook Station l
Technical Specification 6.8.1.5.
i i
Very. truly yours, Ted C. Felgenbaum -
l Enclosure (s)
TCP:WJT/ tad.
cc:
- Mr. Thomas T. Martin Regional Administrat'or United States Nuclear-Regulatory Commission ~
Region 1 475 Allendale: Road King of Prussia,- PA 19406 Mr. Noel Dudley.
NRC Senior. Resident faspector
.o F,0. Box-1149 '
l Seabrcok, NH 03874' l
9102200067 Y103:31 PDR ADOCK 05000443 h.
I R
-t
. New Hompshire Yankee Division of Public Service Company of New Hampshlre gpp j
.1NOOfjf P.O. Im 300
- Seabrook, NH 03874
- Telephone (603) 474 9521 j
- lll.
l
New llampshiro Yackee February 14, 1991 f
ENCLOSUEt TO NYN 41024
OPERATING DATA REPORT DOCKET NO.
$0-443 UNIT _Jenbrook 1 DATE 02/14/91 COMPl.ETED BY _f._Nardone TELEPHONE _(fW3) 474-952l (Ext. 4074)
OPERATING STATUS 1.
Unit Haee:
Seabrook Station Unit 1 2.
Reporting Period JANUARY 1991 3.
Licensed Thermal Power (HWt):
3411 4.
Haneplate Rating (Gross HWe):
1197 5.
Design Electrical Rating (Net M4e):
1146 6.
Maximum Dependable Crpacity (Gross H'4e):
1200 7.
Maximum Dependable Capacity (Net HWe):
11$0.
8.
If Changus occur in Capacity Ratings (Items Number 3 Through 7)-
Since Last Report, Give Reasons
_._Not Aeolicable 9.
Power Level To Which Restricted, If Any:
None
- 10. Reascne For Restrictions, If Any:
NEL Aeolicable
'this Month Yr..to-Date cumulative-
- 11. Hourt In Reporting Period 744.0:_
744.0_,
37633.0
- 12. Number Of Hours Reactor Was Critical 744.0 744,0 6463.3
- 13. Retictor Reserve Shutdown Houts 0.0 0.0 953 1-4
- 14. Hour; Generator On-Line 74460 744.0__
4871.4
- 15. Unit Ret rve Shutdown Hours 0_L 0.0 0.q
- 16. Gross Thermal Energy Generated (HWH) 2535476 253547_6__
_1}))5802 l
- 17. Gross Elet. Energy Generated (HWH) 889130 889130__
,_5161047
~
- 16. Het Electrical Energy Conerated (HWH) 854774 354774__
49B'171
- 19. Unit Service Fatto' 100.0
,__ 100.0 SM
- 20. Unit Availability factor
.,__100.0 100 9._
8 8._2_
4
- 21. Unit Capacity Factor (Using KDC Net) 99.9 99.R.,
85.7, I
- 22. Unit Capacity Factor (Using-)ER Net) 100.1 100.1 85 0 l
- 23. Unit Forced Outage Rate 0.0 0.0 11.8
- 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
REFUELING. 07/27/91. 67 BAYS
- 25. If Shut Down At End Of Report Pe'riod, Estimated Date Of StartNps Not Acolicable 1
i r
- NOTE:
Cr.aulative values based on hours storting-08/19/90, date Regular Full Power Operation began.
1 of 5 L
i 1
.x
AVE!.1GE DAILY UNIT POWER LEVEL DOCKET NO.
50-443 UNIT Seabrook 1 DATE 02/14/91 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074) l MC N fl JANUARY. 1991 DAY
'VLtAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(HWe-Net)
L) 1 1148 16 1149 q
l 2
1150 37 1150 3
1151 A) 1151 4
_1149 19 1150 1147 20 1152 6
lu9 21 1151 7
...1149 22
,,_1149 8
1147 23 1148 5
9 1146 24 1150 10 1149 25 1148 11 1147 26 1148 l?
1141 27 1150 13 1140 28-1150 l
14
. J '( % 0, 29 1150 q
\\
15 laL 30 1150 31 1150 INSTRUCTIONS on this tormat, list the tverage daily unit '.sover level in HWe-Net for each day in the I
reporting month.
Comput i te. the nearest v;ule megawatt.
-.)
i 2 of 5 5
I
' UNIT SHUTDOWNS'AND POWER REDUCTIONS DOCKET NO.-
50-443.-
,.z UNIT Sm brook 1 "
DATE 02114191 REPORT MONTH
' JANUARY. 1991 COMPLETED BY P.'Nardone TELEPHONE-(603) 474-95211 (Ext. 4074) l t
No.
'Date
- Type
. Duration Reason Method of Licensee Cause & Corrective-(Hours).
' Shutting
' Event.
Action to 3
~
Down Reactor
- Report.d.
Prevent Recurrence Page 1 ef 1:
1NO ENTRIE'S FOR THIS MONTH J
- 1 2-:
- 3
F :, Forced-,
~ Reason:'
- & thods-S: ' Scheduled A-Equipment: Failure.' (Explain) : Manual ~
'B-Maintenance-or Test ~.
. 2-Manual' Scram'-
L3-Automatic Scram C-RefuelingL 4-Continued ' front
'D-Regulatory,-Restriction
..' previous month' E-Operator Training & License Exantination '
~
5-Power Reduction-
.F-Administrative ~
7 H-Other.(Explain)
. (Duration - 0)
- G-Operational Error - (Explain) -
%Other (Explain))
3 of.. 'S L
~
L l.
...,_~
.L.a s -.~. - -,.
... ~. ~ -..
m
2 DOCKET NO.
50-443 UNIT Seabrook 1 f
i DATE 02/14/91 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT COMPLETED BY P. Nardone
. i REPORT MONTH JANUARY. 1991 TELEPHONE (603) 474-9521 (Ext. 4074)
- Page 1.of 1 DATE
' SYSTEM COMPONENT' MAINTENANCE ACTION
- 01/03/91 Reactors
'.1-RC-P-1C Low flow detected on No. 1 seal leakoff.
Coolant
= Loop.3-Replaced pump: seal.. assembly.
~
-Pump
'[
01/08/91 Reactor Vessel' 1-MM-CP-486B
. Microprocessor communication failure.
Level' Indication Train B Replaced +5 VDC power supply.and memory i
System!
. Reactor VesselLLevel circuit board.
Electronics Cabinet-01/10/91 Main Steam
. 1-MS-V-92 Valve failed to return to full open l
Steam: Generator D-
- position..following.10I valve closure
' Main Steam.
- surveillance. Hydraulic' pump cycling-Isolation Valve frequently.z Replaced' fast and slow.
closure solenoids.and pump on. hydraulic
- system..
.; 01/31/91
-Main Steam 1-MS-V-394 Valve not fully. closing during'surveillt.nce Train'AD testing because of misaligned valve plug.=
wt Main' Steam' Replaced valve. trim.
~ Supply. Valve to EFW Pump-t
.j
-4 of 5
,s r
.,-y
,wu.
.~
' ~..
,a v.
-.#......,,y.,
y DOCKET NO.
50 t,43 l
+*
. UNIT Seabrook 1 DATE 02/14/91 i
COHPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)
REFUELING INFORMAjlpN RE011)lH,
- 1. Name of facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown:
07/27/91
- 3. Scheduled date for restart following refueling:
10/02/91
- 4. Vill refueling or resumption of operation thereafter require a technical l
specification change or other license amendment?
Yes, the removal of the Residual Heat Removal System Autoclosure Interlock I
- 5. Scheduled date(s) for submitting licensing action'and supporting.
Information:
New Hampshire Yankee Letter NYN-91011, submitted on January 24, 1991
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier..unreviewed design-or performance analysis methods, significant.changos in fuel design, new operating procedures:
None I
- 7. The number of fuel assemblies (a) in the core and-(b) in the spent fuel storage pools (a) In Core 193 (b) ___ 0
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
1 The current licensed capacity is adequate until at least the year 2014.
5 of 5 l
__